2. Have you done sometime rigid pavements and please explain why longitudinal joints are
provided. What is the purpose and how it executed at site.
4. What is the difference between construction joints and contraction joints. What is the purpose
of providing it.
5. How and when cutting of rigid pavements are carried out and what purpose it serves.
6. Why and when, grooming of Rigid pavement surface essential and carried out.
8. What are the procedures for joint of rigid pavement and flexible pavement.
11. What are the IRC-SP Manual for 2/4/6 lane and express way.
14. In case of accidents at construction site , what steps are required to be taken.
18. What is the level /class of Quality and what level we adopt. (Q1, Q2, Q3 and Q4.)
19. What is the difference between Quality Assurance and Quality Control. - QA- The Govt system in
place to monitor the Quality Control efforts of the contractor. 1. tests necessary to make a
decision on acceptance 2. Performed by owner QC- The contractor systems in place during the
construction to manage , control and document his activities in order to comply with contract
requirements.1. Tests necessary to control a product 2. Determine quality of products being
produced,3. Performed by contractor.
23. What are required highways lighting and ellumination at street light and Toll Plaza.
24. What is the width of lane of toll plaza and lane width for extra wide vehicles.
27. What are the test of Piles. Explain how is being carried out. (Initial, Routine and Integreted.
30. Define skew angle of bridge. How the length of bridge measured.
31. What are type of bridge, like cable stayed/ Extra dose/suspension/cantilever etc.
1. Why Mastic Asphalt layer is not being compacted by roller. How it is laid & Compacted.
What is the percentage of Bitumen in Mastic Asphalt and what other materials are used
in what qualities. How it is prepared.
32. Explain what is the difference between Proctor and modified proctor compaction test.
35. What are the standard procedure for adopting new materials.
36. What are the type of median barriers and shoulders barriers.
37. What is PLR and what is the effects of delayed payments to contractors. What is the limiting
time for release of payments.
41. What is French drain , fabric filter and pipe with filters .
43. What is the main reason of rutting and failure of flexible pavements.
44. How many types of cracks occurs in flexible pavement and what is the treatment for
rectification.
55. What are the Types of joints. Contraction joint, Construction joints, Expansion joints and
Longitudinal Joints (required to avoid top drowning cracking)
56. What is Continuously reinforced concrete pavement, (CRCP)- High volume commercial vehicle
and closers of road is difficult for maintenance.
58. What is EMP Environment Mitigation Plan. (There are four type of Pollution may occur 1, Air
pollution, 2.water pollution, 3.soil Pollution, 4.noise pollution, which needs to be
control/restrict.)
59. What are the applicable permits are required be taken by the contractors for execution of
highways projects.
60. How do you measure/calculate Time over Run /EOT. What are the factors to be considered for
Time over run/EOT.
1. Have you done Well foundation, where it is provided, what precautions are taken.
4. What are the types of pile testing say - Initial / Routine / Integrative test , what is the frequency
of load test - ? Explain the procedure of load testing.
6. What is the purpose of Bento nite and what should be the density of Bentonite .
7. What is Scoure Depth and what is the precautionary measure needed w.r.t. scoured depth.
8. What do you mean by Bridge Length – A.A /Dirt wall to Dirt wall.
12. What is Couplers and where it is used in reinforcement, which material and what should be
Strength( 125% strength of reinforcement)
14. What should be the strength of reinforcement (fe 500), what is Galvanised Steel, where it is
used.
19. What types of stressing are in practice and what are the procedure & precautions to be taken
during executions.
22. How many types of bearings are used now these days.
24. What precautions are required to be taken/measure during lifting of prestressed girder.
26. What is requirements and procedures for preparation of casting bed for PSC girders.
7. Explain Marshal Test and how do you determine the % of bitumen in bituminous mix.
11. How to check compaction, full procedures (sand replacement method foreign material -)
12. How do you take care of Soil Erosion, what precaution/Vegetable soil.
15. Procedure for Cube testing and beam testing (size of the beam).
16. Mix Design of DBM & BC.- Optimum Bitumen content to satisfy the specified values of a)
Marshal Stability Value, b) Flow Value, c) Voids in Mineral Aggregate (VMA), d) Voids filled by
Bitumen (VFB) and e) Air Voids in Mix.
3. What are the Type of Crash barrier – / wire rope specification W beam etc ., at what Height
(0.75 – Depth 0.6m)
5. What essential tools and equipment’s are required in highways Petrol Vehicle.
2. What is the IRC guidelines for Design of Flexible pavement and Rigid Pavements. Name the IRC
6. What is the purpose of Dowel bars and tie bar in rigid pavement.
9. What is Crack Relief Layer (SAMI) Stress Absorbing Membrane Interlayer. (P-26/ IRC 37-2018)
10. What is Reclaimed Asphalt Pavement (RAP) Base. ( Refer page 27-IRC 37-2018)
11. IRC 37-2018- p/27- Bitumen Emulsion/ Foamed Bitumen Treated Reclaimed Asphalt Pavement
(RAP) Base. -
12. Bituminous Layers - P-27/IRC- 37-2018, For high traffic volume roads with a design traffic of
more than 50 msa, (a) Stone Matrix Asphalt (SMA), (b) Grap Graded Mix with rubberised
Bitumen (GGRB) and Bituminous Concrete (BC).
13. What is perpetual pavement. (IRC37-2018-p 32)- Long life Pavement, having life of 50 years or
longer.
15. What is the curing period of CTB before laying of next layer.
16. Please compare the advantages of CTBS & CTB with normal pavement layer. For 50 msa traffic.(
Refer page 80 -IRC 37-2018)