You are on page 1of 16

Page | 1

Laxmi Associates
Consultancy |Third party Inspection |RLA | Testing&
Commissioning |AMC |Project Management |Training
“Sun Enclave” Office No: 13, 14, 15, Near Sun City Paradise,
Manjalpur, Vadodara-390020. E-mail: lxassociates@gmail.com,
Contact No: 08000645964

TEST REPORT

OF

TELK Make,
50 MVA, 220/11 kV,
3 Phase Power Transformer

Sr.No:-120694-01
(PRE-COMMISIONING TEST)

AT

TS TRANSCO
Kaleshwaram-Telangana

Site TS Transco Client Sunflower Transformer Limited


Location Kaleshwaram-Telangana Test Date 07-10-2018
Testing Engineer Jaydeep,Himanshu & Abhineet Report Prepared By Aditi Vangikar
Equipment Tested # Phase Transformer Report Sr. No. LA/18-19/01292/01
Page | 2

Laxmi Associates
Consultancy |Third party Inspection |RLA | Testing&
Commissioning |AMC |Project Management |Training
“Sun Enclave” Office No: 13, 14, 15, Near Sun City Paradise,
Manjalpur, Vadodara-390020. E-mail: lxassociates@gmail.com,
Contact No: 08000645964

Test Details :-

1. Details of Transformer
2. Tan Delta & Capacitance measurement of winding
3. Tan Delta & Capacitance measurement of Bushing
4. Insulation Resistance Measurment
5. Magnetization Current Test
6. Short Circuit Current Test
7. Vector Group
8. Voltage Ratio Test
9. Magnetic Balance Test
10. Winding Resisitance Test
11. SFRA Test
12. Details of Instrument Used

1. Transformer Details :-

Company TS Transco Serial Number 120694-01


Location Kaleshwaram-Telangana Phases 3
Type Power MVA 50
Manufacturer Telk kV 220/11
Frequency 50 Hz Vector Group YNd1

Site TS Transco Client Sunflower Transformer Limited


Location Kaleshwaram-Telangana Test Date 07-10-2018
Testing Engineer Jaydeep,Himanshu & Abhineet Report Prepared By Aditi Vangikar
Equipment Tested # Phase Transformer Report Sr. No. LA/18-19/01292/01
Page | 3

Laxmi Associates
Consultancy |Third party Inspection |RLA | Testing&
Commissioning |AMC |Project Management |Training
“Sun Enclave” Office No: 13, 14, 15, Near Sun City Paradise,
Manjalpur, Vadodara-390020. E-mail: lxassociates@gmail.com,
Contact No: 08000645964

2. Tanδ And Capacitance Measurement of Winding: OTI: 35°C


Capacitance Tanδ
Combination Mode Test Voltage (nF) (%)
Site Site
2 KV 6.02295 0.3182
HV/LV UST 5 KV 6.02367 0.3182
10 KV 5.96917 0.3192
2 KV 3.72342 0.2265
HV/ground with LV
GST-g 5 KV 3.73229 0.2281
Guard
10 KV 3.79869 0.2245
2 KV 9.75971 0.2850
HV/LV+Ground GST 5 KV 9.66863 0.2831
10 KV 9.67123 0.2842
2 KV 6.02483 0.3224
LV/HV UST 5 KV 6.02535 0.3205
7 KV 5.96927 0.3212
2 KV 12.781 0.2325
LV/ground with HV
GST-g 5 KV 12.658 0.2309
Guard
7 KV 12.660 0.2342
2 KV 18.625 0.2597
LV/HV Ground GST 5 KV 18.625 0.2600
7 KV 18.629 0.2623

Site TS Transco Client Sunflower Transformer Limited


Location Kaleshwaram-Telangana Test Date 07-10-2018
Testing Engineer Jaydeep,Himanshu & Abhineet Report Prepared By Aditi Vangikar
Equipment Tested # Phase Transformer Report Sr. No. LA/18-19/01292/01
Page | 4

Laxmi Associates
Consultancy |Third party Inspection |RLA | Testing&
Commissioning |AMC |Project Management |Training
“Sun Enclave” Office No: 13, 14, 15, Near Sun City Paradise,
Manjalpur, Vadodara-390020. E-mail: lxassociates@gmail.com,
Contact No: 08000645964

3. TanδAnd Capacitance Measurement of Bushing:


Capacitance Tanδ
Bushing Mode Test Voltage (kV) (pF) (%)
Site Site
2 321.176 0.2155
1U Phase UST 5 321.208 0.2152
Sr. No. 330139-19 10 321.264 0.2143
GST-g 1 385.971 0.2345
2 322.284 0.2207
1V Phase UST 5 322.316 0.2184
Sr. No. 330139-20 10 322.368 0.2218
GST-g 1 377.912 0.2105
2 322.347 0.2288
1W Phase UST 5 322.435 0.2291
Sr. No. 330139-21 10 322.373 0.2281
GST-g 1 373.600 0.1780

Site TS Transco Client Sunflower Transformer Limited


Location Kaleshwaram-Telangana Test Date 07-10-2018
Testing Engineer Jaydeep,Himanshu & Abhineet Report Prepared By Aditi Vangikar
Equipment Tested # Phase Transformer Report Sr. No. LA/18-19/01292/01
Page | 5

Laxmi Associates
Consultancy |Third party Inspection |RLA | Testing&
Commissioning |AMC |Project Management |Training
“Sun Enclave” Office No: 13, 14, 15, Near Sun City Paradise,
Manjalpur, Vadodara-390020. E-mail: lxassociates@gmail.com,
Contact No: 08000645964

4. Insulation Resistance Measurement :


IR Value(in GΩ) at 5 kV
Connection PI
15 Sec 60 Sec 600 Sec
HV/LV 9.51 12.3 29.39 2.39
HV/E 102 132 179.5 1.36
LV/E 108 122 190.32 1.56
PI=600 Sec/60 Sec

5. Magnetization Current Test :


With 1-phase power supply
HV SIDE
TAP VOLTAGE APPLIED (VOLTS) CURRENT MEASURED IN mAmps
NO. 1U – 1N 1V – 1N 1W – 1N 1U 1V 1W
1 226 227 227.5 2.10 1.85 2.30
9B 227 227 226.5 2.63 2.17 2.41
17 227 226.9 227.2 2.81 2.24 2.94

With 3 phase power supply


LV SIDE
TAP VOLTAGE APPLIED (VOLTS) CURRENT MEASURED IN mAmps
NO. 2U – 2V 2V – 2W 2W – 2U 2U 2V 2W
9b 415 415 414 112.7 70.1 85.9

6. Short Circuit Current Test

HV / LV (Applied Voltage in HV Side and Measured Current), While LV Shorted.


HV Side (Applied Volts) HV Side (Current in Amp) Isc
TAP POS.
1U – 1V 1V – 1W 1W – 1U U V W (A)
1 414 413 414 1.83 1.82 1.83 40.00
9 413 415 413 2.38 2.35 2.38 43.99
17 413 412 412 2.98 2.95 2.98 53.80

Site TS Transco Client Sunflower Transformer Limited


Location Kaleshwaram-Telangana Test Date 07-10-2018
Testing Engineer Jaydeep,Himanshu & Abhineet Report Prepared By Aditi Vangikar
Equipment Tested # Phase Transformer Report Sr. No. LA/18-19/01292/01
Page | 6

Laxmi Associates
Consultancy |Third party Inspection |RLA | Testing&
Commissioning |AMC |Project Management |Training
“Sun Enclave” Office No: 13, 14, 15, Near Sun City Paradise,
Manjalpur, Vadodara-390020. E-mail: lxassociates@gmail.com,
Contact No: 08000645964

7. Vector Group Verification:-

3 – Phase Voltage applied on HV

Measure Voltage
Connection Remark
(Volts)
1U-2U terminals shorted
Applied Voltage
1U-1V 395
1V-1W 394
1U-1W 395
Measured Voltage
1W-2W 376
1V-2W 395
Condition 1) 1V-2W>1W-2W As all conditions are satisfied, the
1U-1N 227 vector group YNd1 is confirmed.
1U-2V 199.2
1N-2V 21.75
Condition 2) 1U-1N=1U-2V+1N-2V
1V-2V 382.4
1W-2V 382.1
Condition 3) 1W-2V=1V-2V

Site TS Transco Client Sunflower Transformer Limited


Location Kaleshwaram-Telangana Test Date 07-10-2018
Testing Engineer Jaydeep,Himanshu & Abhineet Report Prepared By Aditi Vangikar
Equipment Tested # Phase Transformer Report Sr. No. LA/18-19/01292/01
Page | 7

Laxmi Associates
Consultancy |Third party Inspection |RLA | Testing&
Commissioning |AMC |Project Management |Training
“Sun Enclave” Office No: 13, 14, 15, Near Sun City Paradise,
Manjalpur, Vadodara-390020. E-mail: lxassociates@gmail.com,
Contact No: 08000645964

8. Turns Ratio Test


HV/LV
MEASURED RATIO
CALCULATED %ERROR
TAP NO. 1U – 1N/ 1V – 1N/ 1W – 1N/
RATIO
2U – 2V 2V – 2W 2W – 2U U V W
1 12.156 12.159 12.158 12.1247 0.2582 0.2829 0.2746
2 12.016 12.013 12.012 11.9804 0.2972 0.2721 0.2638
3 11.864 11.866 11.864 11.8360 0.2366 0.2535 0.2366
4 11.718 11.722 11.721 11.6917 0.2249 0.2592 0.2506
5 11.570 11.571 11.570 11.5473 0.1966 0.2052 0.1966
6 11.431 11.434 11.432 11.4030 0.2455 0.2719 0.2543
7 11.282 11.285 11.286 11.2587 0.2070 0.2336 0.2425
8 11.140 11.142 11.143 11.1143 0.2312 0.2492 0.2582
9 10.989 10.993 10.989 10.9700 0.1732 0.2097 0.1732
10 10.849 10.851 10.857 10.8256 0.2162 0.2346 0.2901
11 10.694 10.699 10.696 10.6813 0.1189 0.1657 0.1376
12 10.558 10.562 10.560 10.5370 0.1993 0.2373 0.2183
13 10.407 10.411 10.413 10.3926 0.1386 0.1770 0.1963
14 10.269 10.271 10.275 10.2483 0.2020 0.2215 0.2605
15 10.118 10.124 10.125 10.1039 0.1396 0.1989 0.2088
16 9.979 9.978 9.978 9.9596 0.1948 0.1847 0.1847
17 9.833 9.831 9.837 9.8152 0.1814 0.1610 0.2221

Site TS Transco Client Sunflower Transformer Limited


Location Kaleshwaram-Telangana Test Date 07-10-2018
Testing Engineer Jaydeep,Himanshu & Abhineet Report Prepared By Aditi Vangikar
Equipment Tested # Phase Transformer Report Sr. No. LA/18-19/01292/01
Page | 8

Laxmi Associates
Consultancy |Third party Inspection |RLA | Testing&
Commissioning |AMC |Project Management |Training
“Sun Enclave” Office No: 13, 14, 15, Near Sun City Paradise,
Manjalpur, Vadodara-390020. E-mail: lxassociates@gmail.com,
Contact No: 08000645964

9. Magnetic Balance Test:

With 1-phase power supply


All Result In Volts (V) TAP-5
APPLIED VOLTAGE
HV SIDE
1U – 1N 1V – 1N 1W – 1N
226.1 214 12.8
123.5 226.7 122.6
13.92 213.8 227.2

All Result In Volts (V) TAP-5


APPLIED VOLTAGE
IV SIDE
2U – 2V 2V – 2W 2W – 2U
414 356.3 64.5
202.5 413 209.9
265.8 359.2 415

Site TS Transco Client Sunflower Transformer Limited


Location Kaleshwaram-Telangana Test Date 07-10-2018
Testing Engineer Jaydeep,Himanshu & Abhineet Report Prepared By Aditi Vangikar
Equipment Tested # Phase Transformer Report Sr. No. LA/18-19/01292/01
Page | 9

Laxmi Associates
Consultancy |Third party Inspection |RLA | Testing&
Commissioning |AMC |Project Management |Training
“Sun Enclave” Office No: 13, 14, 15, Near Sun City Paradise,
Manjalpur, Vadodara-390020. E-mail: lxassociates@gmail.com,
Contact No: 08000645964

10. Measurement of Winding Resistance :


HV Side OTI=35⁰C
WINDING RESISTANCE IN mOhms
TAP
1U – 1N(mΩ) 1V – 1N(mΩ) 1W –1N(mΩ)
NO.
At 35⁰C At 75 ⁰C At 35⁰C At 75⁰C At 35⁰C At 75 ⁰C
1 970.3 1130.8 971.6 1132.3 971.4 1132.1
2 950.5 1107.7 951.6 1109.0 951.1 1108.4
3 933.8 1088.3 933.3 1087.7 934.1 1088.6
4 912.4 1063.3 913.1 1064.1 912.8 1063.8
5 889.8 1037.0 890.0 1037.2 889.2 1036.3
6 869.8 1013.7 870.2 1014.1 870.7 1014.7
7 847.8 988.0 848.1 988.4 847.9 988.2
8 828.1 965.1 828.7 965.8 829.1 966.2
9 806.9 940.4 807.2 940.7 807.3 940.8
10 829.1 966.2 829.7 966.9 829.9 967.2
11 848.4 988.7 849.1 989.6 849.4 989.9
12 870.2 1014.1 870.9 1015.0 871.1 1015.2
13 890.2 1037.5 890.8 1038.2 891.3 1038.7
14 910.7 1061.3 911.1 1061.8 911.8 1062.6
15 932.8 1087.1 931.9 1086.0 932.5 1086.7
16 951.3 1108.7 951.1 1108.4 951.9 1109.4
17 970.9 1131.5 971.7 1132.4 971.3 1132.0

LV Side (in mOhms)


WINDING RESISTANCE IN mohms
TAP
2U-2V(mΩ) 2V-2W(mΩ) 2W-2U(mΩ)
NO.
At 35⁰C At 75 ⁰C At 35⁰C At 75⁰C At 35⁰C At 75 ⁰C
9b 6.841 7.973 6.829 7.959 6.862 7.997

Site TS Transco Client Sunflower Transformer Limited


Location Kaleshwaram-Telangana Test Date 07-10-2018
Testing Engineer Jaydeep,Himanshu & Abhineet Report Prepared By Aditi Vangikar
Equipment Tested # Phase Transformer Report Sr. No. LA/18-19/01292/01
Page | 10

Laxmi Associates
Consultancy |Third party Inspection |RLA | Testing&
Commissioning |AMC |Project Management |Training
“Sun Enclave” Office No: 13, 14, 15, Near Sun City Paradise,
Manjalpur, Vadodara-390020. E-mail: lxassociates@gmail.com,
Contact No: 08000645964

11. SFRA Test Signature

1U-1N ALL OPEN TAP 9

1V-1N ALL OPEN TAP 9

Site TS Transco Client Sunflower Transformer Limited


Location Kaleshwaram-Telangana Test Date 07-10-2018
Testing Engineer Jaydeep,Himanshu & Abhineet Report Prepared By Aditi Vangikar
Equipment Tested # Phase Transformer Report Sr. No. LA/18-19/01292/01
Page | 11

Laxmi Associates
Consultancy |Third party Inspection |RLA | Testing&
Commissioning |AMC |Project Management |Training
“Sun Enclave” Office No: 13, 14, 15, Near Sun City Paradise,
Manjalpur, Vadodara-390020. E-mail: lxassociates@gmail.com,
Contact No: 08000645964

1W-1N ALL OPEN TAP 9

1U-1N LV SHORT TAP 9

Site TS Transco Client Sunflower Transformer Limited


Location Kaleshwaram-Telangana Test Date 07-10-2018
Testing Engineer Jaydeep,Himanshu & Abhineet Report Prepared By Aditi Vangikar
Equipment Tested # Phase Transformer Report Sr. No. LA/18-19/01292/01
Page | 12

Laxmi Associates
Consultancy |Third party Inspection |RLA | Testing&
Commissioning |AMC |Project Management |Training
“Sun Enclave” Office No: 13, 14, 15, Near Sun City Paradise,
Manjalpur, Vadodara-390020. E-mail: lxassociates@gmail.com,
Contact No: 08000645964

1V-1N LV SHORT TAP 9

1W-1N LV SHORT TAP 9

Site TS Transco Client Sunflower Transformer Limited


Location Kaleshwaram-Telangana Test Date 07-10-2018
Testing Engineer Jaydeep,Himanshu & Abhineet Report Prepared By Aditi Vangikar
Equipment Tested # Phase Transformer Report Sr. No. LA/18-19/01292/01
Page | 13

Laxmi Associates
Consultancy |Third party Inspection |RLA | Testing&
Commissioning |AMC |Project Management |Training
“Sun Enclave” Office No: 13, 14, 15, Near Sun City Paradise,
Manjalpur, Vadodara-390020. E-mail: lxassociates@gmail.com,
Contact No: 08000645964

2U-2V

2V-2W

Site TS Transco Client Sunflower Transformer Limited


Location Kaleshwaram-Telangana Test Date 07-10-2018
Testing Engineer Jaydeep,Himanshu & Abhineet Report Prepared By Aditi Vangikar
Equipment Tested # Phase Transformer Report Sr. No. LA/18-19/01292/01
Page | 14

Laxmi Associates
Consultancy |Third party Inspection |RLA | Testing&
Commissioning |AMC |Project Management |Training
“Sun Enclave” Office No: 13, 14, 15, Near Sun City Paradise,
Manjalpur, Vadodara-390020. E-mail: lxassociates@gmail.com,
Contact No: 08000645964

2U-2W

THREE PHASE COMPARISION


1U-1N,1V-1N,1W-1N ALL OPEN TAP 9

Site TS Transco Client Sunflower Transformer Limited


Location Kaleshwaram-Telangana Test Date 07-10-2018
Testing Engineer Jaydeep,Himanshu & Abhineet Report Prepared By Aditi Vangikar
Equipment Tested # Phase Transformer Report Sr. No. LA/18-19/01292/01
Page | 15

Laxmi Associates
Consultancy |Third party Inspection |RLA | Testing&
Commissioning |AMC |Project Management |Training
“Sun Enclave” Office No: 13, 14, 15, Near Sun City Paradise,
Manjalpur, Vadodara-390020. E-mail: lxassociates@gmail.com,
Contact No: 08000645964

1U-1N,1V-1N,1W-1N LV SHORT TAP 9

2U-2V,2V-2W,2U-2W

Site TS Transco Client Sunflower Transformer Limited


Location Kaleshwaram-Telangana Test Date 07-10-2018
Testing Engineer Jaydeep,Himanshu & Abhineet Report Prepared By Aditi Vangikar
Equipment Tested # Phase Transformer Report Sr. No. LA/18-19/01292/01
Page | 16

Laxmi Associates
Consultancy |Third party Inspection |RLA | Testing&
Commissioning |AMC |Project Management |Training
“Sun Enclave” Office No: 13, 14, 15, Near Sun City Paradise,
Manjalpur, Vadodara-390020. E-mail: lxassociates@gmail.com,
Contact No: 08000645964

12. Details of Instruments Used:


Equipment Used Make Sr. No Calibrated on Date
Tan Delta Kit Megger 14880813 02-08-2018
IR Tester Kyoritsu W0309555 05-11-2017
Leakage Tester Meco 16250264 18-11-2017
WRM Kit Scope 2307.02AB556 29-10-2017
Ratio Kit Vanguard 29138 24-11-2017
SFRA Test Megger 1400754 22-06-2018

-- END –

Please contact us in case of any further query regarding this report.


Thanking you,
For & on behalf of Laxmi Associates

(Engineering consultancy & Service Provider)


DR. ARADHANA RAY
E-mail: rayaradhana@yahoo.com
Mobile No. 09374076950

Site TS Transco Client Sunflower Transformer Limited


Location Kaleshwaram-Telangana Test Date 07-10-2018
Testing Engineer Jaydeep,Himanshu & Abhineet Report Prepared By Aditi Vangikar