KONTRAKTOR : KONSULTAN :

PROPORTION CONCRETE
K - 250

0.241

MIX DESIGN PROPORSI LAPANGAN BERAT ISI PROPORSI CAMPURAN


VOLUME MATERIAL
1M 3
0.1471 M 3
MATERIAL ( KOTAK )

PC : 340 kg PC : 50.0 kg PC : 1 zak PC : 1 zak PC : 1 zak N S (2box) = 0.0383 m3


L = 0.5000 m
NS : 771 kg NS : 113.4 kg NS : 1,480 kg/m3 NS : 0.0766 m3 NS : 0.0766 m3 W= 0.4000 m
2 box = 0.038
0,50 / 0,40
C A 10-25 : 1034 kg C A 10-25 : 152.1 kg C A 10-25 : 1,621 kg/m3 C A 10-25 : 0.0938 m3 C A 10-25 : 0.0938 m3 T= 0.19 m
3 box
CA 10 -25 (3box) = 0.0313 m3
Water : 170 kg Water : 25.0 kg Water : 1.000 kg/m 3
Water : 25.0 kg Water : 25.0 kg L = 0.5000 m
W= 0.4000 m
= 0.0313
0,50 / 0,40
T= 0.16 m
Keterangan : Campuran lapangan = 1 PC : 2 NS : 3 CA 10-25 mm

Kontraktor Konsultan SNVT PJSA

( ……………………………. ) ( ……………………………. ) ( ……………………………. )


BOX DIMENSION
K - 250

Semen Type 1 (1 zak) = 50.0 Kg


Pasir (2 box) = 0.0766 M3
Aggregat 10-25 mm (3 box) = 0.0938 M3
Air = 25.0 Kg

Box Pasir

T = 0,19 m

L = 0,40 m

P = 0,50 m

P = 0,45 m

T = 0,19 m

L = 0,40 m

P = 0,50 m

Box Coarse Aggregate 10 - 25 mm

T = 0,16 m

L = 0,40 m

P = 0,50 m

P = 0,45 m

T = 0,16 m

L = 0,40 m

P = 0,50 m

Kontraktor Konsultan SNVT PJSA

( ……………………………. ) ( ……………………………. ) ( ……………………………. )