Supply, Spreading of 20mm HBG matal and Rectification of
03/2016-17 of
1 damaged cable duct in Switch yard and other miscellaneous works at 1457481.00 1183233.00 01.07.16
SE/Civil/Warangal
132/33kv SS Wardhannapet in Warangal Dist.
Construction of ladies toilet on 1st floor of control house at 220 08/2016-17of
2 128100.00 71158.00 29.01.17
KVSS Nagaram in Warangal Dist SE/Civil/Warangal.
Laying of CC road and white washing to existing compound wall at
03/2014-2015 of
3 1045339.00 726525.00 24.12.2014
SE/Civil/Warangal.
220kvss waddekothapally in TL&SS Circle Warangal Dist
:Construction of Racks at office of SE/OMC/Warangal and providing
39/2017-18 of SE/OMC
4 Alluminium partition in the office of CE/Zone/Warangal for 106786.00 81498.00 03.08.2017
Circle/Warangal.
DE/T/Warangal section at Zonal office building warangal
Renovation of existing store room for extension of PLCC room and
38/2017-18of SE/OMC
5 244918.00 216919.00 04.08.2017
Circle/Warangal
other miscellaneous works at 220KV Switching station Nagaram
Renovation of old guest house for accommodation of SE/LIS/WGL
. 56/2017-18of SE/OMC
6 603123.00 525355.00 05.11.2017
Circle/Warangal
office in the premises of 220/132 KVSS warangal
7 Construction of new compound wall by dismantling existing
compound wall to Providing access through Sub-Station premises for 57/2017-18of SE/OMC
176657.00 145794.00 06.01.18
House sites alloted to surrendered extremists in Sy.No.643 adjoining Circle/Warangal
132/33 KVSS Ghanapur in Jangoan District.
Construction of Comound wall in place of collapsed leaned and
09/2018-19 of SE/Civil
8 ready to collapse compound wall at 220/132 KV SS Warangal in 1217199.00 953794.00 28.01.2019
Circle/Warangal
Warangal dist
9 providing of rcc fensing poles for praposed 220/132kvss Fort 05/2017-18 of
459644.20 397286.00 16.11.18
warangal(Ammavaripet) in warangal urban dist. SE/Civil/Warangal
10 Providing CC road and spreading of 20mm HBG metal in switchyard
10/2018-19 of SE/Civil
and other Miscelleneous works at 132KV Ghanpur SS in Jangaon 1944022.00 1269910.00 16.10.2018
Circle/Warangal
Dist
11 Construction of balance compound wall and material stacking 08/2018-19 of SE/Civil
11035024.38 3823521.43 06.08.2019
plotform at 132/33 KV SS at Raghunathpally in Warangal dist Circle/Warangal
12 Construction of Compound wall at proposed 220/132/33 KVSS 11/2018-19 of SE/Civil
7151757.00 1563956.66 2710473.50 10.04.2019
Ammavaripet in Warangal Urban District Circle/Warangal
Page 2

Sl. Name of the Work BILL PAID


No. LS. Agreement No Agt.Amount 2017-2018 2018-2019 2019-2020 DOC
13 Laying of cc road from main gate to control room gate at 220/132/33
01/2019-20 of SE/Civil
KVSS premises in the zonal office building, Warangal in Warangal 1525350.83 1251689.00 262408.20 19.04.2019
Circle/Warangal
Urban Dist
14 Providing & laying of tiles for passage in the garden, laying of CC in
07/2018-19 of
the vehicle parking shed, providing of cattle guard at gate of Onal 932280.00 608602.00 37292.00 27.07.2018
SE/Civil/Warangal
officebuilding in the premises of 220/132 KVSS Warangal
15 Supply and spreading of 20mm HBG metal in Switchyard,Laying of
05/2018-19 of
CC road and Other miscellaneous works in 132/33 KV SS 3468319.73 2714108.00 57925.00 08.11.2018
SE/Civil/Warangal
Waddepally in Warangal Urban dist
16 Supply and spreding of 20mm HBG metal in switch yard at 12/2018-19 of SE/Civil
1684484.00 630297.00 23.03.19
132/33KVSS Nekkonda in Warangal Dist. Circle/Warangal
Specialised Waterproofing treatment to the Terrace and External
06/2019-20 of
17 Walls Repairs to the chajjas areaand structural repairs to the ceiling 543345.62 543345.62 13.09.2019
SE/Civil/Warangal
of 132/33 KV SS Waddepally in Warangal Rural Dist.
18 Construction of R.R masonry protection wall to the Loc No:68 of
02/2018-19 of SE/Civil
132KV Warangal-Kalvasrirampur line& 132KV kamalapur- 562886.95 497772.00 65114.57 05.09.2018
Circle/Warangal
Jammikunta line in warangal urban dist.
19 Revetment to the cut point tower legs at location No.130 of 220 KV
07/2019-20 of SE/Civil
Bheemghanpur –Gangarm line to safe guard against Godavari Water 4907731.66 799722.56 21.08.2019
Circle/Warangal
Flows
20 Renovation of Old quarters for arranging Sports Room at Warangal 03/2019-20 of
406224.00 398104.00 30.06.2019
Zonal Office Building SE/Civil/Warangal
Total 39600673.37 9800463.28 8784858.26
Page 3

Sl. Name of the Work BILL PAID


No. LS. Agreement No Agt.Amount 2017-2018 2018-2019 2019-2020 DOC
Page 4

Sl. Name of the Work BILL PAID


No. LS. Agreement No Agt.Amount 2017-2018 2018-2019 2019-2020 DOC

Construction of cable duct beside 160MVA PTR-II at 220/132 KVSS


120336
Warangal in Warangal Dist.
Renovation of ALDC office building by painting, laying of sewerage

pipe line to the existing septic tank and other miscellanious works in 306851

the premises of 220/132 KVSS Warangal.


Page 5

Sl. Name of the Work BILL PAID


No. LS. Agreement No Agt.Amount 2017-2018 2018-2019 2019-2020 DOC
Arresting of water leakage from water supply pipe line, sewerage

pipe line and flooring of the common toilet at Zonal office building

Warangal.
5 Extension of control room in ground floor & construction of first floor

at existing control house for erection of 132/33 KV features and

accommodation office room & store room in existing 132/11 KV SS

at Dharmassagar 2126087
11 Laying of CC road in front of main gate I&II and other miscellaneous

owrks at 220/132 KVSS Waddekothapally in Mahabubabad Dist


9 Extension of existing control room with provision of panel room,

office room and store room at 220 KV SS Gangaram in Jayashankar

Bhupalapally dist
10 Extension of existing control room with provision of panel room,

office room and store room at 220 KV SS BheemGhanpur in

Jayashankar Bhupalapally dist


19 Providing of road crossing cable trench towards 33 KV switch yard at

132 KVSS Nekkonda


Page 6

Sl. Name of the Work BILL PAID


No. LS. Agreement No Agt.Amount 2017-2018 2018-2019 2019-2020 DOC
20 Providing of road crossing cable trench towards 33 KV and 132 KV

Switch yard at 132 KVSS Mustyal


21 Extension of existing control room with provision of panel

room, office room & store room and erection of new 33 KV

bay for singareni colleries company limited at 132 KVSS

Chelpur in Jayashankar Bhupalpally Dist


22 Construction of RR masonry protection wall to loc.no.07 of 132 KV

Chityala LILO line


23 Specialised Waterproofing treatment to the Terrace and External

Walls Repairs to the chajjas area of 220/132/33 KV SS Warangal

in Warangal Urban Dist.


24 Specialised Waterproofing treatment to the Terrace and External

Walls Repairs to the chajjas area of 132/33 KV SS Wardhannapet

in Warangal Rural Dist.


25 Renovation of control room by providing painting, water proofing

treatment to the terrace, cable dict cover slabs, Road crossing cable

duct, water supply arrangments & electrification works and other

miscellaneous works at 132 /33 KVSS Mulugu in Mulugu Dist


Page 7

Sl. Name of the Work BILL PAID


No. LS. Agreement No Agt.Amount 2017-2018 2018-2019 2019-2020 DOC
29 Extension of existing control room with provision of office rooms at

132 KVSS Waddepally in Warangal Urban Dist


31 Renovation of Control room by providing internal painting, water

supply arrangements, renovation of toilets and other miscellaneous

works at 132 KVSS Waddepally in Warangal Urban Dist


32 Shifting of existing barbed wire fencing and extension of metal

spreading in 33 KV Switch yard at 220KVSS Warangal


33 Erection of 3 New CPL structures in place of Old damaged and

leaned CPL structures at 220/132/33 KVSS Warangal in Warangal

Urban Dist
34 Renovation of Control room by providing Internal Electrification,

Internal Painting and Specialised Waterproofing treatment to the

Terrace ad External walls, Repairs to the Chajja area of 220/132/33

KVSS Waddekothapally in Mahabubabad Dist


35 Construction of Toilets and water supply arrangements in control

room at 220/132 33 KVSS Warangal in Warangal Urban Dist


Page 8

Sl. Name of the Work BILL PAID


No. LS. Agreement No Agt.Amount 2017-2018 2018-2019 2019-2020 DOC
36 Construction of Material stacking plotform at 220/132/33 KVSS

Warangal in Warangal Urban Dist


37 Construction of Indoor Store, Material Stacking plotform, Oil

Generator Shed and Renovation of TRE Sub-Division office by

Painting, Arresting Roof Leakages, Water Supply Arrangements,

Internal Electrification and Other miscellaneous works in the

premises of Zonal Office Building, Warangal


41 Estimate for Modification of store room and shifting of Equipment due

to demolishing by NHAI for construction of 4 Lane road widening of

132/33 KV SS Ghanpur in Jangaon Dist(Battery room)


42 Modification of control room and shifting of Equipment due to

demolishing by NHAI for construction of 4 Lane road widening of

132/33 KV SS Ghanpur in Jangaon Dist


43 Renovation of MRT Sub Division Office and Lines Sub Division office

by Painting, Arresting Roof Leakages, Water Supply Arrangements,

Internal Electrification and Other miscellaneous works in the

premises of Zonal Office Building, Warangal


Total 6047225.50 2207710.00 3124750.00
PROGRESS OF O&M CIVIL WORKS as on 23.12.2019
Sl.No
Name of the work Amount (Rs) Status of work

Estimates submitted and to be awarded.


1 Laying of CC road,construction of new& collapsed compound wall and other 4,450,000.00 Revised estimate submitted on Dt:25/03/2019
miscellaneous works at 132/33 KV Nekkonda in Warangal rural dist.
2 Providing of Bore well at 132/33 KVSS Palakurthy in Jangaon Dist 277,000.00 Estimate submitted on Dt:15.05.2019
3 Extension of existing control room with provision of panel room, office room and 4,379,595.00 Technical Sanctioned issued vide reference
store room and erection of new 33 KV Bay for Singareni Colleries Company Limited Memo.No.CE/WGL/Z/DE(T)/ADE(T)/AE2/F./D.No.5
at 132 KVSS Chelpur in Jayashankar Bhupalpally Dist 81/19,Dt:02.08.2019. Work to be awarded.
4 Construction of Backup SLDC in the premises of 220KVSS Warangal in Warangal 70,000,000.00 Estimate submitted on Dt:10.06.2019
Urban Dist

5 Estimate for construction of RR masonry Protection wall at Loc.No.07 of 132 KV 530,026.00 Estimate submitted and Sanctioned vide reference
Chityala LILO line Memo.No.CE/WGL/Z/DE(T)/ADE(T)/AE2/F./D.No.6
58/19,Dt:20.08.2019. Work to be awarded.

6 Providing of road crossig cable trench towards 33 KV Switch yard at 132 KVSS 157,986.00 Estimate submitted on Dt:19/07/2019
Nekkonda
7 Providing of road crossig cable trench towards 33 KV Switch yard at 132 KVSS 154,398.00 Estimate submitted on Dt:19/07/2019
Mustyal
8 Specialised water proofing treatment to the Terrace and external walls Repairs to 1,000,799.00 Estimate submitted on Dt:08/08/2019
the chajjas area of 220 KVSS Warangal in Warangal Urban Dist
9 Specialised water proofing treatment to the Terrace and external walls Repairs to 477,555.00 Estimate submitted on Dt:08/08/2019
the chajjas area of 132/33 KVSS Wardhannapet in Warangal Rural Dist
10 Renovation of control room by providing paintig, water proofing treatment to the 1,153,740.00 Tenders Called for work awarding.
terrace, cable duct cover slabs, road crossing cable duct, water supply arrangements
& Electrification works and other miscellaneouse works at 132/33 KV Mulugu in
Mulug Dist
11 Extension of existing control room with provision of office rooms at 132 KVSS 1,970,553.00 Estimate submitted on Dt:29/10/2019.
Waddepally in Warangal Urban Dis
12 Renovation of Control room by providing internal painting, water supply 338,881.00 Estimate submitted on Dt:29/10/2019.
arrangements, renovation of toilets and other miscellaneous works at 132 KVSS
Waddepally in Warangal Urban Dist

13 Shifting of existing barbed wire fencing and extension of metal spreading in 33 KV 455,172.00 Estimate submitted on Dt:01/11/2019.
Switch yard at 220KVSS Warangal

Page 9
14 Renovation of control room by providing Internal Electrification, internal painting 1,435,778.00 Estimate Sanctioned vide reference
and specialized water proofing treatment to the Terrace and External walls, repairs Memo.No.CE/WGL/Z/DE(T)/ADE(T)/AE2/F./D.No.1
to the chajjas area of 220/133/33 KVSS Waddekothapally in Mahabubababad Dist 419/19,Dt:21.01.2020. Work to be awarded.

15 Construction of Toilets and water supply arrangements in control room at 220/132 495,022.00 Estimate sanctioned vide reference
33 KVSS Warangal in Warangal Urban Dist emo.No.SE/Civil/wgl/AEE(T)/f.220KV Toilets
/D.No.769/19, Dt:18/12/2019.
16 Construction of Material stacking plotform at 220/132/33 KVSS Warangal in 1,478,849.00 Estimate submitted on Dt:20/12/2019. Revised
Warangal Urban Dist with SSR 2019-20.
17 Construction of Indoor Store, Material Stacking plotform, Oil Generator Shed and 1,978,378.00 Estimate submitted on Dt:18/01/2020.
Renovation of TRE Sub-Division office by Painting, Arresting Roof Leakages, Water
Supply Arrangements, Internal Electrification and Other miscellaneous works in the
premises of Zonal Office Building, Warangal
18 Dismantling of 1No.132 KV (P+0) tower at Loc.No.23 and erection of 1No. new 132 190,000.00 Estimate submitted on Dt:18/01/2020.
KV (P+6) tower at Loc.No.23 across BT road crossing of Enugallu to Nekkonda at
Enugallu(V), Parvathagiri(M),Warangal Rural Dist
19 Erection of 1No.P+0 tower at Loc.No.159A in existing 132 KV DC line Circuit-I & 370,000.00 Estimate submitted on Dt:20/01/2020.
Circuit-II
20 Erection of 1No.P+0 tower at Loc.No.99A in existing 132 KV RSS-Warangal DC line 380,000.00 Estimate submitted on Dt:20/01/2020.

21 Estimate for Modification of store room and shifting of Equipment due to 28,484.00 Estimate submitted on Dt:21/01/2020.
demolishing by NHAI for construction of 4 Lane road widening of 132/33 KV SS
Ghanpur in Jangaon Dist(Battery room)
22 Modification of control room and shifting of Equipment due to demolishing by NHAI 4,543,636.00 Estimate submitted on Dt:23/01/2020.
for construction of 4 Lane road widening of 132/33 KV SS Ghanpur in Jangaon Dist

23 Renovation of MRT Sub Division Office and Lines Sub Division office by Painting, 1,984,776.00 Estimate submitted on Dt:24/01/2020.
Arresting Roof Leakages, Water Supply Arrangements, Internal Electrification and
Other miscellaneous works in the premises of Zonal Office Building, Warangal

Executive Engineer /Civil,


OMC/Division/Warangal

Page 10
Lr.No.EE/Civil/OMC/Division/Wgl/F.Progress/D.No. /19,Dt: .09.2019
TO
The Chief Engineer/Warngal zone /Warangal
The Superintending Engineer/Civil/Warangal
The Superintending Engineer/OMC/Warangal

Page 11
TRANSMISSION CORPORATION OF TELANGANA LIMITED
LIST OF O&M ESTIMATES PERTAINS TO THE OFFICE OF EXECUTIVE ENGINEER/CIVIL/OMC/ DIVISION/WARANGAL FROM 01.04.2019 TO till to date

Sl. Name of the Work Amount (Rs.) D No & Date D No & Date ( From EE/Civil- Sanctioned D.No.&Date
No ( From AEE to EE/Civil/OMC/ I/Divn/ Warangal to Estimate Amount
. Warangal) SE/OMC/Circle, Warangal)

Specialised Waterproofing treatment to the Terrace and External Walls & chajjas and Structural repairs 479557 D.No.12/19,Dt:12-04-2019 D.No.34/19,Dt:15-04-2019
to the Ceiling area of 132/33 KV SS Waddepally in Warangal Urban Dist.

Maintenance of zonal office building by procurement of the toiletries, repair and rectification of sewerage 239580 D.No.18/19,Date:16-04-2019 D.No.53/19,Dt:22-04-2019
line, water pipe lines and rectification of damaged electric accessories and maintenance of garden etc., to
maintain hygienic atmosphere for the period from 01.04.2019 to 31.03.2020

Renovation of Old quarters for arranging Sports Room at Warangal Zonal Office Building 380399 D.No.27/19,Date:30-04-2019 D.No.74/19,Dt:02-05-2019
Replacement of existing P+0 tower at Lo.No.62 with B+3 and loc.no.63 with R+0 tower of 132 KV 1460000/revised D.No.34/19,Date:14-05-2019 D.No.102/19,Dt:15-05-2019
Waraqngal – Kalvasrirampur and 132 KV Kamalapur-Jammikunta DC line
Estimate for 1No Sweeping charges for cleaning of common toilet at ground floor of zonal office building, 48000 D.No.45/19,Date:23-05-2019 D.No.114/19,Dt:24-05-2019
Warangal for the period from 01.04.2019 to 31.03.2020
Construction of Backup SLDC in the premises of 220KVSS Warangal in Warangal Dist 70000000 D.No.52/19,Date:07.06.2019 D.No.140/19,Dt:10-06-2019
Revetment to the cut point tower legs at location No.130 of 220 KV Bheemghanpur –Gangarm line to safe D.No. 59/19,Dt:14.06.2019 D.No.152/19,Dt:14-06-2019 2374699 Memo.No.CE/Wgl/Z/DE(T)/
guard against Godavari Water Flows ADE(T)/AE2/F./
Erection of new 33 KV Bay at 132/33 KVSS Chelpur for SINGARENI COLLERIES COMAPANY LIMITED 1,185,000.00 D.No. 66/19,Dt:19.06.2019 D.No.172/19,Dt:19-06-2019 D.No.319/19,Dt:14.06..2019
11No’s Sweeping charges for maintenance of zonal office building premises and roads at 220 KVSS 5,28,000.00 D.No.28/19,Date:30.04.19
Warangal by duly removing the waste papers, cups, debris, grass and sludge in the drains etc., including
vehicle parking area, road area, road sie area etc., to maintain hygienic atmosphere, for the period from
01.04.2019 to 31.03.2020

Dismantling of 1No (P+3) type tower at loc.no.46& 1No(S+3) type tower at loc.no.47 of 132 KV 1823023 D.No.67/19,Dt:20/6/2019 D.No.176/19,Dt:20/6/19
Raghunathpally-Ghanpur DC line across National Highway (Hyd-Wgl NH-163) road crossing near ghanpur D.No.103/19,Dt:26/7/19 D.No.262/19,Dt:26/7/19
village & Erection of new 2 Nos (NB+6) towers at that locations for improving road clearances

Estimate for disamantling of 1No.(P+0) tower at loc.no.133& erection of 1No.(C+9) TSP design tower at 51529691 Memo.No.CE/Wgl/Z/DE(T)/
loc.no.133 for improving ground clearance across road crossing between loc.no.133 to 134 of 132 KV ADE(T)/AE2/F./
Rahunathpally -Waddekothapally DC line D.No.376/19,Dt:25.06..2019
Replacement of 132 KV ABB chityala feeder breaker with new 132 KV siemens make breaker at 132 KVSS 95022 D.No.74/19,Dt:27/6/2019 D.No.191/19,Dt:01/07/2019
Chelpur
ProvidinginofJayashankar Bhupalpally
road crossing District
cable trench towards 33 KV switch yard at 132 KVSS Nekkonda 157986 D.No.97/19,Dt:19/07/2019 D.No.241/19,Dt:19/07/2019
Providing of road crossing cable trench towards 33 KV and 132 KV Switch yard at 132 KVSS Mustyal 154398 D.No.98/19,Dt:19/07/2019 D.No.241/19,Dt:19/07/2019
Extension of existing control room with provision of panel room, office room & store room and erection of 5078103 D.No.96/19,Dt:19/07/2019 D.No.242/19,Dt:19/07/2019 4379595 Memo.No.CE/Wgl/Z/DE(T)/
new 33 KV bay for singareni colleries company limited at 132 KVSS Chelpur in Jayashankar Bhupalpally Dist ADE(T)/AE2/F./
D.No.58119,Dt:02.08..2019
Construction of RR masonry protection wall to loc.no.07 of 132 KV Chityala LILO line 532038 D.No.115/19,Dt:03/08/2019 D.No.280/19,Dt:05/08/2019
Specialised Waterproofing treatment to the Terrace and External Walls Repairs to the chajjas area of 1000799 D.No.121/19,Dt:08/08/2019 D.No.287/19,Dt:08/08/2019
220/132/33 KV SS Warangal in Warangal Urban Dist.

Specialised Waterproofing treatment to the Terrace and External Walls Repairs to the chajjas area of 1066626 D.No.120/19,Dt:08/08/2019 D.No.288/19,Dt:08/08/2019
220/132/33 KV SS Waddekothapally in Warangal Rural Dist.

Specialised Waterproofing treatment to the Terrace and External Walls Repairs to the chajjas area of 477555 D.No.124/19,Dt:08/08/2019 D.No.291/19,Dt:08/08/2019
132/33 KV SS Wardhannapet in Warangal Rural Dist.
Renovation of control room by providing painting, water proofing treatment to the terrace, cable dict cover 1153740 D.No.128/19,Dt:13/08/2019 D.No.298/19,Dt:14/08/2019
slabs, Road crossing cable duct, water supply arrangments & electrification works and other miscellaneous
works at 132 /33 KVSS Mulugu in Mulugu Dist

Erection of Intermediate tower in 132 KV Warangal-Kalvasrirampur DC line(132 KV Warangal-Ramagundam 388633 D.No.149/19,Date:05-09-2019 D.No.340/19,Dt:7/09/2019
DC line) at
Estimate forLoc.No.112(R+6)
1No Sweeping charges for cleaning of common toilet at ground floor of zonal office building, 48000 D.No.186/19,Date:16-10-2019 D.No.416/19,Dt:17.10.2019
Warangal
Erection offorNew
the period
11 KV from
ABB 01.04.2019 to 31.03.2020
Kiosk of 31.5 MVA PTR-II LV at 220/11 KVSS Gangaram in Jayashankar 58682 D.No.184/19,Date:16-10-2019 D.No.417/19,Dt:17.10.2019
Bhupalpally
Erection Dist New 33 KV feeder Breaker Schneider make at 132/33 KVSS Palakurthy in Warangal Urban
of 1No 32217 D.No.194/19,Date:24-10-2019 D.No.443/19,Dt:29.10.2019
Dist
Extension of existing control room with provision of office rooms at 132 KVSS Waddepally in Warangal 1970553 D.No.172/19,Date:05-10-2019 D.No.444/19,Dt:29.10.2019
Urban Dist
Renovation of Control room by providing internal painting, water supply arrangements, renovation of toilets 338881 D.No. 196/19.Dt:29.10.2019 D.No.447/19,Dt:29.10.2019
and other miscellaneous works at 132 KVSS Waddepally in Warangal Urban Dist
Shifting of existing barbed wire fencing and extension of metal spreading in 33 KV Switch yard at 220KVSS 455172 D.No. 191/19.Dt:21.10.2019 D.No.452/19,Dt:01.11.2019
Warangal
Erection of 3 New CPL structures in place of Old damaged and leaned CPL structures at 220/132/33 KVSS 99640 D.No.199/19,Date:04-11-2019 D.No.460/19,Dt:04.11.2019
Warangal in Warangal
Renovation of ControlUrban
roomDist
by providing Internal Electrification, Internal Painting and Specialised 1435778 D.No. 200/19.Dt:06.11.2019 D.No.467/19,Dt:06.11.2019
Waterproofing treatment to the Terrace ad External walls, Repairs to the Chajja area of 220/132/33 KVSS
Waddekothapally in Mahabubabad Dist
Page 14

ANNEXURE-III 3W
Repairs and Maintenance of Civil works
Name of the Circle: Superintending Engineer/OMC/Warangal
Unit Code and Name: (Rs. in Lakhs)
Name of the Work 2017-18 (Autuals) 2018-19 (R.E)
2019-20 (Projections)
Sl. 1st Half Actuals 2nd Half Actuals Total 1st Half Actuals 2nd Half Actuals Total
No. Materi
Works Material Works Material Works Material Works Material Works Material Works Material Works
al
1 Construction of Comound wall in
place of collapsed leaned and
ready to collapse compound wall at 953794.10 953794.10 263500.00
220/132 KV SS Warangal in
Warangal dist
2 Supply and spreading of 20mm
HBG metal in Switchyard,Laying of
CC road and Other miscellaneous
1430798.64 1430798.64 2037521
works in 132/33 KV SS
Waddepally in Warangal Urban
dist
3 Consturction of RR masonry
protection wall to the loc.no.68 of
132 kV Warangal Kalvasrirampur
497772 497772.00 70000
line and 132 KV Kamalapur-
Jammikunta line in Warnagal
urban dist
4 Construction of balance compound
wall and material stacking plotform
1000000.00 1000000.00 5516181
at 132/33 KV SS at
Raghunathpally in Warangal dist
5 Providing & laying of tiles for
passage in the garden, laying of
CC in the vehicle parking shed,
0.00 608602.00 608602.00 323678.00
providing of cattle guard at gate of
Onal officebuilding in the premises
of 220/132 KVSS Warangal
6 Laying of cc road from main gate
to control room gate at 220/132/33
KVSS premises in the zonal office 0.00 1325120.00 1325120.00 1325120.00
building, Warangal in Warangal
Urban Dist
Page 15

Name of the Work 2017-18 (Autuals) 2018-19 (R.E)


2019-20 (Projections)
Sl. 1st Half Actuals 2nd Half Actuals Total 1st Half Actuals 2nd Half Actuals Total
No. Materi
Works Material Works Material Works Material Works Material Works Material Works Material Works
al
7 Extension of existing control room
with provision of panel room, office
room and store room at 220 KV SS 0.00 0.00 3643105.69
Gangaram in Jayashankar
Bhupalapally dist
8 Extension of existing control room
with provision of panel room, office
room and store room at 220 KV SS 0.00 0.00 2416253.7
BheemGhanpur in Jayashankar
Bhupalapally dist
9 Extension of control room in
ground floor & construction of first
floor at existing control house for
erection of 132/33 KV features and 0.00 1000000.00 1000000.00 1126087.00
accommodation office room &
store room in existing 132/11 KV
SS at Dharmassagar
10 Providing CC road and spreading
of 20mm HBG metal in switchyard
and other Miscelleneous works at 1944022.00 1944022.00 1944022.00
132KV Ghanpur SS in Jangaon
Dist
11 Construction of Compound wall at
220/132 KV SS Ammavaripeta in 0.00 7151757.88
Warangal urban dist
12 Supply and Spreading of 20mm
HBG metal in Switchyard,Laying of
CC road ,Construction of new and
collapsed compound wall,
1684484.00 1684484.00 1684484.00
Retaining wall and other
miscelleneous works at 132/33 KV
SS Nekkonda in Warangal Rural
dist
13 Providing of barbed wire fencing
with RCC poles and name boards
along the boundary of proposed 339986.26
132/33 KV SS Peechara in
Warangal dist
Page 16

Name of the Work 2017-18 (Autuals) 2018-19 (R.E)


2019-20 (Projections)
Sl. 1st Half Actuals 2nd Half Actuals Total 1st Half Actuals 2nd Half Actuals Total
No. Materi
Works Material Works Material Works Material Works Material Works Material Works Material Works
al
14 Providing main gate cum finishing
of balance compound wall and
other miscelleneous works at 350000.00 350000.00 0.00 350000
132/33 KV SS Gudur in
Mahabubabad dist
15 Construction of 1 No,CGL make
132 KV Circuit Breaker Kamalapur 120000.00 120000.00 0.00 120000
in Jayashankar-Bhupalapally dist
16 Exetension of existing control room
with provision of panel room,office
room and store room at 132/33 KV 3923677.00 3923677.00 0.00 3923677
SS Chelpur in Jayashankar
Bhupalapally dist
17 Construction of Diesel Generator
room at 220/132/33 KV SS
95000.00 95000.00 0.00 95000
Waddekothapally in Mahabubabad
dist
18 Eartwork excavation for laying of
1000Sqm XLPE cable from
31.5MVA PTR-I Kiosk to 11 KV
bus, foundation for Kiosk and 2 215000.00 215000.00 0.00 215000
Nos foundation for TB structures at
220 KV SS Bheemghanpur in
Jayashankar-Bhupalapally dist
19 Removal of gravel ground and
inside the tower Loc.No.85 of 132
9859.00 9859.00 0.00 9859
KV Nekkonda-Wardhannapet DC
line.
20 Providing cable strench cover
slabs in Switchyard at 132/33 KV
105000.00 105000.00 0.00 105000
SS Mulugu in Jayashankar
Bhupalapally dist
21 Shifting existing 33 KV Thorrur
feeder to another bay at
220/132/33 KV SS 220000.00 220000.00 0.00 220000
Waddekothapally in Mahabubabad
dist
Page 17

Name of the Work 2017-18 (Autuals) 2018-19 (R.E)


2019-20 (Projections)
Sl. 1st Half Actuals 2nd Half Actuals Total 1st Half Actuals 2nd Half Actuals Total
No. Materi
Works Material Works Material Works Material Works Material Works Material Works Material Works
al
22 Cleaning and clearing of earth
heaps between bays of 132 KV
Kamalapur and new 132 KV
Regonda feeder bay, road crossing
325000.00 325000.00 0.00 325000
cable duct infront of control room
and miscelleneous works at 132/33
KV SS Chelpur in Jayashankar-
Bhupalapally dist
23 Construction of RCC protection
wall for the Loc.no.161 of 132 KV
Chityal-RSS line & 132 KV Chelpur 175000.00 175000.00 0.00 175000
Monthini in Jayashankar-
Bhupalapally dist
24 Construction of 1No.ABB make
132 KV circuit breaker railway-1
70665.00 70665.00 0.00 70665
feeder at 132/33 KV SS Nekkonda
in Warangal Rural dist
25 Dismantling of 1 No(A+0)
tower ar Loc No. 232 and
dismantling of 1 No. (C+0)
SAE design tower, 8 No.s TNS
towers & 4 No.s BNC booms
at Loc No. 233 and Erection of
1No. (D+3) 220 kV L&T design
tower at Loc No. 232 and 1No.
(Z+3) 220 kV multi circuit
0.00 0.00 2132976.17
tower at Loc No.233 acroos
proposed National Highway
(NH-365) road
crossing(Jamandlapally yo
Mangalavarpeta) at Budigonda
Village, Gudur Mandal,
Mahabubabad dist. of 132 kV
KTS-Nekkonda line & 132 kV
KTS-Mahabubabad line.
Page 18

Name of the Work 2017-18 (Autuals) 2018-19 (R.E)


2019-20 (Projections)
Sl. 1st Half Actuals 2nd Half Actuals Total 1st Half Actuals 2nd Half Actuals Total
No. Materi
Works Material Works Material Works Material Works Material Works Material Works Material Works
al
26 Providing bore well at 132/33 KV
SS Mustyal in Gangaram 0.00 0.00 187109.56
Subdivision
27 Dismantling & erection of 3Nos
220KV Bheemghanpur-Gangaram
DC line shifting due to new pond
construction Loc.No.26 to 28 0.00 0.00 3100000.00
(A+O,A+3,A+3) to be dismantled
and replaced with B+O,B+9
(400KV) & B+9(400KV)
28 renovation of exisitng store room
for extnesion of PLCC room and
other miscellaneous works at 246848.00
220KV Switching station Nagaram
in Warangal Urban Dist
29 Providing of 20mm thick
Bituminous surface over existing
damaged BT road from main gate
699584.00 699584.00 0.00 699584
to 220KVSS control room & other
miscellaneous works at 220KVSS
Warangal
30 Renovation of unfinished abanded
quarter beside control room at 840229.00 840229.00 0.00 840229
132/33kV SS/Chelpur in Wgl.Dist.
31 Construction of ADE/Maintenance,
office and store room at First Floor
of Existing control House at 132 1467279.00 1467279.00 0.00 1467279
KVSS Pulakurthy in Warangal Dist

32 Providing of C.C Road, Supply and
spreading of 20mm HBG metal in
switchyard and other 2200000.00 2200000.00 0.00 2200000
miscellaneous works at 132 KVSS
Ghanpur in Jangaon Dist.
Page 19

Name of the Work 2017-18 (Autuals) 2018-19 (R.E)


2019-20 (Projections)
Sl. 1st Half Actuals 2nd Half Actuals Total 1st Half Actuals 2nd Half Actuals Total
No. Materi
Works Material Works Material Works Material Works Material Works Material Works Material Works
al
33 Construction of ADE/Maintenance
Office and Store rooms at First
Floor of Existing Control House at 1533296.00 1533296.00 0.00 153296
220/11 KVSS Gangaram in
Warangal Dist
34 “Construction of old collapsed
compound wall, renovation of
control house, construction of
septic tank, renovation of 1027054.00 1027054.00 0.00 1027054
sewerage pipe line and other
miscellaneous works at 132/33
KVSS Nekkonda in Warangal Dist”
35 Construction of PTR plinth for
Aguementation of PTR capacity
from 31.5MVA to 50 MVA at 300000.00 300000.00 0.00 300000
132/33 KVSS Mustyal in Warangal
Dist
36 Shifting of the existing 220KV 3210000.00
towers of loc.No.3,4 & 5 of type
D+6,A+6 and B+0 of 220KV
3210000.00 0.00
Bheemghanpur-
Pulukurthy/Salivagu DC line in
Bhoopalpally Dist 3210000.00
38 “Construction of Drain to the back
side of control room, providing
RCC Hume pipes for road crossing 0.00 149291.00
and other miscellaneous works at
220KVSS Warangal” 149291.00 149291.00
39 Construction of ADE/Maintenance
Office and Store rooms at First
Floor of Existing Control House at 0.00 1548738.00
220/11 KVSS Bheemghanpur in
Warangal Dist 1548738.00 1548738.00
Page 20

Name of the Work 2017-18 (Autuals) 2018-19 (R.E)


2019-20 (Projections)
Sl. 1st Half Actuals 2nd Half Actuals Total 1st Half Actuals 2nd Half Actuals Total
No. Materi
Works Material Works Material Works Material Works Material Works Material Works Material Works
al
40 Providing and laying of tiles for
passage in the garden, laying of
CC in the vehicle parking shed,
providing of cattle guard at gate of
0.00 1020000.00
Zonal office building and other
miscellaneous works in the
premises of 220/132KVSS
Warangal 1020000.00 1020000.00
41 Construction of new control room
at 132 KVSS Kamalapur in 0.00 9004052.00
Warangal Dist 9004052.00 9004052.00
42 Supply and spreading of 20mm
HBG metal in switch yard, laying of
CC road, renovation of control
room , expansion of control room
0.00 6823060.00
for accommodation subdivision
office and other miscellaneous
works in 132/33KVSS Waddepally
in Warangal Urban District. 6823060.00 6823060.00
43 Construction of new control room
(old type single storied, size 16.80
0.00 6010070.00
x 11.00m) at 132 KVSS
Raghunathapally in Warangal Dist 6010070.00 6010070.00
44 Construction of new control room
(old type single storied size 16.80 x
0.00 6467389.00
11.00m) at 132KVSS Nekkonda in
Warangal Dist 6467389.00 6467389.00
45 Supply and spreding of 20mm
HBG metal in switch yard at
0.00 1940609.00
132/33KVSS Nekkonda in
Warangal Dist. 1940609.00 1940609.00
46 Providing of C.C Road, Supply and
spreading of 20mm HBG metal in
switchyard and other
0.00 4800000.00
miscellaneous works at 132 KVSS
Kamalapur in Jayashankar -Bhupal
pally-Dist. 4800000.00 4800000.00
Page 21

Name of the Work 2017-18 (Autuals) 2018-19 (R.E)


2019-20 (Projections)
Sl. 1st Half Actuals 2nd Half Actuals Total 1st Half Actuals 2nd Half Actuals Total
No. Materi
Works Material Works Material Works Material Works Material Works Material Works Material Works
al
47 Providing of chequered plates vinyl
flooring I control room street lights
from main gate to control room and 0.00 498600.00
other miscellaneous works at
220KVSS Warangal. 498600.00 498600.00
48 Construction of fire protection wall
at existing 220kV
0.00 440000.00
SS/Waddekothapally in Warangal
Dist. 440000.00 440000.00
49 Investigation and providing bore
well at 132/33kV SS/Mulugu in 0.00 400000.00
Wgl.Dist. 400000.00 400000.00
50 Construction of shed to the 25KVA
Diesel generator shed and road
0.00 400000.00
crossing RCC slab at 220/132
KVSS Warangal 400000.00 400000.00
51 Arresting roof leakage in control
room and other places, Repair of
front side control room window
glasses, construction of compound 0.00 150000.00
wall towards south and north side
in 132 KVSS Nekkonda in
Warangal dist 150000.00 150000.00
52 Providing of office room for the
official use of ADE/Maintenance
and store room at 132KVSS 0.00 800000.00
Waddepally in Warangal Dist
800000.00 800000.00
53 Providing of plat form and shed for
oil filtration Machine at 220KVSS 0.00 350000.00
Warangal 350000.00 350000.00
54 Renovation of office for 400KV
MRT Division at 220KVSS 0.00 200000.00
Warangal 200000.00 200000.00
55 Renovation of old Accounts section
office for accommodation of
0.00 224313.00
DE/400KV MRT/Warangal in the
premises of 220KVSS Warangal 224313.00 224313.00
Page 22

Name of the Work 2017-18 (Autuals) 2018-19 (R.E)


2019-20 (Projections)
Sl. 1st Half Actuals 2nd Half Actuals Total 1st Half Actuals 2nd Half Actuals Total
No. Materi
Works Material Works Material Works Material Works Material Works Material Works Material Works
al
56 Construction of MRT/TRE material
stacking platform and GI sheet
shed for protection of existing oil 0.00 583009.00
filter machine at 220/132KV Sub-
station Warangal 583009.00 583009.00
57 Providing compound wall to road
side of 132/33 KVS.S at Nekkonda 0.00 663100.00
Warangal dist. 663100.00 663100.00
58 Construction of diesel generator
shed at 132 KVSS Nekkonda in 0.00 322600.00
Warangl dist 322600.00 322600.00
59 Procurement of the Toiletries,
repair and rectification of sewerage
line water pipe lines and
0.00 200000.00
maintenance of garden and other
items for maintenance of Zonal
Office Building warangal 200000.00 200000.00

Construction of compound wall on


North and Southern side of 132
KVSS Mustyal in Warangal Dist. 200000.00
61 Construction of 132 KV Breaker
220/33 KVSS Waddekothapally in 86198.00
Mahabubabad Dist
62 Erection of 33 KV feeder bay at
132 KVSS Peddanagaram in 502000.00
Warangal rural Dist
63 Erection of 33 KV feeder bay at
132 KV SS Geesukonda for
102000.00
upcoming Kakatiya mega textile
park in Warangal Rural Dist
64 Renovation of control room by providing 528120
painting aluminium windows and other
miscellaneous works at chelpur 0.00 0.00
132/33KVSS in Jayashankar Bhupalpally
dist
65 Providing of bore well at 132/33 KV
0.00 0.00 146887.00
SS Dornakal in Mahabubabad dist
Page 23

Name of the Work 2017-18 (Autuals) 2018-19 (R.E)


2019-20 (Projections)
Sl. 1st Half Actuals 2nd Half Actuals Total 1st Half Actuals 2nd Half Actuals Total
No. Materi
Works Material Works Material Works Material Works Material Works Material Works Material Works
al
66 Providing of bore well at 220/132
KV SSMahabubabad in 0.00 0.00 138714.00
Mahabubabad dist
67 Providing of Bore well at 132/33 KVSS 228454
0.00 0.00
Nellikuduru in Mahabubabad Dist
68 Providing of Borewell at 132/33 KVSS 277952
0.00 0.00
Wardhannapet in Warangal rural Dist
69 Supply and spreading of 20mm HBG 7317397
metal in Switch yard, laying of CC road,
construction of new & collapsed
compound wall, retaining wall & other
0.00 0.00
miscellaneous works at 132/33KVSS
Nekkonda in Warangal Rural Dist
70 Maintenance of zonal office building by 191100
procurement of the toiletries, repair and
rectification of sewerage line, water pipe
lines and rectification of damaged
0.00 0.00
electric accessories and maintenance of
garden etc., to maintain hygienic
atmosphere for the period from
01.05.2018 to 31.03.2019
71 Earth excavation for laying of 1000sqmm 35988
XLPE cable from 50MVA PTR-II KIOSK
to 11KV Bus at 220KVSS 0.00 0.00
Bheemghanpur at Jayashanker
Bhupalpally Dist
72 Construction of 1No ABB make 132KV 70656
Circuit Breaker of Railway-I feeder at
132/33 KVSS Nekkonda in Warangal
0.00 0.00
Rural Dist
73 Erection of Intermediate tower between 795000
Loc.No. 285 -286 of 132KV KTS -
Nekkonda & Gudur -Narsampet DC line
0.00 0.00
in Mahabubababad Dist
74 Erection of new 33 KV breaker of
33 KV Eturnagaram feeder at
68000.00 68000.00 0.00 68000
132/33 KV SS Kamalapur in
Jayashankar Bhupalapally dist
75 Erection of Intermediate tower between 775000
Loc.No. 41 -42 of 132KV
Raghunathpally- Ghanpur -Traction DC
0.00 0.00
line in Jangaon Dist
Page 24

Name of the Work 2017-18 (Autuals) 2018-19 (R.E)


2019-20 (Projections)
Sl. 1st Half Actuals 2nd Half Actuals Total 1st Half Actuals 2nd Half Actuals Total
No. Materi
Works Material Works Material Works Material Works Material Works Material Works Material Works
al
76 Erection of 1No.R+0 Intermediate tower 310000
between Loc.No. 41 -42 of 132KV
Raghunathpally- Ghanpur -Traction DC
0.00 0.00
linefor improving ground clearence
between Loc.No.41-42 at Ghanpur(stn)
reservoir in Jangaon Dist
77 Dismantling of 1No.P+0 type tower at 163000
Loc.No.133 of 132KV Raghunathpally-
Waddekothapally Dc line and Erection of
1No. New R+6 type tower in that location 0.00 0.00
for improving groud clearence across the
road between Loc.No.133 to 134at
Waddekothapally in Mahabubabad Dist
78 Dismantling of 1No. A+0 type tower at 621000
Loc.No.285 of 132KV KTS-Warangal DC
line and Erection for improving ground 0.00 0.00
clearance between Location No.285 to
286 at Gundenga in Mahabubabad Dist
79 Cleaning and clearing of earth heaps 325000
between the bays of 132KV Kamalapur
and new 132KV Regonda feeder bay,
road crossing cable duct infront of 0.00 0.00
control room and other miscellaneous
works at 132/33KV SS clelpur in
Jayashankar Bhupalpally Dist
80 Supply and spreading of 20mm HBG
metal in Switch yard, retaining wall and
0.00 0.00
kerb wall at 132/33 KVSS Nekkonda in
Warangal Rural Dist 1,862,131.00
81 Laying of CC road,construction of new & 4500000
collapsed compound wall and other
miscellaneous works at 132/33 KVSS
0.00 0.00
Nekkonda in Warangal Rural Dist
82 Laying of CC road in front of main
gateI & II and other miscelleneous
works at 220/132 KV SS 0.00 787214.00
Waddekothapally in Mahabubabad
Dist
Page 25

Name of the Work 2017-18 (Autuals) 2018-19 (R.E)


2019-20 (Projections)
Sl. 1st Half Actuals 2nd Half Actuals Total 1st Half Actuals 2nd Half Actuals Total
No. Materi
Works Material Works Material Works Material Works Material Works Material Works Material Works
al
83 “Laying of CC road from main gate to 1616000
control room gate at 220/132/33 KVSS
0.00 0.00
premises in the zonal office building
Warangal in Warangal Urban Dist
84 Construction of RCC protection wall for 175000
the loc.No.161 of 132 KV Chityal-RSS
line & 132 KV Chelpur-monthini line in
0.00 0.00
Jayashankar Bhupalpally Dist
85 Erection of Intermediate tower in
132 KV Raghunathpally-
Waddekothapally line at loc.no.133
0.00 0.00 980000.00
for maintain prpoer ground
clearance across national
highways
86 Shifting of existing 33 KV Thorruru
feeder to another bay at
220/132/33 KVSS 0.00 0.00 220000.00
Waddekothapally in Mahabubabad
Dist
87 Providing cable trench cover slabs
in switching station ard at 132/33
0.00 0.00 105000.00
KVSS Mulugu in Jayashankar
Bhupalpally dist
88 Renovation of cotrol room by
providing painting, Aluminium
windows, cleaning & clearing of
earth heaps between the bays of
132 KV Kamalapur and new 132
KV Regonda, feeder bay, Road 0.00 0.00 642744.00
crossing cable duct infront of
control room and other
miscellaneous works at 132/33
KVSS Chelpur in Jayashankar
Bhupalpally Dist
89 Providing of Main gate cum
finishing of balance compound wall
and other miscellaneous works a 0.00 0.00 350000.00
132/33 KVSS Gudur in
Mahabubabad dist
90 Construction of Diesel generator
room at 220/132 /33 KVSS 0.00 0.00 95000.00
Waddekothapslly in Mbad dist
Page 26

Name of the Work 2017-18 (Autuals) 2018-19 (R.E)


2019-20 (Projections)
Sl. 1st Half Actuals 2nd Half Actuals Total 1st Half Actuals 2nd Half Actuals Total
No. Materi
Works Material Works Material Works Material Works Material Works Material Works Material Works
al
91 Construction of 1No CGL make
132 KV Circuit Breaker at 132/33
0.00 0.00 120000.00
KVSS Kamalapur in Jayashankar
Bhupalpally Dist
92 Extensionof existing control room
with provision of panel room office
room and store room at 132/33 0.00 0.00 3923677.00
KVSS Chelpur in Jayashankar
Bhupalpally Dist
93 Replacement of existing p+o tower
at loc.No.62 with B+3 tower of 132
KV Warangal Kalvasrirampur and 0.00 0.00 400000.00
132 KV Kamalapur-Jammikunta
DC line
94 Dismantling erection of 3Nos
220KV Bheemghanpur -Gangarm
DC line shifting due to new pond
constrction loc.no.26 to 28 0.00 0.00 3100000.00
(A+0,A+3,&A+3) to be dismantled
and replaced with
B+0,B+9(400KV)
95 Providing of new bore well at
132/33 KVSS mustyal in 0.00 0.00 187109.00
Gangaram Sub division
96 Providing of 1No new 33 KV
Breaker for 33 KV Damravancha
0.00 0.00 64575.00
feeder at 132 KVSS Gudur in
Mahabubabd Dist
Total 6816086.74 6816086.74 124021020.35
Page 27

Name of the Circle:


Unit Code and Name:

Sl.
No.

1217199
2

3468319.73

6516181.00 5

31

932280
32
Page 28

Sl.
No.

25

26

27

2126087

8
Page 29

Sl.
No.

10

11

12

13

15

16

17
Page 30

Sl.
No.

18

19

22

29
Page 31

Sl.
No.

30

32

20

21

22

23
Page 32

Sl.
No.

24

25

26

28

30

31
Page 33

Sl.
No.

33

35

36

37

38

39

40
Page 34

Sl.
No.

41

42

43

44

45

46

47

48

49
Page 35

Sl.
No.

51

52

53

54

23
Page 36

Sl.
No.

24

14
Page 37

Sl.
No.

3
Page 38

Sl.
No.
Page 39

Sl.
No.

28
Page 40

ANNEXURE-III 3W
Repairs and Maintenance of Civil works
Name of the Circle: Superintending Engineer/OMC/Warangal
Unit Code and Name: (Rs. in Lakhs)
Name of the Work 2017-18 (Autuals) 2018-19 (R.E)
2019-20 (Projections)
Sl. 1st Half Actuals 2nd Half Actuals Total 1st Half Actuals 2nd Half Actuals Total
No. Materi
Works Material Works Material Works Material Works Material Works Material Works Material Works
al
1 Construction of Comound wall in
place of collapsed leaned and
ready to collapse compound wall at 0.00 953794.10 953794.10 263404.90
220/132 KV SS Warangal in
Warangal dist
2 Supply and spreading of 20mm
HBG metal in Switchyard,Laying of
CC road and Other miscellaneous
0.00 1430798.64 1430798.64 2037521.09
works in 132/33 KV SS
Waddepally in Warangal Urban
dist
3 Laying of CC road in front of main
gateI & II and other miscelleneous
works at 220/132 KV SS 0.00 787214.00 787214.00
Waddekothapally in Mahabubabad
Dist
4 Providing CC road and spreading
of 20mm HBG metal in switchyard
and other Miscelleneous works at 0.00 1944022.00 1944022.00
132KV Ghanpur SS in Jangaon
Dist
5 Consturction of RR masonry
protection wall to the loc.no.68 of
132 kV Warangal Kalvasrirampur
0.00 497772 497772.00 70000
line and 132 KV Kamalapur-
Jammikunta line in Warnagal
urban dist
6 Construction of balance compound
wall and material stacking plotform
0.00 1000000.00 1000000.00 5516181
at 132/33 KV SS at
Raghunathpally in Warangal dist
7 Construction of Copound wall at
220/132 KV SS Ammavaripeta in 0.00 0.00 7151757.88
Warangal urban dist
Page 41

Name of the Work 2017-18 (Autuals) 2018-19 (R.E)


2019-20 (Projections)
Sl. 1st Half Actuals 2nd Half Actuals Total 1st Half Actuals 2nd Half Actuals Total
No. Materi
Works Material Works Material Works Material Works Material Works Material Works Material Works
al
8 Supply and Spreading of 20mm
HBG metal in Switchyard,Laying of
CC road ,Construction of new and
collapsed compound wall,
0.00 1684484.00 1684484.00
Retaining wall and other
miscelleneous works at 132/33 KV
SS Nekkonda in Warangal Rural
dist
9 Providing of barbed wire fencing
with RCC poles and name boards
along the boundary of proposed 0.00 0.00 339986.26
132/33 KV SS Peechara in
Warangal dist
10 Providing main gate cum finishing
of balance compound wall and
other miscelleneous works at 350000.00 350000.00 0.00
132/33 KV SS Gudur in
Mahabubabad dist
11 Construction of 1 No,CGL make
132 KV Circuit Breaker Kamalapur 120000.00 120000.00 0.00
in Jayashankar-Bhupalapally dist
12 Exetension of existing control room
with provision of panel room,office
room and store room at 132/33 KV 3923677.00 3923677.00 0.00
SS Chelpur in Jayashankar
Bhupalapally dist
13 Construction of Diesel Generator
room at 220/132/33 KV SS
95000.00 95000.00 0.00
Waddekothapally in Mahabubabad
dist
Page 42

Name of the Work 2017-18 (Autuals) 2018-19 (R.E)


2019-20 (Projections)
Sl. 1st Half Actuals 2nd Half Actuals Total 1st Half Actuals 2nd Half Actuals Total
No. Materi
Works Material Works Material Works Material Works Material Works Material Works Material Works
al
14 Eartwork excavation for laying of
1000Sqm XLPE cable from
31.5MVA PTR-I Kiosk to 11 KV
bus, foundation for Kiosk and 2 215000.00 215000.00 0.00
Nos foundation for TB structures at
220 KV SS Bheemghanpur in
Jayashankar-Bhupalapally dist
15 Erection of new 33 KV breaker of
33 KV Eturnagaram feeder at
68000.00 68000.00 0.00
132/33 KV SS Kamalapur in
Jayashankar Bhupalapally dist
16 Removal of gravel ground and
inside the tower Loc.No.85 of 132
9859.00 9859.00 0.00
KV Nekkonda-Wardhannapet DC
line.
17 Providing cable strench cover
slabs in Switchyard at 132/33 KV
105000.00 105000.00 0.00
SS Mulugu in Jayashankar
Bhupalapally dist
18 Shifting existing 33 KV Thorrur
feeder to another bay at
220/132/33 KV SS 220000.00 220000.00 0.00
Waddekothapally in Mahabubabad
dist
19 Cleaning and clearing of earth
heaps between bays of 132 KV
Kamalapur and new 132 KV
Regonda feeder bay, road crossing
325000.00 325000.00 0.00
cable duct infront of control room
and miscelleneous works at 132/33
KV SS Chelpur in Jayashankar-
Bhupalapally dist
20 Construction of RCC protection
wall for the Loc.no.161 of 132 KV
Chityal-RSS line & 132 KV Chelpur 175000.00 175000.00 0.00
Monthini in Jayashankar-
Bhupalapally dist
Page 43

Name of the Work 2017-18 (Autuals) 2018-19 (R.E)


2019-20 (Projections)
Sl. 1st Half Actuals 2nd Half Actuals Total 1st Half Actuals 2nd Half Actuals Total
No. Materi
Works Material Works Material Works Material Works Material Works Material Works Material Works
al
21 Construction of 1No.ABB make
132 KV circuit breaker railway-1
70665.00 70665.00 0.00
feeder at 132/33 KV SS Nekkonda
in Warangal Rural dist
22 Providing of bore well at 132/33 KV
146887.00 146887.00 0.00
SS Dornakal in Mahabubabad dist
23 Providing of bore well at 220/132
KV SSMahabubabad in 138714.00 138714.00 0.00
Mahabubabad dist
24 Extension of existing control room
with provision of panel room, office
room and store room at 220 KV SS 3643105.69 3643105.69 0.00
Gangaram in Jayashankar
Bhupalapally dist
25 Extension of existing control room
with provision of panel room, office
room and store room at 220 KV SS 2416253.70 2416253.70 0.00
BheemGhanpur in Jayashankar
Bhupalapally dist
26 Extension of control room in
ground floor & construction of first
floor at existing control house for
erection of 132/33 KV features and 2126087.00 2126087.00 1000000.00 1000000.00 1126087.00
accommodation office room &
store room in existing 132/11 KV
SS at Dharmassagar
27 Replacement of existing p+o tower
at loc.No.62 with B+3 tower of 132
KV Warangal Kalvasrirampur and 0.00 0.00 400000.00
132 KV Kamalapur-Jammikunta
DC line
Page 44

Name of the Work 2017-18 (Autuals) 2018-19 (R.E)


2019-20 (Projections)
Sl. 1st Half Actuals 2nd Half Actuals Total 1st Half Actuals 2nd Half Actuals Total
No. Materi
Works Material Works Material Works Material Works Material Works Material Works Material Works
al
28 Dismantling of 1 No(A+0)
tower ar Loc No. 232 and
dismantling of 1 No. (C+0)
SAE design tower, 8 No.s TNS
towers & 4 No.s BNC booms
at Loc No. 233 and Erection of
1No. (D+3) 220 kV L&T design
tower at Loc No. 232 and 1No.
(Z+3) 220 kV multi circuit
tower at Loc No.233 acroos 0.00 0.00 2132976.17
proposed National Highway
(NH-365) road
crossing(Jamandlapally yo
Mangalavarpeta) at
Budigonda Village, Gudur
Mandal, Mahabubabad dist. of
132 kV KTS-Nekkonda line &
132 kV KTS-Mahabubabad
line.
29 Providing bore well at 132/33 KV
SS Mustyal in Gangaram 0.00 0.00 187109.56
Subdivision
30 Providing & laying of tiles for
passage in the garden, laying of
CC in the vehicle parking shed,
0.00 608602.00 608602.00 323678.00
providing of cattle guard at gate of
Onal officebuilding in the premises
of 220/132 KVSS Warangal
31 Laying of cc road from main gate
to control room gate at 220/132/33
KVSS premises in the zonal office 0.00 1325120.00 1325120.00
building, Warangal in Warangal
Urban Dist
Page 45

Name of the Work 2017-18 (Autuals) 2018-19 (R.E)


2019-20 (Projections)
Sl. 1st Half Actuals 2nd Half Actuals Total 1st Half Actuals 2nd Half Actuals Total
No. Materi
Works Material Works Material Works Material Works Material Works Material Works Material Works
al
32 Dismantling & erection of 3Nos
220KV Bheemghanpur-Gangaram
DC line shifting due to new pond
construction Loc.No.26 to 28 0.00 0.00 3100000.00
(A+O,A+3,A+3) to be dismantled
and replaced with B+O,B+9
(400KV) & B+9(400KV)
33 Construction of ladies toilet on 1st
floor of control house at 220 KVSS 71158.00 71158.00 0.00
Nagaram in Warangal Dist
34 Renovation of control room,
Providing of PLCC room in store
room with aluminum partition walls
for accommodation of PLCC 323985.00 323985.00 0.00
exchange and other miscellaneous
works at 132 KVSS Kamalapur in
Warangal Dist..
35 Supply, Spreading of 20mm HBG
matal and Rectification of
damaged cable duct in Switch yard
1183233.00 1183233.00 0.00
and other miscellaneous works at
132/33kv SS Wardhannapet in
Warangal Dist.
36 Construction of Racks at office of
SE/OMC/Warangal and providing
Alluminium partition in the office of
81498.00 81498.00 0.00
CE/Zone/Warangal for
DE/T/Warangal section at Zonal
office building warangal
37 Construction of PTR plinth for
modification of 50 MVA IMP make
196591.00 196591.00 0.00
PTR-II at 132/33 KVSS
waddepally in Warangal Dist
Page 46

Name of the Work 2017-18 (Autuals) 2018-19 (R.E)


2019-20 (Projections)
Sl. 1st Half Actuals 2nd Half Actuals Total 1st Half Actuals 2nd Half Actuals Total
No. Materi
Works Material Works Material Works Material Works Material Works Material Works Material Works
al
38 Renovation of ALDC office building
by painting, laying of sewerage
pipe line to the existing septic tank
306851.00 306851.00 0.00
and other miscellanious works in
the premises of 220/132 KVSS
Warangal.
39 Construction of cable duct beside
160MVA PTR-II at 220/132 KVSS 120336.00 120336.00 0.00
Warangal in Warangal Dist.
40 Construction of new compound
wall by dismantling existing
compound wall to Providing access
through Sub-Station premises for
169921.00 169921.00 0.00
House sites alloted to surrendered
extremists in Sy.No.643 adjoining
132/33 KVSS Ghanapur in
Jangoan District.
41 Construction of PTR plinth for
Aguementation of PTR capacity
from 31.5MVA to 50 MVA at 252124.00 252124.00 0.00
132/33 KVSS Ghanpur in
Warangal Dist
42 Renovation of old guest house for
accommodation of SE/LIS/WGL
665038.00 665038.00 0.00
office in the premises of 220/132
KVSS Warangal
43 Renovation of Room No. 107 for
accommodation of the Chief
Engineer 400KV Warangal office,
642417.00 642417.00 0.00
providing Aluminum partition and
other miscellaneous works in Zonal
office building Warangal
Page 47

Name of the Work 2017-18 (Autuals) 2018-19 (R.E)


2019-20 (Projections)
Sl. 1st Half Actuals 2nd Half Actuals Total 1st Half Actuals 2nd Half Actuals Total
No. Materi
Works Material Works Material Works Material Works Material Works Material Works Material Works
al
44 Construction of PTR plinth for
Augmentation of PTR-II capacity
from 50MVA to 80MVA at 220/132 348502.00 348502.00 0.00
KVSS Warangal in Warangal
Urban Dist
45 Construction of R.R masonry
protection wall to the Loc No:68 of
132KV Warangal-Kalvasrirampur
562000.00 562000.00 0.00
line& 132KV kamalapur-
Jammikunta line in warangal Urban
Dist.
46 Providing of 20mm thick
Bituminous surface over existing
damaged BT road from main gate 699584.00 699584.00 0.00
to 220KVSS control room & other
miscellaneous works at 220KVSS
Warangal
47 Renovation of unfinished abanded
quarter beside control room at 840229.00 840229.00 0.00
132/33kV SS/Chelpur in Wgl.Dist.
48 Construction of ADE/Maintenance,

office and store room at First Floor


1467279.00 1467279.00 0.00
of Existing control House at 132

KVSS Pulakurthy in Warangal Dist “


49 Providing of C.C Road, Supply and
spreading of 20mm HBG metal in
switchyard and other 2200000.00 2200000.00 0.00
miscellaneous works at 132 KVSS
Ghanpur in Jangaon Dist.
50 Construction of ADE/Maintenance
Office and Store rooms at First
Floor of Existing Control House at 1533296.00 1533296.00 0.00
220/11 KVSS Gangaram in
Warangal Dist
Page 48

Name of the Work 2017-18 (Autuals) 2018-19 (R.E)


2019-20 (Projections)
Sl. 1st Half Actuals 2nd Half Actuals Total 1st Half Actuals 2nd Half Actuals Total
No. Materi
Works Material Works Material Works Material Works Material Works Material Works Material Works
al
51 “Construction of old collapsed
compound wall, renovation of
control house, construction of
septic tank, renovation of 1027054.00 1027054.00 0.00
sewerage pipe line and other
miscellaneous works at 132/33
KVSS Nekkonda in Warangal Dist”
52 Construction of PTR plinth for
Aguementation of PTR capacity
from 31.5MVA to 50 MVA at 300000.00 300000.00 0.00
132/33 KVSS Mustyal in Warangal
Dist
53 Extension of existing control room 2416253.70

for accomdation of pannel , office


2416253.70 0.00
room and store room at 220KVSS

Bheemghanpur - Bhupal pally Dist.


54 Shifting of the existing 220KV 3210000.00
towers of loc.No.3,4 & 5 of type
D+6,A+6 and B+0 of 220KV
3210000.00 0.00
Bheemghanpur-
Pulukurthy/Salivagu DC line in
Bhoopalpally Dist
55 Construction of outdoor material
stacking platform, formation of
road with crushed run stone agree
gate and other miscellaneous 0.00 0.00
works in stores of
TLC-2/SD/Warangal at
220/132KVSS Warangal
56 “Construction of Drain to the back
side of control room, providing
RCC Hume pipes for road crossing 0.00 149291.00
and other miscellaneous works at
220KVSS Warangal” 149291.00
Page 49

Name of the Work 2017-18 (Autuals) 2018-19 (R.E)


2019-20 (Projections)
Sl. 1st Half Actuals 2nd Half Actuals Total 1st Half Actuals 2nd Half Actuals Total
No. Materi
Works Material Works Material Works Material Works Material Works Material Works Material Works
al
57 Construction of ADE/Maintenance
Office and Store rooms at First
Floor of Existing Control House at 0.00 1548738.00
220/11 KVSS Bheemghanpur in
Warangal Dist 1548738.00
58 Extension of existing control room 3643105.69
with provision of pannel room,
office room and store room at 3643105.69 3417750.00
220KVSS Gangaram in
Jayashankar - Bhupal pally Dist. 3417750.00
59 Providing and laying of tiles for
passage in the garden, laying of
CC in the vehicle parking shed,
providing of cattle guard at gate of
0.00 1015000.00
Zonal office building and other
miscellaneous works in the
premises of 220/132KVSS
Warangal 1015000.00
60 Construction of balance compound
wall and material stacking plotform
0.00 6520000.00
at 132/33 KV sub station at
Raghunathpally in Jangaon Dist. 6520000.00
61 Construction of new control room
at 132 KVSS Kamalapur in 0.00 9004052.00
Warangal Dist 9004052.00
62 Supply and spreading of 20mm
HBG metal in switch yard, laying of
CC road, renovation of control
room , expansion of control room
0.00 6823060.00
for accommodation subdivision
office and other miscellaneous
works in 132/33KVSS Waddepally
in Warangal Urban District. 6823060.00
Page 50

Name of the Work 2017-18 (Autuals) 2018-19 (R.E)


2019-20 (Projections)
Sl. 1st Half Actuals 2nd Half Actuals Total 1st Half Actuals 2nd Half Actuals Total
No. Materi
Works Material Works Material Works Material Works Material Works Material Works Material Works
al
63 Construction of new control room
(old type single storied, size 16.80
0.00 6010070.00
x 11.00m) at 132 KVSS
Raghunathapally in Warangal Dist 6010070.00
64 Construction of new control room
(old type single storied size 16.80 x
0.00 6467389.00
11.00m) at 132KVSS Nekkonda in
Warangal Dist 6467389.00
65 Supply and spreding of 20mm
HBG metal in switch yard at
0.00 1940609.00
132/33KVSS Nekkonda in
Warangal Dist. 1940609.00
66 Providing of C.C Road, Supply and
spreading of 20mm HBG metal in
switchyard and other
0.00 4800000.00
miscellaneous works at 132 KVSS
Kamalapur in Jayashankar -Bhupal
pally-Dist. 4800000.00
67 Providing of chequered plates vinyl
flooring I control room street lights
from main gate to control room and 0.00 498600.00
other miscellaneous works at
220KVSS Warangal. 498600.00
68 Construction of fire protection wall
at existing 220kV
0.00 440000.00
SS/Waddekothapally in Warangal
Dist. 440000.00
69 Investigation and providing bore
well at 132/33kV SS/Mulugu in 0.00 400000.00
Wgl.Dist. 400000.00
70 Construction of shed to the 25KVA
Diesel generator shed and road
0.00 400000.00
crossing RCC slab at 220/132
KVSS Warangal 400000.00
Page 51

Name of the Work 2017-18 (Autuals) 2018-19 (R.E)


2019-20 (Projections)
Sl. 1st Half Actuals 2nd Half Actuals Total 1st Half Actuals 2nd Half Actuals Total
No. Materi
Works Material Works Material Works Material Works Material Works Material Works Material Works
al
71 Arresting roof leakage in control
room and other places, Repair of
front side control room window
glasses, construction of compound 0.00 150000.00
wall towards south and north side
in 132 KVSS Nekkonda in
Warangal dist 150000.00
72 Providing of office room for the
official use of ADE/Maintenance
and store room at 132KVSS 0.00 800000.00
Waddepally in Warangal Dist
800000.00
73 Providing of plat form and shed for
oil filtration Machine at 220KVSS 0.00 350000.00
Warangal 350000.00
74 Renovation of office for 400KV
MRT Division at 220KVSS 0.00 200000.00
Warangal 200000.00
75 Renovation of old Accounts section
office for accommodation of
0.00 224313.00
DE/400KV MRT/Warangal in the
premises of 220KVSS Warangal 224313.00
76 Construction of balance compound
wall at 220KV Sub-station 0.00 3693929.00
Warangal in Warangal Dist 3693929.00
77 Construction of MRT/TRE material
stacking platform and GI sheet
shed for protection of existing oil 0.00 583009.00
filter machine at 220/132KV Sub-
station Warangal 583009.00
78 Providing compound wall to road
side of 132/33 KVS.S at Nekkonda 0.00 663100.00
Warangal dist. 663100.00
79 Construction of diesel generator
shed at 132 KVSS Nekkonda in 0.00 322600.00
Warangl dist 322600.00
Page 52

Name of the Work 2017-18 (Autuals) 2018-19 (R.E)


2019-20 (Projections)
Sl. 1st Half Actuals 2nd Half Actuals Total 1st Half Actuals 2nd Half Actuals Total
No. Materi
Works Material Works Material Works Material Works Material Works Material Works Material Works
al
80 Procurement of the Toiletries,
repair and rectification of sewerage
line water pipe lines and
0.00 200000.00
maintenance of garden and other
items for maintenance of Zonal
Office Building warangal 200000.00
81 Construction of compound wall on
North and Southern side of 132 0.00 200000.00 200000.00
KVSS Mustyal in Warangal Dist.
82 Renovation of control room by providing 528120
painting aluminium windows and other
miscellaneous works at chelpur 0.00 0.00
132/33KVSS in Jayashankar Bhupalpally
dist
83 Providing of Bore well at 132/33 KVSS 228454
0.00 0.00
Nellikuduru in Mahabubabad Dist
84 Providing of Borewell at 132/33 KVSS 277952
0.00 0.00
Wardhannapet in Warangal rural Dist
85 Supply and spreading of 20mm HBG 7317397
metal in Switch yard, laying of CC road,
construction of new & collapsed
0.00 0.00
compound wall, retaining wall & other
miscellaneous works at 132/33KVSS
Nekkonda in Warangal Rural Dist
86 Maintenance of zonal office building by 191100
procurement of the toiletries, repair and
rectification of sewerage line, water pipe
lines and rectification of damaged
0.00 0.00
electric accessories and maintenance of
garden etc., to maintain hygienic
atmosphere for the period from
01.05.2018 to 31.03.2019
87 Earth excavation for laying of 1000sqmm 35988
XLPE cable from 50MVA PTR-II KIOSK to
0.00 0.00
11KV Bus at 220KVSS Bheemghanpur at
Jayashanker Bhupalpally Dist
Page 53

Name of the Work 2017-18 (Autuals) 2018-19 (R.E)


2019-20 (Projections)
Sl. 1st Half Actuals 2nd Half Actuals Total 1st Half Actuals 2nd Half Actuals Total
No. Materi
Works Material Works Material Works Material Works Material Works Material Works Material Works
al
88 Arresting of water leakage from water 255797
supply pipe line, sewerage pipe line and
0.00 0.00
flooring of the common toilet at Zonal
office building, Warangal
89 Construction of 1No ABB make 132KV 70656
Circuit Breaker of Railway-I feeder at
0.00 0.00
132/33 KVSS Nekkonda in Warangal
Rural Dist
90 Erection of Intermediate tower between 795000
Loc.No. 285 -286 of 132KV KTS -
0.00 0.00
Nekkonda & Gudur -Narsampet DC line
in Mahabubababad Dist
91 Erection of Intermediate tower between 775000
Loc.No. 41 -42 of 132KV
0.00 0.00
Raghunathpally- Ghanpur -Traction DC
line in Jangaon Dist
92 Erection of 1No.R+0 Intermediate tower 310000
between Loc.No. 41 -42 of 132KV
Raghunathpally- Ghanpur -Traction DC
0.00 0.00
linefor improving ground clearence
between Loc.No.41-42 at Ghanpur(stn)
reservoir in Jangaon Dist
93 Dismantling of 1No.P+0 type tower at 163000
Loc.No.133 of 132KV Raghunathpally-
Waddekothapally Dc line and Erection of
1No. New R+6 type tower in that
0.00 0.00
location for improving groud clearence
across the road between Loc.No.133 to
134at Waddekothapally in Mahabubabad
Dist
94 Dismantling of 1No. A+0 type tower at 621000
Loc.No.285 of 132KV KTS-Warangal DC
line and Erection for improving ground 0.00 0.00
clearance between Location No.285 to
286 at Gundenga in Mahabubabad Dist
95 Cleaning and clearing of earth heaps 325000
between the bays of 132KV Kamalapur
and new 132KV Regonda feeder bay,
road crossing cable duct infront of 0.00 0.00
control room and other miscellaneous
works at 132/33KV SS clelpur in
Jayashankar Bhupalpally Dist
Page 54

Name of the Work 2017-18 (Autuals) 2018-19 (R.E)


2019-20 (Projections)
Sl. 1st Half Actuals 2nd Half Actuals Total 1st Half Actuals 2nd Half Actuals Total
No. Materi
Works Material Works Material Works Material Works Material Works Material Works Material Works
al
96 Supply and spreading of 20mm HBG
metal in Switch yard, retaining wall and
0.00 0.00
kerb wall at 132/33 KVSS Nekkonda in
Warangal Rural Dist 1,950,000.00
97 Laying of CC road,construction of new & 4500000
collapsed compound wall and other
0.00 0.00
miscellaneous works at 132/33 KVSS
Nekkonda in Warangal Rural Dist
98 Laying of CC road in front of Main gate I 950000
& II and other miscellaneous works at
0.00 0.00
220/132 KVSS Waddekothapally in
Mahabubabad Dist
99 “Laying of CC road from main gate to 1900000
control room gate at 220/132/33 KVSS
0.00 0.00
premises in the zonal office building
Warangal in Warangal Urban Dist
100 Construction of RCC protection wall for 175000
the loc.No.161 of 132 KV Chityal-RSS
0.00 0.00
line & 132 KV Chelpur-monthini line in
Jayashankar Bhupalpally Dist
101 Erection of Intermediate tower in
132 KV Raghunathpally-
Waddekothapally line at loc.no.133
0.00 0.00 980000.00
for maintain prpoer ground
clearance across national
highways
102 Shifting of existing 33 KV Thorruru
feeder to another bay at
220/132/33 KVSS 0.00 0.00 220000.00
Waddekothapally in Mahabubabad
Dist
103 Providing cable trench cover slabs
in switching station ard at 132/33
0.00 0.00 105000.00
KVSS Mulugu in Jayashankar
Bhupalpally dist
Page 55

Name of the Work 2017-18 (Autuals) 2018-19 (R.E)


2019-20 (Projections)
Sl. 1st Half Actuals 2nd Half Actuals Total 1st Half Actuals 2nd Half Actuals Total
No. Materi
Works Material Works Material Works Material Works Material Works Material Works Material Works
al
104 Renovation of cotrol room by 642744.00
providing painting, Aluminium
windows, cleaning & clearing of
earth heaps between the bays of
132 KV Kamalapur and new 132
KV Regonda, feeder bay, Road 0.00 642744.00
crossing cable duct infront of
control room and other
miscellaneous works at 132/33
KVSS Chelpur in Jayashankar
Bhupalpally Dist
105 Providing of Main gate cum
finishing of balance compound wall
and other miscellaneous works a 0.00 0.00 350000.00
132/33 KVSS Gudur in
Mahabubabad dist
106 Construction of Diesel generator
room at 220/132 /33 KVSS 0.00 0.00 95000.00
Waddekothapslly in Mbad dist
107 Construction of 1No CGL make
132 KV Circuit Breaker at 132/33
0.00 0.00 120000.00
KVSS Kamalapur in Jayashankar
Bhupalpally Dist
108 Extensionof existing control room
with provision of panel room office
room and store room at 132/33 0.00 0.00 3923677.00
KVSS Chelpur in Jayashankar
Bhupalpally Dist
109 Dismantling erection of 3Nos
220KV Bheemghanpur -Gangarm
DC line shifting due to new pond
constrction loc.no.26 to 28 0.00 0.00 3100000.00
(A+0,A+3,&A+3) to be dismantled
and replaced with
B+0,B+9(400KV)

Total 20880395.78 15528308.00 36408703.78 1944022.00 66752038.74 68696060.74 52911842.86


Page 56

Name of the Circle:


Unit Code and Name:

Sl.
No.

1217199
2

3468319.73

6516181.00 5

6
Page 57

Sl.
No.

10

11

12
Page 58

Sl.
No.

13

14

15

16

17

18

19
Page 59

Sl.
No.

22

23

24

25

26

27

2126087

28
Page 60

Sl.
No.

29

30

31

932280
32
Page 61

Sl.
No.

32

10

11
Page 62

Sl.
No.

12

13

14

15

16

17
Page 63

Sl.
No.

18

19

20

21

22

23

24
Page 64

Sl.
No.

25

26

27

28

29

30
Page 65

Sl.
No.

31

32

33

34

35

36
Page 66

Sl.
No.

37

38

39

40

41

42

43

44
Page 67

Sl.
No.

45

46

47

48

49

50

51

52

53
Page 68

Sl.
No.

54

55
Page 69

Sl.
No.
Page 70

Sl.
No.
Page 71

Sl.
No.
ANNEXURE-III 3W
Repairs and Maintenance of Civil works
Name of the Circle: Superintending Engineer/OMC/Warangal
Unit Code and Name: (Rs. in Lakhs)
2018-19 (Autuals) 2019-20 (R.E)
2020-21 (Projections)
Sl. 1st Half Actuals 2nd Half Actuals Total 1st Half Actuals 2nd Half Actuals Total
Name of the Work Materi
No.
Works Material Works Material Works Material Works Material Works Material Works Material Works
al
1 Construction of Comound wall
in place of collapsed leaned and
ready to collapse compound
wall at 220/132 KV SS Warangal 1217199.00
in Warangal dist

2
Supply and sporeading of 20mm
HBG metal in Switchyard,Laying
of CC road and Other
2805663.30
miscellaneous works in 132/33
KV SS Waddepally in Warangal
Urban dist

Laying of CC road in front of


main gateI & II and other
3 miscelleneous works at 220/132 787214.00
KV SS Waddekothapally in
Mahabubabad Dist

Providing CC road and


spreading of 20mm HBG metal
4 in switchyard and other 1944022.00
Miscelleneous works at 132KV
Ghanpur SS in Jangaon Dist

Construction of balance
compound wall and material
5 stacking plotform at 132/33 KV 6516181.00
SS at Raghunathpally in
Warangal dist

Construction of Copound wall at


6 220/132 KV SS Ammavaripeta in 7151757.88
Warangal urban dist
Supply and Spreading of 20mm
HBG metal in Switchyard,Laying
of CC road ,Construction of new
and collapsed compound wall,
7 1684484.00
Retaining wall and other
miscelleneous works at 132/33
KV SS Nekkonda in Warangal
Rural dist

Augmentation of PTR-II capacity


from 31.5 MVA to 50MVA at
8 227020.00
132/33 KVSS Wardhannapet in
Waddepally sub division

Laying of CC road from main


gate to 220 KV control room
9 gate at 220/132/33 premises 1251689.00
Warangal in Warangal Urban
Dist
Construction of balance
compound wall and material
10 stacking platform at 132/33 508207.00
KVSS at Raghunathpally in
Jangaon Dist”.

Extension of control room in


ground floor & costruction of
first floor at existing control
house for erection of 132/33 KV
11 497772.00
features and accommodating
office room & store room in
existing 132/11 KVSS
Dharmasagar in Warangal Dist

Providing of new ABT energy


meters to 132 KV Railway feeder
at 132/25 KV Traction sub
12 181813.00
station Khazipet emanating from
132/33 KVSS Waddepally in
Warangal Dist
Supply & Spreading of 20mm
HBG metal in switchyard and
13 Kerb wall at 132/33 KVSS 630297.00
Nekkonda in Warangal Rural
Dist

Providing of barbed wire fencing


with RCC poles and name
8 boards along the boundary of 339986.26
proposed 132/33 KV SS
Peechara in Warangal dist

Replacement of existing p+o


tower at loc.No.62 with B+3
28 tower of 132 KV Warangal 400000.00
Kalvasrirampur and 132 KV
Kamalapur-Jammikunta DC line

Dismantling of 1 No(A+0)
tower ar Loc No. 232 and
dismantling of 1 No. (C+0)
SAE design tower, 8 No.s
TNS towers & 4 No.s BNC
booms at Loc No. 233 and
Erection of 1No. (D+3) 220 kV
L&T design tower at Loc No.
232 and 1No. (Z+3) 220 kV
29 multi circuit tower at Loc 2132976.17
No.233 acroos proposed
National Highway (NH-365)
road crossing(Jamandlapally
yo Mangalavarpeta) at
Budigonda Village, Gudur
Mandal, Mahabubabad dist.
of 132 kV KTS-Nekkonda
line & 132 kV KTS-
Mahabubabad line.
Providing bore well at 132/33 KV
30 SS Mustyal in Gangaram 187109.56
Subdivision

Dismantling & erection of 3Nos


220KV Bheemghanpur-
Gangaram DC line shifting due
to new pond construction
31 3100000.00
Loc.No.26 to 28 (A+O,A+3,A+3)
to be dismantled and replaced
with B+O,B+9 (400KV) &
B+9(400KV)

Total 8460203.00 6494560.30 2666501.00 630297.00 13311829.87


LIST OF O&M BILLS PERTAINS TO THE OFFICE OF EXECUTIVE ENGINEER/CIVIL/OMC/ DIVISION/WARANGAL 01.04.2019- till to date

S Name of the Work Name of the contractor LS.Agt.No. Type of Bill PO Number Invoice Number Gross Amount D No & Date D No & Date ( From Remarks
No in Rs. ( From AEE to EE/Civil-I/Divn/ Warangal to
EE/Civil/Const/ Warangal) SE/OMC/Circle, Warangal)

1 Augmentation of PTR-II capacity from 31.5 LS.Agt.No.84/2018 CC1st and final bill/ mannual bill 227020 Dno:07/18,dt.08.04.19 D.No:16/19 ,Dt.09.04.2019 Submitted to SE/OMC/Circle/Wgl office for
MVA to 50MVA at 132/33 KVSS M/s.Sri Venkateswara Electrical -19 of MB.2643 payment
Wardhannapet in Waddepally sub division Contractor, #2-76/4,Banjarupally(V),
SE/OMC/Warangal
Dharmasagar(M),Warangal Dist
.
2 Laying of CC road from main gate to 220 KV CC 1st and part Bill / 5105630600 1251689 Dno:09/19,dt.27/04/2019 D.No:66/19,Dt.29/04/2019 Submitted to SE/OMC/Circle/Wgl office for
control room gate at 220/132/33 premises ). L.S.Agt.No. MB.2551 payment
T.Srinivas Reddy, M/s. Sri sai ram
Warangal in Warangal Urban Dist 01/2019-20 of
Elec&Civil work, H.No.46/4,APSHC,
SE/Civil
Nakkalagutta, Hanamkonda
Circle/Warangal.

3 Construction of balance compound wall and CC 1sy & part Bill/ 5105631822 508207 Dno:47/19,dt.27.05.2019 D.No:127/19 ,Dt.28.05.2019 Submitted to SE/OMC/Circle/Wgl office for
material stacking platform at 132/33 KVSS at ). L.S.Agt.No. MB .No.2648,2419 payment
Raghunathpally in Jangaon Dist”. Kurella Upender, R/O:6-10, Main road, 08/2018-19 of
Raghunathpally, Jangaon Dist SE/Civil
Circle/Warangal.

4 CC 1st and part Bill 5105631822 497772D.No.68/19, Dt.20.06.2019 D.No:177/19 ,Dt.21.06.2019 Submitted to SE/OMC/Circle/Wgl office for
Extension of control room in ground floor & MB .No.2648,2419(2No’s) payment
costruction of first floor at existing control M/s.Sai kumar Electricals, #1-7- L.S.Agt.No.
house for erection of 132/33 KV features and 883/6/22/203, Chandraprakash residency 13/2018-19 of
accommodating office room & store room in II, Nandi Hills, Hunter Road, SE/Civil
existing 132/11 KVSS Dharmasagar in Hanamkonda, Warangal Circle/Warangal.
Warangal Dist

CC 1st and part Bill 5105632540 181813D.No.102/19, Dt.26.07.2019 D.No:264/19 ,Dt.30.07.2019 Submitted to SE/OMC/Circle/Wgl office for
Providing of new ABT energy meters to 132 M/s.Sai kumar Electricals, #1-7- L.S.Agt.No. MB .No2413(1No) payment
KV Railway feeder at 132/25 KV Traction sub 883/6/22/203, Chandraprakash residency 77/2018-19 of
station Khazipet emanating from 132/33 KVSS II, Nandi Hills, Hunter Road, SE/OMC/Circle/W
Waddepally in Warangal Dist Hanamkonda, Warangal arangal.

CC 1st and part Bill 5105635811 630297D.No.213/19, Dt.18.11.2019 D.No:505/19 ,Dt.21.11.2019 Submitted to SE/OMC/Circle/Wgl office for
M/s.Sai kumar Electricals, #1-7- L.S.Agt.No.
Supply & Spreading of 20mm HBG metal in MB .No.2637(1No) payment
883/6/22/203, Chandraprakash residency 12/2018-19 of
switchyard and Kerb wall at 132/33 KVSS
II, Nandi Hills, Hunter Road, SE/Civil
Nekkonda in Warangal Rural Dist
Hanamkonda, Warangal Circle/Warangal.