TEST REPORT

OF

TELK MAKE, 50 MVA,


3 PHASE TRANSFORMER

SR.NO:- 120694-1
(Tan Delta & Capacitance
Measurement of Bushing & IR)

AT

TSTRANSCO,
KALESHWARAM-TELANGANA

Site TSTRANSCO Client SUNFLOWER TRANSFORMER


Location KALESHWARAM Test Date 02-07-2018
Testing Engineer RONAL & VIJAY Report Prepared by DHRUSHIK HINGRAJIYA
Equipment Tested BUSHING Report Sr. No. LA/18-19/0679/02
Laxmi Associates
Consultancy |Third party Inspection |RLA | Testing&
Commissioning |AMC |Project Management |Training
‘Sun Enclave’ Office No: 13-14-15, Near Suncity Paradise, Manjalpur,
Vadodara-390020. E-mail: lxassociates@gmail.com,
Contact No: 09374076950

Content:
1. Insulation Resistance Test of CTs
2. Capacitance and Tan Delta Measurement
3. Details of Instruments Used

Details of Instrument Used


Company TSTRANSCO Serial Number 120694-1
Location KALESHWARAM MVA 50
Manufacturer TELK Mfr. Location INDIA

Site TSTRANSCO Client SUNFLOWER TRANSFORMER


Location KALESHWARAM Test Date 02-07-2018
Testing Engineer RONAL & VIJAY Report Prepared by DHRUSHIK HINGRAJIYA
Equipment Tested BUSHING Report Sr. No. LA/18-19/0679/02
Laxmi Associates
Consultancy |Third party Inspection |RLA | Testing&
Commissioning |AMC |Project Management |Training
‘Sun Enclave’ Office No: 13-14-15, Near Suncity Paradise, Manjalpur,
Vadodara-390020. E-mail: lxassociates@gmail.com,
Contact No: 09374076950

1) Insulation Resistance Measurement Of Bushing CT’s (Using 500VMegger)


All Results in GΩ. (at 32°C)
HV LV
MEASUREMENT BETWEEN UNIT N
U V W U V W
Core1 to Earth GΩ 17 25.3 97.4 102 10.9 296 56.2
Core2to Earth GΩ - 44.9 - - 11.5 - -
Core1 to Core 2 GΩ - 157 - - 34.27 - -

2) Capacitance and Dissipation Factor (Tan Delta) Test data of Bushings with
IR:

Test % D.F IR @5Kv


Bushing Test Capacitance
Voltage (Tan Tan Delta to Earth
(Make:Telk) Mode (pF)
(kV) Delta)
15 Sec 60 Sec
2 321.543 0.2095
Sr. No. UST 5 322.682 0.2117
346 GΩ 420 GΩ
330139-19 10 322.780 0.2130
GST-g 1 375.393 0.3142
2 323.239 0.2201
Sr. No. UST 5 323.171 0.2200
330139-20 134 GΩ 193 GΩ
10 323.194 0.2197
GST-g 1 360.442 0.2921
2 322.910 0.2243
Sr. No. 5 322.935 0.2243
UST
330139-21 163 GΩ 321 GΩ
10 322.939 0.2251
GST-g 1 361.294 0.3883

Site TSTRANSCO Client SUNFLOWER TRANSFORMER


Location KALESHWARAM Test Date 02-07-2018
Testing Engineer RONAL & VIJAY Report Prepared by DHRUSHIK HINGRAJIYA
Equipment Tested BUSHING Report Sr. No. LA/18-19/0679/02
Laxmi Associates
Consultancy |Third party Inspection |RLA | Testing&
Commissioning |AMC |Project Management |Training
‘Sun Enclave’ Office No: 13-14-15, Near Suncity Paradise, Manjalpur,
Vadodara-390020. E-mail: lxassociates@gmail.com,
Contact No: 09374076950

3) Details of Instrument Used


Instrument Make Sr.No. Calibrated on date
CPC100 Omicron HF371M 07-09-2017
IR Tester Kyoritsu E0048955 05-10-2017

-- END –

Please contact us in case of any further query regarding this report.

Thanking you,
For & on behalf of Laxmi Associates

(Engineering consultancy & Service Provider)


DR. ARADHANA RAY
E-mail: rayaradhana@yahoo.com
Mobile No. 09374076950

Site TSTRANSCO Client SUNFLOWER TRANSFORMER


Location KALESHWARAM Test Date 02-07-2018
Testing Engineer RONAL & VIJAY Report Prepared by DHRUSHIK HINGRAJIYA
Equipment Tested BUSHING Report Sr. No. LA/18-19/0679/02