You are on page 1of 2

Four Laning of Cholopuram - Thanjavur From km 116.

440 to km
164.275 Section of NH-45C in the State of TamilNadu Under NHDP
Phase-IV on Hybrid Annuity Mode.
FORMAT NO : CTP/QC/EW/R1/102
Client National Highways Authority of India

Independent Engineer Theme Engineering Services Pvt.Ltd

Concessionaire Patel Cholopuram - Thanjavur Highway Pvt.Ltd

EPC Contractor Patel Infrastructure Limited.

FREE SWELL INDEX


[As per IS: 2720 (PART - 40)]

Lab Job No. Date of Sampling

Location/Source (km) Date of testing

Type of Material Sampled by

Proposed Use Tested by

Trails
Sl.No Description Formulae
1 2 3

Volume of Specimen in Graduated Cylinder


1 vd
Containing Distilled Water after 24 hrs (ml)

Volume of Specimen in Graduated Cylinder


2 vk
Containing Kerosene after 24 hrs (ml)

3 Difference of Volume in Water & Kerosene (ml) (vd-vk)

(vd - vk)X100
4 Free Swell Index
vk

Average

Remarks :
EPC Contractor Concessionaire Independent Engineer
Representative Representative Representative

You might also like