This document outlines a handover protocol for flooring work. It includes checks for proper tile laying patterns, joint thickness, levelness, finish, and slopes. Final housekeeping and tile installation around doors, fittings, and structures is also checked. The contractor and client engineer sign off to release the floor once observations and any non-conformances are addressed.
This document outlines a handover protocol for flooring work. It includes checks for proper tile laying patterns, joint thickness, levelness, finish, and slopes. Final housekeeping and tile installation around doors, fittings, and structures is also checked. The contractor and client engineer sign off to release the floor once observations and any non-conformances are addressed.
This document outlines a handover protocol for flooring work. It includes checks for proper tile laying patterns, joint thickness, levelness, finish, and slopes. Final housekeeping and tile installation around doors, fittings, and structures is also checked. The contractor and client engineer sign off to release the floor once observations and any non-conformances are addressed.