Four Laning of Cholopuram - Thanjavur From km 116.440 to km 164.

275
Section of NH-45C in the State of TamilNadu Under NHDP Phase-IV on Hybrid
Annuity Mode.
FORMAT NO : CTP/QC/EW/R1/105
Client National Highways Authority of India
Independent Engineer Theme Engineering Services Pvt.Ltd
Concessionaire Patel Cholopuram - Thanjavur Highway Pvt.Ltd
EPC Contractor Patel Infrastructure Limited
DETERMINATION OF DRY DENSITY (MDD)
[IS 2720, (Part-8)]
Lab Job no Date of Sampling
Type of material Sampled by
Source Date of Testing
Location Tested by
Proposed Use Method used :-
Rammer Wt.:- 4.9 kg No. of blows/layer :- 25 / 55 No. of layer :- 5
B Mould No. :- Wt.of mould (A) = gm Volume of mould (V)= cc
C Trial No.
D Wt.of wet soil + mould (gm )
E Wt.of wet soil (E = D-A) (gm)
F Wet density of soil, (F = E/V) (gm/cc)
G Container No.
H Wt.of container (gm)
J Wt.of wet soil+Container (gm )
K Wt.of dry soil+Container (gm)
L Wt.of water(L=J-K) (gm)
M Wt.of dry soil(M=K-H) (gm)
N Water content [N = 100X(L/M)] (%)
P Dry density[P=100x(F/(100+N))] (gm/cc)
Dry Density (gm/cc)

% of Moisture Content
Results / Remarks: MDD:………………….(gm/cc) OMC :………………….(%)

EPC Contractor Concessionaire


Independent Engineer
Representative Representative Representative