You are on page 1of 1

CATATAN

POTONGAN MELINTANG SALURAN SEKUNDER


SALURAN SEKUNDER BPr6 SALURAN SEKUNDER BPr15
A = 526 ha SALURAN SEKUNDER BPr10
A = 1221 ha A = 517 ha
SALURAN SEKUNDER BPr1 Q = 0,689 m3/s Q = 0,677 m3/s
v = 0,5 m/s Q = 1,599 m3/s
A = 1226 ha v = 0,5 m/s
a = 2,73 m v = 0,5 m/s
Q = 1,606 m3/s 1.50 a = 2,73 m
1.50
b = 0,7 m a = 3,72 m 1.50 1.50
v = 0,5 m/s
t = 1,02 m b=1m b = 0,7 m INSTITUSI

1.36
a = 3,72 m

1.36
t = 1,36 m t = 1,02 m
b=1m
1.50 1.50
t = 1,36 m 1.50 1.50
1.00

1.02
1.00

1.02
SALURAN SEKUNDER BPr11
SALURAN SEKUNDER BPr2 0.70 A = 1081 ha
0.70
A = 1083 ha Q = 1,416 m3/s
Q = 1,418 m3/s 1.50 1.50
v = 0,5 m/s 1.50 1.50 SALURAN SEKUNDER BPr16
v = 0,5 m/s a = 3,72 m
A = 382 ha PROGRAM STUDI TEKNIK SIPIL

1.36

1.36
a = 3,72 m b=1m DEPARTEMEN PENDIDIKAN TEKNIK SIPIL
b=1m SALURAN SEKUNDER BPr7 t = 1,36 m Q = 0,500 m3/s FAKULTAS PENDIDIKAN TEKNOLOGI DAN
t = 1,36 m A = 387 ha v = 0,5 m/s KEJURUAN
1.00 Q = 0,506 m3/s 1.00 a = 2,1 m UNIVERSITAS PENDIDIKAN INDONESIA
v = 0,5 m/s b = 0,6 m 2018

0.75
a = 2,1 m t = 0,75 m

0.75
SALURAN SEKUNDER BPr12
b = 0,6 m 1.50 1.50
t = 0,75 m
A = 934 ha
Q = 1,223 m3/s
1.50 1.50 MATA KULIAH
SALURAN SEKUNDER BPr3 v = 0,5 m/s GAMBAR STRUKTUR BANGUNAN
0.60
A = 958 ha a = 3,29 m 0.60
Q = 1,254 m3/s
1.50 1.50
b = 0,9 m
t = 1,19 m
1.50 1.50
JUDUL TUGAS

1.19
v = 0,5 m/s
1.19

a = 3,29 m SALURAN SEKUNDER BPr17


b = 0,9 m 0.90
A = 253 ha TUGAS
t = 1,19 m 0.90 Q = 0,331 m3/s
v = 0,5 m/s
GAMBAR TEKNIK
SALURAN SEKUNDER BPr8 a = 1,72 m
A = 254 ha SALURAN SEKUNDER BPr13 DOSEN/ASISTEN PARAF
A = 792 ha b = 0,5 m
Q = 0,332 m3/s t = 0,61 m
v = 0,5 m/s Q = 1,037 m3/s

0.61
DR. IR. DRS. H. ISKANDAR
SALURAN SEKUNDER BPr4 v = 0,5 m/s

0.61
a = 1,72 m MUDA P, MT.
A = 812 ha a = 3,29 m 1.50 1.50
b = 0,5 m 1.50 1.50
1.50 1.50
Q = 1,063 m3/s 1.50 1.50 t = 0,61 m b = 0,9 m

1.19
v = 0,5 m/s t = 1,19 m
1.19

0.50
a = 3,29 m 0.50
BAMBANG EKO WIDYANTO,
b = 0,9 m 0.90 ST., MT.
t = 1,19 m 0.90

DIGAMBAR NIM
SALURAN SEKUNDER BPr18
SALURAN SEKUNDER BPr9 SALURAN SEKUNDER BPr14 A = 124 ha FAATHIRA YAUMIL
A = 128 ha Q = 0,162 m3/s 1804331
A = 652 ha HASANAH
Q = 0,167 m3/s Q = 0,854 m3/s v = 0,5 m/s
SALURAN SEKUNDER BPr5 v = 0,5 m/s v = 0,5 m/s a = 1,23 m
a = 1,23 m b = 0,4 m NO. LEMBAR NO. TUGAS
A = 661 ha a = 2,73 m
Q = 0,865 m3/s b = 0,4 m b = 0,7 m t = 0,42 m
1.50 1.50

0.42
1.50 1.50 t = 0,42 m
v = 0,5 m/s t = 1,02 m
0.42

1.02
1.02

a = 2,73 m 1.50 1.50


1.50 1.50
b = 0,7 m
t = 1,02 m 0.70 0.70 JML. LEMBAR
0.40
0.40

You might also like