Sr. No. Stages of Progress Date of Monitoring Criteria of Monitoring

This document outlines a monitoring schedule with 18 stages for the development of an intelligent braking system project, including tasks like market surveys, problem definition, design and testing.

Uploaded by

rass
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
23 views1 page

Sr. No. Stages of Progress Date of Monitoring Criteria of Monitoring

This document outlines a monitoring schedule with 18 stages for the development of an intelligent braking system project, including tasks like market surveys, problem definition, design and testing.

Uploaded by

rass
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

Sr.

Stages of progress Date of Criteria of monitoring


No. Monitoring
1 Orientation 22 – 07 -2020 orientation
2 Market survey for project 29 – 07 - 2020 To visit different industries and
places
3 Project Definition 05 – 08 -2020 Project selection
4 Details Collection 19 – 08 -2020 Basic introduction and details
collection
5 Literature survey 02 – 09 - 2020 Study of Research paper
6 Problem Definition 16 – 09 - 2020 Find out problem
7 Data collection 23 – 09 - 2020 Data collection from research
papers
8 Evaluation 07 – 10 - 2020 Justify methodology
9 Calculation 21 – 10 - 2020 Theory and Calculation from
books and research papers
10 Design and Development 11 – 11 - 2020 Using Design software
11 Market survey for components 25 – 11 - 2020 Estimation and costing
12 Purchase of components 02 – 12 – 2020 to Estimation and costing
04 – 01 - 2021
13 Machining and welding 06 – 01 - 2021 performance
14 Assembling 27 – 01 - 2021 Final project product
15 Testing of project 10 – 02 - 2021 Check weather collected data
16 Implementation 24 – 02 - 2021 Check validated result
17 Taking data 10 – 03 - 2021 Check validate data
18 Documentation 08 – 04 - 2021 Report writing
19 Presentation 22 -04 -2020 To make power point
presentation

GOVERNMENT POLYTECHNIC, GODHRA


MECHANICAL ENGINEERING DEPARTMENT

NAME OF PROJECT: DEVELOPMENT OF INTELLIGENT BRAKING SYSTEM


FOR MOTORCYCLE

MONITORING SCHEDULE