You are on page 1of 8

Page No.1 of 8 Issue Date15.01.

2017 WDM/0003
WAGON DIRECTORATE
RESEARCH DESIGN AND STANDARDS ORGANISATION
1.0 TITLE MASTER LIST OF MAINTENANCE/HANDLING INSTRUCTIONS
Effective from 01.01.2016 TO 31.12.2016

S.NO. Date of Amendment Page Nos. Version Reason for


Amendment
1. NIL N.A. 0 1st issue
2. 15.12.99 NIL 1 IInd issue
3. 15.01.2001 NIL 2 3rd issue
4. 15.01.2002 NIL 3 4th Issue
5. 15.01.2003 NIL 4th 5th Issue
6. 15 .01.2004 NIL 5th 6th Issue
7. 15.01.2005 NIL. 6th 7th. Issue
8. 15.01.2006 NIL 7th 8th Issue
9. 15.01.2007 NIL. 8th 9th Issue
10. 15.01.2008 NIL 9th. 10th Issue
11. 15.01.2009 NIL 10th. 11th Issue
12. 15.01.2010 NIL. 11th. 12th Issue
13. 15.01.2011 NIL 12th. 13 th Issue
14. 15.01.2012 NIL 13 th. 14 th Issue
15 15.01.2013 NIL 14 th 15 th Issue
16 15.01.2014 NIL 15 th 16 th Issue
17 15.01.2015 NIL 16 th 17 th Issue
18 15.01.2016 NIL 17 th 18 th Issue
19 15.01.2017 NIL 18 th 19 th Issue

Approved by
DSW/MFB
Signature
Page No.2 of 8 Issue Date 15.01.2017 WDM/0003
LIST OF GOODS MAINTENANCE /HANDLING INSTRUCTIONS

S.No. Name of Description Year of No. of Last Issuing


Manual/ Revision Correction correction Authority
Publication slips issued Slip No. &
date
1 G-2/Dec.60 80 Ton bogie open wagon Dec.,61 - - Dir.
type “BOX” (Mark-1) Wagon.
2. G-7/Jan.,63 Bogie wagon type “MBOC” Jan.,63 - - -do-
(Open Coal)
3. G-15 Four Wheel wagon type “O” March,61 - - -do-
(open)
4. G-16 Special features and operating Revision in Corrigendum Corrigendum -do-
Rev.2, July’78. instructions 80 ton bogie open July,78 as No. 3 of Feb.,86 No. 2 of
wagon type “BOX” (Rev.-II.) Sept,83

5. G-29/Oct.,62 Bogie hopper wagon type - - -do-


‘BOB’
6. G-33(Rev.-1) Technical Pam plate for 02/06 -do-
Tippler Insulation. (Rev.-1) may. - -
2010
G-37 (Rev.-1) Recommend practice for April,1971 as -do-
7. welded fabrication in wagon G-37 - -
(Rev.-1)
8. G-38 Instructions for operation and -do-
maintenance of liquid chlorine
tank wagon, type “ TCL”. - - -
9. G-40 Manual of instructions for Oct.,76 - - -do-
anhydrous ammonia tank.
Type `TAL` Wagon.
Page No.3 of 8 Effective from 15.01.2017 WDM/0003

S.No. Name of Description Year of No. of Last Issuing


Manual/ Revision Correction correction Authority
Publication slips issued Slip No. &
date
10 G-44 Instructions for operating Aug.,69 Dir.
staff hump shunting and - - Wagon.
marshalling of BOX Wagon.
11 G-45 H Instructions for fitting 1978 - -do-
trapauling equipment on -
“BOX” wagon.
12 G-55 “Instructions for Jan.,68 -do-
maintenance and operation
of hydrochloric acid tank
wagon type “THA” - -
(preliminary issued in
Jan.,68 (File Ref.
MW/WT/HCL)
13 G-60 Instructions for Oct.,76 -do-
maintenance and operation
of bitumen tank wagon type - -
“TB” (preliminary)
14 G-61/Oct.,1971 Operating instructions for Oct.,71 - - -do-
sliding roof wagon
15 G- Maintenance Manual of June,1983 - - -do
62/June,1983 Alliance –II Coupler
Page No.4 of 8 Issue Date 15.01.2017 WDM/0003

S.No. Name of Description Year of No. of Last Issuing


Manual/ Revision Correction correction Authority
Publication slips issued Slip No. &
date
16 G-65/1983 Maintenance Manual for 4- 1983 Corrigendum Corrigendum Dir.
wheeled liquefied petroleum No.4 of No.3 of Wagon.
gas tank wagon type July,2003 December,199
“TPGLR” (Preliminary) 9
17 G-66/1983 Maintenance Manual for 1983 - - -do
TSA & MBTSA
18 G-70/1986 Maintenance Manual for 8/86 Corrigendum - -do
BOXN No.1of
Aug.,98
19 G-71/1996 Maintenance Manual for June,92 Corrigendum - -do-
Phosphoric Acid Tank No.1 of
Wagon Feb.,99
20 G-72 (Rev.3 ) General Std. Spec. for (Rev.-3) Corrigendum Corrigendum -do-
(Sup.Rev.2 of fabrication of wagon ‘U’ April.-07 No. 2 of Jan. No. 1 of Oct.
oct.01 frame and bogies 08 07

21 G-73,2005 Operation and Oct.-05 -do-


(Rev. I) maintenance Manual for - -
BOBR/BOBRN Wagon
22 G-76/1987 Instruction and 1987 -do-
Maintenance CBC for line - -
staff.
Page No.5 of 8 Issue Date 15.01.2017 WDM/0003

S.No. Name of Description Year of No. of Last Issuing


Manual/ Revision Correction correction Authority
Publication slips issued Slip No. &
date
23 G-79 Instruction for operation and Corrigendum Dir.
Maintenance for - No.1 of - Wagon.
BTAL/BTALN. April,99
24 G-80/1989 Instructions for 1989 -do-
maintenance CBC (for - -
workshop)
25 G-81 Inspection and July,1993 Amendment -do-
maintenance of cartridge No. 1 of
taper roller bearing fitted Feb.,2000 -
on Casnub Bogie.
26 G-82 Instructions for operation June,88 -do-
and maintenance BG bogie
tank wagon for Alumina - -
type ‘BTAP’
27 G-83 Instructions for operation August,1988 -do-
for maintenance of “BTCS” - -
wagon.
28 G-84 Instructions for operation Dec.,1988 -do-
and maintenance of M/s.
BHEL,Hardwar Alaknada,8 - -
Axle B.G. well wagon type
special wagon fitted with
UIC bogie and CBC (T) and
Vacuum brake system.
Page No.6 of 8 Issue Date 15.01.2017 WDM/0003

S.No. Name of Description Year of No. of Last Issuing


Manual/ Revision Correction correction Authority
Publication slips issued Slip No. &
date
29 G-85,April,89 Operational Instructions for April,89 Dir.
shading roof on BOX Wagon.
30 G-86, (Rev.-1) Maintenance manual for Revised in Corrigendum - -do-
bogie liquefied petroleum 1994, New No.1 of
gas tank wagon type No. is G-86- Dec.99.
BTPGL./BTPGLN Rev.-1)
31 G-87 Safe handling of -do-
hazardous chemicals
transported in Rail Tankers - - -
32 G-90/1993 Maintenance and Nov.’91 Amendment Amendment -do-
operating instructions for No. 6 of No. 5 of
bogie petrol tank wagon Oct. 2016 Dec. 2015
type “BTPN”
33 G-92/1998 Maintenance of IRSA-600 Sept.,98 - -do-
Slack Adjuster. -
34 G-95 (Rev.-1) Preparation for common Rev. 1 in 1997 Amendment Amendment -do-
March,1997 maintenance manual for No. 5 of No.4of
all various of BG Casnub Jan.2003 April.2002
Bogie 22W, 22W(M),
22NL,22 NLB, 22NLB,
22NLM and 22HS bogie.
Page No.7 of 8 Issue Date 15.01.2017 WDM/0003

S.No. Name of Description Year of No. of Last Issuing


Manual/ Revision Correction correction Authority
Publication slips issued Slip No. &
date
35. G-97/1997 Maintenance Manual of air May,96 Amendment Amendment Dir.
brake system for freight No. 3 of No. 2 of Wagon.
stock. Jan.2010 July.,2001
36. G-100 Instruction for Inspection July 2010 Amendment
&Maintance of Automatic No. 1 of
Twist locks (ALT) Devices May.2012 -do-
fitted on container flat -
Wagon.
-
37. G-103 Strengthening of u/frame Nov. 2010
Repair of Critical Weld
Joints. Repair of centre sill, (Rev.-2) of -do-
centre Girder & sole Bar May. 2011 - -
Craacks.
38 G-104 Schedule of Infrastructure Aug.2914 -do-
Requirement of
Manufacturing
Testing & Quality Control
Requirement for Bogie
Mounted
Brake System.
39 G-105 Standards of Infrastructure, June-2011 -do-
Manufacturing, Testing and
Quality Assurance Systems - -
to qualify as
Railway Wagon Builder
Page No.8 of 8 Issue Date 15.01.2017 WDM/0003

S.No. Name of Description Year of No. of Last Issuing


Manual/ Revision Correction correction Authority
Publication slips issued Slip No. &
date
40 G-106 Operation and Maintenance Feb.-2014 - - Dir.
Manual for Bogie Covered Wagon.
Double Decker Wagon Type
`BCACBM`
41 G-107 PROCEDURE FOR May.2015 -do-
RECAMBERING
OF BOGIE RAIL WAGON
TYPE BRN/BRNA/BRNAHS
42 G-108 Instruction for Maintenance Oct.-2015 Amendment Amendment -do-
operation Bogie Patrol Tank No. 2 of No. 1 of
Wagon type –BTFLN. Oct. 2016 Dec. 2015

43 G-109 Maintenance & operation of 296t. Nov. 2015


28-AXLE Threaded Beam. BG
Special Wagon.
BHEL/HARIDWAR.

You might also like