Professional Documents
Culture Documents
Group A
Start up
Tekan ENTER
Masukan setpoint 1000 RPM
Tekan ENTER
Temp casing upper 262 C
Temp casing lower 204 C
Temp main steam sesudah MV 2,384 C
Pressure main steam 5,14 MPA
14. Jam 10 : 18 speed dinaikan ke 1500 RPM
Tekan ENTER
Masukan setpoint 1500 RPM
Tekan ENTER
Temp casing upper 261 C
Temp casing lower 205 C
Temp main steam sesudah MV 2,408 C
Pressure main steam 5,14 MPA
15. Jam 10 : 40 speed dinaikan ke 3000 RPM
ON proteksi “overspeed”
ON proteksi “turbin lube oil press LL”
Tekan ENTER
Masukan setpoint 3000 RPM
Tekan ENTER
Temp casing upper 260 C
Temp casing lower 208 C
Temp main steam sesudah MV 2, 418 C
Pressure main steam 5,14 MPA
16. Jam 10 : 44 stop AOP
17. Jam 10 : 50 buka MV exhaust steam turbin ke proses setelah pressnya 0,50 Mpa
Set point speed turbin remote posisikan ENABLE di DCS
18. Jam 10 : 55 syncrone turbin generator dengan jaringan PLN
Load 0,7 MW
Naikan load turbin generator ke 2 MW secara perlahan dan monitor vibrasi
turbin ,axial displacement,periksa suara turbin di lokal
19. Jam 11 : 00 ON proteksi di panel ETS kecuali
Exhaust pressure LL
Generator trip
Vibrasi front bearing turbin HH
20. Jam 11 : 00 parameter turbin
Turbin upper casing temperature 266 C
Turbin lower casing temperature 225 C
Temp main steam 446 C
Press main steam 4,94 Mpa
Turbin front bearing vibrasi Y 103 um
21. Jam 11 : 10 stop letdowndesuperheater
22. Jam 11 : 30 parameter turbin
Turbin upper casing temperature 291 C
Turbin lower casing temperature 267 C
Temp main steam 459 C
Press main steam 4,55 Mpa
Turbin front bearing vibrasi Y 100 um