You are on page 1of 2

Four Laning of Cholopuram - Thanjavur From km 116.440 to km 164.

275
Section of NH-45C in the State of TamilNadu Under NHDP Phase-IV on
Hybrid Annuity Mode.
FORMAT NO : CTP/QC/EW/R1/106
Client National Highways Authority of India
Independent Engineer Theme Engineering Services Pvt.Ltd
Concessionaire Patel Cholopuram - Thanjavur Highway Pvt.Ltd
EPC Contractor Patel Infrastructure Limited.
California Bearing Ratio (IS : 2720 (Part -16))
Lab Job No. Date of Casting
Source / Location Date of Testing
Method Used MDD…………… (gm/cc)
Proposed Use OMC……………..(%)
Before After Before After Before After
Description Soaking Soaking Soaking Soaking Soaking Soaking
Mould No.
Volume of the mould (V) (cc)
Wt. of the mould (m1) (gm)
Wt. of mould + Compacted soil in gms (m 2) (gm)
Wt. of compacted soil in gms m 3 = (m2-m1) (gm)
Wet Density in γЬ = m3/v (gm/cc)
Container No.
Wt. of container (W1) (gm)
Wt. of container + wet soil (W 2) (gm)
Wt. of container + dry soil (W 3) (gm)
Wt. of water ( W2- W3) (gm)
Wt. of dry soil ( W3 - W1) (gm)
Moisture Content, W =W2-W3/W3-W1x100 (% )
Dry density γd = γb / (1+W/100) (gm/cc)
Compaction (%)

Proving Ring No : __________________ Calibration Factor, 1 Division = __________Kg.


Mould No. Mould No. Mould No.
Proving Proving Proving
Sl. No Penetration (mm) Ring Ring Ring
Load (Kgs) Load (Kgs) Load (Kgs)
Reading Reading Reading
(Div) (Div) (Div)
1 0.5
2 1.0
3 1.5
4 2.0
5 2.5
6 3.0
7 4.0
8 5.0
9 7.5
10 10.0
11 12.5
Corrected CBR Value at 2.5 mm. = _____________ Remarks
Corrected CBR Value at 5.0 mm.= ____________
CBR Value @ ____________
Independent Engineer
EPC Contractor Concessionaire
Representative Representative Representative

You might also like