Name of work: Extension of Control Room in Ground floor & Construction of first floor at existing control house for

erection of
Page 1 of 139
132/33KV features and accommodating Office room & Store room in Existing 132/11KV SS at Dharmasagar in Warangal District

Date of preparation:- SSR adopted:SSR 2019-20 (With Revised


Cement & Steel Rates for the Month of
August 2020)

Sl.N APDSS Basic RATE AMOUNT


QUANTITY DESCRIPTION OF ITEM OF WORK PER
o No. Rs. Rs

CIVIL WORKS
1 Supplying and fixing CPVC pipes of SDR 13.50 pipes Medium Grade as
per IS 15778 of approved make for water supply line to toilets including
cost and conveyance of pipe, specials such as elbows, Tees concealing
same in walls and floors by cutting 25/ 20/ 15mm dia to be included
grooves, packing, finishing after laying pipe in position as per the
directions of the Engineer in charge for the finished item of work.

a 30.00 RM 34.90 mm Outer dia Pipe 275.42 One RM 8262.65

b 60.00 RM 28.6 mm Outer dia Pipe 202.12 One RM 12127.22


c 30.00 RM 22.20 mm Outer dia Pipe 152.90 One RM 4586.99

d 20.00 RM 15.90 mm Outer dia Pipe 134.05 One RM 2680.94

2 30.00 RM Providing and fixing in position at all levels of the building under floors 167.55 One RM 5026.63
and against walls 75mm dia (4kg/cm2) PVC pipes of prince / sudhakar
or any ISI brand make with specials such as junctions,couplers,
bends/Tees etc., with or without access doors as required and with
solvent jointing as per standard practice wherever necessary including Total 32684.43
excavation and refilling wherever required,, testing etc. complete as per
18.00% Goods and services Tax at 18% on total value of above civil work items 32684.43 5883.20
the directions of the Engineer in charge for the finished item of work.
including labour cess
0.10% Cess towards NAC 32684.43 32.68
Grand TOTAL Amount in Rs. 38600.31
DETAILED ESTIMATE
Name of work: Extension of Control Room in Ground floor & Construction of first floor at existing control house
for erection of 132/33KV features and accommodating Office room & Store room in Existing 132/11KV SS at
Dharmasagar in Warangal District
Sl.No Description of work No L(m) B(m) D(m) Qty.
1 Supplying and fixing CPVC pipes of SDR 13.50 pipes Medium Grade as per IS 15778 of approved make for water
supply line to toilets including cost and conveyance of pipe, specials such as elbows, Tees concealing same in
walls and floors by cutting 25/ 20/ 15mm dia to be included grooves, packing, finishing after laying pipe in position
as per the directions of the Engineer in charge for the finished item of work.

34.90 mm Outer dia Pipe 1 30 30.00 RM

28.6 mm Outer dia Pipe 1 60 60.00 RM

22.20 mm Outer dia Pipe 1 30 30.00 RM

15.90 mm Outer dia Pipe 1 20 20.00 RM

2 Providing and fixing in position at all levels of the building under floors and against walls 75mm dia (4kg/cm2) PVC
pipes of prince / sudhakar or any ISI brand make with specials such as junctions,couplers, bends/Tees etc., with or
without access doors as required and with solvent jointing as per standard practice wherever necessary including
excavation and refilling wherever required,, testing etc. complete as per the directions of the Engineer in charge
for the finished item of work.

1 30 30.00 RM

Page 2 of 139
CHECK LIST (Preparation of Estimate)
Name of work: Extension of Control Room in Ground floor & Construction of first
floor at existing control house for erection of 132/33KV features and
accommodating Office room & Store room in Existing 132/11KV SS at
Dharmasagar in Warangal District

Sl.No Description Check Yes/NO

1 Report accompanying the estimate with complete details shall be YES


enclosed
2 Collect the following details for the lead statement
a Area allowance of the requisite site YES
b Overhead & contractors profit YES
c Cement &steel rates (Monthly rates released in website YES
Telangana PHMED) Adopt Fe 500 grade steel rate (approved
Brand)
d Sand rate as per nearby stock yard /lead chart YES
e water rate(Urban/Rural) YES
f Lead (in KM) YES
Nearets stockyard for SS YES
Weighted average of nearest stock yards lead for line YES
3 Quantities
Provide the quanities as per type of towers provided for line & SS
with the approvals communicated by the elecrical wing and with
respect to the standard quantities for SS and as per the approved
drawings.
Enclose quanitities communicated by Electrical wing
Levelling Quanitites:
_if site is already identified, level sheet should be prepared and
the same quantities to tbe provided in the estimate
Hard rock involving blasting/controlled blasting/blasting
prohibited:
Restrict the quantities as decided in HQ
Any variations to be clearly substantiated in Report to
accompanying the estimate
4 Template
Verify the units of the items, especially Reinforcement steel & YES
structural steel whether the units in Quantity coloumns and in
Rate columns are same
Ex: Unit in quantity colomn is MT and in rate columns is in kgs

5 Taxes to be provided as below:


GST YES
DC works : 12% of total value of estimate
Others: 18% of total value of estimate
NAC 0.1% of toal value of estimate YES
6 Seignorage charges including 2% SMET charges to be calculated YES
separately wihtou GST
Page 4 of 139

TRANSMISSION CORPORATION OF TELANGANA LIMITED

Office of
The Chief Engineer/Civil,
TSTransco, Vidyut Soudha,
Hyderabad

U.O. to Executive Director/LIS/VS:

Sub: Supply, Erection, Testing and Commissioning of 220/11KVSS at V.K.Ramapuram (V) Mulkalapally
(M) under Seetharama Lift irrigation Scheme in Bhadradri Kothagudem Dist. and connected line for
providing supply to the Seetharama Lift irrigation Scheme - Civil estimate scrutinized and
Transmitted-Reg.

Ref: 1) U.O.No.ED/LIS/ SE(LI)/DE/LIS/ADE6/Sita Rama LIS/D.No.1199/17, Dt:27.11.17.


2) Circular Memo No.CE/Projects-I/SE/Civil/VS/Hyd/D.No:81/17,Dt:13.06.17
3) Circular Memo No.CE/C/SE/C-II/EE/C-II/VS/Hyd/D.No:67/17,Dt:01.09.17
****
In the reference (1) cited above, the Executive Director/LIS has requested to scrutiny the subject work
estimate as per the GST. Estimates for the subject work is scrutinized as per guide lines issued vide ref. 3rd cited on
GST & with SoR 2016-17. Deducting 5% material VAT on earth, gravel, metal, bricks and sand and 18.125% on all
other materials and Cement and Steel Rates for the Month of November' 2017 are issued by Dy. Executive Engineer
(PH) exclusive of all taxes. In GST regime there is no need to seperate labour portion and material portion of the data
rates are transmitted herewith for taking further necessary action.

1 Supply,Erection,Testing and Commissioning of 220/11KVSS at Rs. 7,10,00,000.00


V.K.Ramapuram (V) Mulkalapally (M) under Seetharama Lift irrigation
Scheme in Bhadradri Kothagudem Dist.
2 Erection of 220 KV TMDC Line from 400/220/11 KV SS V.K.Ramapuram in Rs. 1,80,00,000.00
Bhadradri District for providing supply to Seetharam Lift Irrigation Scheme.

The following taxes are added to the estimate value and exhibited separately:

a. Labour welfare cess 1 % on Total Estimate value. (to be paid by the department to concerned department.
b. Good Service Tax 18 % on Gross Value. ( Total Estimate value + Labour cess 1%)
c. Corpus fund @0.1% of total estimate value (to be paid by the department to concerned department.

State Mineral Exploration Trust fund 2% on seignorage charges are included in the estimate as per TOO
MS.No.74, Dt 16.05.2017

Further as per the circular memo vide reference 3rd cited, the Overheads and Contractors profit is revised from
13.615% to 11.765% and 11.765% extra on estimate value of each item was added towards contractor profit and over
head charges of contractor.

The overhead charges include the following elements:


• Site accommodation, setting up plant, access road, water supply, electricity and general site arrangements.
• Office furniture, equipment and communications
• Expenditure on:
• Corporate office of contractor
Page 5 of 139

• site supervision
• Documentation and “as built” drawings
• Mobilisation/ de-mobilisation of resources
• Labour camps with minimum amenities and transportation to work sites.

** AP revised standard data Special Condition

Photographs shall be taken by the contractor for each tower location of EHT lines in the following stages of

1. After excavation is over in normal soils.


2. Before and after blasting in Hard rock soils.
3. During dewatering.
4. During concreting.
5. Shoring & strutting.

The photographs should be clear and hard copy or soft copy (2Nos) shall be submitted to the Engineer in charge
immediately.

The estimate is prepared with Reinforcement steel Fe 500/550 grade as per circular memo vide ref 2nd cited.This
may be incorporated in the tender specification and in agreements.

There is no detailed estimate for borrowed gravel. It should be ensured that quantity of cutting should be equal
to quantity of filling in all the cases where final yard level is above surrounding ground level for preper drainage
excess borrowed gravel should not be permitted.

The above said particulars are to be incorporated in tender specifications and agreements.

Encl: As above

CHIEF ENGINEER/CIVIL
TSTRANSCO
To,
The Executive Director/ LIS /TSTRANSCO/VS/Hyd

U.O.No.CE/C/SE/C-II/ EE/C-II /AE/C/T/F.V.K.Ramapuram SS&Lines/D.No. /17, Dt: /12/17


Page 6 of 139

LEAD STATEMENT

Name of work: Extension of Control Room in Ground floor & Construction of first floor at existing control house for erection of 132/33KV
features and accommodating Office room & Store room in Existing 132/11KV SS at Dharmasagar in Warangal District

Date of preparation:- SSR adopted:SSR 2018-19 (With Revised Cement & Steel Rates for the Month of Febrauary 2019)

AREA ALLOWANCE (20 to 25 %) / GHMC AREA ALLOWANCE ( 40%) ON LABOUR 0%


Overheads & Contractors Profit (11.765%) 11.765%

Water Charges is if URBAN - (R&B Sl.No.155=98) or RURAL - (R&B Sl.No.154=73) vide of SSR 20117-18 73.0

OVER INITIAL LEAD OF 1 KM

including UL (with

Total Conveyance
Effective Lead in

Loading charges
Conveyance
Lead in KM

UL charges

only transp
Basic Rate

profit)
Sl.

KM
Material Item Sl.No. Unit Source
No.

1 Cement Sl.No. 5, Pg.11, 1 Mt Local 0 -1 4700.00 0.00 0.00 75.50 75.50 75.50
Irrg Items
2 Sand for filling Stock yard price 1cum Godavari River 75 74 600.00 935.40 0.00 11.45 946.85 946.85
(unscreened)
3 fine aggregate / Stock yard price 1cum Godavari River 75 74 600.00 935.40 0.00 11.45 946.85 946.85
Sand for concrete
& filtering items

4 Fine Stock yard price + 1cum Godavari River 75 74 667.00 935.40 0.00 11.45 946.85 946.85
aggregate/sand for 67.00 for
Mortar & screening as per
Plastering works AP SoR

5a Earth Sl.No. 102, Pg.18 1 cum Local 10 9 65.00 146.10 0.00 11.45 157.55 157.55
of Irg

5 Gravel Sl.No. 90, SS Local 10 9 98.00 146.10 0.00 11.45 157.55 157.55
Item 34 of R&B

6 RR stone (HBG) Sl.No. 12, SS 1 cum Thoggudem 32 31 306.00 445.20 0.00 0.00 445.20 445.20
Item 22.G, of
R&B+Blst Chgs

6a RR stone (Other Sl.NO.1, SS Item. 1 cum Thoggudem 32 31 219.00 445.20 0.00 22.90 468.10 468.10
than Granite) 22.a, of
R&B+Blst Chgs

7 CR stone (HBG) Sl.No. 14, SS 1 cum Thoggudem 32 31 316.00 445.20 0.00 22.90 468.10 468.10
Item 23.a of
R&B+Blst Chgs
7a CR stone (Other Sl.No. 15, SS 1 cum Thoggudem 32 31 246.00 445.20 0.00 22.90 468.10 468.10
than Granite) Item. 23.B of
R&B+Blst Chgs

8 Bond stone Sl.No.18, SS 1 cum Thoggudem 32 31 1208.33 445.20 0.00 22.90 468.10 468.10
Item.28 of R&B

9 Hard Stone 150mm Sl.No. 79, SS 1 cum Thoggudem 32 31 157.00 445.20 0.00 22.90 468.10 468.10
of Granite for Item. 33, z3 of
Soling Stone(Hand R&B
broken)

10 Aggregates 20mm Sl.No. 28, SS 1 cum Thoggudem 32 31 1154.50 445.20 0.00 22.90 468.10 468.10
Nominal size (HB Item. 33. d of
stone of Granite/ R&B+Blst
Dolamite/ Dolerite/ Chgs+25%
Trap) Crushing chgs

11 12 mm size Sl.No. 27, SS 1 cum Thoggudem 32 31 1043.25 445.20 0.00 22.90 468.10 468.10
aggregate Item. 33. c of
R&B+Blst
Chgs+25%
Crushing chgs
12 10mm Nominal Sl.No. 26, SS 1 cum Thoggudem 32 31 888.25 445.20 0.00 22.90 468.10 468.10
size Item. 33.b of
R&B+Blst
Chgs+25%
Crushing chgs
13 40 mm nominal Sl.No. 30, SS 1 cum Thoggudem 32 31 698.25 445.20 0.00 22.90 468.10 468.10
size (HB stone of Item. 33.f of
Granite ) R&B+Blst
Chgs+25%
Crushing chgs
Page 7 of 139

13a Aggregates 63 mm Avg of Sl.No. 1 cum Thoggudem 32 31 642.00 445.20 0.00 22.90 468.10 468.10
to 45 mm (IRC) 51&53, SS Item.
33.g&I of
R&B+Blst Chgs
13b Aggregates 22.4 Avg of 1 cum Thoggudem 32 31 883.25 445.20 0.00 22.90 468.10 468.10
mm to 5.6 mm Sl.No.46&49, SS
(IRC) Item. 33.b& e of
R&B+Blst Chgs
13c Aggregates below Sl.No. 45, SS 1 cum Thoggudem 32 31 673.25 445.20 0.00 22.90 468.10 468.10
5.6 mm (IRC) Item. 33.a of
R&B+Blst Chgs
13a Aggregates 45 mm Avg of Sl.No. 1 cum Thoggudem 32 31 905.13 445.20 0.00 22.90 468.10 468.10
to 22.4 mm (IRC) 49&51, SS Item.
33.e&g of
R&B+Blst Chgs
13b Aggregates 22.4 Avg of 1 cum Thoggudem 32 31 883.25 445.20 0.00 22.90 468.10 468.10
mm to 2.36 mm Sl.No.45&49, SS
(IRC) Item. 33.a& e of
R&B+Blst Chgs
13c Aggregates below Sl.No. 92, SS 1 cum Thoggudem 32 31 485.00 445.20 0.00 22.90 468.10 468.10
2.36 mm (IRC) Item. 35.b of
R&B+Blst Chgs
14 Coarse Aggregates Sl.No. 35, SS 1 cum Thoggudem 32 31 357.00 445.20 0.00 22.90 468.10 468.10
75 to 100mm (HB Item. 33.k of
Stone of Granite R&B+Blst Chgs
( Excl. Seign

14 Coarse Aggregates sl.No 10, of basic 1 cum Thoggudem 32 31 510.00 445.20 0.00 22.90 468.10 468.10
80 to 40mm (HB input data+ Blstg
Stone of Granite
( Excl. Seign)

15 63 mm nominal Sl.No. 53, SS 1 cum Thoggudem 32 31 467.00 445.20 0.00 22.90 468.10 468.10
size IRC metal item. 33 i, of
(granite) R&B, +Blstg

16 40 mm nominal Sl.No. 51, SS 1 cum Thoggudem 32 31 717.00 445.20 0.00 22.90 468.10 468.10
size IRC metal item. 33g, of
( granite)Crusher R&B, +Blstg+
metal machine crushing

17 Stone Crusher Dust Sl.No. M-021, of 1 cum Thoggudem 8 7 357.00 118.70 0.00 22.90 141.60 141.60
IrgSoR 2015-16

18 Bricks Sl.No.1, BMT- 1000 Bommanpally 32 31 5700.00 715.20 62.90 62.90 841.00 841.00
A.01, Bldg Nos

18(a)Bricks (Fly Ash) TBSC-A.II-12, 1000 5 4 6000.00 124.80 62.90 62.90 250.60 250.60
comp stren of 50 Sl.No.14, Bldg Nos
kg/Cm2 class 5 of items
size 225 X 100 X
60 mm

19 Water (Rural or (R&B 1 KL Local 2 1 73.00 20.50 0.00 0.00 20.50 20.50
Urban) Sl.No.154=73)

20 RCC Hume pipe 1 RM Thoggudem 27 26 126.64


600 dia
21 RCC Hume pipe 1 RM Thoggudem 6 5 34.51
450 dia
21 RCC Hume pipe 1 RM Thoggudem 6 5 16.69
300 dia
22 HYSD/TMT Sl.No. 62, Pg.13, 1 MT Palvoncha 1 0 43000.00 0.00 0.00 90.50 90.50 90.50
Reinforce steel bars Irrg

23 HYSD/TMT Sl.No. M-179, of 1MT Palvoncha 1 0 45000.00 0.00 0.00 90.50 90.50 90.50
structural steel Irg

Note : 1) Four KM Extra water lead for line & One KM for SS works.
Labour rates to be adopted: Pg.No Sl.No Rs. Ps.
Mason 1st class vide item no: 7 I-11 470.00
Mason 2nd class vide item no: 10 II-35 450.00
Painter 1st class vide item no: 8 I-35 540.00
Painter 2nd class vide item no: 11 II-37 450.00
Man Mazdoor vide item no: 12 III-3 425.00
Woman Mazdoor vide item no: 12 III-4 425.00

IEF ENGINEER/CIVIL
SEIGNORAGE CHARGE CALCULATION SHEET
Qty of Metal incl
Item qty Qty of Earth Qty of Gravel Qty of Sand Crusher dust and Bricks
Sl.No. Description of Item stones
Total Qty Total Qty Total Qty in Total Qty
Per unit Per unit Per unit Per unit Per unit
in Cum in Cum Cum in Cum
1 Levelling with borrowed #REF! Cum 1.00 #REF!
gravel

2 Laying of CC 1:4:8 #REF! Cum 0.45 #REF! 0.90 #REF!


3 Construction of RR/ CRS #REF! Cum 0.33 #REF! 1.10 #REF!
Masonry
4 Laying of PCC 1:3:6 #REF! Cum 0.45 #REF! 0.90 #REF!
5 Flush pointing CM (1:4) #REF! Sqm 0.003 #REF!
6 Plastering 12mm thk #REF! Sqm 0.01575 #REF!
7 Plastering 20mm thk (2 #REF! Sqm 0.022 #REF!
coats)

8 Plastering 20mm thk (1 #REF! Sqm 0.02205 #REF!


coat)

9 Providing Sand cushion #REF! Cum 1.00 #REF!

10 Providing Crusherdust #REF! Cum 1.00 #REF!


cushion
11 RCC M20 / PCC M20 #REF! Cum 0.45 #REF! 0.90 #REF!
nominal mix
12 Brick Masonry CM(1:6) #REF! Cum 0.22 #REF! 0.512

13 Metal spreading 20 Mm #REF! Cum 1.00 #REF!


HBG

14 Cable duct 1/99 in #REF! RM


switchyard
Concrete (PCC & RCC) #REF! RM 0.081225 #REF! 0.16245 #REF!
Plastering #REF! RM 0.032445 #REF!
Brick Masonry #REF! RM 0.04554 #REF! 0.105984
Sand Cushion #REF! RM 0.25 #REF!
15 Cable duct in switch yard #REF! RM
for Road Crossing -RCC
Hume Pipe

PCC 1:3:6 #REF! RM 0.223 #REF! 0.446 #REF!


16 Cable duct in switch yard RM
for Road Crossing -AC
pipe

PCC 1:4:8 0.00 RM 0.135 0 0.27 0


17 Cable duct 1/99 in Control #REF! RM
room
concrete #REF! RM 0.101025 #REF! 0.20205 #REF!
plastering #REF! RM 0.0584325 #REF!
Brick masonry #REF! RM 0.108856 #REF! 0.253338
18 Providing impervious coat #REF! Sqm 0.02205 #REF!

19 RCM Facia 50 thk #REF! Sqm 0.06059 #REF!

20 Flooring with #REF! Sqm 0.012 #REF!


ceramic/vitrified tiles /
Tandur

21 Flooring with Granite slabs #REF! Sqm 0.02 #REF!

22 RCC precast planks #REF! Sqm 0.01125 #REF! 0.0225 #REF!

23 20 mm thick plain cement #REF! RM 0.0023 #REF!


mortar bands
24 Planting plants #REF! Nos 0.11 #REF! 0.06 #REF!
25 Koreion grass #REF! Sqm 0.15 #REF!

26 Septic Tank #REF! Nos


concrete #REF! Nos 0.882 #REF! 1.764 #REF!
plastering #REF! Nos 0.333837 #REF!
Brick masonry #REF! Nos 0.902 #REF! 2.0992
RR masonry #REF! Nos 2.5971 #REF! 8.657 #REF!
27 Wet mix macadam #REF! Cum 1.32 #REF!

28 Supply of gravel for road #REF! Cum 1.16 #REF!


berms
29 Precasting and fixing kerb #REF! RM
wall with PCC(1:2:4
PCC #REF! RM 0.010125 #REF! 0.02025 #REF!

Plastering #REF! RM 0.007875 #REF!

30 Construction of PCC Road #REF! Cum 0.45 #REF! 0.90 #REF!

31 RCC Hume pipe #REF! RM 0.00256 #REF!


32 Filling Fdn with borrowed Cum 1.00 0
earth

33 Filling Fdn with borrowed Cum 1.00 0


gravel

34 Laying of CC 1:2:4 Cum 0.45 0 0.90 0.00

Total Quantities #REF! #REF! #REF! #REF!


Seignorage charges 30.00 #REF! 30.00 #REF! 40.00 #REF! 75.00 #REF! 60.00

Total seignorage charges #REF!


SMET 2% on above #REF!
#REF!
Bricks

Total Qty in
thousands

#REF!
#REF!

#REF!
#REF!

#REF!
#REF!
Page 15 of 139

DATA

Name of work: Extension of Control Room in Ground floor & Construction of first floor at existing control house for erection of
132/33KV features and accommodating Office room & Store room in Existing 132/11KV SS at Dharmasagar in Warangal District
Date of preparation:- SSR adopted:SSR 2018-19 (With Revised Cement
& Steel Rates for the Month of Febrauary 2019)

1 Supplying and fixing CPVC pipes of SDR 13.50 pipes Medium Grade as per IS 15778 of approved make for
water supply line to toilets including cost and conveyance of pipe, specials such as elbows, Tees concealing
same in walls and floors by cutting 25/ 20/ 15mm dia to be included grooves, packing, finishing after laying
pipe in position as per the directions of the Engineer in charge for the finished item of work.

a 34.90 mm Outer dia Pipe


Rate as per TBSP-J.III- 04, of SSR RM 1.00 263.00 263.00
over heads and contractor profit 11.765% 11.765% 263.00 30.94

Basic rate per 1RM 293.94


1.11765 Area allowances on labour with profit on TBSP-H.IV- 01 0% 76.00 0.00
SoR
Rate per 1RM 293.94
Tender percentage 6.30% less -18.52
total 275.42

b 28.6 mm Outer dia Pipe


Rate as per TBSP-J.III- 03, of SSR RM 1.00 193.00 193.00
over heads and contractor profit 11.765% 11.765% 193.00 22.71
Basic rate per 1RM 215.71
1.11765 Area allowances on labour with profit on TBSP-H.IV- 01 0% 76.00 0.00
SoR
Rate per 1RM 215.71
Tender percentage 6.30% less -13.59
total 202.12

c 22.20 mm Outer dia Pipe


Rate as per TBSP-J.III- 02, of SSR RM 1.00 146.00 146.00
over heads and contractor profit 11.765% 11.765% 146.00 17.18
Basic rate per 1RM 163.18
1.11765 Area allowances on labour with profit on TBSP-H.IV- 01 0% 76.00 0.00
SoR
Rate per 1RM 163.18
Tender percentage 6.30% less -10.28
total 152.90

d 15.90 mm Outer dia Pipe

Rate as per TBSP-J.III- 01, of SSR 2015-16 RM 1.00 128.00 128.00


over heads and contractor profit 11.765% 11.765% 128.00 15.06
Basic rate per 1RM 143.06

1.11765 Area allowances on labour with profit on TBSP-H.IV- 01 0% 76.00 0.00


SoR
Rate per 1RM 143.06
Tender percentage 6.30% less -9.01
total 134.05
Page 16 of 139

86 Providing and fixing in position at all levels of the buildings Bronze Gate (GM peet) Valve (Tata/Zenith
make)as per IS-778 class- 1, Indian make heavy type for water services with hand wheel at all elevations for
following sizes including jointing complete as per the directions of the Engineer in charge for the finished
item of work.

a 32 mm dia Nominal Bore


Each 1.00 1700.00 1700.00
Cost of Gate(GM peet) Valve, TBSP-G.III-04, Sl.No. of
SSR
over heads and contractor profit 11.765% 11.765% 1700.00 200.01
Basic rate per 1No 1900.01
1.11765 Area allowances on labour with profit on TBSP-G.IV-03 0% 62.00 0.00

Rate per 1NO 1900.01

b 25mm dia Nominal Bore


Cost of Gate(GM peet) Valve, TBSP-G.III-03, Sl.No. of Each 1.00 1119.00 1119.00
SSR
over heads and contractor profit 11.765% 11.765% 1119.00 131.65
Basic rate per 1No 1250.65
1.11765 Area allowances on labour with profit on TBSP-G.IV-03 0% 62.00 0.00

Rate per 1NO 1250.65


c 20mm dia Nominal Bore
Cost of Gate(GM peet) Valve, TBSP-G.III-02, Sl.No. of Each 1.00 778.00 778.00
SSR
over heads and contractor profit 11.765% 11.765% 778.00 91.53

Basic rate per 1NO 869.53


1.11765 0% 62.00 0.00
Area allowances on labour with profit on TBSP-G.IV-03
Rate per 1NO 869.53
d 15mm dia Nominal Bore
Cost of Gate(GM peet) Valve, TBSP-G.III-01, Sl.No. of Each 1.00 577.00 577.00
SSR
over heads and contractor profit 11.765% 11.765% 577.00 67.88
Basic rate per 1NO 644.88
1.11765 0% 62.00 0.00
Area allowances on labour with profit on TBSP-G.IV-03
Rate per 1NO 644.88

1 Clearing thick jungle growth (less than 50 percent open space) including bushes up to 30 cm /parthenium and other
weeds including burning or disposing off the same as directed by Engineer in charge for the finished item of work.

Data per 1000 Sqm As per IRR-PMW 1-2


Labour:
Work inspector, S.No.10, of Irg SSR, Labour rates Day 0.50 565.00 282.50

Mazdoor Day 5.00 425.00 2125.00


over heads and contractor profit 11.765% 11.765% 2407.50 283.24
Page 17 of 139

Basic Rate per Sqm 2690.74


1.11765 Area allowances on labour including 11.765% towards profit & O.H 0% 2407.50 0.00
charges
Total Rate/1000Sqm 2690.74
Rate per 1 Sqm Rs. 2.69
2 Providing and fixing in position at all levels of the building under floors and against walls 75mm dia
(4kg/cm2) PVC pipes of prince / sudhakar or any ISI brand make with specials such as junctions,couplers,
bends/Tees etc., with or without access doors as required and with solvent jointing as per standard practice
wherever necessary including excavation and refilling wherever required,, testing etc. complete as per the
directions of the Engineer in charge for the finished item of work.

Cost of Pipe as per TBSP-H.I-01, SSR 1RM 1.00 84.00 84.00

labour charges of TBSP-H.IV-01, SSR 1RM 1.00 76.00 76.00


over heads and contractor profit 11.765% 11.765% 160.00 18.82
178.82
Basic rate per 1RM
1.11765 Area allowances on labour with profit 0% 76.00 0.00
Rate per 1RM 178.82
Tender percentage 6.30% less -11.27
total 167.55
2 Levelling the lowlying areas with excavated earth ( obtained from the foundations of Control house and Switch yard
structures) with a lead up to 1 KM over initial lead, depositing the soils in filling areas , spreading soils, and consolidation
with three wheel 8 to 10 MT static Road Roller @ OMC to meet requirement as per standard specification , including all
hire and operational charges of T&P complete for finished item of work as per the directions of the Engineer in Charge.
(Payment will be made based on final levels for the finished item of work).

Unit = 1 cum Machinery & material as per Data Sl.No.3, Pg.297 of Roads &
Bridges
Conveyance charges up to a lead of 1 KM = 34.2 Cum 1.00 34.20 34.20
b) Machinery
L.C 3.86 Water tanker 6 kl capacity Sl.No.10 of R&B (Hire Chgs), Hour 0.02 698.89 13.98
P.No.27 of SSR
L.C. 3.09 Static Road Roller 80 - 100 kN Sl.No.8 of R&B (Hire hour 0.0125 1342.30 16.78
Chgs), Pg.27 of SSR
Water KL 0.12 73.00 8.76
over heads and contractor profit 11.765% 11.765% 39.52 4.65
Basic Rate per Cum 78.37
Conveyance charges of water with OH &P Kl 0.12 20.50 2.46
1.11765 Area allowances on labour (Loading & Unloading) with profit 0% 6.95 0.00

Rate per 1cum 80.83

3 Levelling by cutting and filling by mechanical means including pre-watering of soil, excavation of soils, depositing the
soils in filling areas , spreading soils, breaking clods, sectioning and consolidation with three wheel 8 to 10 MT static Road
Roller @ OMC to meet requirement as per standard specification , including all hire and operational charges of T&P and
seigniorage charges, complete for finished item of work as per (Payment will be made based on level for finished item of
work).

a) up to 10 meters radius
Unit = cum Data Sl.No.4-iii, Pg.299 of Roads & Bridges
Taking output = 100 cum
a) Labour
Mate day -
Mazdoor (Unskilled) day 0.52 425.00 221.00
b) Machinery
L.C. 429.86 Hydraulic Excavator 0.9 cum bucket capacity @ 60 cum hr 1.67 2967.90 4956.39
per hour Sl.No.4 (Hire Chgs), of R&B SSR 2017-18

L.C. 47.26 Tractor with grader Sl.No.12 (Hire Chgs), of R&B hour 1.00 472.64 472.64

L.C. 772.44 Water tanker 6 kl capacity Sl.No.10 of R&B (Hire Chgs), hour 4.00 698.88 2795.52
of SSR 2017-18
L.C. 308.875 Static Road Roller 80 - 100 kN Sl.No.8 of R&B (Hire hour 1.25 1342.30 1677.88
Chgs), Pg.27 of SSR 2017-2018
C) Water kl 24.00 73.00 1752.00
over heads and contractor profit 11.765% 11.765% 11875.43 1397.14

Conveyance charges of water with OH &P Kl 24 20.50 492.00


Cost for 100 cum 13764.57
Basic cost /1cum 137.65
1.11765 area allowance on labour with profit 0% 17.79 0.00
Rate per Cum 137.65
b) Levelling by cutting and filling by mechanical means including pre-watering of soil, excavation of soils,
depositing the soils in filling areas , spreading soils, breaking clods, sectioning and consolidation with three
wheel 8 to 10 MT static Road Roller @ OMC to meet requirement as per standard specification , including all
hire and operational charges of T&P and seigniorage charges, complete for finished item of work as per
(Payment will be made based on level for finished item of work).

above 10m to 1000m radius


Taking output = 100 cum Data Sl.No.4 (i), Pg.297 of R&B Data
a)  Labour
Mate day -
Mazdoor (Unskilled) day 1.04 425.00 442.00
L.C. b) Machinery
Page 18 of 139

429.86 Hydraulic Excavator 0.9 cum bucket capacity @ 60 cum hour 1.67 2967.90 4956.39
per hour Sl.No.4 (Hire Chgs), of R&B SSR 2017-18

L.C. 868.95 Tipper 5.0/5.5 cum with 10 t capacity Sl.No.54 (Hire hour 4.50 1004.40 4519.80
Chgs), Pg.43 of Irg SSR
L.C. 87.92 Dozer D-50 for spreading @ 200 cum per hour Sl.No.2 hour 0.50 1758.40 879.20
(Hire Chgs), of R&B SSR
L.C. 23.63 Tractor with grader Sl.No.12 (Hire Chgs), of R&B hour 0.50 472.64 236.32

L.C. 386.22 Water tanker 6 kl capacity Sl.No.10 of R&B (Hire Chgs), hour 2.00 698.89 1397.78
P.No.27 of SSR
L.C. 308.88 Static Road Roller 80 - 100 kN Sl.No.8 of R&B (Hire hour 1.25 1342.30 1677.88
Chgs), Pg.27 of SSR 2017-2018
c) Material
C) Water kl 12.00 73.00 876.00
over heads and contractor profit 11.765% 11.765% 14985.37 1763.03
Conveyance charges of water with OH &P Kl 12 20.50 246.00
Cost for 100 cum 16994.40
Basic cost /1cum 169.94
1.11765 area allowance on labour with profit 0% 25.47 0.00
Rate per Cum 169.94
avg rate with grader 153.80
4 Levelling by filling with borrowed Gravel by mechanical means including cost & conveyance of earth,
depositing the soils in filling areas , spreading soils, breaking clods, sectioning and consolidation with three
wheel 8 to 10 MT static Road Roller @ OMC to meet requirement as per standard specification , including all
hire and operational charges of T&P and seigniorage charges, complete for finished item of work as per
(Payment will be made based on level for finished item of work).

Unit = cum Data Sl.No.4 (ii), Pg.298 of R&B Data


Taking output = 10 cum
a)  Labour
Mate day -
Mazdoor (Unskilled) day 0.104 425.00 44.20
L.C. b) Machinery
L.C. 8.792 Dozer D-50 for spreading @ 200 cum per hour Sl.No.2 hour 0.05 1758.40 87.92
(Hire Chgs), of R&B SSR
L.C. 4.73 Tractor with grader Sl.No.12 (Hire Chgs), of R&B hour 0.100 472.64 47.26

L.C. 77.24 Water tanker 6 kl capacity Sl.No.10 of R&B (Hire Chgs), hour 0.40 698.89 279.56
P.No.27 of SSR
L.C. 30.8875 Static Road Roller 80 - 100 kN Sl.No.8 of R&B (Hire hour 0.125 1342.30 167.79
Chgs), Pg.27 of SSR
c) Material
C) Water kl 0.24 73.00 17.52
Cost of Gravel cum 10.00 98.00 980.00
over heads and contractor profit 11.765% 11.765% 1624.25 191.09
Cost for 10 cum 1815.34
Basic cost /1cum 181.53
Conveyance charges of water with OH &P Kl 0.0240 20.50 0.49
Conveyance of gravel including Seignorage charges 1.00 157.55 157.55

1.11765 Area allowances on labour with profit 0% 16.58 0.00


Rate per Cum 339.58
5 Flush Pointing with CM (1:4) to RR Masonry including cost and conveyance of all materials, all leads and lifts
complete as per the directions of the Engineer in charge for the finished item of work.

Unit = 10 sqm BLD-CSTN-7-2 pg.41 of Bldgs Data


A. MATERIALS:
Cement kg 10.80 4.70 50.76
Fine aggregate (Sand) cum 0.03 667.00 20.01
B. LABOUR:
Mason 2nd class day 0.50 450.00 225.00
Mazdoor (unskilled) day 0.74 425.00 314.50
add towards water charges 1% on cost of materials and 0.01 610.27 6.10
labour
over heads and contractor profit 11.765% 11.765% 610.27 71.80
cost per 10 sqm 688.17
cost per 1 sqm 68.82
d) cement conveyance charges with profit 1.08 0.08 0.08
e) Sand conveyance charges incl seignorage charge 0.003 946.85 2.84
1.11765 g) area allowances on labour on b 0% 53.95 0.00
Rate per 1 sqm Rs. 71.74

6 Dismantling of existing stone masonry up to 3 m height, including carefully stacking materials useful for re
use and clearing all debris away from the site with initial lead & lift labour charges, T&P complete as per the
directions of the Engineer in charge for the finished item of work.

Data for 1.25 Cum RBR - STCL-7 (B) pg. 285


Mazdoor ( unskilled) day 0.78 425.00 331.50
Machinery
12.5496 Tractor rate as per SoR R&B item.11 hour 0.27 464.80 125.50
457.00
Page 19 of 139

Rate per 1 Cum 365.60


over heads and contractor profit 11.765% 11.765% 365.60 43.01
1.11765 D.area allowances on labour with profit 0% 275.24 0.00
Rate per 1 Cum Rs. 408.61
7 Dismantling of existing Brick masonry including clearing away and carefully stacking materials useful for re
use and all debris away from the site with lead & lift labour charges, T&P complete as per the directions of
the Engineer in charge for the finished item of work.
Data for 10 Cum BLD-CSTN-14-9,299 , pg.109 of Bldgs Data

Mazdoor ( unskilled) day 4.09 425.00 1738.25

1738.25
Rate per 1 Cum 173.83
over heads and contractor profit 11.765% 11.765% 173.83 20.45
1.11765 D.area allowances on labour with profit 0% 173.83 0.00
Rate per 1 Cum Rs. 194.28
8 Dismantling the existing RCC by mannual means and carefully stacking the reuseful material at site and
disposing the unserviceable metraial to any remote place 1000 mts distance away from site with all leads and
lifts includung cost of T&P ,labour and as per the directions of the Engineer-in - charge for finished item of
work.
Unit = cum
RBR STCL . 5 I (c), pg.283 of Roads Data
Taking output = 1.25 cum
labour
Black Smith day 0.400 470.00 188.00
Mazdoor (Unskilled) day 3.500 425.00 1487.50
Machinery
12.5496 Tractor rate as per SoR R&B item.11 Hr 0.270 464.80 125.50

over heads and contractor profit 11.765% 11.765% 1801.00 211.89


Cost for 1.25 cum 2012.88
Cost for 1.00 cum 1610.31
1.11765 Area Allowance with profit 0% 1350.44 0.00
Cost for 1 cum Rs. 1610.31
9 Dismantling doors, windows and clear storey windows, ventilators etc.; (wood or steel) shutters including
chowkhats, architraves, hold fasts and other attachments etc., complete and stacking them at departmental
stores ( By departmental Vehicle) and disposing the unserviceable metraial away from site premises by
contractors own transport as specified and directed by the engineer-in - charge.

Not exceeding 3 sq.m. in area:


Details of cost per each
Labour :-
Mason, II class day 0.100 450.00 45.00
Mazdoor (male) day 0.200 425.00 85.00
Blacksmith II class day 0.050 450.00 22.50
over heads and contractor profit 11.765% 11.765% 152.50 17.94
Cost for 1sqm = a+b+c 170.44
1.11765 Area Allowance with profit 0% 152.50 0.00
Rate/1 sqm 170.44

10 Cutting of trees, including cutting of trunks, branches and removal of atumps & roots, refilling, compaction
and backfillng and stacking of serviceable material by manual means with all leads & lifts as per technical
specification clause 201 MORD/MORTH

Lead upto 100 m


Unit = each
A Girth above 300mm. To 600 mm
a)Labour
Mate Day
Mazdoor(Unskilled) Day 0.624 425.00 265.20
b) Machinery
3.25 Tractor rate as per SoR R&B item.11 hour 0.070 464.80 32.54
over heads and contractor profit 11.765% 11.765% 297.74 35.03
Rate per No 332.76
1.11765 Area allowances on labour including towards profit & O.H charges 0% 268.45 0.00

Rate per No 332.76


Lead upto 100 m
Unit = each
B Girth above 600mm.To 900 mm
a)Labour
Mate Day
Mazdoor(Unskilled) Day 0.936 425.00 397.80
b) Machinery
9.76 Tractor rate as per SoR R&B item.11 hour 0.210 464.80 97.61
over heads and contractor profit 11.765% 11.765% 495.41 58.28
Rate per No 553.69
1.11765 Area allowances on labour including towards profit & O.H charges 0% 407.56 0.00
Page 20 of 139

Rate per No 553.69


Lead upto 100 m
Unit = each
C Girth above900mm. To 1800 mm
a)Labour
Mate Day
Mazdoor(Unskilled) Day 2.080 425.00 884.00
b) Machinery
13.01 Tractor rate as per SoR R&B item.11 hour 0.280 464.80 130.14
over heads and contractor profit 11.765% 11.765% 1014.14 119.31
Rate per No 1133.46
1.11765 Area allowances on labour including towards profit & O.H charges 0% 897.01 0.00
Rate per No 1133.46
Lead upto 100 m
Unit = each
D Girth above1800mm. To 2700 mm
a)Labour
Mate Day
Mazdoor(Unskilled) Day 4.160 425.00 1768.00
b) Machinery
19.52 Tractor rate as per SoR R&B item.11 hour 0.420 464.80 195.22
over heads and contractor profit 11.765% 11.765% 1963.22 230.97
Rate per No 2194.19
1.11765 Area allowances on labour including towards profit & O.H charges 0% 1787.52 0.00
Rate per No 2194.19
BORE WELL
6 1Job Job work for Geologist charges for site investigation for locating bore well points
(As per RWS estimate)+20% increase for SOR 18-19 1200.00
Total Rate per 1 Job Rs. 1200.00

7 Drilling of bore well by down the hole hammer (DTH) drilling to the finished diameter of 163 mm (6 1/2") in
all formations to the depth as specified and remaining the bore to the required dia, flushing the bore walls at
an average pressure of 7 Kg/Sqcm(100 PSI), conducting yield test, inclusive of transportation from point to
point , crew charges, consumables , shifting of ring and all other charges etc., complete. The bore well should
be true & vertical and work should be carried out to the amendments if any from time . The rate is inclusive of
all taxes etc., complete as per the directions of the Engineer in charge for the finished item of work.

a) Up to 90 Running meters ( As per RWS estimate rate) RM 1.00 336.00 336.00


+10% increase for SOR 18-19
Total Rate per 1 RM. Rs. 336.00

b) Above 90 RM to any depth


Rate up to 90 RM( As per RWS estimate)+10% increase for RM 1.00 336.00 336.00
SOR 17-18
Add for 10% of above rate 0.10 336.00 33.60
Total Rate per 1 RM. Rs. 369.60
8 Supply& fixing of 180 mm dia 6 kg/cm2 PVC casing pipes for bore wells for potable water supply
conforming to IS 12818-1992 as amended from time to time including transortation, QC inspection etc.,
complete. as per the directions of the Engineer in charge for the finished item of work
Unit-1RM
cost of pipe including Table 17 of PH of SSR RM 1.00 641.00 641.00

641.00
over heads and contractor profit 11.765% 11.765% 641.00 75.41
BASIC COST per 1 RM 716.41
Total Rate/1RM 716.41
Supplying & fixing 32 mm Nominal Bore GI pipe of TATA/ZENITH/JSW/ZOLOTO Medium grade
properties & weight as per IS 1239 ISI mark with GI fittings of make HB/Kirthi/R-Brand including the cost of
pipe & its fittings & labour charges , leads, and lifts complete as per the directions of the Engineer in charge
for the finished item of work.

Supply & fixing of pipe as per Sl.No 402,P.No 146 Sanitary 1rm 1.00 375.00 375.00
items SSR TBSP-G.I-10
Add for over heads and contractors profit 11.765% 375.00 44.12
BASIC COST per 1 RM 419.12
1.11765 area allowances on labour including 11.765% profit&O.H 0% 41.00 0.00
charges
Total Rate/1RM 419.12
9 RM Supplying & fixing 34.90 mm OD CPVC pipes of SDR 13.5 as per IS standards with fittings fittings including
the cost of pipe & its fittings & labour charges , leads, and lifts complete as per the directions of the Engineer
in charge for the finished item of work.

Supply & fixing of pipe as per Sl.No. 673, P.No.167 SSR 1rm 1.00 263.00 263.00
TBSP-J.III-04
over heads and contractor profit 11.765% 11.765% 263.00 30.94
BASIC COST per 1 RM 293.94
1.11765 area allowances on labour including profit & O.H charges TBSP- 0% 76.00 0.00
H.IV-01
Total Rate/1RM 293.94
Page 21 of 139

10 Supplying & fixing 1 1/4" (32 mm inner dia HDPE pipe (12.5kg/Sqcm) PE-100 grade of approved quality &
make including nipples, bends, couplings etc., complete for finished item of work from bore well to delivery
including cost & conveyance of all materials, specials/fixtures and fittings labour charges, leads, and lifts
complete as per the directions of the Engineer in charge for the finished item of work.

cost of pipe as per table 15 of PH items SSR 1 rm 1.00 57.00 57.00

Labour charges for fixing 12B (PH), P.No.3 of SSR 1 rm 1.00 42.00 42.00

over heads and contractor profit 11.765% 11.765% 99.00 11.65


BASIC COST per 1 RM 110.65
1.11765 area allowances on labour 0% 42.00 0.00
Total Rate/1RM 110.65
11 Supply and fixing of MS Bore cover duly painted suitable for 8" dia casing pipe including cost &b conveyance
of all materials and fittings and leads complete as per the directions of the Engineer in charge for the finished
item of work.

Cost as per local market rate No 1.00 190.00 190.00


Total Rate per 1 No. Rs. 190.00

12 Supply and fixing of MS clamps cover suitable for 1/4" dia GI pipe including cost &b conveyance of all
materials and fittings and leads complete as per the directions of the Engineer in charge for the finished item
of work.
Cost as per local market rate No 1.00 150.00 150.00

Total Rate per 1 No. Rs. 150.00


13 Supplying & fixing of 3 core 2.5 Sqmm PVC Insulated and FRLS round sheathed multi core copper cable of
Finolex / Polycab /Gold Medal make and as approved by the Engineer in charge for submergible motor
including cost & conveyance of all materials, labour charges, leads complete as per the directions of the
Engineer in charge for the finished item of work.

cost of 2.5 sqmm copper cable Sl.No.137 n, Electrical RM 1.00 114.00 114.00
items ELEC-1.5.8
Labour charges for fixing 2.00
over heads and contractor profit 11.765% 11.765% 116.00 13.65
BASIC COST per 1 RM 129.65

14 Supplying & fixing 3 Phase 3HP motor , 30 to 35 stage (Crompton Greaves/texmo make) of approved type, as
directed by Engineer in charge, submersible for 6.5" dia bore well including cost & conveyance of all materials,
labour charges, and fitted with L.T/L.K MK-1 DOL starter with panel board (Seimens/crompton/L&T) fitted
with related fittings such as Ammeter , volt meter,capacitors and including nuts & bolts and GI sheet box for
panel board complete as per the directions of the Engineer in charge for the finished item of work.

Cost of Motor as per the Market Rate each 1 20500.00 20500.00


cost of panel board with necessary accessories ELEC- 1 4480.00 4480.00
5.10.1, sl.No.617
Rate of D.O.L starter 415V, 3 phase, 50 each 1 1450.00 1450.00
Hz.(Seimens/crompton/L&T)as per SR item 583/ELEC-
5.4.2of SSR Electrical items
installation charges and conveyance charges etc Rate as 1job 1 2500.00 2500.00
per the Market Rate
over heads and contractor profit 11.765% 11.765% 5930.00 697.66
Total Rate per 1 No. Rs. 29627.66
CONTROL HOUSE
15 Earthwork excavation in all types of soils (up to stone matrix)which can be excavated with pick axe and crow
bars and do not require blasting in all conditions such as dry, wet and slushy etc. covering initial lead and lift
etc and backfilling the foundations (after laying foundations) with excavated earth complete as per the the
directions of the Engineer in charge for the finished item of work. .

A Ordinary soil
II Manual Means Data RBR-FNDN-1 (I), Pg.484
Upto 3 m depth
Unit = cum Taking output = 10 cum
a)  Labour
Mate day -
Mazdoor (Unskilled) day 3.64 425.00 1547.00
over heads and contractor profit 11.765% 11.765% 1547.00 182.00
Cost for 10 cum = a+b 1729.00
Rate per cum = (a+b)/10 172.90
1.11765 d) area allowances on LABOUR including profit & O.H charges 0% 154.70 0.00

Total for Control House Rate/1cum 172.90

a Earth work excavation for Road Works


Excavation Rate per Cum as above 172.90
Rate/Cum for Road works 172.90
b Earth work excavation for Switch Yard Works, Cable Duct, Retaining walls, flowering of plants
Road culvert, Compound wall, Drain
Excavation Rate per Cum as above Rs. 172.90
Page 22 of 139

16 Excavation in Ordinary rock (HDR, soft rock ) (not requiring blastingThe rate includes labour charges, cost
of tools and tackles, disposing of unuseful excavated materail at all leads and lifts, complete for finished
item of work as per directions of the Engineer-in-charge

A) Materials: Nil IRR-DAW-1-2,Pg.No.49


Unit = cum Taking output = 520 cum
B)  Machinery:
2059.20 Shovel 0.85 cum capacity(Sl.No.52 ,Pg.No.50 of Hire Hour 8.000 2967.90 23743.20
charges)Fuel / Energy charges
7907.20 Dumpers 5 cum capacity (4 Nos) Sl.No.34 Fuel / Energy Hour 32.000 1326.60 42451.20
charges
1544.80 Tipper 5 cum capacity (1No) Sl.No.54Fuel / Energy Hour 8.000 1004.40 8035.20
charges
Total hire charges of Machinery 74229.60
B)  Labour:
Work inspector Sl No.I.10 Lbr Rates ICAD Hour 1.000 565.00 565.00
Crowbar man Sl No.II.8 Lbr Rates ICAD Hour 2.500 450.00 1125.00
Mazdoor Hour 10.000 425.00 4250.00
Total cost of Labour 5940.00
Total 80169.60
over heads and contractor profit 11.765% 11.765% 80169.60 9431.95
Total cost of 520 cum Rs. 89601.55
Rate/Cum 172.31
1.11765 f) area allowances on labour including profit & O.H charges 0% 33.56 0.00

Rate/Cum 172.31

17 Excavation in HDR, soft rock, F&F requiring blasting where ever necessary. The rate includes labour
charges, cost of blasting materials, tools and tackles, safety measures, disposal of unuseful excavted material
at all leads and lifts, complete for finished item of work as per directions of the Engineer-in-charge.

Unit = cum Taking output = 520 cum


IRR-DAW-1-3,Pg.No.49
A)Materials:
Use rate of 1.5m drill rod, rate as per I&CAD data 2017-18 RM 216 23.21 5013.36

Reconditioning charges @ 10% 10% 501.336


Use rate of hair hose 4 Nos rate as per I&CAD data 2015- hour 26 9.69 251.94
2016
Explosive small dia(Sl.No.26,Basic input data for Kg 104 75.00 7800
Irrigation work items
Electrical detonators (Sl.No.21,Basic input data for Nos 154 8.00 1232
Irrigation work items
Fuse coil (Sl.No.18,Pg.No.20,Basic input data for Irrigation Nos 320 7.00 2240
work items
Sundries LS 5 20.00 100

Total cost of Materials 17138.636


B)  Machinery:
2059.20 Shovel 0.85 cum capacity(Sl.No.52 ,Pg.No.50 of Hire Hour 8.000 2967.90 23743.20
charges)Fuel / Energy charges
7907.20 Dumpers 5 cum capacity (4 Nos) Sl.No.34 Fuel / Energy Hour 32.000 1326.60 42451.20
charges
1544.80 Tipper 5 cum capacity (1No) Sl.No.54Fuel / Energy Hour 8.000 1004.40 8035.20
charges
2408.90 Air compressorn8.5cmm(ele)2Nos (Sl.No.6)Fuel / Energy Hour 13.000 848.20 11026.60
charges
9633.00 Jack Hammers 4 Nos (Sl.No.39) Fuel / Energy charges Hour 26.000 390.40 10150.40

Total hire charges of Machinery 95406.60

B)  Labour:
Work inspector Hour 1.000 565.00 565.00
Blaster Hour 1.000 565.00 565.00
Helper Blaster Hour 1.000 450.00 450.00
Crowbar man Hour 2.500 450.00 1125.00
Stone breaker Hour 1.000 450.00 450.00
Mazdoor Hour 10.000 425.00 4250.00
Total cost of Labour 7405.00
Total 119950.24
over heads and contractor profit 11.765% 0.11765 119950 14112.15
Total cost of 520 cum Rs. 134062.38
Rate/Cum 257.81
1.11765 f) area allowances on labour including profit & O.H charges 0% 59.53 0.00

Rate/Cum 257.81
Page 23 of 139

18 Excavation in Hard Rock requiring control blasting where ever necessary. The rate includes labour charges,
cost of blasting materials, tools and tackles, safety measures, disposal of unuseful excavted material at all
leads and lifts, complete for finished item of work as per directions of the Engineer-in-charge.

Unit = cum Taking output = 480 cum


IRR-DAW-1-5 page No.52&53
A)Materials: Nil
Use rate of drill rod 1.5 m length, rate as per I&CAD data RM 464 23.21 10769.44
2017-18
Reconditioning charges @ 10% 10% 1076.94
Use rate of 50 m air hose 4 Nos rate as per I&CAD data hour 70 9.69 678.3
2015-2016
Use rate of chain link wire mesh as per I&CAD data 2017- sqm 715 65.84 47075.6
2018
Use rate of sand bag as per SSR 2017-2018, Sl.No. 97 nos 580 30.00 17400

Explosive small dia(Sl.No.26,Basic input data for Kg 149 75.00 11175.00


Irrigation work items
Ordinary detonators (Sl.No.22,Basic input data for nos 23.00 6.00 138.00
Irrigation work items

Electric delay detonators detonators Nos 500 15.00 7500.00


(Sl.No.20,Pg.No.20,Basic input data for Irrigation work
items
Fuse coil (Sl.No.18,Pg.No.20,Basic input data for Irrigation Nos 700 7.00 4900
work items

Sundries LS 10 20.00 200


Total cost of Materials 100913.28
B)  Machinery:
3088.80 Shovel 0.85 cum capacity(Sl.No.52 ,Pg.No.50 of Hire Hour 12.000 2967.90 35614.80
charges)Fuel / Energy charges

514.80 Angle dozer 90 hp(Sl.No.8 ,Pg.No.49 of Hire Hour 2.000 2661.20 5322.40
charges)Fuel / Energy charges

8895.60 Dumpers 5 cum capacity (4 Nos) Sl.No.34 Fuel / Energy Hour 36.000 1326.60 47757.60
charges
772.40 Tipper 5 cum capacity (1No) Sl.No.54Fuel / Energy Hour 4.000 1004.40 4017.60
charges

6485.50 Air compressor 8.5 cmm ( elec)2Nos (Sl.No.6)Fuel / Hour 35.000 848.20 29687.00
Energy charges
25935.00 Jack Hammers 2 Nos (Sl.No.39) Fuel / Energy charges Hour 70.000 390.40 27328.00
Total hire charges of Machinery 149727.40

B)  Labour:
Work inspector Hour 4.500 565.00 2542.50
Blaster Hour 1.500 565.00 847.50
Helper Blaster Hour 3.000 450.00 1350.00
Crowbar man Hour 2.500 450.00 1125.00
Stone breaker Hour 2.500 450.00 1125.00
Mazdoor Hour 20.000 425.00 8500.00
Total cost of Labour 15490.00
Total 266130.68
over heads and contractor profit 11.765% 0.11765 266131 31310.27
Total cost of 480 cum Rs. 297440.96
Rate/Cum 619.67
1.11765 f) area allowances on labour including profit & O.H charges 0% 127.46 0.00
Rate/Cum 619.67

19 Excavation in Hard Rock requiring blasting where ever necessary. The rate includes labour charges, cost of
blasting materials, tools and tackles, safety measures, disposal of unuseful excavted material at all leads and
lifts, complete for finished item of work as per directions of the Engineer-in-charge.

Unit = cum Taking output = 320 cum


IRR-DAW-1-4,Pg.No.51&52
A)Materials: Nil
Use rate of 1.5m drill rod, rate as per I&CAD data 2017-18 RM 310 23.21 7195.1

Reconditioning charges @ 10% 10% 719.51


Use rate of hair hose 4 Nos rate as per I&CAD data 2017- hour 48 9.69 465.12
2018
Explosive small dia(Sl.No.26,Pg.No.18,Basic input data for Kg 95 75.00 7125
Irrigation work items
Ordinary detonators (Sl.No.22,Pg.No.18,Basic input data nos 10.00 6.00 60.00
for Irrigation work items

Electrical detonators (Sl.No.21,Pg.No.18,Basic input data Nos 333 8.00 2664


for Irrigation work items
Fuse coil (Sl.No.18,Pg.No.18,Basic input data for Irrigation Nos 450 7.00 3150
work items
Sundries LS 5 20.00 100
Page 24 of 139

Total cost of Materials 21478.73


B)  Machinery:
2059.20 Shovel 0.85 cum capacity(Sl.No.52 ,Pg.No.50 of Hire Hour 8.000 2967.90 23743.20
charges)Fuel / Energy charges
5930.40 Dumpers 5 cum capacity (4 Nos) Sl.No.34 Fuel / Energy Hour 24.000 1326.60 31838.40
charges
772.40 Tipper 5 cum capacity (1No) Sl.No.54Fuel / Energy Hour 4.000 1004.40 4017.60
charges
257.40 Angle dozer 90 hp(Sl.No.8 ,Pg.No.49 of Hire Hour 1.000 2661.20 2661.20
charges)Fuel / Energy charges
4447.20 Air compressorn8.5cmm(ele)2Nos (Sl.No.6)Fuel / Energy Hour 24.000 848.20 20356.80
charges
17784.00 Jack Hammers 4 Nos (Sl.No.39) Fuel / Energy charges Hour 48.000 390.40 18739.20

101356.40
Total hire charges of Machinery
B)  Labour:
Work inspector Hour 1.000 565.00 565.00
Blaster Hour 1.000 565.00 565.00
Helper Blaster Hour 1.000 450.00 450.00
Crowbar man Hour 1.000 450.00 450.00
Stone breaker Hour 2.000 450.00 900.00
Mazdoor Hour 6.000 425.00 2550.00
Total cost of Labour 5480.00
Total 128315.13
over heads and contractor profit 11.765% 0.11765 128315 15096.28
Total cost of 320 cum Rs. 143411.41
Rate/Cum 448.16
1.11765 f) area allowances on labour including profit & O.H charges 0% 114.78 0.00

Rate/Cum 448.16
Difference of rate between excavation with controlled Cum 1.00 171.51 171.51
blasting & with blasting

20 Excavation in Hard Rock (blasting prohibited)where ever necessary. The rate includes labour charges, cost of
blasting materials, tools and tackles, safety measures, disposal of unuseful excavted material at all leads and
lifts, complete for finished item of work as per directions of the Engineer-in-charge.( For Switch yard levelling
works)

Unit = cum Taking output = 10 cum


IRR-CCDW-1-7 pages 234-235
A)Materials: Nil
Total cost of Materials 0.00
B)  Machinery:
1422.60 Air compressor 8.5 cmm ( diesel )2Nos (Sl.No.3)Fuel / Hour 6.000 1614.40 9686.40
Energy charges
Total hire charges of Machinery 9686.40
B)  Labour:
Work inspector Hour 0.200 565.00 113.00
Mazdoor Hour 5.000 425.00 2125.00
Total cost of Labour 2238.00
Total 11924.40
over heads and contractor profit 11.765% 11.765% 11924.40 1402.91
Total cost of 10 cum Rs. 13327.31
Rate/Cum 1332.73
1.11765 f) area allowances on labour including profit & O.H charges 0% 366.06 0.00

Rate/Cum 1332.73

21 Excavation in Hard rock (requiring blasting) The rate includes labour charges, cost of blasting materials, tools
and tackles, safety measures, disposal of unuseful excavted material at all leads and lifts, complete for
finished item of work as per directions of the Engineer-in-charge
Unit = cum Data Sl.No.14, Pg.17 of Bldg. items
Taking output = 10 cum
a)  Labour
Mate day -
Driller Sl.No. 19 of Irg. SSR Labour day 0.50 540.00 270.00
Blaster Sl.No. 3 of Irg. SSR Labour day 0.25 565.00 141.25
Mazdoor (Unskilled) day 8.35 425.00 3548.75
b) Machinery
LC 978.1 Air compressor 210 cfm / 250 cfm with 2 jack hammers for hour 1.00 2139.50 2139.50
drilling at 15 cum per hour (7 cmm diesel = 1358.7 (237.1
labour) + jack hammer 390.4 each (370.5 labour) Pg.33-34,
(Hire Charges Sl.No.3 & 39) Irg SSR

c) Material
Explosive small dia(Sl.No.26,Pg.No.18,Basic input data for kg 3.50 75.00 262.50
Irrigation work items
Detonator Electric Sl.No.21, Pg.18 SSR Nos. 14.00 8.00 112.00
over heads and contractor profit 11.765% 11.765% 6474.00 761.67
Cost for 10 cum = a+b+c+d+e 7235.67
Page 25 of 139

Basic Rate per cum = (a+b+c+d+e)/10 723.57


1.11765 f) area allowances on labour including profit & O.H charges 0% 493.81 0.00
Rate/1cum 723.57

Excavation in Hard Rock requiring control blasting where ever necessary. The rate includes labour charges,
cost of blasting materials, tools and tackles, safety measures, disposal of unuseful excavted material at all
leads and lifts, complete for finished item of work as per directions of the Engineer-in-charge.

Rate of excavation in Hard rock with blasting as per Cum 1.00 723.57 723.57
foundations ata
Add difference of rate with blasting and controlled Cum 1.00 171.51 171.51
blasting as per Irrigation data
Rate/1cum 895.08

22 Excavation in Hard rock ( Blasting Prohibited) upto 3m depthThe rate includes labour charges, tools and
tackles, safety measures, disposal of unuseful excavted material at all leads and lifts, as per drawing removal
of stumps and other deleterious material and disposal upto a lead of 50m, complete for finished item of work
as per directions of the Engineer-in-charge

Unit = cum Data Sl.No.15, Pg.18 of Bldg. items


Taking output = 10 cum
a)  Labour
Mate day -
Mazdoor (Unskilled) day 5.20 425.00 2210.00
b) Machinery
LC 5868.6 Air compressor 210 cfm / 250 cfm with 2 jack hammers for hour 6.00 2139.50 12837.00 1176.6
drilling at 15 cum per hour (7 cmm diesel = 1174.6 (210.9
labour) + jack hammer 349 each (329.6 labour) Pg.33-34,
(Hire Charges Sl.No.3 & 39) Irg SSR

over heads and contractor profit 11.765% 11.765% 15047.00 1770.28


Cost for 10 cum = a+b+d+e 16817.28
Basic Rate per cum = (a+b+c+d+e)/10 1681.73
1.11765 f) area allowances on labour including profit & O.H charges 0% 807.86 0.00
Rate/1cum 1681.73

23 Providing sand cushion for foundations and basement in layers, including cost & conveyance of all materials,
labour charges, leads, lifts , watering and consolidating to required density complete as per the directions of
the Engineer in charge for the finished item of work( APSS No. 309&310)

Unit = cum Data Sl.No.16, Pg.18 of Bldg. items


Taking output = 6 cum
a)  Labour
Mate day -
Mazdoor (Unskilled) day 0.31 425.00 131.75
b) Material
Sand cum 6.00 600.00 3600.00
C) Water kl 0.60 73.00 43.80

over heads and contractor profit 11.765% 11.765% 3775.55 444.19


Basic Rate per 6 cum 4219.74
Basic Rate per 1 cum 703.29
e) Sand conveyance charges incl seignorage charge 1.00 946.85 946.85
e) Water conveyance charges 0.10 20.50 2.05
1.11765 e) area allowances on labour including profit & O.H charges 0% 21.96 0.00
Rate/1cum 1652.19

24 Providing stone crusher dust for foundations and basement in layers, including cost & conveyance of all
materials, labour charges, leads, lifts , watering and consolidating to required density complete as per the
directions of the Engineer in charge for the finished item of work( APSS No. 309&310)

Unit = cum Data Sl.No.16, Pg.18 of Bldg. items


Taking output = 6 cum
a)  Labour
Mate day -
Mazdoor (Unskilled) day 0.31 425.00 131.75
b) Material
Crusher dust cum 6.00 357.00 2142.00
C) Water kl 0.60 73.00 43.80

over heads and contractor profit 11.765% 11.765% 2317.55 272.66


Basic Rate per 6 cum 2590.21
Basic Rate per 1 cum 431.70
e) Crusher dust conveyance charges incl seignorage charge 1.00 141.60 141.60

e) Water conveyance charges 0.10 20.50 2.05


1.11765 e) area allowances on labour including profit & O.H charges 0% 21.96 0.00
Rate/1cum 575.35

25 Providing borrowed gravel for foundations and basement in layers, including cost & conveyance of all
materials, labour charges, leads, lifts , watering and consolidating to required density complete as per the
directions of the Engineer in charge for the finished item of work( APSS No. 309&310)

Unit = cum Data Sl.No.16, Pg.18 of Bldg. items


Page 26 of 139

Taking output = 6 cum


a)  Labour
Mate day -
Mazdoor (Unskilled) day 0.31 425.00 131.75
b) Material
Gravel cum 6.00 98.00 588.00
C) Water kl 0.72 73.00 52.56
over heads and contractor profit 11.765% 11.765% 772.31 90.86
Basic Rate per 6 cum 863.17
Basic Rate per 1 cum 143.86
e) Gravel conveyance charges incl seignorage charge 1.00 157.55 157.55
e) Water conveyance charges 0.12 20.50 2.46
1.11765 e) area allowances on labour including profit & O.H charges 0% 21.96 0.00
Rate/1cum 303.87

26 Laying of Cement Concrete (1:4:8) mix using 40mm size HBG Machine crushed metal for foundations
including cost and conveyance of all materials at all leads and lifts, ramming, consolidating, curing
etc,complete. for finished item of work as per directions of the Engineer-in-charge.

Unit = 1cum Data Sl.No.22, Pg.20 of Bldg. items


A. MATERIALS:
Cement kg 162.00 4.70 761.40
Coarse aggregate 40 mm cum 0.90 698.25 628.43
Fine aggregate (Sand )) cum 0.45 600.00 270.00
C) Water kl 1.20 73.00 87.60 1747.4
B. MACHINERY
L.C. 247.00 Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity hour 1.00 397.50 397.50
Sl.No.16, of Hire chrgs Irg SSR

C. LABOUR:
Mason 1st class day 0.10 470.00 47.00
Mazdoor (unskilled) day 1.39 425.00 590.75
D) Overheads & Contractors Profit on a to c 11.765% 2782.68 327.38
Total 3110.06
e) cement conveyance charges with profit 162.00 0.08 12.23
e) Sand conveyance charges incl seignorage charge 0.45 946.85 426.08
g) metal conveyance charges incl. seignorage charge 0.90 468.10 421.29
h) water conveyance charges with profit 1.20 20.50 24.60
1.11765 h) area allowances on labour with profit including profit & O.H 0% 884.75 0.00
charges
Total Rate/1cum with HBG metal 3994.26
27 Laying of Cement Concrete (1:4:8) mix using 50% of 40mm size and 50% of 20mm HBG machine crushed metal for bed
flooring

Rate of CC 1:4:8 3994.26


Add difference of HBG metal 205.31 205.31
over heads and contractor profit 11.765% 0.11765 205.31 24.16
Total Rate/1cum with HBG metal 4223.73

28 Plain Cement concrete - Nominal Mix (1:3:6) with 12 to 20mm HBG metal for encasing/embedding the
structural steel supportng 'Y' angles with necessary form work including cost and conveyance of all materials,
labour charges, water charges, tools and tackles, all leads & lifts etc., complete for finished item of work as
per directions of the Engineer-in-charge. (IS-456)

Unit-1Cum Data Sl.No.27, Pg.22 of Bldg. items


A. MATERIALS:
Cement Kg 220.00 4.70 1034.00
Coarse aggregate 20mm to 12 mm cum 0.90 1098.88 988.99
Avg of items
Fine aggregate (Sand) cum 0.45 600.00 270.00
C) Water kl 1.20 73.00 87.60 2380.59

B.MACHINERY
L.C. 247.00 Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity hour 1.00 397.50 397.50
Sl.No.16, of Hire chrgs Irg SSR

C. LABOUR:
Mason 1st class day 0.10 470.00 47.00
Mazdoor (unskilled) day 1.39 425.00 590.75
L.C. 325 Add for centring charges for bedblocks S.No.I B Of SSR 1.00 389.00 389.00

over heads and contractor profit 11.765% 11.765% 3804.84 447.64


BASIC COST per 1 cum 4252.48
e) cement conveyance charges with profit 220.00 0.08 16.61
e) Sand conveyance charges incl seignorage charge 0.45 946.85 426.08
g) metal conveyance charges incl. seignorage charge 0.90 468.10 421.29
h) water conveyance charges with profit 1.20 20.50 24.60
1.11765 i) area allowances on labour on b including 0% 1209.75 0.00

Total Rate/1cum 5141.06


28(a) PCC (1:3:6) for Drains
Total Rate of CC(1:3:6) 5141.06
BASIC COST per 1 cum 5141.06
Total Rate/1cum 5141.06
Page 27 of 139

28(b) Laying of Cement Concrete (1:3:6) mix using 50% of 40mm size and 50% of 20mm HBG machine crushed metal

Rate of CC 1:3:6 5141.06


Add difference of HBG metal -155.25 -155.25
over heads and contractor profit 11.765% 0.11765 155.25 -18.27
Total Rate/1cum with HBG metal 4967.54

29 Plain Cement concrete - Nominal Mix (1:2:4) with 12 to 20mm HBG metal including cost and conveyance of all
materials, labour charges, water charges, tools and tackles, all leads & lifts etc., complete for finished item
of work as per directions of the Engineer-in-charge. (IS-456)
Total Rate of CC(1:3:6) 5141.06
a) Add difference in quantity of cement Kg 110.00 4.70 517.00
(330-220)kg = 110 Kg

over heads and contractor profit 11.765% 11.765% 517.00 60.83


BASIC COST per 1 cum 5718.89
d) Add cement conveyance charges for difference quantity of cement 110.00 0.07550 8.31
with profit
Total Rate/1cum 5727.20
30 A Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) (Fe 500/
500D/550D) grade as per IS 1786-1979) of TISCO/ SAIL/ VSP/Jindal make, different diameters for RCC
works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in
position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18
SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and
conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost
and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting,
bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished
item of work in all floors.( APSS No.126)

Unit = MT Data Sl.No.34, Pg.28 of Bld. items Amendment


given by SSR2011-12 pg.No.260
(a) Material
HYSD/TMT including 5 per cent for overlaps and wastage t 1.05 43000.00 45150.00

Binding wire (Sl.No.3, Pg.11, Irrg Items) SSR kg 6.00 50.00 300.00
(b) Labour for cutting, bending, shifting to site, tying, lap
splicing and placing in position
Blacksmith / Bar bender day 10.00 565.00 5650.00
Mazdoor (Unskilled) day 10.00 425.00 4250.00
over heads and contractor profit 11.765% 11.765% 55350.00 6511.93
Rate per MT = a+b 61861.93
d) Steel conveyance charges with profit 1.05 90.50 95.03
1.11765 e) area allowances on labour including profit & O.H charges 0% 9900.00 0.00
Rate/1MT 61956.96
b First Floor
Ground floor rate 61956.96
Add for lift charges ( 10% on labour charges) 10% 9900.00 990.00
over heads and contractor profit 11.765% 11.765% 990.00 116.47
1.11765 e) area allowances on labour including profit & O.H charges 0% 990.00 0.00

First floor Rate/1MT 63063.43


b Second Floor
Ground floor rate 61956.96
Add for lift charges ( 10% on labour charges) 20% 9900.00 1980.00
over heads and contractor profit 11.765% 11.765% 1980.00 232.95
1.11765 e) area allowances on labour including 1 profit & O.H charges 0% 1980.00 0.00

Second floor Rate/1MT 64169.91


Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) (Fe 500/
500D/550D) grade as per IS 1786-1979) of TISCO/ SAIL/ VSP/Jindal make, different diameters for RCC
works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in
position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18
SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and
conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost
and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting,
bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished
item of work in all floors.(SWITCHYARD WORK)

HYSD/TMT including 5 per cent for overlaps and wastage t 1.05 43000.00 45150.00
Binding wire (Sl.No.3, Pg.11, Irrg Items) SSR kg 6.00 50.00 300.00

(b) Labour for cutting, bending, shifting to site, tying ,lap


splicing and/placing
Blacksmith in position
Bar bender day 2.00 565.00 1130.00
Mazdoor (Unskilled) day 6.40 425.00 2720.00
over heads and contractor profit 11.765% 11.765% 49300.00 5800.15
Rate per MT = a+b 55100.15
d) Steel conveyance charges with profit 1.05 90.50 95.03
1.11765 e) area allowances on labour including profit & O.H charges 0% 3850.00 0.00
Rate/1MT 55195.17
For above 3.66 Mtrs
Rate per 1 MT 55195.17
Add for lift charges ( 10% on labour charges) 10% 3850.00 385.00
over heads and contractor profit 11.765% 11.765% 385.00 45.30
Page 28 of 139

1.11765 e) area allowances on labour 0% 385.00 0.00


For above 3.66 Mtrs Rate/1MT 55625.47
31 Construction of RR Masonry in CM (1:6) using hard CRS , rough granite stone and bond stones (0.16 cum)
including cost and conveyance of all matreials., labour charges, water lead , Curing, all leads and lifts etc.,
complete for finished item of work as per directions of the Engineer-in-charge.

Unit = 1cum Data Sl.No.67, Pg.39 of Bldg. items


A. MATERIALS:
Cement kg 79.20 4.70 372.24
Rough Stone (granite) cum 0.50 306.00 153.00
CRS cum 0.44 316.00 139.04
Bond Stones 7 Nos 0.24 x 0.24 x 0.4 = 0.16cum cum 0.16 1208.33 193.33
Fine aggregate (Sand) cum 0.33 600.00 198.00
B. LABOUR:
Mason 1st class day 1.20 470.00 564.00
Mazdoor (unskilled) day 2.00 425.00 850.00
add towards water charges 1% on cost of materials and 0.01 2469.61 24.70
labour
over heads and contractor profit 11.765% 11.765% 2469.61 290.55
BASIC COST per 1 cum 2784.86
D) cement conveyance charges with profit 79.20 0.08 5.98
e) Sand conveyance charges incl seignorage charge 0.33 946.85 312.46
g) Stone conveyance charges incl. seignorage charge 1.00 503.46 503.46
1.11765 G) area allowances on labour on b including profit & O.H charges 0% 1414.00 0.00

Total Rate/1cum 3606.76

Rate/1cum with HB stone other than granite 219.00 1.11765 91.40 3515.36
variety(deduct cost diff with Cont. Profit)) (306- 219) *
0.94 * 1.11765 =91.4

32 Construction of RR Masonry in CM (1:6) using hard CRS , rough, other than granite stone and bond stones
(0.16 cum) including cost and conveyance of all matreials., labour charges, water lead , Curing, all leads
and lifts etc., complete for finished item of work as per directions of the Engineer-in-charge.

Unit = 1cum Data Sl.No.67, Pg.39 of Bldg. items


A. MATERIALS:
Cement kg 79.20 4.70 372.24
Rough Stone (other than granite) cum 0.50 219.00 109.50
CRS (other than granite) cum 0.44 246.00 108.24
Bond Stones 7 Nos 0.24 x 0.24 x 0.4 = 0.16cum cum 0.16 1208.33 193.33
Fine aggregate (Sand) cum 0.33 600.00 198.00
B. LABOUR:
Mason 1st class day 1.20 470.00 564.00
Mazdoor (unskilled) day 2.00 425.00 850.00
add towards water charges 1% on cost of materials and 0.01 2395.31 23.95
labour
C ) Overheads & Contractors Profit on a to c 11.765% 2395.31 281.81
BASIC COST per 1 cum 2701.07
D) cement conveyance charges with profit 79.20 0.08 5.98
e) Sand conveyance charges incl seignorage charge 0.33 946.85 312.46
g) Stone conveyance charges incl. seignorage charge 1.10 468.10 514.91
1.11765 G) area allowances on labour on b including 11.765% profit & O.H 0% 1414.00 0.00
charges
Total Rate/1cum 3534.42

32 CRS Masonry in CM (1:6) 2nd Sort in CM (1:6) using hard rough granite stone and bond stones (0.16 cum)
including cost and conveyance of all matreials., labour charges, water lead , Curing, all leads and lifts etc.,
complete for finished item of work as per directions of the Engineer-in-charge.

Unit = 1cum Data Sl.No.61, Pg.37 of Bldg. items


A. MATERIALS:
Cement kg 76.80 4.70 360.96
Coursed Rubble Stone (granite) cum 0.94 316.00 297.04
Bond Stones 7Nos 0.24 x 0.24 x 0.39 = 0.16cum cum 0.16 1208.33 193.33
Fine aggregate (Sand) cum 0.32 600.00 192.00
B. LABOUR:
Mason 1st class day 1.50 470.00 705.00
Mazdoor (unskilled) day 2.32 425.00 986.00
add towards water charges 1% on cost of materials and 0.01 2734.33 27.34
labour
over heads and contractor profit 11.765% 11.765% 2734.33 321.69
BASIC COST per 1 cum 3083.37
D) cement conveyance charges with profit 76.80 0.0755 5.80
E) Sand conveyance charges & SEIGNORAGE 0.32 946.85 302.99
F) Stone conveyance charges & Seignorage 1.10 468.1 514.91
1.11765 j) area allowances on labour on b including profit & O.H charges 0% 1691.00 0.00
Total Rate/1cum 3907.07

38 CRS Masonry in CM (1:6) 2nd Sort in CM (1:6) using hard rough other than granite stone and bond stones (0.16
cum) including cost and conveyance of all matreials., labour charges, water lead , Curing, all leads and lifts
etc., complete for finished item of work as per directions of the Engineer-in-charge.

Unit = 1cum Data Sl.No.61, Pg.37 of Bldg. items


Page 29 of 139

A. MATERIALS:
Cement kg 76.80 4.70 360.96
Coursed Rubble Stone ( other than granite) cum 0.94 246.00 231.24
Bond Stones 7Nos 0.24 x 0.24 x 0.39 = 0.16cum cum 0.16 1208.33 193.33
Fine aggregate (Sand) cum 0.32 600.00 192.00
B. LABOUR:
Mason 1st class day 1.50 470.00 705.00
Mazdoor (unskilled) day 2.32 425.00 986.00
add towards water charges 1% on cost of materials and 0.01 2668.53 26.69
labour
C ) Overheads & Contractors Profit on a to c 11.765% 2668.53 313.95
BASIC COST per 1 cum 3009.17
D) cement conveyance charges with profit 76.80 0.0755 5.80
E) Sand conveyance charges & SEIGNORAGE 0.32 946.85 302.99
F) Stone conveyance charges & Seignorage 1.10 468.1 514.91
1.11765 j) area allowances on labour on b including 11.765% profit & O.H 0% 1691.00 0.00
charges Total Rate/1cum 3832.87

33 RCC M- 20 Nominal mix (Cement 400 kgs ) using 20mm size graded machine crushed hard granite metal
(coarse aggregate) (20mm & 12mm (2:1)) from approved quarry including cost and conveyance of all materials
like cement, fine aggregate (screened sand) coarse aggregate, water etc., to site and including Seigniorage
charges, sales & other taxes on all materials including all operational, incidental and labour charges such as
machine mixing, laying concrete, curing and centering, etc.,complete but excluding cost of steel and its
fabrication charges for finished item of work(Sand 0.45 cum and Metal 0.90 cum) as directed by the Engineer
in charge for finished item of work.

Unit - 1Cum
I) FOUNDATIONS,PLINTH, PEDESTALS (Below Plinth) Data Sl.No.30-A, Pg.23 of Bld. Items

A. MATERIALS:
20mm HBG graded metal (20mm & 12mm (2:1)) cum 0.90 1117.42 1005.68
Fine Aggregrate cum 0.45 600.00 270.00
Cement Kgs 400.00 4.70 1880.00 1967.60
B. LABOUR:
1st Class Mason day 0.133 470.00 62.51
2nd Class Mason day 0.267 450.00 120.15
Mazdoor (Both Men and Women) day 3.60 425.00 1530.00
C. MACHINERY
L.C. 247.00 Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity hour 1.00 397.50 397.50
Sl.No.16, of Hire chrgs Irg SSR

L.C. 177.8 Vibrator hire charges Sl.No.40, of Hire chrgs SSR hour 1.00 205.00 205.00
C) Water kl 1.20 73.00 87.60
over heads and contractor profit 11.765% 11.765% 5558.44 653.95
COST per 1 cum 6212.38
e) Cement Conveyance charges with profit 400.00 0.08 30.20
e) Sand conveyance charges incl seignorage charge 0.45 946.85 426.08
g) Metal conveyance charges incl. seignorage charge 0.90 468.10 421.29
h) water conveyance charges with OH 1.20 20.50 24.60
1.11765 D) area allowances on labour with profit 0% 2137.46 0.00

BASIC COST of RCC(M20 Nominal Mix )per 1 cum Rs. 7114.55


A Footings
a) BASIC COST of RCC per 1 cum 7114.55
L.C. 631.00 b) Centering & scaffolding S.No.IA Pno.116 of SSR cum 1.00 919.00 919.00
over heads and contractor profit 11.765% 11.765% 919.00 108.12
Basic Cost per1Cum 8141.67
1.11765 d) area allowances on labour with profit 0% 631.00 0.00
Total COST for foundations per 1 cum 8141.67
B Pedestals
a)BASIC COST of RCC per 1 cum 7114.55
LC 1004.00 b)Centering & scaffolding S.No. I C of SSR 2015-16 cum 1.00 1332.00 1332.00
over heads and contractor profit 11.765% 11.765% 1332.00 156.71
Basic Cost per 1Cum 8603.26
1.11765 d) area allowances on labour with profit 0% 1004.00 0.00
Total COST for pedestals per 1 cum Rs. 8603.26
Rate for RCC M20 Nominal Mix for Switchyard Foundations ( Avg Rate per Cum 8372.47
Rate of Footings and Pedestals)
C Plinth beams
a)BASIC COST of RCC per 1 cum 7114.55
L.C. 760.5 b)Centering & scaffolding (50% of SSR) S.No. I D, of SSR cum 1.00 1455.50 1455.50

over heads and contractor profit 11.765% 11.765% 1455.50 171.24


Basic Cost per Cum 8741.29
1.11765 area allowances on labour with profit 0% 760.50 0.00
Total COST for Plinth Beams per 1 cum 8741.29
D) For RCC Cover Slabs with 50% 20mm & 50% 12mm HBG metal
BASIC COST of RCC with 20mm graded metal per 1 cum 7114.55

Deduct difference of Rate for HBG 20mm graded metal & Cum 0.90 18.54 -16.69
12 to 20mm HBG metal
325.00 Add centring charges of bed blocks vide item 1 B of SoR Cum 1.00 389.00 389.00
Page 30 of 139

over heads and contractor profit 11.765% 11.765% 372.31 43.80


1.11765 area allowances on labour with profit 0% 325.00 0.00
Rate for RCC Cover Slabs per 1 Cum 7530.67
II ) COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN Rs.Items
Data Sl.No.30-B, Pg.23 of Bld.
BUILDINGS

A. MATERIALS:
20mm HBG graded metal (20mm & 12mm (2:1)) cum 0.90 1117.42 1005.68
Fine Aggregrate cum 0.45 600.00 270.00
Cement Kgs 400.00 4.70 1880.00
B. LABOUR:
1st Class Mason day 0.167 470.00 78.49
2nd Class Mason day 0.167 450.00 75.15
Mazdoor (Both Men and Women) day 4.70 425.00 1997.50
C. MACHINERY
L.C. 247.00 Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity hour 1.00 397.50 397.50
Sl.No.16, of Hire chrgs Irg SSR
L.C. 177.8 Vibrator hire charges Sl.No.40, of Hire chrgs SSR hour 1.00 205.00 205.00

C) Water kl 1.20 73.00 87.60


over heads and contractor profit 11.765% 11.765% 5996.92 705.54
Rate per Cum 6702.45
e) Cement Conveyance charges with profit 400.00 0.08 30.20
e) Sand conveyance charges incl seignorage charge 0.45 946.85 426.08
g) Metal conveyance charges incl. seignorage charge 0.90 468.10 421.29
h) water conveyance charges with OH 1.20 20.50 24.60
1.11765 e) area allowances on labour with profit 0% 2575.94 0.00
COST of RCC per 1 cum 7604.62
E COLUMNS and RCC Walls Ground Floor
a) BASIC COST of RCC per 1 cum 7604.62
L.C. 1757 b)Centering & scaffolding with casurina ballies, bamboos, cum 1.00 1995.00 1995.00
wooden reapers, runners, wood posts, wall posts etc
S.No.IG, of SSR
over heads and contractor profit 11.765% 11.765% 1995.00 234.71
Rate per cum 9834.33
1.11765 area allowances on labour with profit 0% 1757.00 0.00
Column Rate per 1 cum 9834.33
( i) First Floor
Basic cost of RCC per Cum 9834.33
Add extra for Centering&scaffolding charges ( @ 10% on 10% 1757.00 175.70
LC of Centering for GF)
Add for lift charges ( 10% on labour charges) 10% 2151.14 215.11
over heads and contractor profit 11.765% 11.765% 390.81 45.98
1.11765 e) area allowances on labour including profit & O.H charges 0% 390.81 0.00

Column First floor Rate/1Cum 10271.12


(II) Second Floor
Basic cost of RCC per Cum 9834.33
Add extra for Centering&scaffolding charges 10% on LC 20% 1757.00 351.40
of Centering
Add for lift charges ( 10% on labour charges) 20% 2151.14 430.23
over heads and contractor profit 11.765% 11.765% 781.63 91.96
1.11765 e) area allowances on labour including profit & O.H charges 0% 781.63 0.00

Column Second floor Rate/1Cum 10707.92


F LINTELS Ground Floor
L.C. a) BASIC COST of RCC per 1 cum 7604.62
1251 b) Centering & scaffolding casurina ballies, bamboos, cum 1.00 2041.00 2041.00
wooden reapers, runners, wood posts, wall posts etc
S.No.IE of SSR
over heads and contractor profit 11.765% 11.765% 2041.00 240.12
Rate per cum 9885.74
1.11765 area allowances on labour with profit 0% 1251.00 0.00
Lintel Rate per 1 cum 9885.74
(I) First Floor
Ground Floor Rate 9885.74
Add extra for Centering&scaffolding charges 10% on LC 10% 1251.00 125.10
of Centering
Add for lift charges ( 10% on labour charges) 10% 2151.14 215.11
over heads and contractor profit 11.765% 11.765% 340.21 40.03
1.11765 e) area allowances on labour including profit & O.H charges 0% 340.21 0.00

Lintel First floor Rate/1Cum 10265.98


(ii) Second Floor
First Floor Rate 9885.74
Add extra for Centering&scaffolding charges 10% on LC 20% 1251.00 250.20
of Centering
Add for lift charges ( 10% on labour charges) 20% 2151.14 430.23
over heads and contractor profit 11.765% 11.765% 680.43 80.05
1.11765 e) area allowances on labour including profit & O.H charges 0% 680.43 0.00

Lintel Second floor Rate/1Cum 10646.22


Page 31 of 139

K RCC(M20 Nominal Mix) for Fire Protection Wall


a) Footing & Vertical wall upto Ground level
Basic rate of RCC 7114.55
724.25 Centring charges ( 75% footing +25% pedestal) Cum 1.00 1022.25 1022.25
over heads and contractor profit 11.765% 11.765% 1022.25 120.27
Basic Cost per 1 cum 8257.07
1.11765 D) area allowances on labour with profit 0% 724.25 0.00
COST per Cum 8257.07
b) Vertical wall upto 3.66m height
Basic rate of RCC 7604.62
1771.67 Centring charges (Steel) vide item of 31-b (4) of PH SoR Cum 1.00 3543.33 3543.33

over heads and contractor profit 11.765% 11.765% 3543.33 416.87


Basic Cost per 1 cum 11564.83
1.11765 D) area allowances on labour with profit 0% 1771.67 0.00
COST per Cum Rs. 11564.83
c) Vertical wall above 3.66m height to
Rate of RCC for vertical wall upto 3.66m height 11564.83
Add 10% extra on labour charges of scaffolding Cum 10% 1771.67 177.17
Lift charges of materials @ 10% of Labour charges 10% 2151.14 215.11
over heads and contractor profit 11.765% 11.765% 392.28 46.15
Basic Cost per 1 cum 12003.26
1.11765 D) area allowances on labour with profit 0% 392.28 0.00
COST per Cum Rs. 12003.26
III ) RCC SLABS, BEAMS Data Sl.No.30-C, Pg.23 of Bld. Items
A. MATERIALS:
20mm HBG graded metal (20mm & 12mm (2:1)) cum 0.90 1117.42 1005.68
Fine Aggregrate cum 0.45 600.00 270.00
Cement Kgs 400.00 4.70 1880.00
B. LABOUR:
1st Class Mason day 0.067 470.00 31.49
2nd Class Mason day 0.133 450.00 59.85
Mazdoor (Both Men and Women) day 2.50 425.00 1062.50
LC C. MACHINERY
65.949 Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity hour 0.267 397.50 106.13
Sl.No.16, of Hire chrgsSSR
L.C. 47.4726 Vibrator hire charges Sl.No.40, of Hire chrgs SSR hour 0.267 205.00 54.74
C) Water kl 1.20 73.00 87.60
over heads and contractor profit 11.765% 11.765% 4557.98 536.25
Rate per Cum 5094.23
e) Cement Conveyance charges with profit 400.00 0.08 30.20
e) Sand conveyance charges incl seignorage charge 0.45 946.85 426.08
g) Metal conveyance charges incl. seignorage charge 0.90 468.10 421.29
h) water conveyance charges with OH 1.20 20.50 24.60
1.11765 D) area allowances on labour with profit 0% 1267.26 0.00
BASIC COST of RCC for Slabs and Beams - per 1 cum 5996.40
G BEAMS Ground Floor
a)BASIC COST per 1 cum 5996.40
L.C. 1473 b)Centering & scaffolding with casurina ballies, bamboos, cum 1.00 2868.00 2868.00
wooden reapers, runners, wood posts, wall plates etc
S.No.1H, of SSR
over heads and contractor profit 11.765% 11.765% 2868.00 337.42
Rate per Cum 9201.82
1.11765 Area Allowance on labour with profit 0% 1473.00 0.00
COST for beams per 1 cum 9201.82
(ii) First Floor
Ground Floor Rate 9201.82
Add extra for Centering&scaffolding charges 10% on LC 10% 1473.00 147.30
of Centering
Add for lift charges ( 10% on labour charges) 10% 1153.84 115.38
over heads and contractor profit 11.765% 11.765% 262.68 30.90
1.11765 e) area allowances on labour including 11.765% profit & O.H 0% 262.68 0.00
charges
Beam First floor Rate/1Cum 9495.41
(ii) Second Floor
Ground Floor Rate 9201.82
Add extra for Centering&scaffolding charges 20% on LC 20% 1473.00 294.60
of Centering
Add for lift charges (20% on labour charges) 20% 1153.84 230.77
over heads and contractor profit 11.765% 11.765% 525.37 61.81
1.11765 e) area allowances on labour including profit & O.H charges 0% 525.37 0.00

Beam Second floor Rate/1Cum 9789.00


H SLABS (upto 150mm thick) Ground Floor
a)BASIC COST per 1 cum Cum 1.00 5996.40
Page 32 of 139

L.C. 1336 b) Centering & scaffolding with casurina ballies, bamboos, cum 1.00 2600.00 2600.00 2184
wooden reapers, runners, wood posts, wall plates etc
For 1Sqm=325; 1SQM = 0.125CUM
for 1Cum = 325/0.125=2600
Only L.C. for 1Sqm=167
For 1Cum= 167/0.125=1336

11.765% 2600.00 305.89 968


Rate per Cum 8902.29
1.11765 Area Allowance on labour with profit 0% 1336.00 0.00
COST for slabs per 1 Cum 8902.29
(ii) First Floor
Ground Floor Rate 8902.29
Add extra for Centering&scaffolding charges 10% on LC 10% 1336.00 133.60
of Centering
Add for lift charges ( 10% on labour charges) 10% 1153.84 115.38
c)Overheads & Contractors Profit on b 11.765% 248.98 29.29
1.11765 e) area allowances on labour including profit & O.H charges 0% 248.98 0.00

Slab First floor Rate/1Cum 9180.57


(ii) Second Floor
Ground Floor Rate 8902.29
Add extra for Centering&scaffolding charges 10% on LC 20% 1336.00 267.20
of Centering
Add for lift charges ( 10% on labour charges) 20% 1153.84 230.77
over heads and contractor profit 11.765% 11.765% 497.97 58.59
1.11765 e) area allowances on labour including profit & O.H charges 0% 497.97 0.00

Slab Second floor Rate/1Cum 9458.84


I Road culvert SLABS (upto 300 mm thick)
a)BASIC COST per 1 cum Cum 1.00 5996.40
L.C. 747.83 b) Centering & scaffolding cum 1.00 1456.522 1456.52
For 1Sqm=335; 1SQM = 0.230CUM
for 1Cum = 335/0.230=1456.522 Only L.C. for
1Sqm=172
For 1Cum= 172/0.230=747.83

over heads and contractor profit 11.765% 11.765% 1456.52 171.36 539.1304348
Rate per Cum 7624.28
1.11765 Area Allowance on labour with profit 0% 747.83 0.00
COST for Road culvert slabs per 1 Cum 7624.28
J SUNSHADES(0.60 M X(0.075M avg thick)X1M Ground Floor
UNIT - 1 SQM = 0.075 CUM 0.045
BASIC COST per 1 cum Cum 1.00 5996.40
A. BASIC COST per 0.075 cum 449.73
L.C. 192 B. Centering & scaffolding S.No.1F, of SSR SQM 1.00 348.00 348.00

over heads and contractor profit 11.765% 11.765% 348.00 40.94


Basic Rate per Sqm 838.67
1.11765 D. area allowances on labour with profit 0% 192.00 0.00
COST for Sunshades per 1SQM Rs. 838.67
(ii) First Floor
Ground Floor Rate 838.67
Add extra for Centering&scaffolding charges 10% on LC 10% 192.00 19.20
of Centering
Add for lift charges ( 10% on labour charges) 10% 86.54 8.65
over heads and contractor profit 11.765% 11.765% 27.85 3.28
1.11765 e) area allowances on labour including profit & O.H charges 0% 27.85 0.00

Sunshade First floor Rate/1Cum 869.80


(ii) Second Floor
Ground Floor Rate 838.67
Add extra for Centering&scaffolding charges 20% on LC 20% 192.00 38.40
of Centering
Add for lift charges ( 20% on labour charges) 20% 86.54 17.31
over heads and contractor profit 11.765% 11.765% 55.71 6.55
1.11765 e) area allowances on labour including profit & O.H charges 0% 55.71 0.00

Second floor Rate/1Cum 900.93

6b PCC M- 20 Nominal mix (Cement 330 kgs ) using 20mm size graded machine crushed hard granite metal
(coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on
all materials including all operational, incidental and labour charges such as machine mixing, laying concrete,
curing and centering, etc., complete

A PCC- M- 20 Nominal mix (Cement:fine aggregate: coarse Data Sl.No.28, Pg.22 of Bld. items
aggregate) correspondin
A. MATERIALS:
Water (including for curing) kl 1.20 73.00 87.60
20mm HBG graded metal (20 mm & 12 mm (2:1) cum 0.90 1117.42 1005.68
Fine aggregate / Sand for concrete cum 0.45 600.00 270.00
Page 33 of 139

Cement Kgs 330.00 4.70 1551.00


B. LABOUR:
1st Class Mason day 0.100 470.00 47.00
Mazdoor (Both Men and Women) day 1.39 425.00 590.75
LC C. MACHINERY
L.C. 247.00 Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity hour 1.00 397.50 397.50
Sl.No.16, of Hire chrgs Irg SSR
177.8 Vibrator hire charges Sl.No.40, of Hire chrgs SSR hour 1.00 205.00 205.00

668.3 Centering & scaffolding (Sl.Nos.A&B, 90% of footings and cum 1.00 960.30 960.30
10% of pedestal of SSR

over heads and contractor profit 11.765% 11.765% 5114.83 601.76


BASIC COST per 1 cum 5716.59
e) cement conveyance charges with profit 330.00 0.0755 24.92
f) Sand conveyance charges with profit plus seignorage 0.45 946.85 426.08
charge
d) metal conveyance charges with profit plus seignorage 0.90 468.1 421.29
charge
h) water conveyance charges with profit 1.20 20.5 24.60
1.11765 i) uniform area allowances on labour with profit 0.00% 1730.85 0.00
Rate/1cum 6613.48
40 Supply and spreading of crusher dust in the switch yard(100mm thick) area including Suitable antiweed
treatment after completion of final levelling and grading including disposal of surplus earth and filling within
switch yard area including cost of all materials, all leads and lifts, labour charges complete as per the
directions of the Engineer in charge for the finished item of work..
A) Cost of crusher dust cum 1.00 357.00 357.00
B) labour charges as per sand filling , 0.31 Mazdoor for 6 0.0517 425.00 21.97
Cum Cum
Final level in grading charges per 10 Sqm area 1Sqm 10.00 3.21 32.10
Anti-weed Treatment LS 20.00
over heads and contractor profit 11.765% 11.765% 378.97 44.59
Basic rate per Cum 475.66
d) crusher dust conveyance charges incl. Seignorage Cum 141.60
1.00 141.60
charge
e) area allowances on labour on B including profit & O H
1.11765 charges 0% 21.97 0.00
Total: Rate/ 1 cum Rs. 617.26
35 Supply and laying of 180 GSM LDPE sheet of approved make in the switch yard including laying the sheet
neatly in between layers of crusher dust without folds to avoid the vegetation and weed growth, cutting and
jointing the sheet properly including cost & conveyance of all materials, all leads , labour charges for laying
complete as per the directions of the Engineer in charge for the finished item of work..

180 GSM LDPE sheet as per Local Market Rate Sqm 1.00 17.50 17.50

Total: Rate/ 1 Sqm Rs. 17.50


36 Supply and Spreading of 20mm size Hard Broken Granite metal in switch yard (100mm thick) providing
suitable PCC guage block of size 100x100x100mm at 2m x2m intervals , cost & conveyance of all materials,
labour charges, leads, lifts complete as per the directions of the Engineer in charge for the finished item of
work
Cost of 20mm metal 1 Cum 1.00 1154.50 1154.50
Cost of spreading charges as per labour charges of sand 1 Cum 0.05170 425.00 21.97
filling , 0.31 Mazdoor for 6 Cum = 0.31/6 = 0.0517
Mazdoor
Add for PCC(1:2:4) gauge blocks of LS 22.00
size100mmX100mmX100mm (Approx)
over heads and contractor profit 11.765% 11.765% 1176.47 138.41
Rate per Cum Rs 1336.88
g) Metal conveyance charges incl. seignorage charge 1 Cum 1.00 468.10 468.10
1.11765 area allowance on labour charges 0% 21.97 0.00
TOTAL Rate per Cum Rs. 1804.98
36 Labour charges for picking old metal in the existing 220 KV switch yard area 50 to 100mm thickness grading
and stacking the useful 20mm metal for re-using including cost andconveyance of all materials labour charges,
lead upto 100mts and initial lift etc., complete for finished item of work as directed by the Engineer-in-charge
at site.

Labour charges for picking old metal, as per labour 1 cum 0.05170 425.00 21.97
charges of sand filling , 0.31 Mazdoor for 6 Cum = 0.31/6
= 0.0517 Mazdoor

over heads and contractor profit 11.765% 11.765% 21.97 2.59

Rate per Cum Rs 24.56


Cost for lead upto 100 mts. cum 1.00 69.00 69.00
1.11765 area allowance on labour charges 0% 21.97 0.00
TOTAL Rate per Cum Rs. 93.56
Page 34 of 139

36 Spreading the useful 20mm Metal available from the stacks picked from existing 220 KV switchyard area to
100mm thickness as directed after doing the micro levelling and providing suitable PCC guage block of size
100x100x100mm at 2m x2m intervals , cost & conveyance of all materials, labour charges, leads, lifts complete
as per the directions of the Engineer in charge for the finished item of work.

Cost of spreading charges as per labour charges of sand 1 Cum 0.05170 425.00 21.97
filling , 0.31 Mazdoor for 6 Cum = 0.31/6 = 0.0517
Mazdoor
Add for PCC(1:2:4) gauge blocks of LS 22.00
size100mmX100mmX100mm (Approx)
over heads and contractor profit 11.765% 11.765% 43.97 5.17
Rate per Cum Rs 49.15
1.11765 area allowance on labour charges 0% 21.97 0.00
TOTAL Rate per Cum Rs. 49.15
Subdata Final levelling and grading including disposal of surplus earth and/or filling with in Switchyard area
complete as approved and as per the directions of the Engineer in charge for the finished item of work

Taking output = 3500 Sqm


Labour for transportation of earth from/upto 250m (50mm 1Cum 175.00 34.20 5985.00
thick avg. qty)
1st class Mason 1No 0.28 470.00 131.60
Semi Skilled Mazdoor 1No 1.00 450.00 450.00
Mazdoor(Unskilled) 1No 6.00 425.00 2550.00
Hand rolling charges with stone roller 2T capacity (LS) 1 Cum 175.00 9.00 1575.00
over heads and contractor profit 11.765% 11.765% 4706.60 553.73

Rate per 3500 Sqm Rs 11245.33


Rate per 1 Sqm Rs 3.21
1.11765 area allowance on labour charges 0% 1.34 0.00
Rate per Sqm Rs. 3.21
37 Construction of cable duct in the switch yard as per drawing no.SE/T(SS)/1/99 including cost & conveyance
of all materials, labour charges, leads, lifts and curing etc, complete as per the directions of the Engineer in
charge for the finished item of work

consider a length of 10.00R.M.


Earth work excavation 1.0 Cum 5.50 172.90 950.95
(10.0x1.10x0.50 = 5.5 Cum)
CC (1:4:8) with 40mm. HBG metal 1.0 Cum 1.10 3994.26 4393.69
(10.0x1.10x0.10 = 1.1Cum)
BM in CM(1:6) 1.0 Cum 2.07 5653.85 11703.47
(10.0x(0.23+0.23)x0.45 = 2.07Cum)
CC(1:2:4) 1.0 Cum 0.305 5727.20 1746.80
(10x(0.23+0.23)x0.05 = 0.23 Cum
(10x2(0.075)x0.05 = 0.075 cum
Total: 0.305 cum
Plastering in CM(1:5)12mm thick 1Sqm 20.60 129.22 2661.93
(10x2(0.50+0.23+0.05+0.15+0.10) = 20.6sqm
sand filling 10.0x50x0.50 = 2.50 cum CUM 2.50 1652.19 4130.48
R.C.C(1:2:4) for cover slabs cum 0.400 7530.67 3012.27
10x0.79x0.05 = 0.36 cum
S&F: Steel reinforcement 1Kg 44.61 61.96 2763.90
8mm dia. Main rods @100mm. c/c
20x9x0.45x0.39 = 31.59
6mm dia. distribution rods @150mm. c/c
20x4.0x0.74x0.22 Kg/m = 13.02 Kg
Total: 44.61kg
Total for 10.0 m length of cable duct 31363.48
RATE per 1.0 RM of cable duct 3136.35
38 Construction of cable duct in the switch yard for Road Crossing by providing 2 Nos.300mm dia RCC Hume
pipe ( plain ended pipe) & collars required confirming to BIS 458/1988 NP2 class as per drawing including
cost & conveyance of all materials, labour charges, leads, lifts and curing etc, complete as per the directions of
the Engineer in charge for the finished item of work .

Consider a length of 9.00R.M.

Earth work excavation (9.0x 1.15x 0.90 =9.315Cum) 1 cum 9.315 172.90 1610.56

CC (1:3:6) with 50% 40mm metal and 50% 20mm metal 1Cum 4.46 4967.54 22155.23

Supplying RCC Hume pipes of 300mm. NP-2 Class, 2Nos 1rm. 18.00 415.00 7470.00
PH SSR
2no.x9m = 18.00R.M
Cost of RCC collars 300mm dia PH SSR 1 No 4.00 104.00
416.00
fixing charges for RCC Hume Pipes rate as per item no.
11a of PH SSR 1rm. 18.00 276.00 4968.00
over heads and contractor profit 11.765% 11.765% 12854.00 1512.27

Rate per 9.00 RM Rs 38132.07


Rate per 1.00 RM Rs 4236.90
1.11765 Area allowance on labour 0% 552.00 0.00
RATE per 1.0 RM of cable duct Rs. 4236.90
Page 35 of 139

37 For Normal Soils - Construction of cable duct in the switch yard( inside clear dimensions 0.5x0.4 m) as per
the EE/Civil/TLC/Metro/Hyd approved drawing including cost & conveyance of all materials, labour
charges, leads, lifts and curing etc, complete as per the directions of the Engineer in charge for the finished
item of work.(i.e earth work excavation 1.10x 0.3 m,pcc 1:4:8 size 1.10x0.1 m ,Brick masonry CM (1:6) size 2
Nos 0.23x0.35 m,CC 1:3:6 above brick masonry 2x0.23x0.05 m,2x0.075x0.05 m,plastering 12 mm thick in
CM(1:5), sand filling 0.35m inside the duct,cover slabs of size 0.78x0.5mx0.05,reinforcement steel 43.84kg)

consider a length of 10.00R.M.


Earth work excavation 1.0 Cum 3.30 172.90 570.57
(10.0x1.10x0.30 = 3.3Cum)
CC (1:4:8) with 40mm. HBG metal 1.0 Cum 1.10 3994.26 4393.69
(10.0x1.10x0.10 = 1.1Cum)
BM in CM(1:6) 1.0 Cum 1.61 5653.85 9102.70
(10.0x(0.23+0.23)x0.35 = 2.07Cum)
CC(1:3:6) 1.0 Cum 0.310 5141.06 1593.73
(10x(0.23+0.23)x0.05 = 0.23 Cum
(10x2(0.075)x0.05 = 0.075 cum
Total: 0.305 cum
Plastering in CM(1:5) 12mm thick 1Sqm 16.00 129.22 2067.52

sand filling 10.0x50x0.40 = 2.00 cum CUM 2.00 1652.19 3304.38


R.C.C(1:2:4) for cover slabs cum 0.400 7530.67 3012.27

10x0.79x0.05 = 0.36 cum


S&F: Steel reinforcement 1Kg 43.84 61.96 2716.19
8mm dia. Main rods @100mm. c/c
20x9x0.45x0.39 = 31.59

6mm dia. distribution rods @150mm. c/c


20x4.0x0.74x0.22 Kg/m = 13.02 Kg
Total: 44.61kg
Total for 10.0 m length of cable duct 26761.04
RATE per 1.0 RM of cable duct 2676.10

38 Construction of cable duct in the switch yard for Road Crossing by providing 8 Nos of 100mm dia AC pipes
of CLASS 20 as per drawing No. CE/Civil/CS.CT/BC / 10 including cost & conveyance of all materials,
labour charges, leads, lifts and curing etc, complete as per the directions of the Engineer in charge for the
finished item of work .

Consider a length of 9.00R.M.


Earth work excavation 1 cum 6.070 172.90 1049.50
(9.0x 0.75x 0.90 =6.07Cum)
CC (1:4:8) with 40mm. HBG metal 1Cum 2.70 3994.26 10784.50
(9.0x 0.75x 0.40 =2.70 Cum
Supplying A.C.pipes of 100mm. Dia . Class - 20 as per 1rm. 72.00 339.00 24408.00
Table 8 of PH SoR
8no.x9m. = 72.00R.M rate as per pno.27 of Irrigation

fixing charges for A.C.Pipes


1rm. 72.00 52.00 3744.00
over heads and contractor profit 11.765% 11.765% 28152.00 3312.08
Rate per 9.00 RM Rs 43298.09
Rate per 1.00 RM Rs 4810.90
1.11765 Area allowance on labour 0% 416.00 0.00
RATE per 1.0 RM of cable duct Rs. 4810.90

39 Brick Masonry in CM (1:6) with common burnt clay bricks of class as per Table-1 of IS:1077-1992 Non-
Modular or traditional size 23 x 11 x 7 cms of approved quality, including cost & conveyance of all materials,
labour charges, scaffolding leads, lifts and curing complete as per the directions of the Engineer in charge for
the finished item of work .

1Cum Data Sl.No.42, Pg.31 of Bld. Items


A. MATERIALS:
Cement kg 48.00 4.70 225.60
Bricks traditional size 23 x 11 x 7 cms 2nd class Sl.No.1, Nos 512.00 5700.00 2918.40
Pg.13 Bldg items
Fine aggregate (Sand) cum 0.22 600.00 132.00
B. LABOUR:
Mason 1st class day 0.24 470.00 112.80
Mason 2nd class day 0.56 450.00 252.00
Mazdoor (unskilled) day 1.89 425.00 803.25
L.C. 345.48 Scaffolding charges 89.78 /1 SQM, for 1 cum = cum 1.00 390.35 390.35
(89.78/0.23)= 390.35 vide S.No. A SSR
add towards water charges 1% on cost of materials and 0.01 4834.40 48.34
labour
over heads and contractor profit 11.765% 11.765% 4834.40 568.77
Basic Rate per Cum 5451.51
d) Bricks conveyance charges incl. seignorage charge Nos 512.00 0.84 430.59
e) Cement Conveyance charges with profit Kg 48.00 0.08 3.62
f) Sand conveyance charges incl. seignorage charge Cum 0.22 946.85 208.31

1.11765 g) area allowances on labour with profit 0% 1513.53 0.00


COST per 1 cum 6094.03
(I) First Floor
Page 36 of 139

COST per 1 cum of G.F. 6094.03


add for lift charges 10 % on labour 10.00% 1168.05 116.81
extra on labour of centering 50% 50.00% 345.48 172.74

over heads and contractor profit 11.765% 11.765% 289.55 34.06


1.11765 area allowances on labour with profit 0% 289.55 0.00
Brick Masonry Rate/1 cum 1st floor 6417.64
(II) Second Floor

COST per 1 cum of F.F. 6417.64


lift charges 10 % on labour 10.00% 1168.05 116.81
extra on labour charges of centering 50.00% 345.48 172.74
over heads and contractor profit 11.765% 11.765% 289.55 34.06
1.11765 area allowances on labour with profit 0% 289.55 0.00
Brick Masonry Rate/1 cum Second floor 6741.25 0
(II) Third Floor
COST per 1 cum of S.F. 6741.25
lift charges 10 % on labour 10.00% 1168.05 116.81
extra on labour charges of centering 50.00% 345.48 172.74
over heads and contractor profit 11.765% 11.765% 289.55 34.06
1.11765 area allowances on labour with profit 0% 289.55 0.00
Brick Masonry Rate/1 cum Third floor 7064.86
39 (a) For Brick Masonry without scaffolding
Cost of BM with scaffolding 6094.03
Deduct scaffolding with profit -440.18
1.11765 area allowances on labour with profit 0% 345.48 0.00
Brick Masonry Rate w/o scaffolding COST per 1 cum 5653.85
39 (b) For Compound wall Brick Masonry
Cost of BM with scaffolding 6094.03
Deduct 50% of scaffolding with profit -220.09
1.11765 area allowances on labour with profit 0% 172.74 0.00
Compound wall Brick Masonry COST per 1 cum 5873.94

40 Plastering with CM (1:3), 12 mm thick ceiling and projections of beams at all heights including cost &
conveyance of all materials, scaffloding, labour charges, leads, lifts and curing complete as per the directions
of the Engineer in charge for the finished item of work.

Unit = 10 sqm Data Sl.No.76, Pg.42 of Bld. Items


A. MATERIALS:
Cement in CM (1:3) Kg 72.00 4.70 338.40 72
Sand Cum 0.16 667.00 105.05
B. LABOUR:
Mason 1st class day 0.60 470.00 282.00
Mazdoor (unskilled) day 0.96 425.00 408.00
Mazdoor for mixing mortor day 0.03 425.00 12.75
L.C. 159.1 Scaffolding charges Blds SSR sqm 10.00 18.37 183.70
add towards water charges 1% on cost of materials and 0.01 1329.90 13.30
labour
over heads and contractor profit 11.765% 11.765% 1329.90 156.46
BASIC COST per 10 SQM 1499.66
BASIC COST per 1 SQM 149.97
Cement conveyance charges Kg 7.20 0.0755 0.54
Sand conveyance charge incl. Seignorage charge Cum 0.016 946.85 14.91

1.11765 D.area allowances on labour with profit 0% 86.19 0.00


Cost of Ground Floor Per 1Sqm Rs. 165.42
(I) First Floor
COST per 1 sqm of G.F. 165.42
add for lift charges 10 % on labour 10.00% 70.28 7.03
extra on labour of centering with 50.00% 15.91 7.96
over heads and contractor profit 11.765% 11.765% 14.98 1.76

1.11765 area allowances on labour with profit 0% 14.98 0.00


Rate/1 Sqm 1st floor 182.17
(ii) Second Floor
COST per 1 cum of F.F. 182.17
lift charges 10 % on labour 10.00% 70.28 7.03
extra on labour charges of centering 50.00% 15.91 7.96
over heads and contractor profit 11.765% 11.765% 14.98 1.76
1.11765 area allowances on labour with profit 0% 14.98 0.00
Rate/1 Sqm Second floor 198.92
(ii) Third Floor
COST per 1 cum of F.F. 198.92
lift charges 10 % on labour 10.00% 70.28 7.03
extra on labour charges of centering 50.00% 15.91 7.96
over heads and contractor profit 11.765% 11.765% 14.98 1.76
1.11765 area allowances on labour with profit 0% 14.98 0.00
Rate/1 Sqm Third floor 215.67
40 (a) Plastering with CM (1:3), 12 mm thick without scaffolding

Plastering with CM (1:3), 12 mm thick at all heights including cost & conveyance of all materials, labour
charges, leads, lifts and curing complete as per the directions of the Engineer in charge for the finished item of
work.
Page 37 of 139

Rate of plastering in CM (1:3), 12mm thick with 165.42


scaffolding
Deduct scaffolding charges sqm -18.55
C. Deduct Overheads & Contractors Profit on scaffolding 11.765% 18.37 -2.16
BASIC COST per 1 SQM 144.71
1.11765 D.Deduct area allowances on scaffolding with profit 0% 15.91 0.00
Cost for 1Sqm Rs. 144.71
41 Plastering with CM (1:3), 12 mm thick and finishing smooth to the required slope and painting two coats of
Janatha Cem including cost & conveyance of all materials, labour charges, leads, lifts and curing including
cost of Janatha Cem paint two coats, complete as per the directions of the Engineer in charge for the finished
item of work.

Unit = 1 sqm Data Sl.No.76, Pg.42 of Bld. Items


Cost for 1Sqm of plastering in CM (1:3), 12mm thick 144.71
without scaffolding
Add cost of Janathacem two coats incl over heads & sqm 1.00 32.09 32.09
Contractor's profit and Area Allowance
BASIC COST per 1 SQM 176.80
0.00 Cost for 1Sqm Rs. 176.80 0.00
42 Plastering with CM (1:3), 20 mm thick including cost & conveyance of all materials, labour charges, leads,
lifts and curing complete as per the directions of the Engineer in charge for the finished item of work.

Unit = 10 sqm Data Sl.No.83, Pg.43 of Bld. Items


A. MATERIALS:
Cement for CM (1:3) Kg 100.80 4.70 473.76
Sand cum 0.221 667.00 147.07
B. LABOUR:
Mason 2nd class day 0.94 450.00 423.00
Mazdoor (unskilled) day 1.60 425.00 680.00
Mazdoor for mixing mortor day 0.04 425.00 17.85
add towards water charges 1% on cost of materials and 0.01 1741.68 17.42
labour
over heads and contractor profit 11.765% 11.765% 1741.68 204.91
BASIC COST per 10 SQM 1964.01
BASIC COST per 1 SQM 196.40
Cement conveyance charges with profit Kg 10.08 0.08 0.76
Sand conveyance charge incl. Seignorage charge Cum 0.02 946.85 20.88
1.11765 D.area allowances on labour with profit 0% 112.09 0.00
Total Cost for 1Sqm Rs. Rs. 218.04
43 Plastering with CM (1:5), 12 mm thick to the even wall surfaces including cost & conveyance of all materials,
labour charges, leads, lifts , scaffolding and curing complete as per the directions of the Engineer in charge
for the finished item of work.

Unit = 10 sqm Data Sl.No.78, Pg.42 of Bld. Items


A. MATERIALS:
Cement for CM Kg 43.20 4.70 203.04
Sand Cum 0.158 667.00 105.05
B. LABOUR:
Mason 1st class day 0.60 470.00 282.00
Mazdoor (unskilled) day 0.96 425.00 408.00
Mazdoor for mixing mortor day 0.03 425.00 12.75
L.C. 79.5 Scaffolding charges Blds SSR sqm 10.00 8.98 89.80
add towards water charges 1% on cost of materials and 0.01 1100.64 11.01
labour
over heads and contractor profit 11.765% 11.765% 1100.64 129.49
BASIC COST per 10 SQM Rs. 1241.14
BASIC COST per 1 SQM Rs. 124.11
Cement conveyance charges with profit Kg 4.32 0.08 0.33
Sand conveyance charge incl. Seignorage charge Cum 0.015750 946.85 14.91
1.11765 D. Area allowances on labour with profit 0% 78.23 0.00
COST for 1Sqm Rs. 139.35
(I) First Floor
COST per 1 sqm of G.F. 139.35
add for lift charges 10 % on labour 10.00% 70.28 7.03
extra on labour of scaffolding 50.00% 7.95 3.98
over heads and contractor profit 11.765% 11.765% 11.00 1.29
1.11765 area allowances on labour with profit 0% 11.00 0.00
Rate/1 Sqm 1st floor 151.65
(ii) Second Floor
COST per 1 cum of F.F. 151.65
lift charges 10 % on labour 10.00% 70.28 7.03
extra on labour charges of scaffolding 50.00% 7.95 3.98
over heads and contractor profit 11.765% 11.765% 11.00 1.29
1.11765 area allowances on labour with profit 0% 11.00 0.00
Rate/1 Sqm Second floor 163.95
(ii) Third Floor
COST per 1 cum of S.F. 163.95
lift charges 10 % on labour 10.00% 70.28 7.03
extra on labour charges of scaffolding 50.00% 7.95 3.98
over heads and contractor profit 11.765% 11.765% 11.00 1.29
1.11765 area allowances on labour with profit 0% 11.00 0.00
Page 38 of 139

Rate/1 Sqm Third floor 176.25


43 (a) Plastering with CM (1:5), 12 mm thick without scaffolding
Rate of plastering in CM (1:5), 12mm thick with 139.35
scaffolding
Deduct scaffolding charges sqm -9.07
C. Deduct Overheads & Contractors Profit on scaffolding 11.765% 8.98 -1.06
BASIC COST per 1 SQM 129.22
1.11765 D.Deduct area allowances on scaffolding with profit 0% 7.95 0.00
Cost for 1Sqm Rs. 129.22
For Above 3.66 Mtrs height
Rate/Sqm 139.35
Add for lift charges (10% on labour charges) 10.00% 70.28 7.03
extra on labour of scaffolding 50.00% 7.95 3.98
over heads and contractor profit 11.765% 11.765% 11.00 1.29
1.11765 area allowances on labour with profit 0% 11.00 0.00
For Above 3.66 Mtrs Rate/Sqm 151.65

47 Plastering with CM (1:5), 12 mm thick and finishing smooth to the required slope and painting two coats of
Janatha Cem including cost & conveyance of all materials, labour charges, leads, lifts and curing including
cost of Janatha Cem paint two coats, complete as per the directions of the Engineer in charge for the finished
item of work.

Unit = 1 sqm Data Sl.No.76, Pg.42 of Bld. Items


Cost for 1Sqm of plastering in CM (1:5), 12mm thick 129.22
without scaffolding
Add cost of Janathacem two coats incl over heads & sqm 1.00 32.09 32.09
Contractor's profit and Area Allowance
BASIC COST per 1 SQM 161.31
Cost for 1Sqm Rs. 161.31
44 Plastering with CM 2 coats, 20 mm thick,base coat in CM (1:6), 16mm thick and top coat in CM (1:4), 4mm
thick with Dubara sponze finishing.on the uneven surfaces of wall including cost & conveyance of all
materials, labour charges, leads, lifts, scaffolding and curing complete as per the directions of the Engineer
in charge for the finished item of work.

Unit = 10 sqm Data Sl.No.84, Pg.43 of Bld. Items


A. MATERIALS:
Base Coat for CM(1:6), 16 mm thick
Cement Kg 43.00 4.70 202.10
Sand Cum 0.18 667.00 120.06
Top Coat for CM(1:4), 4 mm thick
Cement Kg 14.50 4.70 68.15
Sand Cum 0.04 667.00 26.68
B. LABOUR:
Mason 1st class day 0.63 470.00 296.10
Mason 2nd class day 1.47 450.00 661.50
Mazdoor (unskilled) day 3.90 425.00 1657.50
L.C. 79.5 Scaffolding charges Blds SSR sqm 10.00 8.98 89.80
add towards water charges 1% on cost of materials and 0.01 3121.89 31.22
labour
over heads and contractor profit 11.765% 11.765% 3121.89 367.29
BASIC COST per 10 SQM 3520.40
BASIC COST per 1 SQM 352.04
Cement conveyance charges with profit Kg 5.75 0.08 0.43
Sand conveyance charge incl. Seignorage charge Cum 0.02 946.85 20.83
1.11765 D.area allowances on labour with profit 0% 269.46 0.00
COST per 1 Sqm Rs. 373.30
(I) First Floor
COST per 1 sqm of G.F. 373.30
add for lift charges 10 % on labour 10.00% 261.51 26.15
extra on labour of scaffolding 50.00% 7.95 3.98
over heads and contractor profit 11.765% 11.765% 30.13 3.54
1.11765 area allowances on labour with profit 0% 30.13 0.00
Rate/1 Sqm 1st floor 406.97
(ii) Second Floor
COST per 1 cum of F.F. 406.97
lift charges 10 % on labour 10.00% 261.51 26.15
extra on labour charges of scaffolding 50.00% 7.95 3.98
over heads and contractor profit 11.765% 11.765% 30.13 3.54
1.11765 area allowances on labour with profit 0% 30.13 0.00
Rate/1 Sqm Second floor 440.64
(ii) Third Floor
COST per 1 cum of S.F. 440.64
lift charges 10 % on labour 10.00% 261.51 26.15
extra on labour charges of scaffolding 50.00% 7.95 3.98
over heads and contractor profit 11.765% 11.765% 30.13 3.54
1.11765 area allowances on labour with profit 0% 30.13 0.00

Rate/1 Sqm Third floor 474.31

46 Plastering to Uneven surfaces of RR /CR, PCC with CM(1:5) 20mm. thick including cost & conveyance of all
materials, labour charges, leads, lifts and curing complete as per the directions of the Engineer in charge for
the finished item of work.
Unit = 10 sqm Data Sl.No.82, Pg.43 of Bld. Items
A. MATERIALS:
Page 39 of 139

Cement for CM (1:5) KG 60.48 4.70 284.26 60.48


Sand cum 0.2205 667.00 147.07
B. LABOUR:
Mason 2nd class day 0.94 450.00 423.00
Mazdoor (unskilled) day 1.60 425.00 680.00
Mazdoor for mixing mortor day 0.04 425.00 17.85
add towards water charges 1% on cost of materials and 0.01 1552.18 15.52
labour
over heads and contractor profit 11.765% 11.765% 1552.18 182.61
BASIC COST per 10 SQM 1750.32
BASIC COST per 1 SQM 175.03
Cement conveyance charges with profit Kg 6.05 0.08 0.46
Sand conveyance charge incl. Seignorage charge Cum 0.02 946.85 20.88
1.11765 D.area allowances on labour with profit 0% 112.09 0.00
TOTALCOST per 1 SQM 196.37
47 Flooring plastering with CM (1:3) 12mm thick and finishing smooth to the required slope and thread lining
for flooring including cost & conveyance of all materials, labour charges, leads, lifts and curing complete as
per the directions of the Engineer in charge for the finished item of work.

Unit = 1 sqm Data Sl.No.76, Pg.42 of Bld. Items


a) Cost for 1Sqm of plastering in CM (1:3), 12mm thick 144.71
without scaffolding
b) Add for thread lining m.rt. 1.00 LS 5.00
COST per 1 SQM Rs. 149.71

48 Construction of cable duct as per drg.No: SE/T/SS/1/99 within the control house including cost and
conveyance of all materials labour charges ,all leads and lifts, centering, ramming, curing complete for
finished item of work as per the directions of the Engineer-in-charge.

Provding CC (1:3:6) prop and using12mm size HBG metal


Spl Specification
Cost of 12mm HBG metal 1cum 0.90 1043.25 938.93
Cost of sand 1cum 0.45 600.00 270.00
cost of cement 1Kg 220.00 4.70 1034.00
L.C. C) Water KL 1.20 73.00 87.60
L.C. 247.00 Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity hour 1.00 397.50 397.50
Sl.No.16, of Hire chrgs SSR
LABOUR
Mason 1st class day 0.10 470.00 47.00

Mazdoor (unskilled) day 1.39 425.00 590.75


over heads and contractor profit 11.765% 11.765% 3365.78 395.98
Basic Rate per 1Cum Rs 3761.76
e) cement conveyance charges with profit 220.00 0.08 16.61
Sand conveyance charge incl. Seignorage charge 0.45 946.85 426.08
Metal conveyance charge incl. Seignorage charge 0.90 468.10 421.29
h) water conveyance charges with OH 1.20 20.50 24.60
1.11765 D.area allowances on labour with profit 0% 884.75 0.00

Rate per 1cum.Rs. 4650.34


Cable duct -10 RM
Earth work 15.435 172.90 2668.71
PCC 1:4:8 40 mm metal 2.205 3994.26 8807.34
BM 1:6 4.948 5653.85 27975.25
Structural Steel, angles, channels, 7mm thick chequered 1066.66 89.64 95615.40
plate, MS jally
PCC(1:3:6) 12mmtrays
HBG Metal
0.04 4650.34 186.01
PLASTERING CM(1:5)20MM THICK 26.50 196.37 5203.81
Rate per 10RM.Rs. 140456.53
Rate per 1RM.Rs. 14045.65
49 Supply and fixing of 40mm thick (0.457x0.457m) polished Kadapa Slabs for cup boards including cost and
conveyance of all materials, all leads and lifts complete as per the directions of the Engineer in charge for the
finished item of work.

Cost of Cuddapah Slab vide item no: TBSC-B.I-04,SSR 1 Sqm 1.00 95.00 95.00

Add for conveyance m.rt. L.S. 6.00 6.00


Add for fixing in position m.rt. L.S. 15.00 15.00
over heads and contractor profit 11.765% 11.765% 116.00 13.65
Rate per 1 Sqm Rs. 129.65
50 Supply and planting of plants like flowering plants fruit bearing plants etc., including excavation of pits of
size 0.6x0.6x0.6m., filling the pit with a mixture of red earth, sand, manure in the ratio of 2:1:1 including cost
and conveyance of all materials with all leads and lifts including watering the plants for a period of six
months, complete as per the directions of the Engineer in charge for the finished item of work.

Earth work excavation 1 cum 0.22 172.90 38.04


as per the main data
cost of red earth 1cum 0.11 65.00 7.15
cost of sand 1cum 0.06 600.00 36.00
cattle manure mrt cum 0.06 350.00 21.00
cost of plant mrt each 1.00 60.00 60.00
labour charges for mixing and filling in the pit mrt L.S 10.00 10.00
Page 40 of 139

Labour charges for watering and maintenance etc rate as month 6.00 7.00 42.00
per , TBSC-R.I-43, SSR
over heads and contractor profit 11.765% 11.765% 176.15 20.72
Sand conveyance charge incl. Seignorage charge 0.06 946.85 56.81

Earth conveyance charge incl. Seignorage charge 0.11 157.55 17.33


Basic Rate per 1No 309.05
1.11765 area allowances on labour with profit 0% 52.00 0.00

Total Rate/1 No. Rs 309.05


51 Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with Impervious
Water proof compound over roof when it is greenincluding cost of all materials, seigniorage charges,
excluding conveyance charges of materials and including all operational, incidental and labour charges for
mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab
etc,, complete for finished item of work

Unit = 10 sqm Data Sl.No.148, Pg.71 of Bld. Items

A. MATERIALS:
Cement sl.No.5, Pg.15 100.80 4.70 473.76
Sand Sl.No.28, Pg.16 0.22 667.00 147.07
Impervious Water proof compound TBSC-G.II-04, Blds kg 2.00 51.00 102.00
SSR
B. LABOUR
Mason 1st class day 0.66 470.00 310.20
Mason 2nd class day 1.54 450.00 693.00
Mazdoor (unskiled) day 3.70 425.00 1572.50
Mazdoor for mixing mortor day 0.042 425.00 17.85
add towards water charges 1% on cost of materials and 0.01 3316.38 33.16
labour
over heads and contractor profit 11.765% 11.765% 3316.38 390.17

BASIC COST per 10 SQM 3739.72

BASIC COST per 1 SQM 373.97


Cement conveyance charges with profit Kg 10.08 0.08 0.76

Sand conveyance charge incl. Seignorage charge Cum 0.02 946.85 20.83

1.11765 D.Area allowances on labour with profit 0% 259.36 0.00

Cost Per Sqm Rs. 395.56


52 Flooring with Non-skid Ceramic floor tiles of scratch free-stain free and scratch free-nano finish of size 600 x
600 mm and thickness between 8-10 mm 1st quality conforming to IS:13711, IS:13712,IS:13630 (Parts 1 to 15) of
any colour and finish in all in all shades and designs as directed by Engineer. in charge, set over base coat of
cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of
honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed
with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc.,
complete, including seigniorage charges, etc., complete as per the directions of the Engineer in charge for the
finished item of work.

Unit = 10 sqm As per BLD-CSTN-9-6 of Bld. Items


A. MATERIALS:
cost of Non-skid red or white full body Ceramic floor tiles sqm 10.50 485.00 5092.50
of scratch free-stain free of size 600 x 600 mm a TBSC-C.I-
04, Bldg items SSR
Cement for CM (1:8) proportion for base coat kg. 21.60 4.70 101.52

Cement for slurry kg. 33.00 4.70 155.10


White cement Sl.No.701, TBSC-R.I-01 of Bldg items SSR kg. 2.00 29.00 58.00

sand for CM (1:8) Cum 0.12 600.00 72.00


B. LABOUR
Mason 1st class day 0.96 470.00 451.20
Mason 2nd class day 2.24 450.00 1008.00

Mazdoor (unskiled) day 3.30 425.00 1402.50

Add water charges 1% 0.01 8340.82 83.41


over heads and contractor profit 11.765% 11.765% 8340.82 981.30

BASIC COST per 10 SQM 9405.53


BASIC COST per 1 SQM 940.55
D. Cement conveyance charges with profit Kg 5.46 0.08 0.41
Sand conveyance charge incl. Seignorage charge 0.012 946.85 11.36
1.11765 D. area allowances on labour with profit 0% 286.17 0.00
Rate per Sqm Rs. 952.33

b First Floor
Ground floor rate 952.33
Add for lift charges ( 10% on labour charges) 10% 286.17 28.62
over heads and contractor profit 11.765% 11.765% 28.62 3.37

1.11765 e) area allowances on labour including profit & O.H charges 0% 28.62 0.00
Page 41 of 139

First floor Rate/Sqm 984.31


b Second Floor

Ground floor rate 952.33


Add for lift charges ( 20% on labour charges) 20% 286.17 57.23
over heads and contractor profit 11.765% 11.765% 57.23 6.73

1.11765 e) area allowances on labour including profit & O.H charges 0% 57.23 0.00
Second floor Rate/Sqm 1016.30

53 Providing skirting to internal walls with glazed full body Ceramic tiles of any size and thickness between 5-7
mm1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) length equal to flooring stones, set
over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30
kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth,
including cost of all materials like tiles, cement, sand and water including seigniorage charges, etc., complete
as per the directions of the Engineer in charge for the finished item of work.

Unit = 10 sqm As per BLD-CSTN-9-18 of Bld. Items

A. MATERIALS:
Cost of glazed red or white full body Ceramic wall tiles of sqm 10.50 480.00 5040.00
any size and thickness between 5-7mm 1st quality TBSC-
C.VI-02, Bldg items SSR
Sand for cm 1:3 base coat cum 0.12 600.00 72.00
Cement for cm 1:3 base coat kgs 57.60 4.70 270.72
Cement for slurry kgs 33.00 4.70 155.10
White cement Sl.No.701, TBSC-R.I-01 of Bldg items SSR kgs 6.00 29.00 174.00
B. LABOUR
Mason 1st class day 0.77 470.00 361.90
Mazdoor (unskiled) day 0.80 425.00 340.00
Add water charges 1% 0.01 6413.72 64.14
over heads and contractor profit 11.765% 11.765% 6413.72 754.57
BASIC COST per 10 SQM 7232.43
BASIC COST per 1 SQM 723.24
D. Cement conveyance charges with profit 9.060 0.08 0.68
Sand conveyance charge incl. Seignorage charge 0.0120 946.85 11.36
1.11765 F. area allowances on labour with profit 0% 70.19 0.00
Rate per 1Sqm Rs. 735.29
b First Floor
Ground floor rate 735.29
Add for lift charges ( 10% on labour charges) 10% 70.19 7.02

over heads and contractor profit 11.765% 11.765% 7.02 0.83

1.11765 e) area allowances on labour including profit & O.H charges 0.000% 7.02 0.00
First floor Rate/Sqm 743.13
b Second Floor
Ground floor rate 735.29
Add for lift charges ( 20% on labour charges) 20% 70.19 14.04
over heads and contractor profit 11.765% 11.765% 14.04 1.65
1.11765 e) area allowances on labour including profit & O.H charges 0% 14.04 0.00

Second floor Rate/Sqm 750.98


52 Flooring with Nano polished soluble salt porcelain vitrified tiles screen printed of size 800 X 800 mm and
thickness between 9-11 mm 1st quality conforming to IS:13711, IS:13712,IS:13630 (Parts 1 to 15) of any colour
and finish in all in all shades and designs as directed by Engineer. in charge, set over base coat of cement
mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey
like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with
pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete,
including seigniorage charges, etc., complete as per the directions of the Engineer in charge for the finished
item of work.

Unit = 10 sqm (As per BLD-CSTN-9-5) of Bld. Items


A. MATERIALS:
Nano polished soluble salt porcelain vitrified tiles screen sqm 10.50 500.00 5250.00
printed of size 800 X 800 mm and thickness between 9-11
mm TBSC-C.II-04

Cement for CM (1:8) proportion for base coat kg. 21.60 4.70 101.52
Cement for slurry kg. 33.00 4.70 155.10
Cement for pointing with CM(1:3) kg. 6.00 4.70 28.20
sand for CM (1:8) Cum 0.12 600.00 72.00
sand for pointing 0.02 667.00 13.34
B. LABOUR
Mason 1st class day 0.96 470.00 451.20
Mason 2nd class day 2.24 450.00 1008.00
Page 42 of 139

Mazdoor (unskiled) day 3.30 425.00 1402.50


Add water charges 1% 0.01 8481.86 84.82
over heads and contractor profit 11.765% 11.765% 8481.86 997.89

BASIC COST per 10 SQM 9564.57


BASIC COST per 1 SQM 956.46
D. Cement conveyance charges with profit Kg 6.060 0.08 0.46
Sand conveyance charge incl. Seignorage charge 0.014 946.85 13.26
1.11765 D. area allowances on labour with profit 0% 286.17 0.00
Rate per Sqm 970.17
b First Floor
Ground floor rate 970.17
Add for lift charges ( 10% on labour charges) 10% 286.17 28.62

over heads and contractor profit 11.765% 11.765% 28.62 3.37

1.11765 e) area allowances on labour including profit & O.H charges 0.000% 28.62 0.00
First floor Rate/Sqm 1002.15
b Second Floor
Ground floor rate 970.17
Add for lift charges ( 10% on labour charges) 20% 286.17 57.23
over heads and contractor profit 11.765% 11.765% 57.23 6.73
1.11765 e) area allowances on labour including profit & O.H charges 0.000% 57.23 0.00

Second floor Rate/Sqm 1034.14


53 Providing skirting to internal walls to 15 cm height/risers of steps with Nano polished soluble salt porcelain
vitrified tiles screen printed of size 800 x 800 mm and thickness between 9-11 mm 1st quality confoRMTing to
IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs length equal to
flooring stones, set over base coat of CM (1:5) 12 mm thick with cement slurry of honey like consistency
spread at the rate of 3.30 kgs per M2 and jointed with white cement paste mixed with pigment of matching
shade to full depth, including cost of all materials like tiles, cement, sand and water including seigniorage
charges, etc., complete as per the directions of the Engineer in charge for the finished item of work.

Unit = 10 sqm (As per BLD-CSTN-9-20) of Bld. Items


A. MATERIALS:
Nano polished soluble salt porcelain vitrified tiles screen sqm 10.50 500.00 5250.00
printed of size 800 X 800 mm and thickness between 9-11
mm 1st quality TBSC-C.II-04, Bldg items SSR

Sand for CM 1:5 base coat cum 0.12 600.00 72.00


Cement for CM (1:5) proportion for base coat kgs 34.56 4.70 162.43
Cement for slurry kgs 33.00 4.70 155.10
White cement Sl.No.701, TBSC-R.I-01 of Bldg items SSR kgs 2.00 29.00 58.00

B. LABOUR
Mason 1st class day 0.96 470.00 451.20
Mason 2nd class day 2.24 450.00 1008.00
Mazdoor (unskiled) day 3.30 425.00 1402.50
Add water charges 1% 0.01 8559.23 85.59

over heads and contractor profit 11.765% 11.765% 8559.23 1006.99


BASIC COST per 10 SQM 9651.82
BASIC COST per 1 SQM 965.18
D. Cement conveyance charges with profit 6.76 0.08 0.51
Sand conveyance charge incl. Seignorage charge 0.01 946.85 11.36
1.11765 F. area allowances on labour with profit 0% 286.17 0.00
Rate per 1Sqm Rs. 977.05
b First Floor
Ground floor rate 977.05
Add for lift charges ( 10% on labour charges) 10% 286.17 28.62

over heads and contractor profit 11.765% 11.765% 28.62 3.37


1.11765 e) area allowances on labour including profit & O.H charges 0.000% 28.62 0.00
First floor Rate/Sqm 1009.03
b Second Floor
Ground floor rate 977.05
Add for lift charges ( 20% on labour charges) 20% 286.17 57.23
over heads and contractor profit 11.765% 11.765% 57.23 6.73
1.11765 e) area allowances on labour including profit & O.H charges 0.000% 57.23 0.00
Second floor Rate/Sqm 1041.02

52 Flooring and skirting with polished Tandur stone slab 15 to 18 mm thick of any size as specified (Tandur blue,
cetre cut) set over base coat of Cement mortor (1:8) over already laid CC bed or RCC roof slab, including neat
cement slurry of honey like consistency spread @ 3.3kgs per sqm & jointed neatly with cement paste mixed
with pigment of matching shade to full depth, including cost of all materials like cement, sand, water and
flooring stones etc., complete, including seigniorage charges, labour charges etc., complete for finished item of
work.

Unit = 10 sqm Data: BLD-CSTN-9-1, 99, Pg.48


Page 43 of 139

Material:
Tandur stone slab 15 to 18 mm thick of any size as
Sqm 11.00 164.00 1804.00
specified TBSC-B.I-03
Cement for CM (1:8) proportion for base coat Kg 21.60 4.70 101.52
Sand for CM(1:8) proportion for base coat Cum 0.12 600.00 72.00
Cement for slurry for bedding Kg 33.00 4.70 155.10
Cement for jointing & pointing Kg 20.00 4.70 94.00
Labour :
Mason 1st Class Day 3.10 470.00 1457.00
Mason 2nd Class Day 1.10 450.00 495.00
Mazdoor (unskilled) Day 0.86 425.00 365.50
Add water charges 1% 0.01 4544.12 45.44
over heads and contractor profit 11.765% 11.765% 4544.12 534.62
Cement conveyance charges with profit Kg 74.60 0.0755 5.63
Sand conveyance charges with profit Cum 0.120 946.85 113.62
1.11765 Area allowances on labour with profit @ 40 % 0% 2317.50 0.00
Basic Rate per 10 Sqm 5243.43
Basic Rate per 1 Sqm 524.34

Flooring and skirting with High polished granite (other than black and regular colours) 16 to 18 ,, thick up to
8' (2.43m) set over base coat of Cement mortor (1:8), 20 mm thick over CC bed already laid or RCC roof
slab,including neat cement slurry of honey like consistency spread @ 3.3kgs per sqm & jointed neatly with
51
white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like
cement, sand, water and tiles etc.,complete , including seigniorage charges,etc., complete for finished item of
work.

Taking output = 10 sqm Data: BLD-CSTN-9-7,Sl.No. 105, Pg.52


Material:
High polished granite16 to 18 ,, thick up to 8' other than
Sqm 10.50 2709.00 28444.50
black and regular colours)TBSC-B.III-02
Cement for CM (1:8) proportion for base coat Kg 36.00 4.70 169.20
Sand for CM(1:8) proportion for base coat Cum 0.20 600.00 120.00
Cement for slurry for bedding Kg 33.00 4.70 155.10
White cement for jointing & pointingTBSC-R.I-01 Kg 6.00 29.00 174.00
Machinery:
Labour:
Mason 1st Class Day 3.00 470.00 1410.00
Mason 2nd Class Day 1.00 450.00 450.00
Mazdoor (unskilled) Day 8.00 425.00 3400.00
Add Water charges 1% 1% 34322.80 343.23
over heads and contractor profit 11.765% 11.765% 34322.80 4038.08
Basic Rate per 10 Sqm 38704.11
Basic Rate per 1 Sqm 3870.41
Cement conveyance charges with profit Kg 6.90 0.076 0.52
Sand conveyance charges with profit Cum 0.02 946.85 18.94
1.11765 Area allowances on labour with profit @ 40 % 0% 526.00 0.00
Rate per 1 Sqm Rs. 3889.87

19 Providing and applying Birla wallcare putty of average 1 to 2mm thickess over plastered surface to prepare
the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose
powdered materials , applying emery paper, sand the surface, clean and wipe off loose dust, applying putty
by putty knife/ muslin pad, air dry for 2 to 3 hours, sand with 180 and 320 No., emery paper for the surface
preparation including cost and conveyance of all materials to work site and all operational , incidental, labour
charges etc complete for finished item of work as per t`he directions of the Engineer in charge. ( for internal
walls) .

Date for 10 sqm SSR 11-12 page No.267, SLNo.18


A) Materials
Synthetic wall putty/ as per SSR TBSC-G.I-03 Rs kg 23.00 41.00 943.00
Labour charges
Painter 1 st class day 0.273 540.00 147.42
Painter 2nd class day 0.637 450.00 286.65
Mazdoor day 0.910 425.00 386.75
sundries for emery papers,fillers, knife etc., 1% 1763.82 17.64
over heads and contractor profit 11.765% 11.765% 1763.82 207.51
Total/10 sqm 1988.97
1.11765 F) area allowances on labour with profit 0.00% 820.82 0.00
COST per 10 sqm 1988.97
Rate per 10 sqm 1988.97
Rate per 1 sqm 198.90
Page 44 of 139

19 Providing and applying Birla wall putty for external walls or equivalent putty such as birla wall care putty or
textur paint or equivalent such as NCL/Saicoat texture paint of average 2 to 3 mm thickness over plastered
surface to prepare the surface even and smooth after thorougly brushing the surface to remove all dirt and
remains of loose powdered materials,applying emery paper, Sand the surface, clean & wipe off loose dust,
applying putty/textur paint filler by putty kinife/muslin pad, air dry for 2-3 hrs for the surface preparation
including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc.
complete for finished item of work.

Date for 10 sqm (As per Revised Data in SOR 2011-12,Sl.No.19)

A) Materials
Synthetic wall putty/ as per SSR TBSC-G.I-03 Rs kg 34.50 41.00 1414.50
Labour charges
Painter 1 st class day 0.546 540.00 294.84
Painter 2nd class day 1.274 450.00 573.30
Mazdoor day 1.820 425.00 773.50
L.C. 79.5 Scaffolding charges Blds SSR sqm 10.00 8.98 89.80
over heads and contractor profit 11.765% 11.765% 3145.94 370.12
Total/10 sqm 3516.06
1.11765 F) area allowances on labour with profit 0.00% 1721.14 0.00
COST per 10 sqm 3516.06
Rate per 10 sqm 3516.06
Rate per 1 sqm 351.61
54 Painting to inner new walls with 2 coats of acrylic emulsion interior grade having VOC(Volatile Organic
Compound) content less than 50 gms/Ltr of approved brand ( Asian, Berger, Nippon ) and shade over a base
coat of appropriate Cement Primer of Interior grade I of approved brand,making 3 coats in all to give an even
shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials,
including cost and conveyance of all materials to work site and all operational, incidental, labour charges
etc.complete for finished item of work as per SS 911 for internal walls

unit = 10 sqm Data Sl.No.168 & 187 of Bld. Items


PRIMARY COAT:
Cost of Water Based Cement Primer of Interior TBSC-G.I- Lts 0.50 150.00 75.00
01(# 186 of Bldgs. Items)
Painter I st class Nos 0.08 540.00 43.20
Painter II class Nos 0.19 450.00 85.50
Acrylic emulsion type TBSC-G.III-01 (# 209 of Bldgs. Lts 0.80 195.00 156.00
Items)
1st classssr
painter Nos 0.36 540.00 194.40
II class painter Nos 0.84 450.00 378.00

Sundries including brushes, ladders, etc.1 % on above 0.01 932.10 9.32


over heads and contractor profit 11.765% 11.765% 932.10 109.66
BASIC COST per 10 SQM 1051.08
1.11765 area allowances on labour with profit 0% 701.10 0.00
total per 10 SQM 1051.08
Total rate per 1 SQM Rs. 105.11
First Floor
BASIC COST per 1 sqm GF 105.11
lift charges 10 % on labour with area allowance & profit 10.00% 70.11 7.01

over heads and contractor profit 11.765% 11.765% 7.01 0.82


1.11765 area allowances on labour with profit 0% 7.01 0.00
Rate/1 sqm 1st floor 112.95
Second Floor
BASIC COST per 1 sqm 105.11
lift charges 20 % on labour with area allowance & profit 20.00% 70.11 14.02

over heads and contractor profit 11.765% 11.765% 14.02 1.65


1.11765 area allowances on labour with profit 0% 14.02 0.00
Rate second floor/1 sqm 120.78

55 Painting to External new walls with 2 coats of acrylic emulsion exterior grade having VOC(Volatile Organic
Compound) content less than 50 gms/Ltr of approved brand ( Asian, Berger, Nippon ) and shade over a
base coat of appropriate primer of grade I quality approved brand,making 3 coats in all to give an even shade
after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including
cost and conveyance of all materials to work site and all operational, incidental, labour charges etc.complete
for finished item of work as per SS 912 for External walls

unit = 10 sqm Data Sl.No.168 & 187 of Bld. Items& revised as per
SoR 2011-12 Sl.No.17
PRIMARY COAT:
Cost of Water Based Cement Primer of Exterior TBSC.GI- Lts 0.50 191.00 95.50
02(# 187, Bldg items SSR
Painter I st class Nos 0.08 540.00 43.20
Painter II nd class Nos 0.19 450.00 85.50
Acrylic emulsion exterior type TBSC-G.III-02, (# 210 of Lts 0.80 204.00 163.20
Bldgs. Items)
1st class painter Nos 0.21 540.00 113.40
II class painter Nos 0.49 450.00 220.50
Page 45 of 139

Mazdoor Day 1.50 425.00 637.50


Sundries including brushes, ladders, etc.1 % on above 0.01 1358.80 13.59
over heads and contractor profit 11.765% 11.765% 1358.80 159.86
BASIC COST per 10 SQM 1532.25
BASIC COST per 1 SQM 153.23
1.11765 area allowances on labour with profit 0.00% 110.01 0.00
Total per 1SQM 153.23

Rate/1st floor
BASIC COST per 1 sqm GF 153.23
lift charges 10 % on labour with area allowance & profit 10.00% 110.01 11.00

over heads and contractor profit 11.765% 11.765% 11.00 1.29


1.11765 area allowances on labour with profit 0% 11.00 0.00
Rate/1 sqm 1st floor 165.53
Rate/ 2nd floor
BASIC COST per 1 sqm 153.23
lift charges 20 % on labour with area allowance & profit 20.00% 110.01 22.00

over heads and contractor profit 11.765% 11.765% 22.00 2.59


1.11765 area allowances on labour with profit 0% 22.00 0.00
Rate second floor/1 sqm 177.82

56 White washing two coats with whiting / Suryacem of approved quality to give an even shade after
thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of
all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of
work

Unit: 10 sqm Data Sl.No.162, Pg.79 of Bld. Items


A. MATERIALS :
paint grade lime for white / colour wash as per TBSC- kg 2.00 22.00 44.00
G.II-01, Bldg items SSR
Gum, conjee water, or prickly pear juice including L.S 4.40
necessary fire wood (10%)
B. LABOUR
Brick Layers / Painter I class day 0.063 540.00 34.02
Sl.No. 35, Pg.10, Bldg items
Brick Layers / Painter II Class day 0.147 450.00 66.15 420
Sl.No. 37, Pg.11, Bldg items
Mazdoor (unskilled) day 0.320 425.00 136.00
Sundries including brushes, ladders, etc., 1.00% 2.85
over heads and contractor profit 11.765% 11.765% 284.57 33.48
Total cost for 10 sqm 320.90
Total cost for 1 sqm Rs. 32.09
1.11765 D) area allowances on labour with profit 0% 23.62 0.00
Rate per 1 Sqm 32.09
For Above 3.66 Mtrs height
Rate/Sqm 32.09
Add for lift charges (10% on labour charges) 10.00% 23.62 2.36
over heads and contractor profit 11.765% 11.765% 2.36 0.28
1.11765 area allowances on labour with profit 0% 2.36 0.00
For Above 3.66 Mtrs Rate/Sqm 34.73

57 Painting two coats with rubber based acid resistant paint of approved make and quality over a coat of Red
oxide primer Gr-I to the walls, flooring and ceiling of the battery room including cost & conveyance of all
materials, scaffloding, labour charges, leads, lifts etc, complete as per the directions of the Engineer in charge
for the finished item of work

Unit: 10 sqm Data Sl.No., Pg. of Bld. Items

Two Coats - New plastered surface :


Unit: 10 sqm
A. MATERIALS & LABOUR
Red Oxide primer Grade - 1, TBSC-G.I-05, Bldg items SSR 1.00 129.00 129.00
LABOUR
1st class painter 0.08 540.00 43.20
2nd class painter 0.19 450.00 85.50
Rubber based acid resistant paint (LMR) kg 2.20 280.00 616.00
LABOUR
1st class painter day 0.36 540.00 194.40
2nd class painter 0.84 450.00 378.00
B. Sundries including brushes, soap, putty etc., 1% 0.01 1446.10 14.46
over heads and contractor profit 11.765% 11.765% 1446.10 170.13
BASIC COST per 10 SQM 1630.69
BASIC COST per 1 SQM 163.07
1.11765 Area allowances on labour with profit 0% 70.11 0.00
Rate/1 sqm incuding priming coat 163.07
Page 46 of 139

58 White washing three coats with with whiting / Suryacem of approved quality to give an even shade after
thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of
all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of
work.

Unit: 10 sqm Data Sl.No.163, Pg.79 of Bld. Items


A. MATERIALS :
paint grade lime for white / colour wash as per TBSC- cum / kg 2.800 22.00 61.60
G.II-01, Bldg items SSR
Gum, conjee water, or prickly pear juice including L.S 6.16
necessary fire wood (10%)
B. LABOUR
Brick Layers / Painter I class day 0.090 540.00 48.60
Sl.No. 35, Pg.10, Bldg items
Brick Layers / Painter II Class day 0.210 450.00 94.50
Sl.No. 37, Pg.11, Bldg items
Mazdoor (unskilled) day 0.430 425.00 182.75
Sundries including brushes, ladders, etc., 1.00% 3.94
over heads and contractor profit 11.765% 11.765% 393.61 46.31
Total cost for 10 sqm 443.85
Total cost for 1 sqm 44.39
1.11765 D) area allowances on labour with profit 0% 32.59 0.00
Total Rate per 1 Sqm 44.39

59 RCM facia 50 MM thick in CM (1:3) for drop walls, fins with Rabbit wire mesh (chicken mesh) of not less than
30 gauge of nominal reinforcement as directed by Engineer-in-charge with dubara sponge finishing, including
cost & conveyance of all materials to site, seigniorage charges, sales & other taxes on all materials, operational
& incidental, cost and conveyance of cement, wire mesh, water to work site, centering, scaffolding and form
work, lift charges etc., complete for finished items of work but excluding cost of steel & its fabrication charges,
for finished item of work. (APSS No.403 & 903)

Unit - 10 sqm Data Sl.No.86, Pg. 44 of Bld. Items


A) MATERIALS

Rabbit wire mesh(chicken mesh) of not less than 30 sqm 13.30 19.00 252.70
gauge(1.0 M panna for 0.6 M drop) TBSC-E.I-12, Bldg
items SSR
Cement for Mortar 1:3 for 25 mm thick (0.25 Cum)
Cement in CM 1:3 Kg 120.00 4.70 564.00

Sand Cum 0.2625 600.00 157.50

Dry Cement for making Lumps kg 50.00 4.70 235.00

12 mm Plastering 2 coats in 1:4 & 1:2 cm both sides 21.8


Sqm
Cement in CM (1:4) Kg 86.33 4.70 405.75 86.328
Sand in CM(1:4) Cum 0.2518 667.00 167.95
Cement in CM (1:2) Kg 62.78 4.70 295.07 62.784
Sand in CM(1:2) Cum 0.09160 667.00 61.10
B) LABOUR CHARGES
1st Class Mason day 8.00 470.00 3760.00
Miller Operator (1st Class ) day 1.00 470.00 470.00
Mazdoor (unskilled) day 10.00 425.00 4250.00
c) Machinery
L.C. 494 Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity Hrs 2.00 397.50 795.00
Sl.No.16, of Hire chrgsSSR
add towards water charges 1% on cost of materials and 0.01 11414.06 114.14
labour
over heads and contractor profit 11.765% 11.765% 11414.06 1342.86
12871.07
BASIC COST per 1 SQM 1287.11
D. Cement conveyance charges with profit 31.91 0.08 2.41
Sand conveyance charge incl. Seignorage charge 0.060590 946.85 57.37
1.11765 f). Area allowances on labour with profit 0% 897.40 0.00
Rate per 1 Sqm Rs. 1346.89
60 Providing and fixing Thermocole False ceiling in true horizontal level 600 mm x 600 mm using 19 mm thick
Thermocole sheet anodised Aluminium Tee sections of size 24.50 mm x 24.0 mm x 2.4 mm in grid with cross
tee of size 24 x 24.5 mm at every 600 mm c/c and anodised aluminium wall angle of size 24 x 24 mm fixed to
periphery of the wall and the above grid is suspended at every 1200 mm c/c in both directions using 2.0 mm
thick GI Wire for finished of size 600 x 600 mm including Cost &conveyance of all materials and labour
charges such as cutting , fixing of standing of frame work exposing roof making complete for finished item of
work

UNIT 1 sqm Data Sl.No.157, Pg.76 of Bld. Items Amendment as


per SSR2011-12 Pno.260
A) Material requirement
19 mm Thermocole sheet 600 x 600 TBSC-K.I-25 SSR sqm 1.00 42.00 42.00
Page 47 of 139

Alumninium Angle : 24 mm x 24 mmTBSC-K.II-12 Bldg RM 0.40 24.00 9.60


items SSR
Anodised Aluminium T Section : 24 x 24.5 x 2.4 mm RM 3.20 31.00 99.20
TBSC-K.II-13 Bldg items SSR
GI Rod - prestraightened - 2.0 mm dia Connecting Nos 1.28 10.00 12.80
RodTBSC-K.II-24Bldg items SSR
Rawl Plugs, TBSC-K.II-15, Bldg items SSR Nos 1.28 3.00 3.84
B) LABOUR CHARGES
1st Class Carpenter day 0.108 565.00 61.02 565
2nd Class Carpenter day 0.108 450.00 48.60 440
Power Saw Cutter - Hand Operated - Operator (1st Class ) day 0.02 565.00 11.30 565

Power Drill - Hand Operated - Operator (1st Class ) day 0.04 565.00 22.60 565
Unskilled Mazdoor day 0.20 425.00 85.00
C) Machinery
Power Saw Cutter - Hand Operated - Hire charges TBSC- Hrs 0.16 130.00 20.80
S1-02 OF SSR
Power Drill - Hand Operated - Hire charges TBSC-S1-03 Hrs 0.32 121.00 38.72
OF SSR
Scaffolding charges 1% 0.01 455.48 4.55
over heads and contractor profit 11.765% 11.765% 460.03 54.12
BASIC COST per 1 SQM 514.16
1.11765 E. Area allowances on labour with profit 0% 228.52 0.00

Rate per 1 Sqm Rs. 514.16


Providing and fixing of False ceiling in true horizontal level 600mmx600mm,14mm thick Mineral fibre sheet
600x600 of fissured-ANF(board/Tegular)edge tiles with a humidity resistance of 90% RH,average NRC
0.50,light Reflectance>80% thermal conductivity /\=0.052 to .057w/mk,fire performance class0/class1 using
hot dipped galvanised steel section exposed surface with pre-coated capping,main Tee of size24x32mm at
every 1200c/c maximum and rotary stiched cross tee of size 24x27mm at every 600mm c/c and sub-cross tee
of size 24mmx25mm at 1200mm c/c and wall angle of size 19x19 mm fixed to periphery of the wall and the
above grid is suspended at every 1200c/c in both directions using 2.0mmthick pre-straightened GI wire
laying fine fissured butt edge ceiling tiles of 15mm thick mineral fibre board including cost and conveyance of
all materials and labour charges such as cutting,fixing of standing of framework exposing roof making
complete as per the directions of the engineer in charge for the finished item of work(Recommended
brands:Armstrong,Insula etc.,)

UNIT = 1Sqm BLD-CSTN-8-33 pg 75&revised as perSor 2011-12

A)Material requirement
14mm mineral fibre sheet 600x600 sqm 1.00 535.00 535.00
TBSC-K.I-05/Sl.No.347,Pg No.35
Hot dipped GI angle-precoated-grid 19mmx19mm TBSC- RM 0.40 37.00 14.80
K.II-08/Sl/No.380,Pg.No.38 Bldg items SSR
Polyester painted GI-T section -1200mm
(1) 24x32mm and (2)24x25mm(sub-cross tee)TBSC-K.II- RM 1.60 43.00 68.80
09/sl.no.381,pg no.38
572 of bldgs
Polyester painted GI-T section - RM 1.60 42.00 67.20
300mm,24mmx27mm,TBSC-K.II-11/sl.no.383,pg
no.38,bldg items SSR
RM 1.28 10.00 12.80
GI rod-Prestraightened-2.0mm dia connecting rod TBSC-
K.II-24/sl.no.396,pg no.38bldg items SSR 2016-2017
6mm nylon rawl plug,TBSC-K.II-16/sl.no.388,pg Nos 1.28 3.00 3.84
no.38bldg items SSR
B)LABOUR CHARGES
per unit 1sqm
1st class carpenter day 0.12 565.00 67.80
2ns class carpenter day 0.12 450.00 54.00
1st class Painter day 0.024 540.00 12.96
2nd class Painter day 0.024 450.00 10.80
power saw cutter hand operated Hrs 0.012 565.00 6.78
power drill-hand operated-operator Hrs 0.012 565.00 6.78
unskilled Mazdoor day 0.072 425.00 30.60
c)Machinery 0.00
Power Saw Cutter - Hand Operated - Hire charges TBSC- Hrs 0.32 130.00 41.60
S1-02 OF SSR
Power Drill - Hand Operated - Hire charges TBSC-S1-03 Hrs 0.32 121.00 38.72
OF SSR
Scaffolding charges 1% 1% 972.48 9.72
over heads and contractor profit 11.765% 11.765% 982.20 115.56

Basic cost per 1sqm Rs 1097.76

1.11765 area allowances on labour with profit 0% 189.72 0.00

Rate per 1 Sqm Rs. 1097.76


Page 48 of 139

61 Supply and fixing of Ramco hylux wall panelling using 8mm Ramco hylux with frame work made of
Aluminium sections of size 50.8mmx50.8mmx1.6mm thick @ 0.890Kg/m fixed at bottom & ceiling of the
brick wall covered with Ramco hylux wall panelling. 50mm thick thermocole is fixed in the cavity of wall
panelling and Ramco hylux calcium silicate board 8mm is to be fixed using jointing compound and glass fibre
tape . The rate inclusive of cost and conveyance of all materials to site and inclusive of two coats synthetic
enamel painting over one coat primer, all other materials, labour and incidental charges complete as per the
directions of engineer in Charge for finished item of work.( For Bay kiosk )

Unit=40.80 sqm
A.MATERIALS:
Aluminium section frame =50.80x50.80x1.60@ 0.890Kg/m
Section-I:22x3.0m=66.00
Section-I:6x4.0m=24.00
Section-II:3x3.4m=10.20
Section-III:6x1.1m=6.60
106.80rmx0.890=95.05
Add 5% wastage 4.75
Total 99.80 Kgs
Say 100.00 Kgs
Aluminium anodised SectionTBSC-R.I-03 SSR Kg 100.00 292.00 29200.00
Ramco hilux calcium silicate board 8mm TBSC-K.I-21 Bldg
items SSR
Section-I:2(4x3)=24
Section-II:3x3.4m =10.20
Section-III:2(1.1x3)=6.6
40.80 Sqm
40.80+5% wastage = 42.84 or 43.0 sqm Sqm 43.00 279.00 11997.00
50 mm thermocol sheet 14 dense as per TBSC-K.I-25&24

(40.80+10% wastage = 44.88sqm or 45.0 sqm) Sqm 45.00 108.00 4860.00


B) Labour charges as per TBSC-T.I-26 Sqm 40.80 318.00 12974.40

C) Screws, washers jointing compound and glass fiber LS 40.80 50.00 2040.00
tapes etc, 80.00
Contractors profit & Over heads 11.765% 61071.40 7185.05
1.11765 Area allowance 0% 12974.40 0.00
Painting Sqm 40.80 147.68 6025.34
Total Rate per 40.80 sqm 74281.79
Total Rate per 1.0 Sqm 1820.63

Painting with 2 coats of synthetic enamel paint over a primer for new Bison particle board including labour
Sub Data charges.
Unit-10Sqm
PRIMARY COAT:
a) Cost of Primer, (TBSC-G.I-07, Bldg items SSR Lts 0.70 144.00 100.80
Painter I class Nos 0.21 540.00 113.40
Pianter II class Nos 0.49 450.00 220.50
b) Cost of synthetic enamel paint Grade-1, (TBSC-G.V-01, Ltr 1.20 251.00 301.20
Bldg
1st items
class SSR
painter Nos 0.36 540.00 194.40
II class painter Nos 0.84 450.00 378.00
c)Sundries including scafolding, brushes, ladders, etc. 0.01 1308.30 13.08

d) Overheads & Contractors Profit on a to c 11.765% 1321.38 155.46


BASIC COST per 10 SQM 1476.84
BASIC COST per 1 SQM 147.68
1.11765 e) area allowances on labour with profit 0% 90.63 0.00
Rate per 1 Sqm Rs. 147.68

63 Supply and fixing of aluminium Partion partially glazed as per drawing using standard anodised alluminum
rectangular hollow sections infill of sixe 63.5 x 38.10 x 1.28 mm @ 0.759 Kg/m (4654) fitted with 12mm thick
bothside prelaminated partical board interior grade and 5mm thick plain glass, glazing fitted with suitable
aluminium glazing clips including cost and conveyance of all materials, leads, lifts, labour charges for
preparation, fixing in position and transportation etc., complete for finished item of work as directed by
Engineer - in - charge.(Half Height Partition at a height of 1.5 M).
UNIT 1 sqm (As per BLD-CSTN-13-28 & Revised Data in SOR
2011-12, Sl.No.8)
2.59x1.51m =3.91 Sqm
A) MATERIAL REQUIREMENT
1)ALUMINIUM SECTION
Requirement of aluminium sections
Aluminium section Frame @ 0.759 kg/ m
End verticals:
2x1.51=3.02 RMT
Middle verticals:
3x(1.51-(2x0.0381))=4.30 RMT
Top & Bottom Horizontal
2x(2.59-(2x0.0381))=5.03 RMT
Middle Horizontal
4x0.6 =4.30 RMT
Page 49 of 139

Total=14.75 RMT + 5% wastage = 15.49 RMT @ 0.759


Kg/m = 11.76 Kgs

Glazing clips @ 0.124 Kg/m


4x2x(2x(0.6+0.9))+4x2x(2x(0.6+0.5)) = 24+17.6 = 41.6 RMT +5%
wastage = 46.38RMT @ 0.124 kg/m =5.42 kgs

L-Angles - 32 Nos. @ 3'' length


32x3x0.254=2.44 RMT +5 % wastage=2.56
RMT @ 0.124 kg/m = 0.32Kgs
Total=11.76 Kgs + 5.42 Kgs + 0.32 Kgs = 17.50 Kgs
Aluminium anodised SectionTBSC-R.I-03 SSR Kgs 17.50 292.00 5110.00
2) GLAZING with Opaque glass 5 mm thick
4 x 0.6 x 0.9 = 1.2 Sqm +5%
wastage = 1.26 Sqm
Pin headed Glass 5 mm thick, Sl.No.172, TBSC-F.II-02 Sqm 1.26 390.00 491.40

3) 12mm thick both sides prelaminiated cement particle


board = 4 x 0.6 x 0.9 = 2.16 Sqm+5% wastage= 2.27 Sqm

BISON LAM PRE LAMINATED CEMENT Sqm 2.27 667.00 1514.09


BONDEDPARTICLE BOARD- 12 mm thick TBSC-H.IV-
22,Sl.No.311
4) Rubber beadings same as glazing clips = 4
x(2x(0.6+0.5)) =8.8RMT +5% wastage = 9.24 RMT

Rubber Beading TBSC-R-I-11 Rm 9.24 3.00 27.72


B) LABOUR CHARGES
3.91 1st Class Carpenter day 0.434 565.00 958.77
3.91 2nd Class Carpenter day 0.434 450.00 763.62
Power Saw Cutter - Hand Operated - Operator (1st Class ) day 0.043 565.00 94.99
3.91
3.91 Power Drill - Hand Operated - Operator (1st Class ) day 0.058 565.00 128.13
3.91 Unskilled Mazdoor day 0.145 425.00 240.95
3.91 Non technical work inspector taken fitter CL-I rate Nos 0.072 565.00 159.06

C) Machinery
3.91 Power Saw Cutter - Hand Operated - Hire charges TBSC- Hrs 0.347 130.00 176.38
S1-02 OF SSR
3.91 Power Drill - Hand Operated - Hire Charges TBSC-S1-03 Hrs 0.463 121.00 219.05
OF SSR
Power charges for Motors 1% on Machinery 0.01 395.43 3.95
over heads and contractor profit 11.765% 11.765% 9888.13 1163.34
Basic Rate for 3.91 Sqm 11051.46
Basic rate per 1 sqm 2826.46
1.11765 E. area allowances on labour with profit for 1 Sqm 0% 599.88 0.00
Total rate per 1 sqm 2826.46
63 Supply and fixing of aluminium Partition partially glazed as per drawing using standard anodised alluminum
rectangular hollow sections infill of size 63.5 x 38.10 x 1.28 mm @ 0.759 Kg/m (4654) fitted with 12mm thick
bothside prelaminated partical board interior grade and 5mm thick plain glass, glazing fitted with suitable
aluminium glazing clips including cost and conveyance of all materials, leads, lifts, labour charges for
preparation, fixing in position and transportation etc., complete for finished item of work as directed by
Engineer - in - charge.(Full Partition from Floor to False ceiling) (Every alternate verticals should tie with the
beam/slab). (As per BLD-CSTN-13-28 & Revised Data in SOR 2011-12, Sl.No.8)

UNIT 1 sqm
5.48x2.2=12.056 Sqm
A) MATERIAL REQUIREMENT
1)ALUMINIUM SECTION
Requirement of aluminium sections
Aluminium section Frame @ 0.759 kg/ m
End verticals:
2x(2.2+0.3)=5.0 RMT
Middle verticals:

4x((2.2+0.3)-0.0381)=9.85 RMT
4x((2.2-(2x0.0381)=8.50 RMT
Top Horizontal
1x(5.48-(6x0.0381))=5.25 RMT
Bottom Horizontal
1x(5.48-(2x0.0381))=5.40 RMT
Middle Horizontal
(8x2x0.6)+(1x2x0.3)=10.20 RMT
Total=44.20 RMT + 5% wastage = 46.41 RMT @ 0.759
Kg/m = 35.23 Kgs

Glazing clips @ 0.124 Kg/m


8x2x2x(2x(0.6+0.6))+1x2x2x(2x(0.3+0.6)) +
1x8x2x(2x(0.6+0.85)+1x2x(2x(0.3+0.85)) = 76.8+7.2+46.4+4.6=135 RMT +5%
wastage @ 0.124 kg/m =17.58 kgs
L-Angles - 108 Nos. @ 3'' length
108x3x0.254=82.30 RMT +5 % wastage @ 0.124 kg/m = 10.72 Kgs

Total=35.23 Kgs + 17.58 Kgs + 10.72 Kgs = 63.53 Kgs


Aluminium anodised SectionTBSC-R.I-03 SSR Kgs 63.53 292.00 18550.76
Page 50 of 139

2) GLAZING with 5 mm thick Float GLASS


(8x0.85x0.6)+(1x0.85x0.3)=4.34 Sqm +5% wastage = 4.56
Sqm
Plain Float Glass 5 mm thick, Sl.No.166, TBSC-F.I-02 Sqm 4.56 507.00 2311.92
3) 12mm thick both sides prelaminiated cement particle
board =(8x2x0.6x0.6)+(1x2x0.3x0.6)=6.12 Sqm +5%
wastage=6.43 Sqm

BISON LAM PRE LAMINATED CEMENT Sqm 6.43 667.00 4288.81


BONDEDPARTICLE BOARD- 12 mm thick TBSC-H.IV-
22,Sl.No.311
4) Rubber beadings same as glazing clips =
8x(2x(0.85x0.6))+1x(2x(0.85x0.3))=25.5 RMT +5% wastage
=26.78 RMT
Rubber Beading TBSC-R-I-11 Rm 26.78 3.00 80.34
B) LABOUR CHARGES
12.056 1st Class Carpenter day 0.434 565.00 2956.25
12.056 2nd Class Carpenter day 0.434 450.00 2354.54
12.056 Power Saw Cutter - Hand Operated - Operator (1st Class ) day 0.043 565.00 292.90

12.056 Power Drill - Hand Operated - Operator (1st Class ) day 0.058 565.00 395.08
12.056 Unskilled Mazdoor day 0.145 425.00 742.95
12.056 Non technical work inspector taken fitter CL-I rate Nos 0.072 565.00 490.44

C) Machinery
12.056 Power Saw Cutter - Hand Operated - Hire charges TBSC- Hrs 0.347 130.00 543.85
S1-02 OF SSR
12.056 Power Drill - Hand Operated - Hire Charges TBSC-S1-03 Hrs 0.463 121.00 675.41
OF SSR
Power charges for Motors 1% on Machinery 0.01 1219.26 12.19
over heads and contractor profit 11.765% 11.765% 33695.44 3964.27
Basic Rate for 12.056 Sqm 37659.70
Basic rate per 1 sqm 3123.73
1.11765 E. area allowances on labour with profit for 1 Sqm 0% 599.88 0.00
Total rate per 1 sqm 3123.73
62 Supply and fixing Aluminium Anodised Two Track Sliding Windows as per approved drawing with
aluminium anodised sections of Series B Jindal sections and outer frame top horizontals & both verticals of
20829 of size 61.85 x 31.75 mm x 1.50mm thick and bottom horizontal - two track frame of 20830 of size 61.85
x 31.75 mm x 1.50mm thick, Shutter frame top, bottom and verticals of 20736 of size 40 mm x 18 mm x 1.55
mm thick and Weather interlocking frame of 20737 of size 40 x 18 x 1.45 mm thick with plain clear float glass 5
mm thick fixed including supply and fixing aluminium handles of 100 mm for each shutter, nylon rollers
assembly and all labour charges for fixing the fixtures with required no.of screws, bolts and nuts and
including labour charges for fixing the frame in position, fixing shutter to frame etc. completed for finished
item of work

UNIT 1 sqm Data Sl.No.286, Pg.105 of Bld. Items and


Spl.spec.Amendment asper SSR2011-12,Pno.263
Aluminium Sliding Window (Two Track) (Size 1.20x1.35 =1.62 Sqm)
A) MATERIAL REQUIREMENT
Aluminium sections

Top & Sides = 61.85 x 31.75 mm x 1.50mm @ 0.784 Kg/m


1x2x1.29 + 1.20 = 3.78 x 0.784 = 2.963 Kgs 2.9635
Bottom = 61.85 x 31.75 mm x 1.50mm @ 0.909 Kg/m
1x1.136 = 1.20 x 0.909 = 1.0908 Kgs 1.0908
Shutter Middle Vertical = 40 x 18 x 1.45 mm @ 0.607 Kg/m
1x2x1.23 = 2.46 x 0.607 = 1.4932 Kgs 1.4932
End Verticals = 40 x 18 x 1.55 mm @ 0.547 Kg/m
1x2x1.23 = 2.46 x 0.547 = 1.346 Kgs 1.3456
Top & Bottom = 40 x 18 x 1.55 mm @ 0.547 Kg/m
2x2x0.61 = 2.44 x 0.547 = 1.3347 Kgs 1.3347
8.2278Kgs 8.2278
Add 5% Wastage = 0.41 0.41
8.6392
8.64 Kgs
Aluminium anodised SectionTBSC-R.I-03 SSR Kg 8.64 292.00 2522.64
GLAZING with 5 mm thick Float GLASS
2x1.306x0.53=1.384sqm
Add 5% Wastage = 0.069
Total = 1.453 sqm
Plain Float Glass 5 mm thick (Blds items # TBSC-F.I-02 ) Sqm 1.453 507.00 736.67
SSR
RUBBER BEADING
2x2x0.53 = 2.12 RM
2x2x1.306 = 5.224 RM

7.344 RM
Add 5% Wastage = 0.367
Total = 7.711 RM
Rubber Beading TBSC-R-I-11, SSR RM 7.711 3.00 23.13
Aluminium Door handle 125 mm long as perTBSC-P.III-03 Nos 2.00 74.00 148.00
SSR
Page 51 of 139

Nylon Rollers (TBSC-P.IX-07 ) Nos 4.00 14.00 56.00


B) LABOUR CHARGES
1.62 1st Class Carpenter day 0.096 565.00 87.87
1.62 2nd Class Carpenter day 0.289 450.00 210.68
1.62 Power Saw Cutter - Hand Operated - Operator (1st Class ) day 0.096 565.00 87.87

1.62 Power Drill - Hand Operated - Operator (1st Class ) day 0.096 565.00 87.87
1.62 Unskilled Mazdoor day 0.289 425.00 198.98
1.62 Non technical work inspector taken fitter CL-I rate Nos 0.096 565.00 87.87

C) Machinery
1.62 Power Saw Cutter - Hand Operated - Hire charges TBSC- Hrs 0.771 130.00 162.37
S1-02 OF SSR
1.62 Power Drill - Hand Operated - Hire Charges TBSC-S1-03 Hrs 0.771 121.00 151.13
OF SSR
Power charges for Motors on hire charges 1% on 0.01 313.50 3.14
Machinery
over heads and contractor profit 11.765% 11.765% 4564.22 536.98
Basic Rate for 1.62 Sqm 5101.20
Basic rate per 1 sqm 3148.89

1.11765 E. area allowances on labour with profit for 1 Sqm 0% 469.84 0.00
Total Rate per 1 sqm 3148.89

63 Supply, fabrication and erection of Anodized Aluminium Double leaf door (partly glazed & partly panelled)
using sections of size 101.60mmx44.75mmx2.40mm @ 1.834 Kg/m (Jindal Sec 14021) for frame and
47.62mmx44.45mmx2.02mm @ 1.052 Kg/m (Jindal Sec 19569) for shutter verticals,
47.62mmx44.45mmx1.95mm @ 0.974 Kg/m (Jindal Sec 19571) for shutter top, 114.30mmx44.45mmx2.15mm @
1.824 Kg/m (Jindal Sec 19574) for shutter bottom, 83.50mmx44.45mmx2.40 mm @ 1.679 Kg/m (Jindal Sec
19525) for shutter middle and fitted with 5mm thick plain glass on upper half and 12mm thick both sides
prelaminated cement particle board for lower half of the shutters including cost & conveyance of all
materials, 1st quality Double action brass cover plate and cast brass body Floor spings (for inner & outer
rotation), central pivots, rubber beading, heavy duty Mortice lock 6/7 levers with PC/CP handles, labour
charges & other incidental charges complete as per the drawing and as per the directions of Engineer-in-
charge for finished item of work.

UNIT 1 sqm Data Sl.No.287, Pg.106 of Bld. Items and


Spl.spec.& Revised as per SoR 2011-12 Pg.264
sl.No.11
Aluminium Double Leaf Door of size (1.81x2.135 = 3.86 Sqm)
A) MATERIAL REQUIREMENT
1)ALUMINIUM SECTION
Requirement of aluminium sections
Frame = (101.60x44.75x2.40) @ 1.834
2x2.135+1.72=5.99x1.834=10.985Kg
Shutter Vertical = (47.62x44.45x2.02) @ 1.052 Kg/m
2x2x2.09 = 8.36mx1.052 =8.795 Kg
Top Horizontal = (47.62x44.45x1.95) @ 0.974 Kg/m
1x2x0.764 = 1.528 x 0.974 = 1.488 Kg

Middle Horizontal = 83.50x44.45x2.40 @ 1.679 Kg/m

1x2x0.764 = 1.528 x1.679 =2.565Kg

Bottom Horizontal = 114.30x44.45x2.15 @ 1.824 Kg/m

1x2x0.764 = 1.528 x1.824 = 2.787 Kg


Glazing clips 19.0mmx 17.30mmx0.80mm size @0.109 kg/rm
2x4x0.764+2x4x1.845 = 20.872x0.109=2.275 Kgs
28.895 Kgs
add 5% wastage = 1.445 Kg
Total = 30.34 Kgs
Aluminium anodised SectionTBSC-R.I-03 SSR Kgs 30.34 292.00 8859.28
2) 5mm thick glass (item 329) 2x0.76x1.00 + (5% waste)
0.076 = 1.596 =1.6
Plain Float Glass 5 mm thick (Blds items # TBSC-F.I-02 ) Sqm 1.60 507.00 811.20
SSR
3) 12mm thick both sides prelaminiated cement particle
board = 1x0.715x1.804 =1.289 + wastage 5%0.064= 1.353
Sqm
BISON LAM PRE LAMINATED CEMENT Sqm 1.353 667.00 902.45
BONDEDPARTICLE BOARD- 12 mm thick TBSC-H.IV-
22,Sl.No.311
4) Rubber beadings same as glazing clips = 20.872 Mts say
21.0Mts
Rubber Beading TBSC-R-I-11, SSR Rm 21.00 3.00 63.00
5)Double action brass cover plate and cast brass body No 2.00 4114.00 8228.00
Floor springs TBSC-P.VII-02 SSR
6) Heavy duty Mortice lock 6/7 levers with CP/PC handle No 1.00 848.00 848.00
TBSC-P VIII-01, SSR
7) Aluminium Tower bolt 300mm long TBSC-P1-11, SSR No 2.00 109.00 218.00
Page 52 of 139

8) Aluminium Handle - 150mm long TBSC-PIII-04, SSR No 2.00 87.00 174.00

SILICON SEALANT
B) LABOUR CHARGES
3.86 1st Class Carpenter day 0.099 565.00 215.91
3.86 2nd Class Carpenter day 0.198 450.00 343.93
Power Saw Cutter - Hand Operated - Operator (1st Class ) day 0.099 565.00 215.91
3.86
3.86 Power Drill - Hand Operated - Operator (1st Class ) day 0.099 565.00 215.91
3.86 Unskilled Mazdoor day 0.297 425.00 487.23
3.86 Non technical work inspector Nos 0.099 565.00 215.91
C) Machinery
Power Saw Cutter - Hand Operated - Hire charges TBSC- Hrs 0.793 130.00 397.93
3.86 S1-02 OF
Power Drill - Hand Operated - Hire Charges TBSC-S1-03 Hrs 0.793 121.00 370.38
3.86 OF SSR

Power charges for Motors 1% on Machinery 0.01 768.31 7.68


over heads and contractor profit 11.765% 11.765% 22574.71 2655.91
Basic Rate for 3.86 Sqm 25230.63
Basic rate per 1 sqm 6536.43
1.11765 E. area allowances on labour with profit for 1 Sqm 0% 439.07 0.00
Total rate per 1 sqm 6536.43

64 Supply and fixing Aluminium Anodised Doors - Single Shutter (partly glazed & partly panneled)as per
approved drawing with aluminium anodised sections of Jindal sections and outer frame top horizontals &
both verticals of 14021 of size 101.6 x 44.75 x 2.40 mm, Shutter frame top of size 44.45 mm x 47.62 mm x 1.95
section 19571 , bottom of size 44.45 mm x 114.30 mm x 2.15 section 19574 and verticals of 19569 of size 44.45
mm x 47.62 mm x 2.02 and Middle lock rail of 19525 of size 83.50 x 44.45 x 2.40 mm and fitted with 12mm
thick both sides prelaminated cement particle board for shutter including supply and fixing aluminium
handles of 125 mm for each shutter, Providing and fixing Cast Iron Body Bottle Type Hydraulic Door Closer
(IS: 3564) with double speed adjustment assembly, aluminum door stopper and all labour charges for fixing
the fixtures with required no.of screws, bolts and nuts and including labour charges for fixing the frame in
position, fixing shutter to frame etc. completed for finished item of work

Data Sl.No.287, Pg.106 of Bld. Items and Spl.spec.Revised as per SoR 2011-12 Pg.264 sl.No.11
Aluminium Single Door (Size 0.90m x 2.1m = 1.89 Sqm)
A) MATERIAL REQUIREMENT
1) Alluminium section
Frame = 101.6 x 44.75 x 2.40 mm @ 1.834 Kg/m
2x2.10+0.810 = 5.01 x1.834 = 9.188 Kgs
Shutter Verticals = 44.45 mm x 47.62 mm x 2.02 mm @ 1.052 Kg/m
2x2.05 = 4.10x1.052 = 4.313 Kgs
Top Horizontal = 44.45 mm x 47.62 mm x 1.95 @ 0.974 Kg/m
1x0.715 = 0.715x 0.974 = 0.696 Kgs
Middle Horizontal = 83.50 x 44.45 x 2.40 @ 1.679 Kgs/ Rm
1x0.715 = 0.715x1.679 = 1.200 Kgs
Bottom Horizontal = 44.45 mm x 114.30 mm x 2.15 mm @1.824 Kgs/ Rm
1x0.715 = 0.715x1.824 = 1.304 Kgs
16.701 Kgs
Glazing clips 19.0mmx 17.30mmx0.80mm size @0.109 kg/rm
2x4x0.715+2x2x1.804 = 12.936x0.109=1.410 Kgs
18.111 Kgs
5% Wastage= 0.906Kgs
Total =19.017 Kgs
Aluminium anodised SectionTBSC-R.I-03 SSR Kg 19.0170 292.00 5552.96
2) 5mm thick glass (item 350) 1x0.715x1.00=0.715 +(5%
waste) 0.036 = 0.751
Plain Float Glass 5 mm thick (Blds items # TBSC-F.I-02 ) Sqm 0.751 507.00 380.76
SSR
3) 12mm thick both sides prelaminiated cement particle
board = 1x0.715x0.804 =0.575 + wastage 5%0.029= 0.604
Sqm
BISON LAM PRE LAMINATED CEMENT Sqm 0.604 667.00 402.87
BONDEDPARTICLE BOARD- 12 mm thick TBSC-H.IV-
22,Sl.No.311
4)Rubber beadings same as glazing clips = 12.936 Mts say
13.0Mts
Rubber Beading TBSC-R-I-11, SSR Rm 13.00 3.00 39.00
5)Providing and fixing Cast Iron Body Bottle Type No 1.00 939.00 939.00
Hydraulic Door Closer (IS: 3564) with double speed
adjustment as per TBSC-PVI -01, SSR
6) Heavy duty Mortice lock 6/7 levers with CP/PC handle No 1.00 848.00 848.00
TBSC-P VIII-01, SSR
7) Aluminium Tower bolt 300mm long TBSC-P I-11, SSR No 1.00 109.00 109.00

No 1.00 58.00 58.00


8) Heavy Duty Aluminium Door Stoper TBSC-P IX-03, SSR
B) LABOUR CHARGES
1.89 1st Class Carpenter day 0.099 565.00 105.72
1.89 2nd Class Carpenter day 0.198 450.00 168.40
1.89 Power Saw Cutter - Hand Operated - Operator (1st Class ) day 0.099 565.00 105.72
Page 53 of 139

1.89 Power Drill - Hand Operated - Operator (1st Class ) day 0.099 565.00 105.72
1.89 Unskilled Mazdoor day 0.297 425.00 238.57
1.89 Non technical work inspector Nos 0.099 565.00 105.72
C) Machinery
1.89 Power Saw Cutter - Hand Operated - Hire charges TBSC- Hrs 0.793 130.00 194.84
S1-02 OF SSR
1.89 Power Drill - Hand Operated - Hire Charges TBSC-S1-03 Hrs 0.793 121.00 181.35
OF SSR
Power charges for Motors 1% on Machinery 0.01 376.19 3.76
over heads and contractor profit 11.765% 11.765% 9539.38 1122.31
Basic Rate for 1.89 Sqm 10661.68
Basic rate per 1 sqm 5641.10
1.11765 E. area allowances on labour with profit for 1 Sqm 0% 439.07 0.00
Total rate per 1 sqm 5641.10

65 Supply and fixing Aluminium Anodised Doors - Single Shutter ( Panneled) as per approved drawing with
aluminium anodised sections of Jindal sections and outer frame top horizontals & both verticals of 14021 of
size 101.6 x 44.75 x 2.40 mm, Shutter frame top of size 44.45 mm x 47.62 mm x 1.95 section 19571 , bottom of
size 44.45 mm x 114.30 mm x 2.15 section 19574 and verticals of 19569 of size 44.45 mm x 47.62 mm x 2.02 and
Middle lock rail of 19525 of size 83.50 x 44.45 x 2.40 mm and fitted with 12mm thick both sides prelaminated
cement particle board for shutter including supply and fixing aluminium handles of 100 mm for each shutter,
Providing and fixing Cast Iron Body Bottle Type Hydraulic Door Closer (IS: 3564) with double speed
adjustment door closure assembly and all labour charges for fixing the fixtures with required no.of screws,
bolts and nuts and including labour charges for fixing the frame in position, fixing shutter to frame etc.
completed for finished item of work

UNIT 1 sqm Data Sl.No.287, Pg.106 of Bld. Items and


Spl.spec.&
Aluminium Single Door (Size 0.90m x 2.1m = revised as per SoR 2011-12 Sl.No.11
1.89 Sqm)
A) MATERIAL REQUIREMENT
1)ALUMINIUM SECTION as per design
Frame = 101.6 x 44.75 x 2.40 mm @ 1.834 Kg/m
2x2.10+0.810 = 5.01 x1.834 = 9.188 Kgs
Shutter Verticals = 44.45 mm x 47.62 mm x 2.02 mm @ 1.052 Kg/m
2x2.05 = 4.10x1.052 = 4.313 Kgs
Top Horizontal = 44.45 mm x 47.62 mm x 1.95 @ 0.974 Kg/m
1x0.715 = 0.715x 0.974 = 0.696 Kgs
Middle Horizontal = 83.50 x 44.45 x 2.40 @ 1.679 Kgs/ Rm
1x0.715 = 0.715x1.679 = 1.200 Kgs
Bottom Horizontal = 44.45 mm x 114.30 mm x 2.15 mm @1.824 Kgs/ Rm
1x0.715 = 0.715x1.824 = 1.304 Kgs
16.701 Kgs
Glazing clips 19.0mmx 17.30mmx0.80mm size @0.109 kg/rm
2x4x0.715+2x2x1.804 = 12.936x0.109=1.410 Kgs
18.111 Kgs
5% Wastage= 0.906Kgs
Total =19.017 Kgs
Aluminium anodised SectionTBSC-R.I-03 SSR Kg 19.017 292.00 5552.96
2) 12mm thick both sides prelaminiated cement particle
board
BISON = 1x0.715x1.804
LAM PRE=1.289LAMINATED
+ wastage 5%0.064= 1.353
CEMENT Sqm 1.353 667.00 902.45
Sqm
BONDEDPARTICLE BOARD- 12 mm thick , TBSC-H.IV-
22,Sl.No.311
3) Rubber beadings same as glazing clips = 12.936 Mts say
13.0 Mts
Rubber Beading TBSC-R-I-11, SSR Rm 13.00 3.00 39.00
5)Providing and fixing Cast Iron Body Bottle Type No 1.00 939.00 939.00
Hydraulic Door Closer (IS: 3564) with double speed
adjustment as per TBSC-PV1-01, SSR
6) Heavy duty Mortice lock 6/7 levers with CP/PC handle No 1.00 848.00 848.00
TBSC-P VIII-01, SSR
7) Aluminium Tower bolt 300mm long TBSC-P I-11, SSR No 1.00 109.00 109.00

No 1.00 58.00 58.00


8) Heavy Duty Aluminium Door Stoper TBSC-P IX-03, SSR
SILICON SEALANT as per design
B) LABOUR CHARGES
1.89 1st Class Carpenter day 0.099 565.00 105.72
1.89 2nd Class Carpenter day 0.198 450.00 168.40
1.89 Power Saw Cutter - Hand Operated - Operator (1st Class ) day 0.099 565.00 105.72

1.89 Power Drill - Hand Operated - Operator (1st Class ) day 0.099 565.00 105.72
1.89 Unskilled Mazdoor day 0.297 425.00 238.57
1.89 Non-technical work inspector Nos 0.099 565.00 105.72
C) Machinery
1.89 Power Saw Cutter - Hand Operated - Hire charges TBSC- Hrs 0.793 130.00 194.84
S1-02 OF SSR
1.89 Power Drill - Hand Operated - Hire Charges TBSC-S1-03 Hrs 0.793 121.00 181.35
OF SSR
Power charges for Motors 1% on Machinery 0.01 376.19 3.76
over heads and contractor profit 11.765% 11.765% 9658.20 1136.29
Basic Rate for 1.89 Sqm 10794.49
Basic rate per 1 sqm 5711.37
Page 54 of 139

1.11765 E. area allowances on labour with profit for 1 Sqm 0% 439.07 0.00
Total rate per 1 sqm 5711.37

66 Supply, fabrication and erection of Anodized Aluminium glazed ventilator using section of size
81.25mmx38.10mmx1.75mm @ 1.093 Kg/m (Jindal Sec 14071) for frame and 'U' seciton of size
12.50mmx12.50mmx1.00mm @ 0.133 Kg/m (Jindal Sec 17533) for louvers and inserting 5mm thick plain glass
panes including cost & conveyance of all materials, labour charges and other incidental charges complete as
per the drawing and as per the directions of Engineer-in-charge for finished item of work.

Data Sl.No.284, Pg.103 of Bld. Items and Spl.spec.Revised as per SoR 2011-12 Pg.261
Aluminium Ventilator Section Outer frame: size (0.75x0.60=0.45 Sqm)
A) MATERIAL REQUIREMENT
ALUMINIUM SECTION
81.50x38.1x1.75mm @ 1.093 Kg/m (as per Item 882)

1x2x0.60 + 2x (0.674)= 2.548x1.093 = 2.785 Kg + 5%


wastage 0.139 = 2.924 Kg

U' Channel 12.50x12.50x1.00 @ 0.133 (as per Item 882)

2x6x0.10 = 1.20 = 0.159+ 5% Wastage = 0.159 + 0.007=0.166


total =3.09 Kgs

5% wastage = 0.155 Kgs

total =3.164 Kgs

Aluminium anodised SectionTBSC-R.I-03 SSR Kg 3.16 292.00 923.89

GLAZING with5 mm thk.plain GLASS


1x6x0.10x0.674=0.404+ 5% wastage0.020=0.424 Sqm
Plain Float Glass 5 mm thick TBSC-F1-02, SSR Sqm 0.424 507.00 214.97

B) LABOUR CHARGES

0.45 1st Class Carpenter day 0.351 565.00 89.24

0.45 2nd Class Carpenter day 0.429 450.00 86.87


0.45 Power Saw Cutter - Hand Operated - Operator (1st Class ) day 0.039 565.00 9.92

0.45 Power Drill - Hand Operated - Operator (1st Class ) day 0.078 565.00 19.83

0.45 Unskilled Mazdoor day 0.234 425.00 44.75


0.45 Non technical work inspector Nos 0.078 565.00 19.83
C) Machinery

0.45 Power Saw Cutter - Hand Operated - Hire charges TBSC- Hrs 0.312 130.00 18.25
S1-02 OF SSR
0.45 Power Drill - Hand Operated - Hire Charges TBSC-S1-03 Hrs 0.624 121.00 33.98
OF SSR
Power charges for Motors 1% on Machinery 0.01 52.23 0.52
over heads and contractor profit 11.765% 11.765% 1462.05 172.01
Basic Rate for 0.45 Sqm 1634.06
Basic rate per 1 sqm 3631.24
1.11765 E. area allowances on labour with profit for 1 Sqm 0% 600.99 0.00
Total rate per 1 sqm 3631.24

67 Supply and fixing of door frame made of hollow extruded PVC section (Nandi or equivalent) having
dimensions of 40 X 57mm with the wall thickness of 2mm +/- 0.2mm duly reinforced with seasoned wood
plank at the hinges side. The door frame top 2 corners shall be metre-cut/ welded. PVC DOOR FRAME
(Nandi or equivalent ) and door shutters made of rigid PVC extruded hollow section(Nandi or equivalent ) of
20mm X 200 mm with the wall thickness of 1.0mm +/- 0.1mm equally divided into 4 no's with tongue and
groove locking arrangements. The shutter frame is made of 30mm X 79mm with the wall thickness of 1.5mm
+/-0.15mm section mitre-cut and joined at 4 corners with 125mm X 225mm plastic brackets. The shutter
shall be horizontally reinforced with 2 no's of 8mm PVC rods. Teak wood batons shall be reinforced inside
the door shutter during the fabrication of the door shutter at those points wherever the hardware is fixed onto
the door shutter.PVC DOOR SHUTTER (Nandi or Equivalent). including fixtures like Aluminium Butt hinges
(IS:205)- 75 mm ,MS-Powder Coated Door Handles (IS:208) 150 mm, Aluminium Tower Bolt-10 mm Bolt
(IS:204) 100 mmand MS-Powder Coated Aldrops (IS:2681) 200 mm. complete for finished item of work.

Single leaf door size 0.75X2.10m


Cost of PVC door frame Rate as per Sl.No.431, TBSC-L.I- RM 5.70 231.00 1316.70
05,
Sqm 1.435 1744.00 2502.64
Door shutter Rate as per Sl.No.480, TBSC-L.III-14 of SSR

Aluminium Butt hinges (IS:205)- 75 mm Long as per SSR 147.00


49.00
item TBSC-P.II-05 Sl. No. 576 No 3.00
MS-Powder Coated Door Handles (IS:208) 150 mm Long 45.00
45.00
TBSC-P.III-06, sl.No.595 No 1.00
Page 55 of 139

Aluminium Tower Bolt-10 mm Bolt (IS:204) 100 mm Long 52.00


52.00
TBSC-P.I-07 No 1.00
MS-Powder Coated Aldrops (IS:2681) 200 mm long sl.No. 105.00
602 TBSC-P.IV-07 105.00
No 1.00
Fixing charges (TBSC-T.I-25) Sl.No.790, Sqm 1.575 426.00 670.95
over heads and contractor profit 11.765% 11.765% 4839.29 569.34
Rate/1.575 sqm Rs 5408.63 0.53
Rate/1sqm Rs 3434.05
1.11765 E. area allowances on labour with profit for 1 Sqm 0% 426.00 0.00
Rate/1sqm 3434.05
73 Supply and fixing of door shutters made of rigid PVC extruded hollow section(nandi or equivalent) of
20mmx200mm with the wall thickness of 1.0mm +/- 0.1mm equally divided into 4nos with tongue and
groove locking arrangements .The shutter frame is made of 30mmx79mm with the wll thickness of 1.5mm+/-
0.15mm section mitre-cut and joined at 4 corners with 125mmx225mm plastic brackets.The shutter shall be
horizontally reinforced with 2nos of 8mm PVC rods.Teakwood batons shall be reinforced insidw the door
shutter suring the fabrication of the door shutter at those points wherever the hardware is fixed onto the door
shutter complete for finished item of work.

single leaf door size .75x2.1m rate as per Sl.NO480,TBSC- Sqm 1 1744.00 1744.00
L.III-14 of SSR
add for overheads&contractors profit 11.765% 1744.00 205.18
Rate/1sqm 1949.18

68 Supplying & fixing of Door frame made of roll formed section of 1.25 mm thick CRCA section, size should be
50 x60 mm with 32 mm rebate and Flush door shutter of 30mm thick solid bond wood block board type with
teak veneer on one face and commericial ply on another face. The corner of the frame should be welded. The
frame should be painted with one coat of primer and finished painted with pure plolyester paint. The frame
should be provided with approved quality butt hinges of 3 Nos.,Heavy duty Mortice lock 6/7 levers with
CP/PC handle, MS Door stoppers, MS Door handles, MS tower bolts, complete as per the directions of
Engineer-in-charge for finished item of work.

Single leaf Door of size 1.05X2.10m


Cost of CRCA MS frame as per SSR Item TBSC-LI-07 of Rm 5.25 199.00 1044.75
SSR
Cost of flush door shutter as per SSR Item TBSC-L.II-10 of Sqm 2.205 2046.00 4511.43
SSR
Mild Steel Powder coated Tower Bolts 300mm long as per No 1.00 85.00 85.00
SSR item TBSC-P I-18, SSR
6) Heavy duty Mortice lock 6/7 levers with CP/PC handle No 1.00 848.00 848.00
TBSC-P VIII-01, SSR
8) MS-Powder Coated - Door Stopers TBSC-P IX-02, SSR No 1.00 45.00 45.00

MS Powder coated Door Handle 125 mm long TBSC-P No 1.00 31.00 31.00
III-05, SSR
Fixing charges TBSC-T.I-25, SSR Sqm 2.205 426.00 939.33
over heads and contractor profit 11.765% 11.765% 7504.51 882.91
8387.42

Rate/2.205 sqm Rs 3803.82


1.11765 E. area allowances on labour with profit for 1 Sqm 0% 426.00 0.00
Rate/1sqm 3803.82

69 Providing & Fixing of Scientific Doors with metal door frames and door shutters made of galvanize steel (base
steel as per IS 513 of 0.58 mm thick D quality, galvanized as per IS 277 with Zinc of 120 GSM). coated with
Zinc Phosphate Primer to receive any paint on site or finished with Thermosetting Polyurethane paint of
Aliphatic Grade providing high levels of scratch resistance and durability/Epoxy polyester powder for
powder coating paint thickness 50-60 microns (Dry film thickness) outer frame section of 100 x 58 mm x 1.2
mm thick, shutter section of 0.80 mm thick galvanized steel sheet pressed (roll formed) for 46mm thick fully
flush, double skin door shell seam joints at stile edges, in-fill of honeycomb Kraft paper used to give the
required rigidity and effective acoustic insulation with 6” Tower bolt – 2 Nos., 6” D handles – 2 Nos., 10”
Aldrops – 1 No., Butt Hinges – 6 Nos, Mortise Lock of approved quality – 1 No, frames fixed to the
concrete/masonry wall by means of self expanding screws complete for finished item of work for Double leaf
Door

Unit = 1 Sqm
Cost as per item No.486 ( TBSC-L.III-20) of ssr Sqm 1.00 10940.00 10940.00
over heads and contractor profit 11.765% 11.765% 10940.00 1287.09
Total Rate 1 Sqm Rs 12227.09

70 Construction of cable duct in the bay kiosk as per the approved drawing including cost & conveyance of all
materials, labour charges, leads, lifts and curing etc, complete as per the directions of the Engineer in charge
for the finished item of work

consider a length of 10.00R.M. for 1.2 m wide cable duct


Earth work excavation 172.90 1722.08
Cum 9.96
(10.0x1.66x0.60 = 9.96 Cum)
CC (1:4:8) with 40mm. HBG metal Cum 1.66 3994.26 6630.47
(10.0x1.66x0.10 = 1.66Cum)
BM in CM(1:6) Cum 2.30 5653.85 13003.86
(10.0x(0.23+0.23)x0.50 = 2.30Cum)
CC(1:2:4) Cum 0.305 5727.20 1746.80
Page 56 of 139

(10x(0.23+0.23)x0.05 = 0.23 Cum


(10x2(0.075)x0.05 = 0.075 cum
Total: 0.305 cum
Plastering in CM(1:3) 12mm thick Sqm 28.60 144.71 4138.71
(10x2(0.50+0.23+0.10)+10x1.2 = 28.6sqm
Sand filling 10.0x1.20x0.50 = 6.00 cum 9913.14
1652.19
cum 6.00
Total for 10.0 m length of cable duct 37155.05
Rate per 1 RM Rs. 3715.51

33 Supply and Fixing of RCC precast flanks of size 1.3x0.55mx0.025 for racks in store room with RCC M- 20
Nominal mix (Cement 350 kgs ) using 6mm size graded machine crushed hard granite metal from approved
quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate,
water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all
operational, incidental and labour charges such as machine mixing, laying concrete, curing and steel
centering, etc.,complete but including cost of 6mm steel and its fabrication charges for finished item of
work(Sand 0.45 cum and Metal 0.90 cum) as directed by the Engineer in charge for finished item of work.

Unit - 1Cum
I) Data Sl.No.30-A, Pg.23 of Bld. Items
A. MATERIALS:
6mm HBG graded metal cum 0.90 698.25 628.43
Fine Aggregrate cum 0.45 600.00 270.00
Cement Kgs 350.00 4.70 1645.00 2543.43
B. LABOUR:
1st Class Mason day 0.133 470.00 62.51
2nd Class Mason day 0.267 450.00 120.15
Mazdoor (Both Men and Women) day 3.60 425.00 1530.00
C. MACHINERY
C) Water kl 1.20 73.00 87.60
L.C. 325.00 Add for centring charges for bedblocks S.No.I B Of SSR 1.00 389.00 389.00
over heads and contractor profit 11.765% 11.765% 4732.69 556.80
8.125 COST per 1 cum 5289.49
e) Cement Conveyance charges with profit 350.00 0.08 26.43
e) Sand conveyance charges incl seignorage charge 0.45 946.85 426.08
g) Metal conveyance charges incl. seignorage charge 0.90 468.10 421.29
h) water conveyance charges with OH 1.20 20.50 24.60
1.11765 D) area allowances on labour with profit 0% 2037.66 0.00

BASIC COST of RCC(M20 Nominal Mix )per 1 cum Rs. 6187.89


HYSD steel reinforcement Rate/MT 55195.17
6mm steel and its fabrication 0.158 MT 8720.84

1 Cum RCC precast flanks of size 1.3x0.55mx0.025 for


racks 40 sqm
RCC M20 6187.89
6mm steel and its fabrication 8720.84
14908.73
Rate/Sqm 372.72
Supply & fixing of Rolling shutter made of 80 x 1.25 mm machine rolled CRCA laths, interlocked together
through their entire length and jointed together at the ends by end-locks, mounted on specially designed pipe
shaft of 50mm dia nominal bore MS B class pipe with brackets, plates, guide channels, stoppers, bottom
locking plates and arrangements for inside & outside locking with push & pull operations including cost of
hood cover and springs complete, painted with one coat of approved steel primer, locks, ball bearings, all
accessories etc complete for finished item of work as per special spn: 1108

rate as per ssr S No.137.TBSC-E.I-01 Sqm 1.000 3890.00 3890.00


BASIC COST per 1 sqm 3890.00
over heads and contractor profit 11.765% 11.765% 3890.00 457.66
Rate/Sqm 4347.66

136 20 mm thick plain cement mortar bands in cement mortar 1 : 4 (1cement : 4 sand) upto 300 mm in width
including cost & conveyance of all materials, labour charges, leads, lifts, scaffolding and curing complete as
per the directions of the Engineer in charge for the finished item of work.

Raised Band :- Data Sl.No.94, Pg.47 of Bld. Items


Materials :-
Cement kg 8.28 4.70 38.92
sand including wastage cum 0.023 667.00 15.34
Labour :—
Mason llnd class day 0.38 450.00 171.00
Mazdoor (unskilled) day 0.43 425.00 182.75
cement mortar mixing charges day 0.200 425.00 85.00
Add for water charges @ 1 % on labour 0.01 438.75 4.39
over heads and contractor profit 11.765% 11.765% 493.01 58.00
Page 57 of 139

Grand Total/10mts long & 10 Cm wide band 555.40


d) cement conveyance charges with profit kg 8.28 0.08 0.63

e) Sand conveyance charges incl. Seignorage charge cum 0.023 946.85 21.78
1.11765 F) area allowances on labour with profit 0.00% 438.75 0.00
COST per 10mts long & 10 Cm wide band 577.80
BASIC COST per 1 cm width X 1 metre long 57.78

15 Providing stainless steel hand railing by running with styles made with 50mm dia 304 Grade of 900mm long
at 1m interval, horizontal supports of 3 Nos 19mm dia 304 Grade pipes and hand railing with 50 mm dia 304
Grade pipes, drilling the holes in the concrete in 1 RM cente to center to insert the spikes with plate welded to
the stainless steel tubes and grouting including cost of all materials and labour charges for Fabrication of
stainless steel railing works using stainless steel welding rods including buffing, polishing, lacquer finishing,
to present seamless finish for finished item of work asper approved drawing and as directed by the Engineer-
In - Charge.

Unit =1 RM
Cost of Stain less steel including 2.5 % wastage (7.5 kg) Kg 7.69 387 2976.03
(Grade 304 rate) TBSC-E.III-01

FABRICATION CHARGES, as per TBSC-T.I-20 kg 7.50 146 1095.00


cost of CC (1:2:4) cum
cost of sand cum 0.060 600.00 36.00
cost of cement for grouting kg 2.000 4.70 9.40
C. LABOUR:
Mason 1st class day 0.0135 470.00 6.35
Mazdoor (unskilled) day 0.188 425.00 79.90
over heads and contractor profit 11.765% 11.765% 4202.68 494.44
Grand Total 4697.12

Conveyance charges for cement with profit kg 2.000 0.08 0.15


Conveyance charges for sand with profit cum 0.060 946.85 56.81
1.11765 F) uniform area allowances on labour including 14% 0% 633.75 0.00
profit & O.H charges Rate/1RM for finished item 4754.08

89 Supply and plating Koreion grass for laying of lawn around the building in specified areas including removal
of weeds, stone pebbles and spreading a layer of 6" of red soil, breaking of clods and levelling, application of
Neem Cake @ 10Kg/100 Sqm, complex fertilizer (17:17:17) @ 1Kg/100Sqm. pesticide (Lindane) @ 100
grams/100 Sqm, consolidation of soil, laying of carpet grass at 50mm c/c, rolling, watering, gap filling and
removal of weeds and maintenance of lawn for 60 days (Nursing of 45 days minimum) & replacement of
sick/dead carpet during this period, cost and conveyance of all materials, labour etc., complete for finished
item of work as approved and directed by the Engineer-in charge at site.

a) Red soil
Cost of Gravel/Red Earth 1cum 0.15 230.20 34.53
Spreading charges 1 Sqm 1.00 5.00 5.00
Ploughing sqm 1.00 0.30 0.30
LMR Koreion grass with Laying sqm 1.00 250.00 250.00
LMR Neem Cake @ 10Kg/100 Sqm kg 0.10 9.00 0.90
LMR complex fertilizer (17:17:17) @ 1Kg/100Sqm kg 0.01 13.00 0.13
LMR pesticide (Lindane) @ 100 grams/100 Sqm kg 0.01 13.00 0.13
Maintenance for 60 day sqm 1.00 20.00 20.00
Transportation charges sqm 1.00 3.50 3.50
Total for 1 sqm 314.49
1.11765 Add Area Allowance 0.00% 5.00 0.00
over heads and contractor profit 11.765% 11.765% 279.96 32.94
Rate for 1 sqm 347.43

88 Supply and providing of Red Earth including all leads and lifts seigniorage stacking at road side to
departmental gauge for pre- measurement complete as approved and directed by the engineer in charge at
site.
Taking output = 1 cum

a)  Labour
Mate day -
c) Material
Cost of Earth ( M-092) cum 1.00 65.00 65.00
Conveyance charges for Red Earth with profit 1.00 157.55 157.55
over heads and contractor profit 11.765% 11.765% 65.00 7.65
1.11765 area allowance on labour with OH & Profit 0.00% 0.00 0
Rate per Cum 230.20

WATER SUPPLY & SANITARY ARRANGEMENTS


71 Supplying & Fixing 580mmx440mm Orissa Pan white glazed W.C 1st quality ISI marked conforming to
IS:2556-Part-3-1981 with "P" or "S" trap Hindware/ Parryware/ Neycer - ISI Mark and 10 Liters capacity
Single Flush PVC low level Cistern parry ware, slim line with internal components & short bendand complete
as per the directions of the Engineer in charge for the finished item of work.

Unit - 1 NO
Page 58 of 139

a) Cost of orissa pan type w/c vide item no: TBSP-E.I-03 Each 1.00 1306.00 1306.00

c)10 ltrs PVC flushing system TBSP-H.II-07 Each 1.00 1439.00 1439.00

over heads and contractor profit 11.765% 11.765% 2745.00 322.95


Basic rate per 1No 3067.95
1.11765 E. Area allowances on labour with profit on TBSP-E.VIII-02+TBSP- 0% 485.00 0.00
H.IV-01, SSR
Rate per 1No Rs. 3067.95
72 Supplying & Fixing 550x400 mm- single C.P. Pillar cock Indian make Flat Back Wash Hand Basin
(HSW/Parryware/ Neycer) 1st quality conforming to IS:2556-Part-4:1972 with waste fittings like rubber plug,
chain, 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15
mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/ Esso or
equivalent complete with standard CI brackets including wooden block as per the directions of the Engineer
in charge for the finished item of work.

Unit - 1 NO
Cost of Wash Basins with specials vide, TBSP-E.VI-04 Each 1.00 1469.00 1469.00

over heads and contractor profit 11.765% 11.765% 1469.00 172.83


Basic rate per 1No 1641.83
1.11765 E. Area allowances on labour with profit on TBSP-E.VIII-08, SSR 0% 409.00 0.00

Rate per 1No Rs. 1641.83

71 Supplying and fixing approved make wash down European Water Closet of 1st quality conforming to IS:2556-
Part-2-2004 of white glazed with 'S' trap) with PVC low level system with internal components & short bend:
10 Liters capacity Single Flush) flushing cistern with internal components and short bend, hard rubber seat, P-
trap, stop-cocks, 32 mm GI flush pipe with fittings, antisiphonage connections, PVC pipe connections with
union at both ends, including painting and fittings and making chases, holes, etc., and making good the same
where required including materials, labour, equipment all complete as per specifications and directions.

European type water closet of standard sl.No.255 TBSP- 1.00 1619.00 1619.00
E.II-02
b)10 ltrs PVC flushing system TBSP-H.II-07 S.no.510 1.00 1439.00 1439.00
12.7mm dia angle stop cock bmw-e-01 ssr 2014-15 1.00 474.00 474.00
PVC connection pipe Pg no.154/644 1.00 101.00 101.00
TBSP-J.I-32
1.11765 Area allowance on labour TBSP-E.VIII-06 + TBSP-H.IV-01 0.0% 363.00 0.00

Rate as per 1No 3633.00


over heads and contractor profit 11.765% 11.765% 3633.00 427.42
Rate per 1No Rs. 4060.43

73 Supplying and fixing Pedestal for wash hand basin (HSW/Parry/Earthenware ) make including cost of all
fixtures, labour for fixing as per the directions of the Engineer in charge for the finished item of work.

Unit-1No
Cost of Pedestal for wash hand basin TBSP-E.VI-12, SSR 1 1036.00 1036.00

over heads and contractor profit 11.765% 11.765% 1036.00 121.89


Basic rate per 1No 1157.89
1.11765 E. Area allowances on labour with profit on TBSP-E.VIII- 0% 148.00 0.00
09, SSR

Rate per 1No Rs. 1157.89

74 Supplying and fixing white glazed flat back Bowl urinal basin (Indian type) of size 440x265x315mm of
HSW/Parry/Neycer make including all fixtures, labour for fixing as per the directions of the Engineer in
charge for the finished item of work.
Unit - 1No

Cost of Flat Back urinal, TBSP-E.VII-01, SSR Each 1.00 767.00 767.00

over heads and contractor profit 11.765% 11.765% 767.00 90.24


Basic rate per 1No 857.24
1.11765 E. Area allowances on labour with profit on TBSP-E.VIII- 0% 163.00 0.00
11, SSR
Rate per 1No Rs. 857.24

35 Supplying and fixing S&F CP finish steel towel rod of 600 mm long and 20 mm dia with brackets of Ist quality
Jaquar/ Hindware/ Plumber/ Parryware/ H & R Johnsonas per the directions of the Engineer in charge for
the finished item of work.
Unit - 1No
Cost of C.P.Towel Rod, TBSP-F.VII-10, SSR Each 1.00 360.00 360.00
over heads and contractor profit 11.765% 11.765% 360.00 42.35
Basic rate per 1No 402.35
Rate per 1No Rs. 402.35

76 Supplying and fixing CP finish Brass Soap dish heavy type with NP Screws including cost & conveyance of
materials and labour for fixing complete as per the directions of the Engineer in charge for the finished item
of work.
Page 59 of 139

S&F CP finish brass soap dish, Sl.No.367, TBSP-F.VII-21 1.00 514.00 514.00
Each
over heads and contractor profit 11.765% 11.765% 514.00 60.47
Rate per 1No Rs. 574.47

78 Supplying and fixing TV Shape mirror with PVC frame size 609.6x457.2mm including cost & conveyance of
materials and labour for fixing complete as per the directions of the Engineer in charge for the finished item
of work.

Cost of mirror, Pg no.155/647,TBSP-J.I-35, of SSR 1.00 466.00 466.00


Each
over heads and contractor profit 11.765% 11.765% 466.00 54.82

Basic rate per 1No 520.82


1.11765 Area allowances on labour with profit on BMW-I.106 0% 116.00 0.00

Rate per 1No Rs. 520.82

79 Supplying and fixing 3" dia (75 mm nominal size) CI plain bends 1st quality ISI marked confirming to
IS:1729-1979 including cost and conveyance of all materials, labour charges complete as per the directions of
the Engineer in charge for the finished item of work.

Cost of bend vide, TBSP-C.II-01, SSR Each 1.00 293.00 293.00


over heads and contractor profit 11.765% 11.765% 293.00 34.47
Basic rate per 1No 327.47
1.11765 Area allowances on labour with profit on TBSP-C.III-02, 0% 78.00 0.00
SSR Rate per 1No Rs. 327.47

80 Supplying and fixing of C.I. soil pipes 3" dia (75 mm nominal size) Single Socket ISI marked conforming to
IS:1729-1979 of approved make with cement caulked joints and fixing as per site requirements including
painting black with Japan paint and fixing with necessary wooden blocks fixed in the masonry walls in
cement mortar (1½:1) including fixing of M.S. clamps if necessary with required no. of Bombay nails etc.,
complete for finished item of work as directed by the Engineer in charge.

Cost of pipe vide, TBSP-C.I-01, SSR 1 RM 1.00 751.00 751.00


over heads and contractor profit 11.765% 11.765% 751.00 88.36
Basic rate per 1RM 839.36
1.11765 Area allowances on labour with profit on TBSP-C.III-01, 0% 246.00 0.00
SSR
Rate per 1RM Rs. 839.36
81 Supplying and fixing of C.I. soil pipes 4" dia (101.6 mm nominal size) Single Socket ISI marked conforming to
IS:1729-1979 of approved make with cement caulked joints and fixing as per site requirements including
painting black with Japan paint and fixing with necessary wooden blocks fixed in the masonry walls in
cement mortar (1½:1) including fixing of M.S. clamps if necessary with required no. of Bombay nails etc.,
complete for finished item of work as directed by the Engineer in charge.

Cost of pipe vide, TBSP-C.I-02, SSR 1 rm 1.00 988.00 988.00


over heads and contractor profit 11.765% 11.765% 988.00 116.24
Basic rate per 1RM 1104.24
1.11765 Area allowances on labour with profit on TBSP-C.III-01, 0% 246.00 0.00
SSR
Rate per 1RM Rs. 1104.24

82 Supplying and fixing 4" dia (101.6 mm nominal size) CI plain bends 1st quality ISI marked confirming to
IS:1729-1979 including cost and conveyance of all materials, labour charges complete as per the directions of
the Engineer in charge for the finished item of work.

Rate as per item, TBSP-C II-02, SSR Each 1.00 372.00 372.00
over heads and contractor profit 11.765% 11.765% 372.00 43.77

Basic rate per 1No 415.77


1.11765 Area allowances on labour with profit on TBSP-C.III-02, 0% 78.00 0.00

Rate per 1No Rs. 415.77

83 Supply, laying, jointing and testing 101.6mm SWG SP-1 pipes of ISI make conforming to ISI 651 & 4127 with
airtight cement joints in CM (1:5:1) prop. Including excavation of trenches and socket pits in any soil (except
rock requiring blasting) upto 914.4mm (3'0") depth and refilling with watering and tamping complete for
finished item of work as directed by the Engineer in charge

Rate as per item, TBSP-A.I-02, SSR 1RM 1.00 423.00 423.00


over heads and contractor profit 11.765% 11.765% 423.00 49.77

Basic rate per 1RM 472.77


1.11765 Area allowances on TBSP-A.III-01, SSR 0% 252.00 0.00
Rate per 1RM Rs. 472.77

84 Supplying and fixing 101.6 mm dia SWG bends confirming to ISI 651- with airtight cement joints as per
standard practice icluding cost of all materials and labour somplete as per the directions of the Engineer in
charge for the finished item of work .
Cost of bend vide, TBSP-A.II-23, SSR Each 1.00 95.00 95.00
Labour charges for fixing and laying as per TBSP-A.III-05, Each 1.00 33.00 33.00
SSR
over heads and contractor profit 11.765% 11.765% 128.00 15.06
Page 60 of 139

143.06
Basic rate per 1RM
1.11765 Area allowances on labour with profit on TBSP-A.III-05, 0% 33.00 0.00
SSR Rate per 1No Rs 143.06
90 Supplying and fixing of 50mm (2") dia G.I. pipes Medium Grade as per IS 1239 of Tata/Zenith make with cap
for Chain link mesh including cost and conveyance of all materials, labour charges, leads and lifts complete as
per the directions of the Engineer in charge for the finished item of work.

Rate as per TBSP-G.I-12, of SSR RM 1.00 452.00 452.00


over heads and contractor profit 11.765% 11.765% 452.00 53.18
Basic rate per 1RM 505.18
1.11765 Area allowances on labour with profit BMW-F.86, 0% 41.00 0.00
RS.41
Rate per 1RM 505.18
86 Providing and fixing in position at all levels of the buildings Bronze GM Ball Valve with SS BALL and spindle
indian make heavy type for water services with hand wheel at all elevations for following sizes including
jointing complete as per the directions of the Engineer in charge for the finished item of work.

a 32 mm dia Nominal Bore


Each 1.00 681.00 681.00
Cost of GateSpindle Ball Valve, TBSP-G.III-23, Sl.No. of
SSR
over heads and contractor profit 11.765% 11.765% 681.00 80.12

Basic rate per 1No 761.12


1.11765 Area allowances on labour with profit on TBSP-G.IV-03 0% 62.00 0.00

Rate per 1NO 761.12

b 25mm dia Nominal Bore


Cost of Gate(GM peet) Valve, TBSP-G.III-22, Sl.No. of Each 1.00 384.00 384.00
SSR
over heads and contractor profit 11.765% 11.765% 384.00 45.18

Basic rate per 1No 429.18


1.11765 Area allowances on labour with profit on TBSP-G.IV-03 0% 62.00 0.00

Rate per 1NO 429.18


c 20mm dia Nominal Bore
Cost of Gate(GM peet) Valve, TBSP-G.III-21, Sl.No. of Each 1.00 273.00 273.00
SSR
over heads and contractor profit 11.765% 11.765% 273.00 32.12

Basic rate per 1NO 305.12


1.11765 0% 62.00 0.00
Area allowances on labour with profit on TBSP-G.IV-03
Rate per 1NO 305.12
d 15mm dia Nominal Bore
Cost of Gate(GM peet) Valve, TBSP-G.III-20, Sl.No. of Each 1.00 188.00 188.00
SSR
over heads and contractor profit 11.765% 11.765% 188.00 22.12
Basic rate per 1NO 210.12
1.11765 0% 62.00 0.00
Area allowances on labour with profit on TBSP-G.IV-03
Rate per 1NO 210.12

87 Supplying and fixing long body C.P. Taps including cost and conveyance, labour charges complete as per the
directions of the Engineer in charge for the finished item of work.

chromium coated long body CP tap and accessories like Each 1.00 260.00 260.00
waste water pipe (MRT)
Rate per 1NO 260.00

88 Providing and fixing 101.6 mm dia UPVC Nahani Trap/Floor trap with of standard make including making
connection to PVC pipes/waste water lines with cement concrete base for embedding traps in position,
finishing up to floor level with water proof cement plaster with grating at top complete as per the directions of
the Engineer in charge for the finished item of work.

Cost of Nahani Trap/ Floor trap, TBSP-H.II-69, SSR Each 1.00 111.00 111.00
Cost of NP grating, TBSP-B.II-07 Each 1.00 20.00 20.00

Cost of CC(1:2:4) (mrt) L.S. 1.00 35.00 35.00


Labour for fixing in position (mrt) L.S. 1.00 55.00 55.00

over heads and contractor profit 11.765% 11.765% 221.00 26.00


Rate per 1No 247.00
Page 61 of 139

89 Providing and fixing in position at all levels of the building under floors and against walls 110mm dia
(4kg/cm2) PVC pipes of prince / sudhakar or any ISI brand make with specials such as junctions,couplers,
bends/Tees etc., with or without access doors as required and with solvent jointing as per standard practice
wherever necessary including excavation and refilling wherever required,, testing etc. complete as per the
directions of the Engineer in charge for the finished item of work.

Cost of Pipe as per TBSP-H.I-03, SSR 1.00 159.67 159.67


1RM
labour charges of TBSP-H.IV-01, SSR 1RM 1.00 76.00 76.00
over heads and contractor profit 11.765% 11.765% 235.67 27.73
Basic rate per 1RM 263.40
1.11765 0% 76.00 0.00
Area allowances on labour with profit
Rate per 1RM 263.40
90 Providing and fixing in position at all levels of Masonry walls as weep holes with 110mm dia (4kg/cm2) PVC
pipes of prince / sudhakar or any ISI brand make wherever necessary including fixing in position & at all
leads & lifts etc. complete as per the directions of the Engineer in charge for the finished item of work.

Cost of Pipe as per TBSP-H.I-03, SSR 1RM 1.00 159.67 159.67

10% 159.67 15.97


Labour charges for fixing
over heads and contractor profit 11.765% 11.765% 175.64 20.66

196.30
Basic rate per 1RM
Rate per 1RM 196.30
95 Providing and fixing in position at all levels of Masonry walls as weep holes with 75mm dia (4kg/cm2) PVC
pipes of prince / sudhakar or any ISI brand make wherever necessary including fixing in position & at all
leads & lifts etc. complete as per the directions of the Engineer in charge for the finished item of work.

Cost of Pipe as per TBSP-H.I-01, SSR 1RM 1.00 84.00 84.00

Labour charges for fixing 10% 84.00 8.40


over heads and contractor profit 11.765% 11.765% 92.40 10.87
Basic rate per 1RM 103.27
Rate per 1RM 103.27

91 Supply & fixing 15 mm brass body CP finish bib cock of not less than 300 grams weight Indian make heavy
duty including cost and conveyance, labour for fixing complete as per the directions of the Engineer in charge
for the finished item of work.
Cost of Bib Cock, (LMR) Each 1.00 300.00 300.00
Rate per 1No. Rs. 300.00

92 Supplying and fixing of 15 mm NP stop cock Indian make heavy duty Seiko/ Senior/ Nice/ Senior/ Nice or
equivalentincluding cost and conveyance, labour for fixing complete as per the directions of the Engineer in
charge for the finished item of work.

Cost of stop cock (LMR) 1 No 1.00 474.00 474.00

Rate per 1NO 474.00

86 Supply & Fixing of 15 mm brass body CP finish bib tap of not less than 300 grams weight screw type (full
turn) with internal / external threaded connection conforming to IS 8931 including cost & conveyance of all
materials, labour charges, leads, lifts complete as per the directions of the Engineer in charge for the finished
item of work .
cost as per TBSP-F.I-01 1 No 1.00 223.00 223.00
Add for Over heads & Contractors profit 11.765% 223.00 26.24
Basic rate per 1NO 249.24
1.11765 0% 51.00 0.00
Area allowances on labour with profit on TBSP-F.VIII-01
Rate/1No 249.24
94 Construction of Brick masonry chamber over the cully trap or peet valves & fitted with 304.8mm X 228.6mm
size CI frame & Hinged cover as including cost & conveyance of all materials, labour charges complete for
finished item of work as per the directions of the Engineer-in-charge

Brick masonry chamber as per TBSP-B.II-03 1.00 473.00 473.00


over heads and contractor profit 11.765% 11.765% 473.00 55.65
Basic rate per 1NO 528.65
1.11765 Area allowances on labour with profit on TBSP-B.III-01, 0% 130.00 0.00
SSR
Rate/1No 528.65

95 Constructing 457.2 mm x 457.2 mm (1'6"x1'6") brick in CM 1:6 prop. Masonry. Inspection chamber up to 914.4
mm (3'0") and fitted with light weight 457.2 mm x 457.2 mm (1'6"x1'6") C.I frame and cover of 20 Kg. weight
including cost and conveyance of all materials, labour charges complete as per the directions of the Engineer
in charge for the finished item of work.
Rate as per TBSP-B.II-02, SSR 2015-16 1No 1.00 3813.00 3813.00
` over heads and contractor profit 11.765% 11.765% 3813.00 448.60
Rate per 1No Rs. 4261.60
Page 62 of 139

96 Providing & Placing on Terrace (at all floor levels) polyethylene water storage tank of 1000 Ltrs capacity with
Double layer approved brand & manufacture (SINTEX or equalent ISI make) with cover and suitable locking
arrangement & making necessary holes for inlet & outlets and over flow pipes but without fittings & base
support for tanks including cost and conveyance of all materials, all fixtures, all leads and lifts complete as
per the directions of the Engineer in charge for the finished item of work.

cost of water storage tank TBSP-H.II-01, SSR 1lt. 1000 7.00 7000.00

conveyance charges, erection charges by constructing


suitable base to keep the tank & giving necessary fittings LS 500.00
over heads and contractor profit 11.765% 11.765% 7500.00 882.38
Rate per 1No 8382.38

97 Construction of 2.0x0.90x2.30m (Internal dimensions) Septic tank as per the approved drawing and
specifications conforming to IS 2470 and soak pit of size 2.5 m dia and 2.5 m depth including inlet and outlet
pipes, ventilating pipe and cowl, 914.4X457.20 sige CI man hole cover, RCC slab etc, cost and conveyance of
all materials, labour charges complete as per the directions of the Engineer in charge for the finished item of
work.

Unit-1No.
ABSTRACT for SEPTIC TANK
Earth work excavation 1 Cum 14.26 172.90 2465.55
(3.1x2.0x2.3=14.26Cum
CC (1:3:6) 1.0 Cum 0.93 5141.06 4781.19
(3.1x2.0x0.15= 0.93Cum )
R.R. Masonry in CM(1:6) 1.0 Cum 7.87 3606.76 28385.20
(7.60x0.45x2.3=7.87Cum )
Plastering in CM(1:3) 20mm thick over roof slab 1Sqm 15.14 218.04 3301.13
((2x2.3x0.9)+(2x2x2.3)+(2x0.9)=15.14Sqm)

RCC(1:2:4) for Roof Slab 1.0 Cum 0.58 8902.29 5163.33


cost of steel and its fabrication charges 1.0 MT 0.052 61956.96 3221.76

SWG T pipe 100mm dia, TBSP-A.II-29, SSR 1 No 1.00 182.00 182.00


SWG bend 100mm dia, TBSP-A.II-23, SSR 1 No 1.00 95.00 95.00
PVC Vent Cowl 110mm dia, TBSP-H.II.55, SSR 1 No 1.00 19.00 19.00
Cost of 110mm dia 4 Kg/sqcm PVC ventilating pipe as 1.0 RM 4.50 159.67
per TBSP-H.I-03, 718.52
Cost of C.I. Manhole cover 30Kg and fixing charges, TBSP- Each 1.00 2013.00
B.II-09, SSR 2013.00
over heads and contractor profit 11.765% 11.765% 3027.52 356.19
Basic rate per 1NO 50701.86
1.11765 E. Area allowances on labour charges for fixing Man hole 0% 130.00 0.00
with profit on TBSP-B.III-01, SSR
Total for one Septic tank 50701.86
ABSTRACT for SOAK PIT
Earth work excavation 1 Cum 12.50 172.90 2161.25
(3.14X2.5X2.5X2.5/4=12.26Cum say 12.50 Cum)
Brick Masonry (3.14X2.27X2.5*0.23=4.098Cum 1 Cum 4.10 5653.85 23180.79
say 4.10 Cum)
RCC(1:2:4) for Roof Slab 1.0 Cum 0.45 8902.29 4006.03
(3.14X2.4X2.4X0.1/4=0.45Cum or say 0.45Cum)
cost of steel and its fabrication charges 1.0 MT 0.042 61956.96 2602.19
Total for one Soak pit 31950.26

ABSTRACT for SEPTIC TANK & Soak Pit: 82652.12

ROAD WORKS
3) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification
including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed
materiald by tipper to site, laying in uniform layers in sub-base/ base course on a well prepared sub-base and
compacting with smooth wheel roller of 80 to 100 kN/ Vibratory Roller 80-100 kN weight to achive the
desired density including lighting, barricading and maintenance of diversion, etc., as per tables 400.11 &
400.12 and technical specification clause 406 MORD/ MORTH.

(B) R & B and Urban Area Works:


Unit = cum Data RBR-SBBS-11, Pg.336 of Roads & Bridges
Taking output = 225 cum
a)  Labour
Mate day -
Mazdoor (Skilled) day 2.480 425.00 1054.00
Mazdoor (Unskilled) day 10.000 425.00 4250.00
b) Machinery
L.C. 1659.17 Wet mix plant of 60/75 tonne hourly capacity hour 9.000 1843.52 16591.68
887.04 Electric generator 125 KVA hour 6.000 1478.40 8870.40
3318.36 Front end loader 1 cum capacity hour 6.000 1843.52 11061.12
1511.33 Paver finisher hour 6.000 2518.88 15113.28
1155.96 Vibratory roller 8-10 tonne hour 3.900 2878.90 11227.71
579.33 Water tanker 6 kl capacity hour 3.000 698.88 2096.64
c) Material (Table 400-11)
45mm to 22.4mm @ 30 per cent cum 89.100 905.13 80647.08
Page 63 of 139

22.4mm to 2.36mm @ 40 per cent cum 118.800 883.25 104930.10

2.36 mm to 75 micron @ 30 per cent cum 89.100 485.00 43213.50


Cost of water Kl 18.000 73.00 1314.00
over heads and contractor profit 11.765% 0.11765 300369.51 35338.47
Cost for 225 cum= a+b+c+d+e 335707.99
Rate per cum = (a+b+c+d+e)/225 1492.04
e) Water conveyance charges kl 0.080 20.5 1.64
f) Metal Conveyance charges + Seigniorage charges with cum 1.320 468.10 617.89
profit
1.11765 g) Area allowance on labour charges with profit 0% 64.07 0.00
Rate per cum 2111.57

98 Providing, laying, spreading and compacting stone aggregates of 63 mm nominal single size to water bound
macadam specification for a compact thickness of 150 mm in two layers including spreading in uniform
thickness, hand packing, rolling with three wheel 80-100 kN static roller/ Vibratory Roller 80-100 KN in
stages to proper grade and camber, applying and brooming crushable screening to fill up the interstces of
coarse aggregate, watering and compacting to the required density Grading 3 as per technical specification
clause 404 MORTH (Measurements to be taken for compact thickness of layer)

(A) By Manual Means


Unit = cum Data Sl.No.9-B-II, Pg.333 of Roads & Bridges
Taking output = 360 cum
a)  Labour
Mate day -
Mazdoor (Skilled) day 12.08 425.00 5134.00
Mazdoor (Unskilled) day 250.00 425.00 106250.00
b) Machinery
L.C. 8895.6 Consolidating soling with static Power Roller 80-100kN hour 36.00 1342.30 48322.80
Sl.No.50, Hire Chrgs, Irg SSR
4634.64 Water tanker 6 kl capacity Sl.No.10 of R&B (Hire Chgs), hour 24.00 698.88 16773.12
of SSR
c) Material (Refer Tables 400.7, 8, 9 and 10)
Aggregate
Grading 2 Hand broken stone aggregate 63 mm nominal cum 435.60 467.00 203425.20
size (passing 80 mm & retained on 50 mm sieve) @ 0.91
cum per 10 sqm for compacted thickness of 75 mm

Crushable type such as Moorum or gravel for Grading 2 @ cum 105.59 98.00 10347.82
0.22 cum per 10 sqm

C) Water kl 144.00 73.00 10512.00


over heads and contractor profit 11.765% 11.765% 400764.94 47150.00
Cost for 360 cum = a+b+c+d (3 Wheel Roller) 447914.94
Basic Rate per cum = (a+b+c+d+e)/360 1244.21
Metal Conveyance charges incl. Seignorage charge cum 1.210 468.10 566.40
Moorum or gravel conveyance charges incl. Seignorage 157.55 46.21
charge 0.2933
Water conveyance charge 0.400 20.50 8.20
1.11765 E. Area allowance on labour charges with profit 0% 346.98 0.00
Rate per cum 1865.02

WBM Grading 3 (using Single Grade Metal)


99 Providing, laying, spreading and compacting stone aggregates of 40 mm Single nominal size to water bound
macadam specification for a compact thickness of 75 mm including spreading in uniform thickness, hand
packing, rolling with three wheel 80-100 kN static roller/ Vibratory Roller 80-100 KN in stages to proper
grade and camber, applying and brooming crushable screening to fill up the interstces of coarse aggregate,
watering and compacting to the required density Grading 3 as per technical specification clause 404 MORTH
(Measurements to be taken for compact thickness of layer)

(A) By Manual Means


Unit = cum Data Sl.No.9-B-III-ii, Pg.336 of Roads & Bridges
Taking output = 360 cum
a)  Labour

Mate day -
Mazdoor (Skilled) day 12.08 425.00 5134.00
Mazdoor (Unskilled) day 250.00 425.00 106250.00
b) Machinery
L.C. 8895.6 Consolidating soling with static Power Roller 80-100kN hour 36.00 1342.30 48322.80
Sl.No.50, Hire Chrgs, Irg SSR
4634.64 Water tanker 6 kl capacity Sl.No.10 of R&B (Hire Chgs), hour 24.00 698.88 16773.12
of SSR
c) Material (Refer Tables 400.7, 8, 9 and 10)
Aggregate 0.00
Grading 3 Hand broken stone aggregate 40 mm nominal cum 435.60 717.00 312325.20
size @ 0.91 cum per 10 sqm for compacted thickness of 75
mm
Crushable type such as Moorum or gravel for Grading 3 @ cum 105.59 98.00 10347.82
0.22 cum per 10 sqm
C) Water kl 144.00 73.00 10512.00
D. over heads and contractor profit on A to C 11.765% 11.765% 509664.94 59962.08
Page 64 of 139

Cost for 360 cum = a+b+c+d (3 Wheel Roller) 569627.02


Basic Rate per cum = (a+b+c+d+e)/360 1582.30

Metal Conveyance charges incl. Seignorage charge cum 1.21 468.10 566.40

Moorum or gravel conveyance charges incl. Seignorage 0.29 157.55 46.21


charge
Water conveyance charge 0.40 20.50 8.20
1.11765 E. Area allowance on labour charges with profit 0% 346.98 0.00
Rate per cum 2203.11

52 Construction of Plain Cement Concrete Road with M20 Nominal Mix (1:2:4) using 40mm & 20mm HBG metal
(50% each), jointed at expansion and construction joint only, over a prepared sub base, with 43 grade cement
(330 kgs per Cum) , coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less
than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side
formwork (steel channel, including levelling the formwork as per drawing),providing joint filler board,
spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished
in continuous operation including provision of contraction and expansion, construction joints,, curing of
concrete for 14- days, complete as per as per drawing and as directed by the Engineer in charge for the
finished item of work.(Technical Specification Clause 1501 MORD).

Unit = cum As per RBR-CCPV-5


Taking output = 75 cum (172.50 t)
(100 x 3.75 x 0.200)
a)  Labour
Mate day -
Mason (1st class) day 5.000 470.00 2350.00

Mason (2nd class) day 5.000 450.00 2250.00


Mazdoor (Unskilled) day 150.000 425.00 63750.00
Mazdoor (Skilled) day 6.000 425.00 2550.00
Surveyor 50% of man days day 1.000 750.00 750.00
Mazdoor (Semi-Skilled) day 6.000 425.00 2550.00
b) Machinery
8892 Concrete mixer 0.28 / 0.4 cum capacity (6 mixers) with hour 36.000 534.30 19234.80
weigh batcher and suitable capacity calibrated water tank,
Sno18
1600.2 Needle vibrator , Sno40/pgno50 hour 9.000 205.00 1845.00

1600.2 Plate vibrator hour 9.000 205.00 1845.00


965.5 Water tanker 6 kl capacity, Sl.No.10 R&B Works hour 5.000 698.88 3494.40

c) Material
Crushed stone coarse aggregates, @ 0.90 cum/cum of cum 67.500 926.38 62530.31
concrete (40 mm & 20 mm blending)
Sand as per IS:383 and conforming to Clause 1500.2.4.2 @ cum 33.750 600.00 20250.00
0.45 cum/cum of concrete

Cement @ 330 kg/cum of concrete t 24.750 4700.00 116325.00


Water for curing kl 18.000 73.00 1314.00

d) Formwork @ 3% of (a+b+c) 301038.51 9031.16


Cost for 75 cum = a+b+c+d+e+f 310069.67
Cost for 1 cum = 4134.26
1.11765 Add Area Allowance 0.0% 1163.44 0.00
Conveyance charges of 40mm& 20 mm blending with cum 0.900 468.10 421.29
profit
Conveyance charges of sand blending with profit cum 0.450 946.85 426.08
Conveyance charges of cement with profit t 0.330 75.50 24.92
Water conveyance charge Kl 0.24 20.50 4.92
over heads and contractor profit 11.765% 11.765% 4134.26 486.40

Rate per Cum 5497.87

105 Precasting and fixing kerb wall with PCC(1:2:4) of size 0.40mx0.30mx0.075m. Including earth work
excavation, cost of kerb slab, plastering with CM (1:3), painting two coats of janatacem and labour charges for
fixing complete as per the directions of the Engineer in charge for the finished item of work.

Earth work excavation 1.00x.10x0.15=0.015cum 1cum 0.015 172.90 2.59

P.C.C.(1:2:4) 1.00X0.075X0.30=0.0225CUM CUM 0.0225 5727.20 128.86

plastering with CM (1:3) 12mm thick with two coats 1 sqm 0.500 176.80 88.40
janatacem paint

LABOUR CHARGES FOR FIXING incl profit mrt 1.000 5.00 5.00

Rate/1 Rm 224.86
102 Supply & Spreading of gravel for formation of Road berms including cost of all materials, all leads and lifts,
rolling with hand roller, watering , consolidation etc.complete as per the directions of the Engineer in charge
for the finished item of work..

A) available gravel for berms cum 1.16 98.00 113.68


Page 65 of 139

B) Labour charges as per Filling with Borrowed gravel, day 0.0520 425.00 22.10
0.31 Man mazdoor for 6 Cum

over heads and contractor profit 11.765%


11.765% 135.78 15.97
Basic rate per Cum 151.75
d) gravel conveyance charges incl. Seignorage charge Cum 1.16 157.55 182.76
e) area allowances on labour on B including profit & O H 0% 22.10 0.00
1.11765 charges
Rate/ 1 cum Rs. 334.51

103 Supplying & Fixing of expansion joint filler board conforming to IS: 1838 for buildings, columns, beams and
slabs 20 mm THICK of CC road in lateral and longitudinal direction complete as per the direction of the
Engineer in charge for the finished item of work.

Cost of expansion joint filler board TBSC-Q.VIII-04, of 1 sqm 1.00 293.00 293.00
SSR
labour charges for fixing in position before laying LS 5% 293.00 14.65
over heads and contractor profit 11.765% 11.765% 307.65 36.20
Rate/1 Sqm Rs. 343.85

104 Supply and fixing Vinyl Flooring Sheets or tiles having a nominal total thickness of 1.5 mm with a wearing
surface impregnated polyurethane homogeneous mixture of PVC, Plasticizers, Urethane, color pigments with
wearing resistance and Fire Resistance as per standards approved make and quality in PLCC room including
cost and conveyance of all materials, adhesive, including cleaning the suface with acid, all leads and lifts,
rolling with hand roller etc.complete as per the directions of the Engineer in charge for the finished item of
work.

Unit = 1 Sqm
Cost vide TBSC-C.X-03 0f Blds, of SSR 1.00 383.00 383.00
Sqm
over heads and contractor profit 11.765% 11.765% 383.00 45.06

Rate per Sqm 428.06

105 Supplying and fixing of sun control film to the glass openings of PLCC room including cost & conveyance of
all materials, labour charges, leads, lifts etc, complete as per the directions of the Engineer in charge for the
finished item of work.

Unit = 1 Sqm
Rate as per TBSC-R.I-07 of SSR sqm 1.00 299.00 299.00
over heads and contractor profit 11.765% 11.765% 299.00 35.18
Rate per Sqm 334.18

106 Supply and fixing in position M.S. grills/Angles/gates of required size of approved design and quality. (for,
gates, windows, hand railing in front of portico, retaining walls ,) and painting with two coats of synthetic
enamel paint of approved quality, make, colour and shade over one coat of red oxide, complete as per the
directions of the Engineer in charge for the finished item of work.

Unit = 1 Kg
Cost of steel (including wastage) kg 1.025 45.00 46.13

Fabrication charges as per # TBSC-TI-16 0f Blds, of SSR Kg 1.00 29.00 29.00


Fixing charges as per # TBSC-TI-17 0f Blds, of SSR kg 1.00 4.00 4.00
Painting charges (LS) kg 1.00 1.00 1.00
over heads and contractor profit 11.765% 11.765% 80.13 9.43
Basic Rate per Kg 89.55
d) Steel conveyance charges with profit 1.03 0.09 0.09
1.11765 Area allowance on labour with profit 0% 18.50 0.00
Rate per Kg 89.64

106 Supply and fixing in position of MS angles (embedded in CC (1:3:6) compound wall including ) over
compound wall including painting with two coats of synthetic enamel paint of approved quality, make,
colour and shade over one coat of red oxide, complete as per the directions of the Engineer in charge for the
finished item of work.

Unit = 1 Kg
Cost of steel (including wastage) kg 1.025 45.00 46.13

Fabrication charges 50% as per # TBSC-TI-16 0f Blds, of Kg 1.00 14.50 14.50


SSR
Fixing charges as per # TBSC-TI-17 0f Blds, of SSR kg 1.00 4.00 4.00
Painting charges (LS) kg 1.00 1.00 1.00
over heads and contractor profit 11.765% 11.765% 65.63 7.72
Basic Rate per Kg 73.35
d) Steel conveyance charges with profit 1.025 0.09 0.09
1.11765 Area allowance on labour with profit 0% 11.25 0.00
Rate per Kg 73.44

107 Supply and fixing in position MS 'Y' Angles of required size poles of chain link mesh fencing and painting
with two coats of synthetic enamel paint of approved quality, make, colour and shade over a coat of red oxide
including cost & conveyance of all materials, labour charges, leads, lifts complete as per the directions of the
Engineer in charge for the finished item of work .
Page 66 of 139

Unit = 1 Kg
Cost of steel (including wastage) kg 1.025 45.00 46.13
Fabrication charges 50% as per # TBSC-TI-16 0f Blds, of Kg 1.00 14.50 14.50
SSR
Fixing charges as per # TBSC-TI-17 0f Blds, of SSR kg 1.00 4.00 4.00
Painting charges (LS) kg 1.00 1.00 1.00
over heads and contractor profit 11.765% 11.765% 65.63 7.72
Basic Rate per Kg 73.35
d) Steel conveyance charges with profit 1.03 0.09 0.09
1.11765 Area allowance on labour with profit 0% 11.25 0.00
Rate per Kg 73.44

Supply and fixing in position G.I. Angles and Channels . over cable duct of required size of approved design
and quality and including cost of galvanizing complete as per the directions of the Engineer in charge for the
finished item of work.

unit=1Kg
cost of steel (including wastage) kg 1.025 45 46.13
Fabrication charges 50% as per # TBSC-TI-16 0f Blds, of kg 1.00 14.50 14.50
SSR
fixing charges as per TBSC-T.I-17 of blds kg 1.00 4 4.00
Galvanizing charges as per TS transco SSR item CS 65 kg 1.00 5.18 5.18
Add for Over heads & Contractors profit vide p.no.21 of 11.765% 69.81 8.21
S.S.R
78.02
d) Steel conveyance charges with profit 1.025 0.0905 0.09
1.11765 Area allowance on labour with profit 0% 11.25 0.00
Rate per Kg 78.11
Providing anchor points in RCC M20 with 40mm dia M.S round bar reinforcement of TISCO/SAIL/VSP make
in foundation complete as per drawings and technical specifications incuding cost of steel &itsfabrication over
laps and wastage cutting,bending,tying grill in position including cost of binding wire,all labour
chargesetc.,complete as per the directions of the engineer in charge for the finished item of work.

Unit=1MT
HYSD/TMT 40MM Ddia including 5 percent for overlaps MT 1.05 45000.00 47250.00
and wastage,structural steel rate plus RS3000 for
TISCO/SAIL/VSPbrands
binding wire as per irrigation material rates sl.no.3 kg 2 50 100.00

(b) labour for cutting,bending,shifting to site,tying,lap 0.00


splicing and placing in position
blacksmith/bar bender day 2 565.00 1130.00
Mazdoor(unskilled) day 6.4 425.00 2720.00
c)overhead & contractors profit on Ato B 11.765% 51200.00 6023.68
rate per MT=a+b 57223.68
d)steel conveyance charges with profit 1.05 90.5 95.03
1.11765 e)area allowances on labour including profit 0% 3850.00 0.00
Rate per MT 57318.71

108 Supply, painting and fixing 3mm thick BP sheet Name boards of following sizes including its cost, cutting,
welding, painting with red oxide primer and enamel painting two coats each, lettering as directed by Engineer
at site including cost of electrodes, hire charges of welding machine, cutting machine, cost of drilling holes for
fixing to structures and labour for painting, fixing complete for finished item of work.

a) Name Board size 5'0"x3'0" with supporting structure


Cost of 3mm thick BP sheet Board of size 5'0"x3'0" ( Kg 32.82 73.44 2410.30
Cost of supporting angle and frame made up of ISA Kg 40.27 73.44 2957.43
50x50x6mm
Cost of earth work excavation Cum 0.43 172.90 74.35

Cost of PCC (1:4:8) Cum 0.43 3994.26 1717.53


Cost of plastering with CM (1:5) 20mm thick Sqm 0.60 196.37 117.82
Cost of paint and labour for lettering (MRT) Nos 75.00 3.00 225.00
Rate per 1 No. Rs. 7502.43

b) Name Board size 2'0" x 1'6" with supporting structure


Cost of 3mm thick BP sheet Board of size 5'0"x3'0" ( Kg 6.56 73.44 481.77
Cost of supporting angle and frame made up of ISA Kg 23.46 73.44 1722.90
50x50x6mm
Cost of earth work excavation Cum 0.43 172.90 74.35
Cost of PCC (1:4:8) Cum 0.43 3994.26 1717.53
Cost of plastering with CM (1:5) 20mm thick Sqm 0.60 196.37 117.82
Cost of paint and labour for lettering (MRT) Nos 35.00 3.00 105.00
Rate per 1 No. Rs. 4219.37

c) Name Board size 6" x 18" with supporting structure


Cost of 3mm thick BP sheet Board of size 5'0"x3'0" ( Kg 1.64 73.44 120.44

Labour for drilling & fixing in position including cost of LS 10.00


wire
Page 67 of 139

Cost of paint and labour for lettering (MRT) Nos 50.00 1.50 75.00
Rate per 1 No. Rs. 205.44

109 Supply and fixing in position G.I. chequered plates of required size of approved design and quality. over
cable duct in control room including cost of galvanizing complete as per the directions of the Engineer in
charge for the finished item of work.

Unit = 1 Kg
Cost of chequered plate ELEC-9.4.8 kg 1.00 70.00 70.00
Fixing charges 50% of TBSC-T.I-17, of SSR 1.00 2.00 2.00
kg
Galvanizing charges as per TS transco SSR item CS 65 1.00 5.18 5.18
kg
over heads and contractor profit 11.765% 11.765% 77.18 9.08
Basic Rate per Kg 86.26
d) Steel conveyance charges with profit 1.00 0.0905 0.09
1.11765 Area allowance on labour with profit 0% 2.00 0.00
Rate per Kg 86.35

110 Supplying and fixing galvanised steel barbed wire (IS : 278-1962 Type I) weighing 9.38 Kg per 100 metres
(min.), Straining and fixing to any type of standard, rails, straining bolts, including securing with and
provision of galvanised mild steel wire, stapples or steel pins, etc., complete as per the directions of the
Engineer in charge for the finished item of work. (Posts and struts of wood, concrete, steel, etc.) and straining
bolts shall be paid for separately).

Details of Cost per 100 metres (day line of wire) Data Sl.No.309, Pg.113 of Bld work items
Materials:—
Galvanised steel barbed wire IS type I weighing 9.38 kg 9.380 90.00 844.20
Kg/100 metre, of SSR TBSC-E.II-01
Carriage of barbed wire. -
G.I. staples steel pins or binding wire LS 10.00
Labour :-
For fixing & stretching wire
Blacksmith, 1st Class day 0.150 470.00 70.50
Blacksmith, 2nd Class day 0.150 450.00 67.50
Mazdoor (male). day 0.300 425.00 127.50
Sundries.
Add water charges @ 1 % 2.66
over heads and contractor profit 11.765% 11.765% 1119.70 131.73
Cost for 100 metres day line of wire 1254.09
Rate per m 12.54
1.11765 Area Allowance on labour with profit 0% 2.66 0.00
Rate per one RM Rs. 12.54
Internal Electrification
111 Supply and Fixing of 25 mm dia 1.5mm thick PVC pipe (ISI MARK) Medium grade, FRLS with IS:9537 part 3
rigid PVC pipe Makes : Sudhakar / Finolex / Modi / VIP / Precision / Universal /
Million Plast or equivalent concealed in roof slab for wiring with all required accessories and labour charges
etc., complete as per the directions of the Engineer in charge for the finished item of work.

As per Index Code BLD-ELEC-1-4 2(b)


Taking Output = 100 M
a)
a) Material
25mm dia 1.5mm thick PVC pipes ELEC-1.2.2.b 100.00 24.00 2400.00
25 mm dia 1,2,3,4 way junction boxes ELEC-1.2.9.b 12.00 24.00 288.00
25mm dia PVC bends ELEC-1.2.10.b Rm 12.00 7.00 84.00
b) Labour charges :
Skilled Electrician, Sl. No.5 of I&CAD Day 2.00 540.00 1080.00
Semi skilled Electrician Day 2.00 450.00 900.00
Helpers (electrical)as per Mazdoor Day 2.00 425.00 850.00
over heads and contractor profit 11.765% 11.765% 5602.00 659.08
BasicCost for 100 RM 6261.08
Basic Rate per 1 RM 62.61
1.11765 Area Allowance on labour with profit 0% 28.30 0.00
Rate per 1 RM 62.61
111 Supply and Fixing of 25 mm dia 1.5mm thick PVC pipe (ISI MARK) Medium grade, FRLS with IS:9537 part 3
rigid PVC pipe Makes : Sudhakar / Finolex / Modi / VIP / Precision / Universal /
Million Plast or equivalent concealed in wall for wiring with all required accessories and labour charges etc.,
complete as per the directions of the Engineer in charge for the finished item of work.

As per Index Code BLD-ELEC-1-4 2(b)


Taking Output = 100 M
a)
a) Material
25mm dia 1.5mm thick PVC pipes ELEC-1.2.2.b Rm 100.00 24.00 2400.00
U' Nails ELEC-9.1.4 Each 200.00 0.30 60.00
25 mm dia 1,2,3,4 way junction boxes ELEC-1.2.9(b) Each 12.00 24.00 288.00
25mm dia PVC bends ELEC-1.2.10(b) Each 12.00 7.00 84.00
Page 68 of 139

Cost of cement Kg 50.00 4.70 235.00


b) Labour charges :
Skilled Electrician, Sl. No.5 of I&CAD Day 2.00 540.00 1080.00
Semi skilled Electrician Day 2.00 450.00 900.00
Helpers (electrical)as per Mazdoor Day 2.00 425.00 850.00
Mason 1st class 2.00 470.00 940.00
over heads and contractor profit 11.765% 11.765% 6837.00 804.37
BasicCost for 100 RM 7641.37
Basic Rate per 1 RM 76.41
1.11765 Area Allowance on labour with profit 0% 37.70 0.00
Rate per 1 RM 76.41
111 Supply and Fixing of 20 mm dia 1.5mm thick PVC pipe (ISI MARK) medium grade, FRLS with IS:9537 part 3
rigid PVC pipe Makes : Sudhakar / Finolex / Modi / VIP / Precision / Universal /
Million Plast or equivalent concealed in roof slab for wiring with all required accessories and labour charges
etc., complete as per the directions of the Engineer in charge for the finished item of work.
As per Index Code BLD-ELEC-1-4.1(b)
Taking Output = 100 M
a)
a) Material
20mm dia 1.5mm thick PVC pipes ELEC-1.2.2.a 100.00 18.00 1800.00

20 mm dia 1,2,3,4 way junction boxes ELEC-1.2.9.a 12.00 21.00 252.00


20mm dia PVC bends ELEC-1.2.10.a Rm 12.00 5.00 60.00
b) Labour charges :
Skilled Electrician, Sl. No.5 of I&CAD Day 2.00 540.00 1080.00
Semi skilled Electrician Day 2.00 450.00 900.00
Helpers (electrical)as per Mazdoor Day 2.00 425.00 850.00
over heads and contractor profit 11.765% 11.765% 4942.00 581.43
BasicCost for 100 RM 5523.43
Basic Rate per 1 RM 55.23
1.11765 Area Allowance on labour with profit 0% 28.30 0.00
Rate per 1 RM 55.23

111 Supply and Fixing of 20 mm dia 1.5mm thick PVC pipe (ISI MARK) medium grade, FRLS with IS:9537 part 3
rigid PVC pipe Makes : Sudhakar / Finolex / Modi / VIP / Precision / Universal /
Million Plast or equivalent concealed in wall for wiring with all required accessories and labour charges etc.,
complete as per the directions of the Engineer in charge for the finished item of work.
As per Index Code BLD-ELEC-1-4.1(b)
Taking Output = 100 M
a)
a) Material
20mm dia 1.5mm thick PVC pipes ELEC-1.2.2.a 100.00 18.00 1800.00
U' Nails ELEC-9.1.4 Each 200.00 0.30 60.00
20 mm dia 1,2,3,4 way junction boxes ELEC-1.2.9.a 12.00 21.00 252.00
20mm dia PVC bends ELEC-1.2.10.a Rm 12.00 5.00 60.00
Cost of cement Kg 50.00 4.70 235.00
b) Labour charges :
Skilled Electrician, Sl. No.5 of I&CAD Day 2.00 540.00 1080.00
Semi skilled Electrician Day 2.00 450.00 900.00
Helpers (electrical)as per Mazdoor Day 2.00 425.00 850.00
Mason 1st class 2.00 470.00 940.00
over heads and contractor profit 11.765% 11.765% 6177.00 726.72
BasicCost for 100 RM 6903.72
Basic Rate per 1 RM 69.04
1.11765 Area Allowance on labour with profit 0% 37.70 0.00
Rate per 1 RM 69.04

111 Supply and run of service wire of 10 Sqmm WPTC (Weather proof twin core) ISI aluminium wire of makes
Polycab / GM / Million / V-Guard / Gold Medal or equivalent make including giving connections and
labour charges and cost of materials complete as directed by the Engineer-in-charge for the finished item of
work at all levels of building.

As per Index
Considering for a length of 1RM
a)
a) Material
cost of 10 sqmm WPTC Supply of 10 Sqmm ELEC-1.6.2.b 100.00 33.87 3387.00

b) Labour charges :
10% Above rate Each 0.10 3387.00 338.70
over heads and contractor profit 11.765% 11.765% 3725.70 438.33
BasicCost for 100 RM 4164.03
Basic Rate per 1 RM 41.64
1.11765 Area Allowance on labour with profit 0% 3.39 0.00
Rate per 1 RM 41.64
Page 69 of 139

111 Supply and Laying of P.V.C casing and caping (Modi make or equivalent )(ISI MARK) with double locking
arrangments with groover trunking of size not below 12.5mm height for the following sizes with all
accessories, duly sealed at points and erected on Wall / Ceiling including cost of all materials and labour
charges complete.
As per Index Code BLD-ELEC-1-5 and Specification Nos. 1.5.1,1.5.2 and 1.5.3
Taking Output = 100 M
a) 19mm / 20mm x 12.5 mm height
a) Material
19mm / 20mm x 12.5 mm height Casing and Caping Rm 100.00 24.00 2400.00
ELEC-1.2.4.a
b) Labour charges :
Skilled Electrician, Sl. No.5 of I&CAD Day 1.00 540.00 540.00
Semi skilled Electrician Day 1.00 450.00 450.00
Helpers (electrical)as per Mazdoor Day 2.00 425.00 850.00
Sundries such as screws, Rawal Plugs, Gutting, Cement, LS 35.00
Sand and Rounding
over heads off. profit 11.765%
and contractor 11.765% 4275.00 502.95
BasicCost for 100 RM 4777.95
Basic Rate per 1 RM 47.78
1.11765 Area Allowance on labour with profit 0% 18.40 0.00
Rate per 1 RM 47.78

b) 25mm x 12.5mm height


a) Material
25mm x 12.5 mm height Casing and Caping 1 Rm 100.00 30.00 3000.00
ELEC-1.2.4.b
b) Labour charges :
Skilled Electrician, Sl. No.5 of I&CAD Day 1.00 540.00 540.00
Semi skilled Electrician Day 1.00 450.00 450.00
Helpers (electrical)as per Mazdoor Day 2.00 425.00 850.00
Sundries such as screws, Rawal Plugs, Gutting, Cement, LS 35.00
Sand and Rounding
over heads off. profit 11.765%
and contractor 11.765% 4875.00 573.54

Cost for 100 RM 5448.54


Basic Rate per 1 RM 54.49
1.11765 Area Allowance on labour with profit 0% 18.40 0.00
Rate per 1 RM 54.49

c) 32mm x 12.5 mm height


a) Material
32mm x 12.5 mm height Casing and Caping ELEC-1.2.4.c 1 Rm 100.00 34.00 3400.00

b) Labour charges :
Skilled Electrician, Sl. No.5 of I&CAD Day 1.00 540.00 540.00
Semi skilled Electrician Day 1.00 450.00 450.00
Helpers (electrical)as per Mazdoor Day 2.00 425.00 850.00
Sundries such as screws, Rawal Plugs, Gutting, Cement, LS 35.00
Sand and Rounding off.
over heads and contractor profit 11.765% 11.765% 5275.00 620.60
Cost for 100 RM 5895.60
Basic Rate per 1 RM 58.96
1.12 Area Allowance on labour with profit 0% 18.40 0.00
Rate per 1 RM 58.96

112 Wiring with 2 runs of 22/0.30(1.5 M2m) Fire Retardant (FR) P.V.C. insulated flexible copper cable (ISI MARK) (Finolex /
RR kabel / Havells / APAR EBXL / KEI / L&T / VGuard make) in existing pipe with 6A Modular switch (Legrand
Arteor / Schneider Zen celo / Honeywell Blenge Plus / Cabtree Amare / Logus Platina.make, Ceiling rose (Anchor
make), Hot dip galvanizes metal (Modular) control box (Legrand Arteor / Schneider Zen celo / Honeywell Blenge Plus /
Cabtree Amare / Logus Platina) and 6 Modular cover frame (Legrand Myrius /Million Tap-Wood / Gold Medal
Curve /Anchor Roma viola / GM Four-Five / Salzar / Stanjo Amron / Havells Fabio / C&S / Benlo make) including all
labour charges etc., complete for light, bell, fan and exhaust fan points in Non-Residential Buildings.

As per Index Code BLD-ELEC-2.1 and Specification Nos. 2.1.1

Taking Output = 6 Points


a) Material
22/0.30 (1.5Sqmm) FR PVC copper wire Finolex make 100RM 100.00 1482.00 1482.00
ELEC-1-5-1.b
Supply of 6A / 10A 1 Way 1 Module Modular Switch each 6.00 59.00 354.00
ELEC-1.9.2.a
3 Plate Jumbo Ceiling Rose,ELEC-1.7.1.m each 6.00 19.00 114.00

6 module Hot dip galvanizes metal box (Modular), ELEC- each 1.00 122.00 122.00
1.3.1.d
Supply of 6 Modular Cover Frame, ELEC-1.3.3.d each 1.00 101.00 101.00
b) Labour charges :
Skilled Electrician, Sl. No.5 of I&CAD Day 0.60 540.00 324.00

Semi skilled Electrician Day 1.20 450.00 540.00


Page 70 of 139

Helpers (electrical)as per Mazdoor Day 0.60 425.00 255.00


over heads and contractor profit 11.765% 11.765% 3292.00 387.30
Cost for 6 Points 3679.30
Basic Rate per Point 613.22
1.11765 Area Allowance on labour with profit 0% 186.50 0.00
Rate per one Point Rs. 613.22
113 Supply and fixing of 6A/10A 3/2 pin modular socket of (Legrand Arteor / Schneider Zen celo / Honeywell Blenge Plus /
Cabtree Amare / Logus Platina) etc with 6A modular switch control of same make on a common switch board with earth
continuity including wire leads, earth connections along with all labour charges etc., complete as per the directions of the
Engineer in charge at site.
As per BLD-ELEC-2.1.4
Taking Output = each
a) Material
Supply of 6A / 10A 3/2 Pin 2 Module Modular Socket each 1.00 87.00 87.00
with shutter. ELEC-1.9.2.d
Supply of 6A / 10A 1 Way 1 Module Modular Switch, each 1.00 59.00 59.00
ELEC-1.9.2.a
b) Labour charges :
Skilled Electrician, Sl. No.5 of I&CAD day 0.067 540.00 36.18
Helpers (electrical)as per Mazdoor day 0.067 425.00 28.48
over heads and contractor profit 11.765% 11.765% 210.66 24.78
Basic Rate per each 235.44

1.11765 Area Allowance on labour with profit 0% 64.66 0.00


Rate per Each 235.44
114 Supply and fixing of 16A /6 A, 1 way 2 Module Combi Socket with indicator lamp /fuse unit of (Legrand Arteor /
Schneider Zen celo / Honeywell Blenge Plus / Cabtree Amare / Logus Platina.) etc with 16A modular switch control
(same make.)on a common switch board with earth continuity including wire leads, earth connections along with all
labour charges etc., complete as per the directions of the Engineer in charge at site.
As per BLD-ELEC-2.1.5
Taking Output = each
a) Material
Supply of 16A/6A 1 way 2 Module Combi Socket each 1.00 126.00 126.00
Modular Socket with shutter, ELEC-1.9.2.l
Supply of 16A / 20A 1 Way 1 Module Modular Switch, each 1.00 78.00 78.00
ELEC-1.9.2.h
b) Labour charges :
Skilled Electrician, Sl. No.5 of I&CAD day 0.10 540.00 54.00

Helpers (electrical)as per Mazdoor day 0.10 425.00 42.50

over heads and contractor profit 11.765% 11.765% 300.50 35.35

Rate per Each 335.85


1.11765 d) Area Allowance on labour including profit 0% 96.50 0.00
Rate per Each 335.85
114 a) Supply and fixing of 20A SP plug and socket (Legrand/Schindler make) for air conditioners including earth
connection all labour charges, complete for finished item of work.

Taking Output = each As per Index Code BLD-ELEC-2.1 and


Specification Nos. 2.1.5
a) Material
20A SP plug and socket as per ELEC-2.16.8.a each 1.00 941.00 941.00
b) Labour charges :
Skilled Electrician, Sl. No.5 of I&CAD day 0.10 540.00 54.00
Helpers (electrical)as per Mazdoor day 0.10 425.00 42.50
over heads and contractor profit 11.765% 11.765% 1037.50 122.06
Rate per Each 1159.56
1.11765 d) Area Allowance on labour including profit 0% 96.50 0.00
Rate per Each 1159.56

115 Supply and fixing of HID / batten holder / slanting holder (Wipro/G.E./Phillips) in lieu of ceiling rose of
light point complete with all connections and all labour charges with 36 W CFL lamp (Phillips / Crompton /
Bajaj / Surya / Havells / HPL / Halonix) (for new installation).
(Specf.No.2.1.7)
Taking Output = each As per Index Code BLD-ELEC-2.1 and
a) Material Specification Nos. 2.1.7
HID / batten holder ELEC-3.6.13 each 1.00 43.00 43.00
36W energy saving CFL bulb ELEC-3.7.7.f each 1.00 120.00 120.00
b) Labour charges :
Skilled Electrician, Sl. No.5 of I&CAD day 0.05 540.00 27.00
Helpers (electrical)as per Mazdoor day 0.05 425.00 21.25
over heads and contractor profit 11.765% 11.765% 211.25 24.85
Rate per Each 236.10

1.11765 d) Area Allowance on labour including profit 0% 48.25 0.00


Rate per Each 236.10
Page 71 of 139

116 Supply and fixing of 12" (300mm) sweep heavy duty exhaust fan (Crompton / Almounard / Havells Turbo
Force make) including cost and conveyance of all fixtures, fittings, labour for fixing in wall with necessary
connections at all positions of building complete as directed by the Engineer in charge for the finished item
of work at all levels of building.

Taking Output = each (Specf.No.9.7.36)Pg.225 of Data Book


a) Material
12" (300mm) sweep heavy duty exhaust fan (Crompton No 1.00 2829.00 2829.00
make) ELEC-5.1.10.a
23/0060 Twin flat wire ELEC-1.5.4, of Elect.. SSR 100 M 1.00 953.00 9.53
b) Labour charges.
Skilled Electrician, Sl. No.5 of I&CAD day 0.25 540.00 135.00
Helpers (electrical)as per Mazdoor day 0.25 425.00 106.25
Sundries such as Sand, Bolt, Nuts etc., 25.00
over heads and contractor profit 11.765% 11.765% 3104.78 365.28
Rate per Each 3470.06
1.11765 d) Area Allowance on labour including profit 0% 241.25 0.00
Rate per Each 3470.06

117 Supply and fixing of 1200mm(48") 230V, AC, 50Hz ceiling fan 5 star rated with 3 blades and double ball
bearings of standard make (Crompton High Speed Decora / Bajaj Regal star / Havells Fusion 50 / Orient
Summer Crown / Usha technix decorative) with suitable down rod covered with flexible pipe, Stepped type
heavy duty electronic regulator (Anchor make) with all standard accessories including cost of all fittings and
fixtures, labour for fixing at all positions of building giving electrical connections with necessary tools
complete as directed by the Engineer in charge for finished item of work.

Taking Output = each (Specf.No.9.7.2, 9.7.35 & 9.7.25)


Data Pg.154,155 of Data Book
a) Material
1200 mm (48") Ceiling Fan 5 star rated ELEC-5.1.3 1 No 1.00 2432.00 2432.00

Transportation Charges on Unit Cost 14.00


19/20mm steel tube down fan rod with bolts & nuts for 1 No 1.00 83.00 83.00
fan with matching colour ELEC-9.1.21

23/0060 Twin flat wire ELEC-1.6.8 , of Elect.. SSR 100 M 1.00 953.00 9.53
Cost of Regulator (Anchor) ELEC-1.7.1.l 1 No 1.00 200.00 200.00

Unforseen item works, such as painting to down rod, LS 25.00


screws etc.,
b) Labour charges.
Skilled Electrician, Sl. No.5 of I&CAD day 0.125 540.00 67.50

Helpers (electrical)as per Mazdoor day 0.225 425.00 95.63


over heads and contractor profit 11.765% 11.765% 2926.66 344.32
Rate per Each 3270.98
1.11765 d) Area Allowance on labour including profit 0% 163.13 0.00
Rate per Each 3270.98

118 Supply and fixing of 1 x 28W Box type powder coated energy conserving tube light luminaire with Electronic
ballast operating voltage range of 90 volts to 350 volts power factor > 0.98 current less than 130ma crest factor
and total hormonic distortion shall be as per IS Specification with auto cut off at high voltage suitable for
36/40W tube with 5 years guarantee for luminaire. Makes: Trinic or its equivalent with all accessories
including giving connections, all labour charges and cost of materials complete as directed by the Engineer in
charge for the finished item of work.

Taking Output = each (Specf.No.8.2.2 & 7.9.3)Data Pg.144,142 of Data


book
a) Material
1 x 28W surface pendent mounting T5 ELEC-3.8.1 each 1.00 806.00 806.00
Sundries and rounding off
23/0060 Twin flat wire ELEC-1.5.4, of Elect.. SSR 100 M 1.00 953.00 9.53
screws with rawal plugs ELEC-9.1.2 each 2.00 0.31 0.62
T.W round blocks ELEC-9.1.29 each 2.00 8.00 16.00

b) Labour charges

Skilled Electrician, Sl. No.5 of I&CAD day 0.10 540.00 54.00


Helpers (electrical)as per Mazdoor day 0.10 425.00 42.50
over heads and contractor profit 11.765% 11.765% 928.65 109.26
Rate per Each 1037.91
1.11765 d) Area Allowance on labour including profit 0% 96.50 0.00
Rate per Each 1037.91

119 Supply and fixing of 2 X 36/40 Box type tube light luminaire powder coated CRCA sheet steel housing with
2 Nos Electronic Ballast Chokes and all standard accessories of makes (Wipro / GE Venture / Phillips /
Crompton / Bajaj) and 2 Nos 36/40W tube ( Phillips / Crompton / Bajaj / Surya make) on Teak Wood Block
on ceiling or wall with all accessories including giving connections, all labour charges and cost of materials
complete as directed by the Engineer in charge for the finished item of work.

Taking Output = each (Specf.No.8.2.3 & 7.9.3)


a) Material Data Pg.144,142 of Data book
Page 72 of 139

2x36/40 box type T.L fitting ELEC-3.6.3.b each 1.00 978.00 978.00

36/40W fluorescent tube ELEC-3.7.4 each 2.00 40.00 80.00


Sundries and rounding off
23/0060 Twin flat wire ELEC-1.5.4, of Elect.. SSR 100 M 1.00 953.00 9.53
screws with rawal plugs ELEC-9.1.2 each 2.00 0.31 0.62
PVC round blocks ELEC-9.1.29 each 2.00 8.00 16.00
b) Labour charges day
Skilled Electrician, Sl. No.5 of I&CAD 0.10 540.00 54.00
Helpers (electrical)as per Mazdoor 0.10 425.00 42.50
over heads and contractor profit 11.765% 11.765% 1180.65 138.90
Rate per Each 1319.55
1.11765 d) Area Allowance on labour including profit 0% 96.50 0.00
Rate per Each 1319.55
121 Supply and Run of 4 of 56/0.30 (4.0Sq mm) FR PVC insulated flexible Copper Cable (Makes: Finolex / RR
kabel / Havells / APAR EBXL / KEI / L&T / VGuard) in PVC pipe including giving connections, all labour
charges and cost of materials complete as directed by the Engineer in charge for the finished item of work at
all levels of building from AC distribution board to Power DB.

Consider for a length of 100RM Data Pg.108 of Data book(Specf.No.3.1.4)


a) Material for fixing
56/0.30 (4.0Sqmm) FR PVC copper wire of Finolex / RR 100 RM 200.00 3650.00 7300.00
kabel / Havells / APAR EBXL / KEI / L&T / Vguard
ELEC-1-5-1.d
b) Labour charges taken as two times of run of 2 of
56/0.30(4.0Sqmm)
Skilled Electrician, Sl. No.5 of I&CAD 1 Day 2.00 540.00 1080.00
Semi skilled Electrician 1 Day 6.00 450.00 2700.00
Helpers (electrical)as per Mazdoor 1 Day 2.00 425.00 850.00
over heads and contractor profit 11.765% 11.765% 11930.00 1403.56
Rate per100 RM 13333.56
Rate per 1 RM 133.34
1.11765 d) Area Allowance on labour including profit 0% 46.30 0.00

Rate per 1 RM 133.34

122 Supply and fixing of 4 Way SPN DB with IP 20 Protection as per IS:13032 and suitable for 4Nos S.P out goings
and for 1 No Incommer etc complete of makes Legrand / Schneider / Siemens / L&T / Cabtree Xpro make)
with IP-20 protection suitable for single phase ELCB/RCCB/DP Isolator (Legrand-DX3 / Schneider-Acti9 /
Siemens / L&T Exora /Cabtree) as incomer and 10KA SP MCBs (Legrand-DX3 / Schneider-Acti9 / Siemens /
L&T Exora /Cabtree) as out-going including internal connection and labour charges and cost of materials
complete as directed by the Engineer in charge for the finished item of work at all levels of building for
surface/flush mounting.

Out put 1 RM (Specf.No.4.4.1A) Data Pg.180 of Data book


a) Material for fixing
Cost of 4 way SPN IP 20 protection suitable for single Each 1.00 794.00 794.00
phase ELCB/RCCB/DP Islator as incomer ELEC-2.15.1.a

40A, DP Isolator/ELCB/RCCB ELEC-2.14.1.b Each 1.00 351.00 351.00


10 KA-6-32 A range SP_ MCBs ELEC-2.13.1.a Each 4.00 193.00 772.00
b) Labour charges for fixing connections
Skilled Electrician, Sl. No.5 of I&CAD Day 0.50 540.00 270.00
Semi skilled Electrician Day 0.50 450.00 225.00 0.50
Helpers (electrical)as per Mazdoor Day 1.00 425.00 425.00
Sundries such as TW plugs, screws, cement.
over heads and contractor profit 11.765% 11.765% 2837.00 333.77
Rate per Each 3170.77
1.11765 d) Area Allowance on labour including profit 0% 920.00 0.00
Rate per 1 No 3170.77

122 Supply and fixing of 8 Way SPN DB with IP 20 Protection as per IS:13032 and suitable for 6 Nos S.P out
goings and for 1 No Incommer etc complete of makes Legrand / Schneider / Siemens / L&T / Cabtree Xpro.
make) with IP-20 protection suitable for single phase ELCB/RCCB/DP Isolator (Legrand-DX3 / Schneider-
Acti9 / Siemens / L&T Exora /Cabtree) as incomer and 10KA SP MCBs (Legrand-DX3 / Schneider-Acti9 /
Siemens / L&T Exora /Cabtree as out-going including internal connection and labour charges and cost of
materials complete as directed by the Engineer in charge for the finished item of work at all levels of building
for surface/flush mounting.

Out put 1 RM (Specf.No.4.4.1B) Data Pg.180 of Data book


a) Material for fixing
Cost of 8 way SPN IP 20 protection suitable for single Each 1.00 919.00 919.00
phase ELCB/RCCB/DP Islator as incomer ELEC-2.15.1.c

40A, DP Isolator/ELCB/RCCB ELEC-2.14.1.b Each 1.00 351.00 351.00


10 KA-6-32 A range SP_ MCBs ELEC-2.13.1.a Each 6.00 193.00 1158.00 6.00
b) Labour charges for fixing connections
Page 73 of 139

Skilled Electrician, Sl. No.5 of I&CAD Day 0.50 540.00 270.00


Semi skilled Electrician Day 0.50 450.00 225.00
Helpers (electrical)as per Mazdoor Day 1.00 425.00 425.00
Sundries such as TW plugs, screws, cement.
over heads and contractor profit 11.765% 11.765% 3348.00 393.89
Rate per Each 3741.89
1.11765 d) Area Allowance on labour including profit 0% 920.00 0.00

Rate per 1 No 3741.89

123 Supply and Run 4 of 84/0.30 (6.0Sqmm) FR PVC insulated flexible Copper cable (Makes: Finolex / RR kabel /
Havells / APAR EBXL / KEI / L&T / VGuard) in existing pipe for run of Mains from AC panel to 32Amps
Main switch as per colour code of wires including giving connections and labour charges and cost of
materials complete as directed by the Engineer in charge for the finished item of work at all levels of building.

Consider for a length of 100RM (Specf.No.3.1.5) Data Pg.169 of Data book


a) Material for fixing
Cost of 84/0.30 (6.0 Sqmm) FR PVC flexible copper wire 100 RM 400.00 5549.00 22196.00
ELEC-1-5-1.e
b) Labour charges taken as two times of run of 2 of
56/0.30(4.0Sqmm)
Skilled Electrician, Sl. No.5 of I&CAD Each 2.00 540.00 1080.00
Semi skilled Electrician Each 6.00 450.00 2700.00
Helpers (electrical)as per Mazdoor Day 2.00 425.00 850.00
over heads and contractor profit 11.765% 11.765% 26826.00
3156.08
Rate per 100 RM 29982.08
Basic Rate per 1 RM 299.82
1.11765 d) Area Allowance on labour including profit 0% 46.30 0.00
Rate per 1 RM 299.82
124 Run 2 of 56/0.30 (4.0Sqmm) FR PVC insulated flexible copper cable (Makes: Finolex / RR kabel / Havells /
APAR EBXL / KEI / L&T / VGuard) in existing pipe for run of Mains from Main switch to Distribution
board as per colour code of wires including giving connections and labour charges and cost of materials
complete as directed by the Engineer in charge for the finished item of work at all levels of building.

(Specf.No.3.1.5) Data Pg.169 of Data


Consider for a length of 100RM book
a) Material for fixing
56/0.30 (4.0Sqmm) FR PVC copper wire of finolex make 100 RM 200.00 3650.00 7300.00
ELEC-1-5-1.d
b) Labour charges

Skilled Electrician, Sl. No.5 of I&CAD Each 1.00 540.00 540.00

Semi skilled Electrician Each 3.00 450.00 1350.00

Helpers (electrical)as per Mazdoor Each 1.00 425.00 425.00


over heads and contractor profit 11.765% 11.765% 9615.00
1131.20
Basic Rate per 100 RM 10746.20
Basic Rate per 1 RM 107.46
1.11765 d) Area Allowance on labour including profit 0% 23.15 0.00
Rate per 1 RM 107.46

125 Run 2 of 36/0.30 (2.5 Sqmm) FR PVC insulated flexible Copper Cable (Makes: Finolex / RR kabel / Havells /
APAR EBXL / KEI / L&T / VGuard) in existing pipe for Mains from Distribution board to 15Amps 3 pin
Power Plug including giving connections and labour charges and cost of materials complete as directed by
the Engineer in charge for the finished item of work at all levels of building.

(Specf.No.3.1.4)Data Pg.168 of Data book


Consider for a length of 100RM
a) Material for fixing
Cost of 36/0.30 2.5 Sqmm flexible copper cable ELEC-1-5- 100 RM 200.00 2391.00 4782.00
1.c
b) Labour charges
Skilled Electrician, Sl. No.5 of I&CAD Each 0.67 540.00 361.80
Semi skilled Electrician Each 2.00 450.00 900.00
Helpers (electrical)as per Mazdoor Each 0.67 425.00 284.75

over heads and contractor profit 11.765% 11.765% 6328.55 744.55


Basic Rate per 100 RM 7073.10
Basic Rate per 1 RM 70.73
1.11765 d) Area Allowance on labour including profit 0% 15.47 0.00
Rate per 1 RM Rs. 70.73

126 Providing independent earthing by excavating a trench to a depth of 2.1m in all soils, as per size specified in
the data, using 40mm dia 'B' class GI pipe of 2.5m length with necessary accessories with hume pipe ring duly
providing staggered holes including filling with equal proportion of salt and charcoal in layers and including
giving connections and labour charges and cost of materials complete for small quarters as directed by the
Engineer in charge for the finished item of work at all levels of building.
Page 74 of 139

Data Pg.186 of Data book


Earthwork excavation in all types of soils including extra 1Cum 1.75 250.00 437.50
for narrow trench & pit and back filling with sand, coke,
salt and levelling. As per work item No ELEC-9.4.17

Cost of 40mm dia G.I. Pipe for bracket TBSP-G.I.11, of Blds 1.0 RM 2.50 420.00 1050.00
SSR
0.234 25x6mm (1"x1/4") GI flat duly drilled 12mm holes (4 Nos) 1NO 1.000 15.21 15.21
of 200mm (8") length ELEC-9.3.6 of SSR =
0.2*0.025*7.8*6 = 0.234
Drilling of 16Nos 12mm dia to GI pipe ELEC-9.4.18 16.00 6.00 96.00
GI Nuts, Bolts and washers ELEC-9.4.19 1set 4.00 12.00 48.00
18" dia 3" Hume pipe ring ELEC-9.4.21 1No. 1.00 300.00 300.00

Hard coke ELEC-9.1.10 Kg 40.00 20.00 800.00


salt ELEC-9.1.11 Kg 20.00 15.00 300.00
Labour for fixing pipe ring and connections
Semi skilled Electrician 1No 0.50 450.00 225.00
Helpers (electrical)as per Mazdoor 1No 0.50 425.00 212.50
over heads and contractor profit 11.765% 11.765% 3484.21 409.92
Basic Rate per 1No 3894.13
1.11765 d) Area Allowance on labour including profit 0% 437.50 0.00
Rate per 1 No. 3894.13

127 Supply and fixing in position 32A. Main Switch (Sputnik or equivalent make) and including giving
connections and labour charges and cost of materials complete as directed by the Engineer in charge for the
finished item of work at all levels of building.

Cost of switch as per Local market Rate Each 1.00 750.00 750.00

Add for fixing charges mrt L.S. 135.00 135.00


Rate per 1No 885.00

128 Supply and fixing of electronic rechargeable flouroscent 10 Watt (including tube) capacity (Crompton
Greeves, Bajaj or BPL make equipped with permanent battery for each fitting including cost of all materials
and labour charges complete for finidhed item of work as directed by the Engineer in charge at site.

Cost of rechargeable flouroscent fitting with tube MRT 1No 1.00 1000.00 1000.00

Basic Rate per 1No 1000.00

129 Supply and fixing of Well Glass Vapour proof and Resistant fitting with 60 Watts PC bulb (Philips, crompton ,
bajaj make)on walls in the battery room including giving connections, all labour charges and cost of
materials complete as directed by the Engineer in charge for the finished item of work.

Cost of Vapour proof resistant fitting with bulb (market Each 1.00 190.00 190.00
rate )
Labour charges for fixing mrt L.S. 35.00
Rate per 1No 225.00

130 Supply and fixing decorative portico type light fitting with all accessories to the ceiling of veranda including
giving connections, all labour charges and cost of materials complete as directed by the Engineer in charge for
the finished item of work.
Cost of decorative type light fitting with bulb mrt Each 1.00 300.00 300.00

Labour charges for fixing mrt L.S. 1.00 35.00 35.00


Rate per 1No 335.00

131 Supply & installation of 1.5 TR 4 Star capable of delivering 18000 BTU/hr and above with operating on
refrigerant R-32 / R-410 (Makes : O General / Daikin / Toshibha) INVERTER Model Cool type split AC unit
with high wall mounted Single Split indoor unit and outdoor condencing unit Hermetically sealed
compressor suitable for operation on 230V, 50Hz, 1Phase AC supply capable of performing Heat cool
dehumidifying air circulating and filtering with cooling and condensing units with 3.5 mts of copper piping,
insulation kit and 4 mts of 4 core copper flexible chord (Voltage range 160- 264 volts) and cordless remote
control including all labour charges and cost of materials complete as directed by the Engineer in charge for
the finished item of work.

A) Material
1.5 TR 4 Star INVERTER SPLIT AC UNITS, ELEC -6.2.1.b 1.00 44200.00 44200.00

for installation charges ELEC-6.5.28 No 1.00 1530.00 1530.00


over heads and contractor profit 11.765% 11.765% 45730.00 5380.13
Rate per 1No 51110.13
Page 75 of 139

116 Supply and fixing of 400W MH Flood light luminaire with Non- integral weather proof diecast aluminium
housing with IP66 protection with control gear box (of make Wipro / G.E. Venture / Phillips / Bajaj /
Crompton / Surya /Halonix) with 400W MH Lamp )of make Phillips / Osram / Crompton / Bajaj / Surya /
HPL / Havells /Halonix) with 16A flush type Swich (of make GM G Home / Gold Medal Olive / Million
Zoom / Anchor Penta Cherry / Great white Omega / HPL / Vimal / CPL) including cost of all materials and
labour charges etc. complete as directed by the Engineer in charge for the finished item of work at all levels of
building.

Taking Output = each (Specf.No.9.7.36)Pg.225 of Data Book


a) Material
400W MH Flood light luminaire ELEC-3.1.1.a Each 1.00 5438.00 5438.00
400W MH Lamp ELEC-3.4.1.l Each 1.00 1301.00 1301.00
supply of 16A flush type Swich ELEC-1.7.1.h Each 1.00 59.00 59.00
HIRE CHARGES FOR CENTERING & SCAFFOLDING - 350.00
Unsupported Height
Labour charges upto
towards 7.32 (LS)
fixing M 100.00
over heads and contractor profit 11.765% 11.765% 6798.00 799.78
Rate per Each 8047.78
1.11765 d) Area Allowance on labour including profit 0% 100.00 0.00
Rate per Each 8047.78

132 Supplying &fixing of 600mm dia RCC Hume pipe for culvert with RCC plain ended pipe & collars required
confirming to BIS 458/2003 NP2 class including cost & conveyance of all materials, labour charges complete
for finished item of work as per the directions of the Engineer-in-charge.

Consider a length of 7.5mt Data as per RBR- PCVT-3 C


600mm dia
a) Labour
Mason 1st class day 0.12 470.00 56.40

Mazdoor(Unskilled) day 1.00 425.00 425.00


b) Material
RCC pipe 600 mm dia -NP2 class table 1 of PH ssr RM 7.50 1190.00 8925.00
coller 600 mm dia table 2 SSR PH each 2.00 339.00 678.00
sand at site cum 0.019 667.00 12.81
Cement at site MT 0.014 4700.00 67.68
over heads and contractor profit 11.765% 0.11765 10164.89 1195.90
Total for 7.50m length 11360.79
Total for 1.0m length 1514.77
Conveyance of RCC pipe rm 1.00 126.64 126.64
Conveyance charges of sand cum 0.0026 946.85 2.424

Conveyance charges of Cement cum 0.00192 0.08 0.00014

1.11765 Area allowance on labour 0% 64.19 0.00

RATE per 1.0 RM of cable duct Rs. 1643.83

RBR- Construction of Granular sub-base/base/surface course with good gravel/ morrum (Table 400.13) by mix in
SBBS-12 place method normal construction of granular sub-base by providing good gravel / morrum spreading in
uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once
and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per
Technical Specification Clause 408 MORD.

i Using naturally occurring gravel


Unit = cum
Taking output = 300 cum
a)  Labour
Mate day -
Mazdoor (Skilled) day 2.480 425.00 1054.00
Mazdoor (Unskilled) day 10.000 425.00 4250.00
b) Machinery

540.3 Motor grader 110 HP 50 cum per hour (Motor grader for hour 1.500 3601.92 5402.88
grading @ 200 cum per hour ( As per the nature of work
in AP Transco 1/4 th componene wsa taken) S.No.3/Pg
no23 R&B SSR
7413 Three wheel 80-100 kN static roller @10 cum per hour hour 30.000 1342.30 40269.00

567.12 Tractor with rotavator 25 cum per hour hour 12.000 472.64 5671.68

965.5 Water tanker 6 kl capacity hour 5.000 698.88 3494.40


c) Material
Naturally occurring gravel (Local materials as per Table cum 384.000 98.00 37632.00
400.13)
Water kl 30.000 73.00 2190.00
Cost for 300 cum = a+b+c+d+e 99963.96
Rate per cum = a+b+c+d+e/300 333.21

1.11765 Add Area Allowance 0.0% 49.30 0


Conveyance charges of gravel with profit cum 1.280 157.55 201.664
Conveyance charges of water KL 0.100 20.50 2.05
Add Contractors Profit 11.765% 333.21 39.2
Rate per Cum 576.13
Page 76 of 139

27 Providing crushed run stone aggregate grading conforming to table 400.20 depositing on a prepared surface
by hauling vehicles, spreading and mixing with a motor grader, watering and compacting with a three wheel
80-100 kN static roller as per Technical Specification Clause 411MORD/ 410 MORTH to form a layer of sub-
base/base

A By mix-in-place method RBR-SBBS-18, Sl.No.17,pg.342


ii With 53 mm maximum size of aggregates
Unit = cum
Taking output = 360 cum
a)  Labour
Mate DAY
Mazdoor (Skilled) day 2.48 425.00 1054.00
Mazdoor (Unskilled) DAY 10 425.00
4250.00
b) Machinery
567.12 Tractor attached with rotavator @ 25 cum / 30 cum per hour 12 472.64 5671.68
hour[as per roads][s.no.12, SSR
540.3 Motor-Grader 110 H.P(As per the nature of work in TS hour 1.5 3601.92 5402.88
Transco 1/4 th componene was taken)-[S.no.3 R&B SSR-]
Page 77 of 139

8895.6 Three wheel 80-100 kN static roller @ 10 cum /hour [R&B hour 36 1342.30 48322.80
SSR 15-16-s.no.8,pg.28,as per roads]
1158.6 Water tanker 6 kl capacity [ as per roads-] R&B ssr sl. No. hour 6 698.88 4193.28
10,
c) Material
Aggregate at site
For 53 mm maximum size
63 mm to 45 mm @ 33 per cent cum 157.46 642.00 101089.32
22.5 mm to 5.6 mm @ 32 per cent cum 151.06 883.25 133423.75
Below 5.6 mm @ 35 per cent cum 116.68 673.25 78554.81
Water kl 36.00 73.0000
2628.00
Cost for 360 cum = a+b+c+d+e (3 Wheel Roller) 384590.52
Rate per cum = (a+b+c+d+e)/360 1068.31
over heads and contractor profit 11.765% 11.765% 1068.31 125.69
1.11765 Area Allowance on labour with profit 0% 45.74 0.00
conveyance of 63mm t0 45mm with profit cum 0.44 468.10 204.74
conveyance of 22.5 mm to 5.6mm with profit cum 0.42 468.10 196.42
conveyance of below 5.6mm with profit cum 0.32 468.10 151.72
conveyance of Water with profit Kl 0.10 20.50 2.05
Rate per 1cum Rs. 1748.92

Filling arround the foundations if required where ever necessary with excavated earth as per the standard
specifications of APDSS in uniform horizontal layers (0.15) including conveyance of all materials, watering
and ramming, tools & tackles, all labour charges, all leads & lifts etc, complete for finished item of work as per
the directions of the Engineer-in-charge.

iia with excavated earth


Unit = cum for 6 cum
a)  Labour
Mate day -
Mazdoor (Unskilled) day 0.31 425.00 131.75
basic rate per /1cum 21.96
Water (M-189) vide P.No.41 of Irg SSR 2015-16 kl 0.72 73.00 52.56
over heads and contractor profit 11.765% 11.765% 184.31 21.68
Rate per 6 cum =( a+b+c+d) 205.99
Rate per cum =( a+b+c+d)/6 34.33
e) Water conveyance charges 0.12 20.50 2.46
1.11765 f) uniform area allowances on labour including profit & 0% 21.96 0.00
O.H charges Rate/1cum 36.79

138 Supplying &fixing of 450mm dia RCC Hume pipe for culvert with RCC plain ended pipe & collars required
confirming to BIS 458/2003 NP2 class including cost & conveyance of all materials, labour charges complete
for finished item of work as per the directions of the Engineer-in-charge.

Consider a length of 7.5mt Data as per RBR- PCVT-3 C


450 mm dia
a) Labour
Mate day
Mason 1st class day 0.10 470.00 45.12
Mazdoor(Unskilled) day 0.80 425.00 340.00
b) Material
RCC pipe 450 mm dia - NP2 class table1 of SSR PH RM 7.50 730.00 5475.00
coller 450 mm Dia table 2 SSR PH each 2.00 219.00 438.00
sand at site cum 0.015 667.00 10.25
Cement at site MT 0.012 4700.00 54.14
over heads and contractor profit 11.765% 0.11765 6362.51 748.55
Total for 7.50m length 7111.06
Total for 1.0m length 948.14
Conveyance of RCC pipe rm 1.00 34.51 34.51
Conveyance charges of sand cum 0.0020 946.85 1.939

Conveyance charges of Cement cum 0.00154 0.08 0.00012

1.11765 Area allowance on labour 0% 51.35 0.00


RATE per 1.0 RM of cable duct Rs. 984.59

13 13 Supply and fixing of 110 lb rail pole conforming to Indian Railway specification and fixing on Transformer plinth
including the cost of all labour, materials, equipment fixing bolts, base plates etc. but excluding the cost of excavation,
concrete, reinforcement, shuttering and guide angles as per specification and approved drawings (top of rail shall flush
with top of concrete) complete as approved and directed by the Engineer in - charge at site.

Data Sl.No.34, Pg.28 of Bld. items


Unit = 1m
(a) Material
Structural Steel including wastage Kg 52.000 45.00 2340.00
(b) Labour for cutting, bending, shifting to site, tying and Kg
placing in position
Fabrication Charges (50%) TBSC-T.I-18 52.000 13.00 676.00
Erection charges (50%) TBSC-T.I-19 Kg 52.000 11.50 598.00
e & f ) Overheads & Contractors Profit on A to B 11.765% 3614.00 425.19
Page 78 of 139

d) Steel conveyance charges 52.000 0.09 4.71


1.11765 F) uniform area allowances on labour including 1.11765% 0% 936.00 0.00
profit & O.H charges (50% of fab + 100% erec)

Rate per 1. RM 4043.89


Rate per 1. MT 77767.18

2 Supply and fixing Hot dipped Galvanized Iron Chain link mesh 8 gauge -(4.0 mm) as per IS: 2721-1979 - PVC Coated -
3"x3" (76mm x 76 mm) - 8 Gauge, size width of the chain link 2000mm . To be fixed to the post at the top and bottom of
the fence by welding/ fixing 50x6mm MS flat on top and bottom both sides all through its length including cost and
conveyace of all materials, labour charges, leads & lifts etc., for finished item of work as approved and directed by the
Engineer-in charge at site.(excluding cost of MS Flat & its accessories)
Unit: 4.00 Sqm
a) Material
Hot dipped Galvanized Iron Chain link mesh 8 1 Sqm 4.200 428.00 1797.60
gauge - (4.0 mm) as per IS: 2721-1979 - PVC
Coated - 3"x3" (76 mm x 76 mm) - 8 Gauge TBSC-E.II-10

Cleats, bolts for fixing to the post sqm 4.000 25.00 100.00
b) Labour charges
Labour charges for Fixing of chain link fence LMR sqm 4.000 50.00 200.00
over heads and contractor profit 11.765% Total 11.765% 2097.60 246.78
Rate for 4 Sqm 2344.38
Rate/1 sqm Rs. 586.10
Page 79 of 139

16 Removal of boulders (surfaced/ embedded) with hydraulic excavator including cutting and loading in
tippers. The rate includes labour charges, cost of tools and tackles, disposing of unuseful materail at all leads
and lifts, complete for finished item of work as per directions of the Engineer-in-charge

A) Materials: Nil RBR-EECD-8(i)-C(iii)


Unit = cum Taking output =240cum
B)  Machinery:
L.C. 1544.40 Hydraulic Excavator 0.9 cum bucket capacity @ 60 cum hr 6.00 2967.90 17807.40
per hour Sl.No.4 (Hire Chgs), of R&B SSR 2017-18

3089.60 Tipper 5 cum capacity (1No) Sl.No.54 4 trips per hour Hour 16.000 1004.40 16070.40

Total hire charges of Machinery 33877.80


B)  Labour:
Mazdoor Hour 2.080 425.00 884.00
Total cost of Labour 884.00
Total 34761.80
over heads and contractor profit 11.765% 11.765% 34761.80 4089.73
Total cost of 240 cum Rs. 38851.53
Rate/Cum 161.88
1.11765 f) area allowances on labour including profit & O.H charges 0% 22.99 0.00

Rate/Cum 161.88
Conditi Activity Service Short Text AMOUNT Conditi Unit of Pricin
on number on measu g unit
Type currenc re
y
ZSSR S00001 Labour-Bar Bender 565.00 INR D 1 S.No.I-1
ZSSR S00002 Labour-Black smith 470.00 INR D 1 S.No.I-2
ZSSR S00003 Labour-Blaster (Licensed) 565.00 INR D 1 S.No.I-3
ZSSR S00004 Labour-Carpenter-1st class 565.00 INR D 1 S.No.I-4
ZSSR S00005 Labour-Fitter Cl- I 540.00 INR D 1 S.No.I-6
ZSSR S00006 Labour-Mason 1st class 470.00 INR D 1 S.No.I-11
ZSSR S00007 Labour-Operator Concrete 500.00 INR D 1 S.No.I-16
ZSSR S00008 Labour-Driller 540.00 INR D 1 S.No.I-19
ZSSR S00009 Labour-Operator Grouting 500.00 INR D 1 S.No.I-22
ZSSR S00010 Labour-Operator Road roller 540.00 INR D 1 S.No.I-27
ZSSR S00011 Labour-Concrete vibrator 500.00 INR D 1 S.No.I-32
ZSSR S00012 Labour-Painter 1st class 540.00 INR D 1 S.No.I-35
ZSSR S00013 Labour-Welder 500.00 INR D 1 S.No.I-41
ZSSR S00014 Labour-Carpenter-2nd class 450.00 INR D 1 S.No.II-4
ZSSR S00015 Labour-Crowbarman 450.00 INR D 1 S.No.II-8
ZSSR S00016 Labour-Helper Batching plant 450.00 INR D 1 S.No.II-13
ZSSR S00017 Labour-Helper Blasting 450.00 INR D 1 S.No.II-14
ZSSR S00018 Labour-Mason 2nd class 450.00 INR D 1 S.No.II-35
ZSSR S00019 Labour-Painter 2nd class 450.00 INR D 1 S.No.II-37
ZSSR S00020 Labour-Stone breaker 450.00 INR D 1 S.No.II-40
ZSSR S00021 Labour-Man Mazdoor (Unskilled) 425.00 INR D 1 S.No.III-3
ZSSR S00022 Labour-Woman Mazdoor (Unskilled) 425.00 INR D 1 S.No.III-4
ZSSR S00023 Material-Binding wire 50.00 INR KG 1 50 50.00 Sl.No. 3 of Irg
ZSSR S00024 Material-LDPE sheet 500 micron thick 84.00 INR M2 1 84 84.00 Sl.No. 52 of Irg
ZSSR S00025 Material-Gravel 98.00 INR M3 1 98 98.00 S.S.Item.34, R&B
ZSSR S00026 Material-Earth 65.00 INR M3 1 65 65.00 Sl.No. 102 of Irg
ZSSR S00027 Material-RR stone (HBG) 306.00 INR M3 1 239 306 Sl.No. 12+ Sl.No.13, SS Item
22.G, of R&B+Blst Chgs

ZSSR S00028 Material-CR stone (HBG) 316.00 INR M3 1 249 67.00 316.00 Sl.No. 14 + Sl.No.17, SS Item
23.a of R&B+Blst Chgs

ZSSR S00029 Material-Bond stone 1208.33 INR M3 1 1208.33333 1208.33 Sl.No. 18, SS Item. 28 of R&B

ZSSR S00030 Material-Rough stone 200.00 INR M3 1 200 200 Sl.No. 98 of Irg

ZSSR S00031 Material-Stone Spalls 185.00 INR M3 1 185 185 Sl.No. 66 of Irg

ZSSR S00032 Material-Aggregates 20mm Nominal size 1154.50 INR M3 1 870 67.00 1154.5 Sl.No. 28 + Sl.No.36, SS Item
33.d of R&B+Blst Chgs

ZSSR S00033 Material-Aggregates 13.2/12.5 mm size 1043.25 INR M3 1 781 67.00 1043.25 Sl.No. 27 + Sl.No.36, SS Item
33.c of R&B+Blst Chgs
ZSSR S00034 Material-Aggregates10mm Nominal size 888.25 INR M3 1 657 67.00 888.25 Sl.No. 26 + Sl.No.36, SS Item
33.b of R&B+Blst Chgs

ZSSR S00035 Material-Aggregates 40 mm nominal size 698.25 INR M3 1 505 67.00 698.25 Sl.No. 30 + Sl.No.36, SS Item
33.f of R&B+Blst Chgs
ZSSR S00036 Material-Stone Crusher Dust 357.00 INR M3 1 357 357 Adopt previous rates

ZSSR S00037 Material-Gelatin 80% 75.00 INR KG 1 75 75.00 Sl.No. 26 of Irg


ZSSR S00038 Material-Detonator Electric 8.00 INR NO 1 8 8.00 Sl.No. 21 of Irg
ZSSR S00039 Material-JungleWoodPlanks 26000.00 INR M3 1 26000 26000.00 Sl.No. 47 of Irg
ZSSR S00040 Material-Explosive small dia 75.00 INR KG 1 75 75.00 Sl.No. 26 of Irg
ZSSR S00041 Material-Detonating fuse coil 7.00 INR RMT 1 7 7.00 Sl.No. 18 of Irg
ZSSR S00042 Material-1.5m Drill Rod - HDR 23.21 INR RMT 1 23.21 23.21 rate as per I&CAD data
ZSSR S00043 Material-Air Hose-25mm dia 9.69 INR HR 1 9.69 9.69 rate as per I&CAD data
ZSSR S00044 Labour-Plumber 540.00 INR D 1 S.No.I-36
ZSSR S00045 Labour-Stone chiseller CI- I 500.00 INR D 1 S.No.I-39
ZSSR S00046 Material-Aggregates 6 mm size 698.25 INR M3 1 505 67.00 698.25 Sl.No. 25 + Sl.No.36, SS Item
33.a of R&B+Blst Chgs

ZSSR S00047 Hire-Hydraulic Excavator-Machinery 2710.50 INR HR 1 2967.9 257.4 2710.5 Sl.No.4 (Hire Chgs), of R&B
ZSSR S00048 Hire-Hydraulic Excavator-Labour 257.40 INR HR 1 Labour - S.No.51 of Irr
ZSSR S00049 Hire-AirCompressor 7cmmDiesel-Machinery 1121.60 INR HR 1 1358.7 237.1 1121.6 Sl.No.3 (Hire Chgs), of Irr
ZSSR S00050 Hire-AirCompressor 7cmmDiesel-Labour 237.10 INR HR 1
ZSSR S00051 Hire-AirCompres.8.5cmmElectric-Machinery 662.90 INR HR 1 848.2 185.3 662.9 Sl.No.6 (Hire Chgs), of Irr
ZSSR S00052 Hire-AirCompres.8.5cmmElectric-Labour 185.30 INR HR 1
ZSSR S00053 Hire-Jack Hammer-Machinery 19.90 INR HR 1 390.4 370.5 19.9 Sl.No.39 (Hire Chgs), of Irr
ZSSR S00054 Hire-Jack Hammer-Labour 370.50 INR HR 1
ZSSR S00055 Hire-ConcreteMixer300/200lt(D)-Machinery 150.50 INR HR 1 397.5 247 150.5 Sl.No.16 (Hire Chgs), of Irr
ZSSR S00056 Hire-ConcreteMixer300/200lt(D)-Labour 247.00 INR HR 1
ZSSR S00057 Hire-Vibrator 40mm-Petrol-Machinery 27.20 INR HR 1 205 177.8 27.2 Sl.No.40 (Hire Chgs), of Irr
ZSSR S00058 Hire-Vibrator 40mm-Petrol-Labour 177.80 INR HR 1
ZSSR S00059 Hire-Dumper 4.5 cum-Machinery 1079.50 INR HR 1 1326.6 247.1 1079.5 Sl.No.34 (Hire Chgs), of Irr
ZSSR S00060 Hire-Dumper 4.5 cum-Labour 247.10 INR HR 1
ZSSR S00061 Hire-Shovel 0.85 cum 110 hp-Machinery 2710.50 INR HR 1 2967.9 257.4 2710.5 Sl.No.52 (Hire Chgs), of Irr
ZSSR S00062 Hire-Shovel 0.85 cum 110 hp-Labour 257.40 INR HR 1
ZSSR S00063 Hire-Tipper 5 cum-Machinery 811.30 INR HR 1 1004.4 193.1 811.3 Sl.No.54 (Hire Chgs), of Irr
ZSSR S00064 Hire-Tipper 5 cum-Labour 193.10 INR HR 1
ZSSR S00065 BailingOutWater-OtherThanSandysoil-0M-1M 269.00 INR M3 1 TBSC-T.I-01

ZSSR S00066 BailingOutWater-OtherThanSandysoil-1M-2M 318.00 INR M3 1 TBSC-T.I-02

ZSSR S00067 BailingOutWater-OtherThanSandysoil-2M-3M 371.00 INR M3 1 TBSC-T.I-03

ZSSR S00068 Sand Bags 30.00 INR EA 1 30 S.No.97 (Irr)


ZSSR S00069 Hire-Cent.&Scafold-Footing-Material 288.00 INR M3 1 919 631 288
ZSSR S00070 Hire-Cent.&Scafold-Footing-Labour 631.00 INR M3 1
ZSSR S00071 Hire-Cent.&Scafold-BedBlocks-Material 64.00 INR M3 1 389 325 64
ZSSR S00072 Hire-Cent.&Scafold-BedBlocks-Labour 325.00 INR M3 1
ZSSR S00073 Hire-Cent.&Scafold-Pedestal-Material 328.00 INR M3 1 1332 1004 328
ZSSR S00074 Hire-Cent.&Scafold-Pedestal-Labour 1004.00 INR M3 1
ZSSR S00075 Material-110mm dia (4kg/cm2) PVC pipes 479.00 INR EA 1 479 479.00 TBSP-H.I-03
ZSSR S00076 Hire-Vibrator 40mm-Electric-Machinery 14.00 INR HR 1 191.8 177.8 14 Sl.No.41 (Hire Chgs), of Irr
ZSSR S00077 Hire-Vibrator 40mm-Electric-Labour 177.80 INR HR 1
ZSSR S00078 Hire-FrontEndLoader-Machinery 1290.46 INR HR 1 1843.52 553.06 1290.46 Sl.No.5 (Hire Chgs), of R&B
ZSSR S00079 Hire-FrontEndLoader-Labour 553.06 INR HR 1
ZSSR S00080 Hire-Crane 3T-Machinery 275.97 INR HR 1 394.24 118.27 275.97 Sl.No.35(c) (Hire Chgs), of
R&B
ZSSR S00081 Hire-Crane 3T-Labour 118.27 INR HR 1
ZSSR S00082 Hire-Piling Rig -Machinery 4292.40 INR HR 1 6132 1839.60 4292.4 Sl.No.39 (Hire Chgs), of R&B

ZSSR S00083 Hire-Piling Rig -Labour 1839.60 INR HR 1

ZSSR S00084 Material-Admixtures 86.00 INR KG 1 86 86 TBSC-Q.I-03

ZSSR S00085 Fabrication Charges-Steel-Windows,Doors 29.00 INR KG 1 29 TBSC-T.I-16

ZSSR S00086 Fixing Charges-fixing Iron Doors,Window 4.00 INR KG 1 4 TBSC-T.I-17

ZSSR S00087 Chipping of pile foundation heads 1800.00 INR M3 1 adopted previous rates

ZSSR S00088 Hire-Batching plant 0.5 cum-Machinery 237.50 INR HR 1 608.1 370.6 237.5 Sl.No.9 (Hire Chgs), of Irr
ZSSR S00089 Hire-Batching plant 0.5 cum-Labour 370.60 INR HR 1
ZSSR S00090 Hire-DieselGeneratingSet 30KVA-Machinery 859.00 INR HR 1 1007.2 148.2 859 Sl.No.23 (Hire Chgs), of Irr
ZSSR S00091 Hire-DieselGeneratingSet 30KVA-Labour 148.20 INR HR 1
ZSSR S00092 Material-Structural Steel-Angles 44500.00 INR MT 1
ZSSR S00093 Material-Reinforcement Steel 46000.00 INR MT 1
ZSSR S00094 Welding Charges (LMR) 330.00 INR LS 1 adopted previous rates
ZSSR S00095 Lowering charges-providing MS liners(LMR 500.00 INR LS 1 adopted previous rates
ZSSR S00096 Material-Sand-Concrete&Filtering 600.00 INR M3 1
ZSSR S00097 Material-Cement 4500.00 INR MT 1
ZSSR S00098 Mob & shifting charges of Rig (LMR) 1000.00 INR LS 1 adopted previous rates
ZSSR S00099 Material-Bentonite 7.50 INR KG 1 adopted previous rates
ZSSR S00100 Material-Sand-Mortar&Plastering 667.00 INR M3 1
ZSSR S00101 Material-Water 98.00 INR KL 1
ZSSR S00102 Material-Balli Props-4to8dia-20'Ht 126.00 INR EA 1 126 TBSC-S.I.06
ZSSR S00103 Labour-Work Inspector 565.00 INR D 1 S.No.I-10
ZSSR S00104 Hire-Tractor-Machinery 418.32 INR HR 1 464.8 46.48 418.32 Sl.No.11 (Hire Chgs), of R&B
ZSSR S00105 Hire-Tractor-Labour 46.48 INR HR 1
ZSSR S00106 Hire-Water Tanker-6KL-Machinery 505.78 INR HR 1 698.88 193.1 505.78 Sl.No.10 (Hire Chgs), of R&B
ZSSR S00107 Hire-Water Tanker-6KL-Labour 193.11 INR HR 1 Labour-S.No.64 of Irr
ZSSR S00108 Hire-Static Roller-8T-Machinery 1095.20 INR HR 1 1342.3 247.1 1095.2 Sl.No.8 (Hire Chgs), of R&B
ZSSR S00109 Hire-Static Roller-8T-Labour 247.10 INR HR 1 Labour-S.No.50 of Irr
ZSSR S00110 Hire-Tractor with rotavator-Machinery 425.38 INR HR 1 472.64 47.26 425.38 Sl.No.12 (Hire Chgs), of R&B
ZSSR S00111 Hire-Tractor with rotavator-Labour 47.26 INR HR 1
ZSSR S00112 Hire-Dozer( D 50 )-Machinery 1582.56 INR HR 1 1758.4 175.84 1582.56 Sl.No.2 (Hire Chgs), of R&B
ZSSR S00113 Hire-Dozer( D 50 )-Labour 175.84 INR HR 1
ZSSR S00114 Locating Borewell Point 1200.00 INR NO 1 1000 1.20000 1200 RWS estimate rate (increase
20%)
ZSSR S00115 Drilling Borewell - upto 90M Depth 336.00 INR RMT 1 305 1.10000 335.50 RWS estimate rate (increase
10%)

ZSSR S00116 FabricationCharges-StainlessSteelRailing 146.00 INR KG 1 146 TBSC-T.I-20

ZSSR S00117 PVC Pipe -180mmDia-10Kg/sqcm 1021.00 INR RMT 1 1021 1021 public health table-17

ZSSR S00118 PVC Pipe -180mmDia-6Kg/sqcm 641.00 INR RMT 1 641 641 public health table-17

ZSSR S00119 Labour for fixing PVC Pipe (LS) 15.00 INR LS 1 adopted previous rates
ZSSR S00120 S&F32mm NB GI pipe MediumGrade(Less Lbr) 334.00 INR RMT 1 375 334 TBSP-G.I-10 (-) 41

ZSSR S00121 S&F 32 mm dia HDPE pipe12.5kg/Sqcm 57.00 INR RMT 1 57 57 public health table-15

ZSSR S00122 LayingCharges-PVC/HDPE Pipes-32mmDia 42.00 INR RMT 1 42 Sl.No. 12(b) of Public health

ZSSR S00123 MS Bore Cover(LMR) 190.00 INR NO 1 220 1.18125 186.24 LMR
ZSSR S00124 MS Clamps (LMR) 150.00 INR NO 1 176 1.18125 148.99 LMR
ZSSR S00125 3 Core 2.5 Sqmm Flat Copper cable 11400.00 INR RMT 100 114 11400 ELEC-1.5.6.g (rate taken per
100 RMT)

ZSSR S00126 Labour for fixing Copper Cable(LMR) 2.00 INR LS 1 adopted previous rates
ZSSR S00127 3HP30-33Stage 3PhaseSubmersibleMotor(MR 20500.00 INR NO 1 22000 1.18125 20486.77 LMR

ZSSR S00128 Control panel board for Motors 4480.00 INR NO 1 4480 4480 ELEC-5.10.1

ZSSR S00129 "S&F D.O.L Starter 415V, 3 phase, 50Hz" 1450.00 INR NO 1 1450 1450 adopted previous rates, SSR
2017-18

ZSSR S00130 Installation & convey charges-Motor 2500.00 INR LS 1 adopted previous rates

ZSSR S00131 Lead-upto1KM-Earth/Sand/Gravel 30.60 INR M3 1 34.2 1.11765 30.6

ZSSR S00132 Lead-upto 2KM-Earth/Sand/Gravel 42.86 INR M3 1 47.9 1.11765 42.86

ZSSR S00133 Lead-upto 3KM-Earth/Sand/Gravel 57.17 INR M3 1 63.9 1.11765 57.17

ZSSR S00134 Lead-upto 4KM-Earth/Sand/Gravel 69.43 INR M3 1 77.6 1.11765 69.43

ZSSR S00135 Lead-upto 5KM-Earth/Sand/Gravel 81.69 INR M3 1 91.3 1.11765 81.69

ZSSR S00136 Lead-upto1KM-RubbleStones/ Coarse Aggre. 29.53 INR M3 1 33 1.11765 29.53

ZSSR S00137 Lead-upto2KM-RubbleStones/ Coarse Aggre. 41.34 INR M3 1 46.2 1.11765 41.34

ZSSR S00138 Lead-upto3KM-RubbleStones/ Coarse Aggre. 57.17 INR M3 1 63.9 1.11765 57.17

ZSSR S00139 Lead-upto4KM-RubbleStones/ Coarse Aggre. 69.43 INR M3 1 77.6 1.11765 69.43

ZSSR S00140 Lead-upto5KM-RubbleStones/ Coarse Aggre. 81.69 INR M3 1 91.3 1.11765 81.69

ZSSR S00141 Lead-EveryKM beyond 5KM upto 30KM-Stones 12.26 INR M3 1 13.7 1.11765 12.26

ZSSR S00142 Lead-EveryKM beyond 30KM -Stones 10.20 INR M3 1 11.4 1.11765 10.2

ZSSR S00143 LoadingCharges-Mechanical-Earth/Sand/Gr. 49.66 INR M3 1 55.5 1.11765 49.66

ZSSR S00144 UnLoadingCharge-Mechanical-Ear./Sand/Gr. 15.48 INR M3 1 17.3 1.11765 15.48


ZSSR S00145 LoadingCharges-Mechanical-Stones/Aggr. 98.96 INR M3 1 110.6 1.11765 98.96

ZSSR S00146 UnLoadingCharge-Mechanical-Stones/Aggr. 15.48 INR M3 1 17.3 1.11765 15.48

ZSSR S00147 Material - Chain link mesh 65.84 INR M2 1 65.84 as per I & CAD data
ZSSR S00148 Hire-Cent.&Scafold-Plinth Beam-Material 1390.00 INR M3 1 2911 1521 1390

ZSSR S00149 Hire-Cent.&Scafold-Plinth Beam-Labour 1521.00 INR M3 1

ZSSR S00150 Hire-Cent.&Scaf(Wood Ballies)-Lintel-Mat 790.00 INR M3 1 2041 1251 790

ZSSR S00151 Hire-Cent.&Scaf(Wood Ballies)-Lintel-Lab 1251.00 INR M3 1

ZSSR S00152 Hire-Cent.&Scaf(Wood Ballies)-Sunsha-Mat 156.00 INR M2 1 348 192 156

ZSSR S00153 Hire-Cent.&Scaf(Wood Ballies)-Sunsha-Lab 192.00 INR M2 1

ZSSR S00154 Hire-Cent.&Scaf(Wood Ballies)-Column-Mat 238.00 INR M3 1 1995 1757 238

ZSSR S00155 Hire-Cent.&Scaf(Wood Ballies)-Column-Lab 1757.00 INR M3 1

ZSSR S00156 Hire-Cent.&Scaf(Wood Ballies)-Beams-Mat 1395.00 INR M3 1 2868 1473 1395

ZSSR S00157 Hire-Cent.&Scaf(Wood Ballies)-Beams-Lab 1473.00 INR M3 1

ZSSR S00158 Hire-Cent.&Scaf(WoodBallies)-Slab150-Mat 158.00 INR M2 1 325 167 158

ZSSR S00159 Hire-Cent.&Scaf(WoodBallies)-Slab150-Lab 167.00 INR M2 1

ZSSR S00160 Hire-Cent.&Scaf(WoodBallies)-Slab300-Mat 163.00 INR M2 1 335 172 163

ZSSR S00161 Hire-Cent.&Scaf(WoodBallies)-Slab300-Lab 172.00 INR M2 1

ZSSR S00162 Hire-Cent.&Scafo-RCC Vert. Wall 1063.00 INR M2 1 1063 531.5 531.5 Sl.No.31.b.4 of Public Health

ZSSR S00163 Hire-Cent.&Scafo-RCC Vert. Wall-Material 531.50 INR M2 1

ZSSR S00164 Hire-Cent.&Scafo-RCC Vert. Wall-Labour 531.50 INR M2 1

ZSSR S00165 Hand rolling charges - stone roller 2T 9.00 INR M3 1 9 LS


ZSSR S00166 Anti-weed Treatment -Material(LMR) 10.00 INR LS 1 adopted previous rates
ZSSR S00167 Anti-weed Treatment -Labour(LMR) 10.00 INR LS 1 adopted previous rates
ZSSR S00168 180 GSM LDPE sheet (LMR) 17.50 INR M2 1 17.5 17.5 LMR
ZSSR S00169 S&F 15mm size PVC Connection 101.00 INR EA 1 101 101 TBSP-J.I-32
ZSSR S00170 PCC(1:2:4) gauge blocks (LS) 22.00 INR LS 1 22 adopted previous rates
ZSSR S00171 Common Burnt Clay Bricks 5.70 INR EA 1 5.7 5.7 TBSC-A.I-01

ZSSR S00172 R.C.C.PlainEndedPipes-300mmDiaNP-2Class 415.00 INR RMT 1 415 415 Public Health Table.1

ZSSR S00173 R.C.C. COLLARS 300mm Dia NP-2 Class 104.00 INR EA 1 104 104 Public Health Table.2

ZSSR S00174 FixingCharges-RCCPipes-per every 25mmDia 23.00 INR M 1 23 S.No. 11.a of Public Health

ZSSR S00175 Hire-Scafold-BRICK MASONRY-Material 10.32 INR M2 1 89.78 79.46 10.32

ZSSR S00176 Hire-Scafold-BRICK MASONRY-Labour 79.46 INR M2 1

ZSSR S00177 Hire-Scafold-PLASTERING toWALLS-Material 1.03 INR M2 1 8.98 7.95 1.03

ZSSR S00178 Hire-Scafold-PLASTERING to WALLS-Labour 7.95 INR M2 1

ZSSR S00179 Hire-Scafold-CEILING PLASTERING-Material 2.46 INR M2 1 18.37 15.91 2.46

ZSSR S00180 Hire-Scafold-CEILING PLASTERING-Labour 15.91 INR M2 1

ZSSR S00181 Paint grade lime- white/ colour wash 22.00 INR KG 1 22 22 TBSC-G.II-01
ZSSR S00182 6mm thick MS Chekered plate 70.00 INR KG 1 70 70 ELEC-9.4.8
ZSSR S00183 Transport&LayingCharges(MSChekeredPlate) 6.00 INR LS 1 adopted previous rates
ZSSR S00184 Material-Impervious WaterProof compound 51.00 INR KG 1 51 51 TBSC-G.II-04
ZSSR S00185 Nano polished Vitrified tiles-800x800mm 500.00 INR M2 1 500 500 TBSC-C.II-04

ZSSR S00186 Material-RR stone (Other then Granite) 219.00 INR M3 1 152 67.00 219.00 Sl.No.1 + Sl.No.13, SS Item
22.a, of R&B+Blst Chgs
ZSSR S00187 Material-CR stone (Other then Granite) 246.00 INR M3 1 179 67.00 246.00 Sl.No. 15 + Sl.No.17, SS Item
23.b of R&B+Blst Chgs

ZSSR S00188 Material-Credit for Excavated Earth 200.00 INR M3 1 S.No.101, Irr
ZSSR S00189 2.36 mm to 5 mm size-IRC-Machine Crushed 673.25 INR M3 1 485 67.00 673.25 Sl.No. 45 + Sl.No.56 +
Sl.No.57, SS Item 33.a of
R&B+Blst Chgs + Machine
Crushing
ZSSR S00190 5 mm to 7 mm size-IRC-Machine Crushed 673.25 INR M3 1 485 67.00 673.25 Sl.No. 46 + Sl.No.56 +
Sl.No.57, SS Item 33.b of
R&B+Blst Chgs + Machine
Crushing
ZSSR S00191 9.5mm to 11.2mm size-IRC-Machine Crushed 842.00 INR M3 1 620 67.00 842.00 Sl.No. 47 + Sl.No.56 +
Sl.No.57, SS Item 33.c of
R&B+Blst Chgs + Machine
Crushing
ZSSR S00192 12mm to 14mm size -IRC-Machine Crushed 942.00 INR M3 1 700 67.00 942.00 Sl.No. 48 + Sl.No.56 +
Sl.No.57, SS Item 33.d of
R&B+Blst Chgs + Machine
Crushing
ZSSR S00193 19mm to 22mm size -IRC-Machine Crushed 1093.25 INR M3 1 821 67.00 1093.25 Sl.No. 49 + Sl.No.56 +
Sl.No.57, SS Item 33.e of
R&B+Blst Chgs + Machine
Crushing
ZSSR S00194 25 mm to 27mm size -IRC-Machine Crushed 1054.50 INR M3 1 790 67.00 1054.50 Sl.No. 50 + Sl.No.56 +
Sl.No.57, SS Item 33.f of
R&B+Blst Chgs + Machine
Crushing
ZSSR S00195 40 mm to 45mm size -IRC-Machine Crushed 717.00 INR M3 1 520 67.00 717.00 Sl.No. 51 + Sl.No.56 +
Sl.No.57, SS Item 33.g of
R&B+Blst Chgs + Machine
Crushing
ZSSR S00196 40 mm to 45mm size -IRC-Hand Broken 587.00 INR M3 1 520 67.00 587.00 Sl.No. 51 + Sl.No.56, SS Item
33.g of R&B+Blst Chgs

ZSSR S00197 50mm to 55mm size -IRC-Machine Crushed 617.00 INR M3 1 440 67.00 617.00 Sl.No. 52 + Sl.No.56 +
Sl.No.57, SS Item 33.h of
R&B+Blst Chgs + Machine
Crushing
ZSSR S00198 60 mm to 63mm size -IRC-Machine Crushed 567.00 INR M3 1 400 67.00 567.00 Sl.No. 53 + Sl.No.56 +
Sl.No.57, SS Item 33.i of
R&B+Blst Chgs + Machine
Crushing
ZSSR S00199 60 mm to 63mm size -IRC-Hand Broken 467.00 INR M3 1 400 67.00 467.00 Sl.No. 53 + Sl.No.56, SS Item
33.i of R&B+Blst Chgs
ZSSR S00200 65 mm size -IRC-Machine Crushed 517.00 INR M3 1 360 67.00 517.00 Sl.No. 54 + Sl.No.56 +
Sl.No.57, SS Item 33.j of
R&B+Blst Chgs + Machine
Crushing
ZSSR S00201 75 mm size -IRC-Machine Crushed 429.50 INR M3 1 290 67.00 429.50 Sl.No. 55 + Sl.No.56 +
Sl.No.57, SS Item 33.k of
R&B+Blst Chgs + Machine
Crushing

ZSSR S00202 Vibratory roller 8 tonne 2878.90 INR HR 1 2878.9 Sl.No.62 (Hire Chgs), of Irg
ZSSR S00203 Wet mix plant 60 TPH 1843.52 INR HR 1 1843.52 Sl.No.15 (Hire Chgs), of R&B

ZSSR S00204 Paver finisher Mechanical 100 2518.88 INR HR 1 2518.88 Sl.No.24 (Hire Chgs), of R&B

ZSSR S00205 Generator-125 KVA 1478.40 INR HR 1 1478.4 Sl.No.43(b) (Hire Chgs), of
R&B
ZSSR S00206 Hire-Batching plant 0.5 cum 608.10 INR HR 1 608.1 370.6 237.5 Sl.No.9 (Hire Chgs), of Irr
ZSSR S00207 Hire-DieselGeneratingSet 30KVA 1007.20 INR HR 1 1007.2 148.2 859 Sl.No.23 (Hire Chgs), of Irr
ZSSR S00208 Hire-Vibrator 40mm-Petrol 205.00 INR HR 1 205.00 177.8 27.2 Sl.No.40 (Hire Chgs), of Irr
ZSSR S00209 Hire-Dozer( D 50 ) 1758.40 INR HR 1 1758.4 Sl.No.2 (Hire Chgs), of R&B
ZSSR S00210 Hire-Hydraulic Excavator 2967.90 INR HR 1 2967.9 Sl.No.4 (Hire Chgs), of R&B
ZSSR S00211 Hire-FrontEndLoader 1843.52 INR HR 1 1843.52 Sl.No.5 (Hire Chgs), of R&B
ZSSR S00212 Hire-Static Roller-8T 1342.30 INR HR 1 1342.3 Sl.No.8 (Hire Chgs), of R&B
ZSSR S00213 Hire-Water Tanker-6KL 698.88 INR HR 1 698.88 Sl.No.10 (Hire Chgs), of R&B

ZSSR S00214 Hire-Tractor 464.80 INR HR 1 464.8 Sl.No.11 (Hire Chgs), of R&B,

ZSSR S00215 Hire-Tractor with rotavator 472.64 INR HR 1 472.64 Sl.No.12 (Hire Chgs), of R&B

ZSSR S00216 Hire-Crane 3T 394.24 INR HR 1 394.24 Sl.No.35(c) (Hire Chgs), of


R&B
ZSSR S00217 Hire-Piling Rig 6132.00 INR HR 1 6132 Sl.No.39 (Hire Chgs), of R&B
ZSSR S00218 Hire-Cent.&Scafold(Steel)-Column(GF)-Mat 355.00 INR M3 1 2623 2268 355

ZSSR S00219 Hire-Cent.&Scafold(Steel)-Column(GF)-Lab 2268.00 INR M3 1

ZSSR S00220 Hire-Cent.&Scafold(Steel)-Column(FF)-Lab 2268.00 INR M3 1

ZSSR S00221 Hire-Cent.&Scafold(Steel)-Column(SF)-Lab 2495.00 INR M3 1

ZSSR S00222 Hire-Cent.&Scafold(Steel)-Column(TF)-Lab 2722.00 INR M3 1

ZSSR S00223 Hire-Cent.&Scafold(Steel)-Beams(GF)-Mat 2085.00 INR M3 1 3988 1903 2085

ZSSR S00224 Hire-Cent.&Scafold(Steel)-Beams(GF)-Lab 1903.00 INR M3 1

ZSSR S00225 Hire-Cent.&Scafold(Steel)-Beams(FF)-Lab 1903.00 INR M3 1

ZSSR S00226 Hire-Cent.&Scafold(Steel)-Beams(SF)-Lab 2093.00 INR M3 1

ZSSR S00227 Hire-Cent.&Scafold(Steel)-Beams(TF)-Lab 2283.00 INR M3 1

ZSSR S00228 Hire-Cent.&Scaf(Steel)-Slab150T(GF)-Mat 236.00 INR M2 1 451 215 236

ZSSR S00229 Hire-Cent.&Scaf(Steel)-Slab150T(GF)-Lab 215.00 INR M2 1

ZSSR S00230 Hire-Cent.&Scaf(Steel)-Slab150T(FF)-Lab 215.00 INR M2 1

ZSSR S00231 Hire-Cent.&Scaf(Steel)-Slab150T(SF)-Lab 237.00 INR M2 1

ZSSR S00232 Hire-Cent.&Scaf(Steel)-Slab150T(TF)-Lab 258.00 INR M2 1

ZSSR S00233 Hire-Cent.&Scaf(Steel)-Slab300T(GF)-Mat 243.00 INR M2 1 465 222 243

ZSSR S00234 Hire-Cent.&Scaf(Steel)-Slab300T(GF)-Lab 222.00 INR M2 1

ZSSR S00235 Hire-Cent.&Scaf(Steel)-Slab300T(FF)-Lab 222.00 INR M2 1

ZSSR S00236 Hire-Cent.&Scaf(Steel)-Slab300T(SF)-Lab 244.00 INR M2 1

ZSSR S00237 Hire-Cent.&Scaf(Steel)-Slab300T(TF)-Lab 266.00 INR M2 1


ZSSR S00238 Hire-Cent.&Scafold(Steel)-Lintel(GF)-Mat 1180.00 INR M3 1 2795 1615 1180

ZSSR S00239 Hire-Cent.&Scafold(Steel)-Lintel(GF)-Lab 1615.00 INR M3 1

ZSSR S00240 Hire-Cent.&Scafold(Steel)-Lintel(FF)-Lab 1615.00 INR M3 1

ZSSR S00241 Hire-Cent.&Scafold(Steel)-Lintel(SF)-Lab 1777.00 INR M3 1

ZSSR S00242 Hire-Cent.&Scafold(Steel)-Lintel(TF)-Lab 1938.00 INR M3 1

ZSSR S00243 Hire-Cent.&Scaf(Steel)-Sunshade(GF)-Mat 233.00 INR M2 1 481 248 233

ZSSR S00244 Hire-Cent.&Scaf(Steel)-Sunshade(GF)-Lab 248.00 INR M2 1

ZSSR S00245 Hire-Cent.&Scaf(Steel)-Sunshade(FF)-Lab 248.00 INR M2 1

ZSSR S00246 Hire-Cent.&Scaf(Steel)-Sunshade(SF)-Lab 273.00 INR M2 1

ZSSR S00247 Hire-Cent.&Scaf(Steel)-Sunshade(TF)-Lab 297.00 INR M2 1

ZSSR S00248 Polished Shahabad/ Tandur stone slabs 164.00 INR M2 1 164 164 TBSC-B.I-03

ZSSR S00249 Kadapa slabs of 40 mm thick 95.00 INR M2 1 95 95 TBSC-B.I-04


ZSSR S00250 Polished Marble slabs-16-20mm 534.00 INR M2 1 534 534 TBSC-B.II-02

ZSSR S00251 Polished Marble slabs-GangSaw Cut 907.00 INR M2 1 907 907 TBSC-B.II-03

ZSSR S00252 High Polished Granite-other than black 2709.00 INR M2 1 2709 2709 TBSC-B.III-02

ZSSR S00253 Non-skid Ceramic floor tiles-300x300mm 300.00 INR M2 1 300 300 TBSC-C.I-01

ZSSR S00254 Non-skid Ceramic floor tiles-400x400mm 310.00 INR M2 1 310 310 TBSC-C.I-02

ZSSR S00255 Non-skid Ceramic floor tiles-600x600mm 485.00 INR M2 1 485 485 TBSC-C.I-03

ZSSR S00256 Ceramic FloorTiles-ScratchFree-600x600mm 485.00 INR M2 1 485 485 TBSC-C.I-04

ZSSR S00257 Precast concrete blocks-M-40 470.00 INR M2 1 470 470 TBSC-C.IX-03

ZSSR S00258 Vinyl Flooring Sheets/tiles-1.5mm thick 383.00 INR M2 1 383 383 TBSC-C.X-03
ZSSR S00259 Rolling shutter 3890.00 INR M2 1 3890 3890 TBSC-E.I-01

ZSSR S00260 Collapsible steel shutters 3403.00 INR M2 1 3403 3403 TBSC-E.I-02

ZSSR S00261 Rabbit wire mesh 19.00 INR M2 1 19 19 TBSC-E.I-12


ZSSR S00262 Galvanized Steel Barbed wire TYPE-B 90.00 INR KG 1 90 90 TBSC-E.II-02

ZSSR S00263 Chain link mesh 8 gauge -3" x 3" 351.00 INR M2 1 351 351 TBSC-E.II-06

ZSSR S00264 StainlessSteel Tubes,Pipes,etc-304Grade 387.00 INR KG 1 387 387 TBSC-E.III-01

ZSSR S00265 Plain Float Glass 5 mm thick 507.00 INR M2 1 507 507 TBSC-F.I-02
ZSSR S00266 Pin headed Glass 5 mm thick 390.00 INR M2 1 390 390 TBSC-F.II-02
ZSSR S00267 Cement Primer of Interior Grade 150.00 INR KG 1 150 150 TBSC-G.I-01
ZSSR S00268 Cement Primer of Exterior Grade 191.00 INR KG 1 191 191 TBSC-G.I-02
ZSSR S00269 Wall putty of White Cement 41.00 INR KG 1 41 41 TBSC-G.I-03

ZSSR S00270 Red Oxide Primer Paint-Iron Works 129.00 INR L 1 129 129 TBSC-G.I-05

ZSSR S00271 Wood Primer 144.00 INR L 1 144 144 TBSC-G.I-07


ZSSR S00272 Acrylic emulsion paint interior grade 195.00 INR L 1 195 195 TBSC-G.III-01

ZSSR S00273 Acrylic emulsion paint exterior grade 204.00 INR L 1 204 204 TBSC-G.III-02

ZSSR S00274 Ready mixed Synthetic Enamel paints 251.00 INR L 1 251 251 TBSC-G.V-01

ZSSR S00275 Prelaminated cement particle board-12mmT 667.00 INR M2 1 667 667 TBSC-H.IV-22

ZSSR S00276 Ceramic Wall Tiles-Any Size 480.00 INR M2 1 480 480 TBSC-C.VI-02

ZSSR S00277 Calcium Silicate Boards - 8mm thick 279.00 INR M2 1 279 279 TBSC-K.I-21
ZSSR S00278 Thermocol 12 mm thick sheets 24.00 INR M2 1 24 24 TBSC-K.I-24
ZSSR S00279 S&F Thermocol 19 mm thick sheets 42.00 INR M2 1 42 42 TBSC-K.I-25
ZSSR S00280 G.I. Ceiling Angle-25mm x 10mm x 0.55mm 67.00 INR RMT 1 67 67 TBSC-K.II-01
ZSSR S00281 GI CeilingSection-51.5x26x10.5x0.55mm 78.00 INR RMT 1 78 78 TBSC-K.II-02

ZSSR S00282 GI IntermediateSection-45x15x15x0.9mm 77.00 INR RMT 1 77 77 TBSC-K.II-03

ZSSR S00283 GI PerimeterChannel-20x27x30x0.55mm 67.00 INR RMT 1 67 67 TBSC-K.II-04

ZSSR S00284 GI PrecoatedFineLineGrid-25x25x0.7mm 38.00 INR RMT 1 38 38 TBSC-K.II-05


ZSSR S00285 GI PrecoatedFineLineGrid-15x25x0.7mm 34.00 INR RMT 1 34 34 TBSC-K.II-06
ZSSR S00286 GI Precoated T-Section-24x38x0.7mm 50.00 INR RMT 1 50 50 TBSC-K.II-07
ZSSR S00287 Hot dipped GI Angle - Precoated 37.00 INR RMT 1 37 37 TBSC-K.II-08
ZSSR S00288 Polyester painted GI-TSection-24x32 mm 45.00 INR RMT 1 45.00 45.00 TBSC-K.II-09
ZSSR S00289 Polyester painted GI-TSection-24x25 mm 41.00 INR RMT 1 41.00 41.00 TBSC-K.II-10
ZSSR S00290 Polyester painted GI-TSection-24x27 mm 42.00 INR RMT 1 42.00 42.00 TBSC-K.II-11
ZSSR S00291 Aluminium Angle : 24 mm x 24 mm 24.00 INR RMT 1 24.00 24.00 TBSC-K.II-12
ZSSR S00292 Anodized Aluminium T Section : 24 x 24.5 31.00 INR RMT 1 31.00 31.00 TBSC-K.II-13
ZSSR S00293 Connecting Clips 3.00 INR EA 1 3.00 3.00 TBSC-K.II-14
ZSSR S00294 Rawl Plug 3.00 INR EA 1 3.00 3.00 TBSC-K.II-15
ZSSR S00295 6 mm Nylon Rawl Plug 3.00 INR EA 1 3.00 3.00 TBSC-K.II-16
ZSSR S00296 Soffit Cleats 3.00 INR EA 1 3.00 3.00 TBSC-K.II-17
ZSSR S00297 Drywall Screws - 25 mm 3.00 INR EA 1 3.00 3.00 TBSC-K.II-18
ZSSR S00299 Jointing Compound 27.00 INR KG 1 27.00 27.00 TBSC-K.II-19
ZSSR S00300 Jointing Paper Tape 5.00 INR RMT 1 5.00 5.00 TBSC-K.II-20
ZSSR S00301 Drywall Top Coat 129.00 INR L 1 129.00 129.00 TBSC-K.II-21
ZSSR S00302 Universal Holding Clips 3.00 INR EA 1 3.00 3.00 TBSC-K.II-22
ZSSR S00303 4 mm Diameter GI Connecting Rod 11.00 INR RMT 1 11.00 11.00 TBSC-K.II-23
ZSSR S00304 2 mm Diameter GI Connecting Rod 10.00 INR RMT 1 10.00 10.00 TBSC-K.II-24
ZSSR S00305 Hollow extruded PVC Door Frame 231.00 INR RMT 1 231 231 TBSC-L.I-05

ZSSR S00306 Door frames-1.25mm thick CRCA section 199.00 INR RMT 1 199 199 TBSC-L.I-07

ZSSR S00307 Flush door shutters - 30 mm thick 2046.00 INR M2 1 2046 2046 TBSC-L.II-10

ZSSR S00308 Door shutters made of rigid PVC 1744.00 INR M2 1 1744 1744 TBSC-L.III-14

ZSSR S00309 Aluminium Tower Bolt-10mm Bolt-100mmLong 52.00 INR EA 1 52 52 TBSC-P.I.07


ZSSR S00310 MS-PowderCoatedTower Bolt-300mmLong 85.00 INR EA 1 85 85 TBSC-P.I.18

ZSSR S00311 Aluminium Tower Bolt-10mm Bolt-300mmLong 109.00 INR EA 1 109 109 TBSC-P.I.11
ZSSR S00312 Aluminium Butt hinges-75mm Long 49.00 INR EA 1 49 49 TBSC-P.II.05
ZSSR S00313 Aluminium Door Handles-125mm Long 74.00 INR EA 1 74 74 TBSC-P.III.03
ZSSR S00314 Aluminium Door Handles-150mm Long 87.00 INR EA 1 87 87 TBSC-P.III.04
ZSSR S00315 MS-Powder Coated Door Handles-125mm Long 31.00 INR EA 1 31 31 TBSC-P.III.05
ZSSR S00316 MS-Powder Coated Door Handles-150mm Long 45.00 INR EA 1 45 45 TBSC-P.III.06
ZSSR S00317 MS-Powder Coated Aldrop-200 mm long 105.00 INR EA 1 105 105 TBSC-P.IV.07
ZSSR S00318 Cast Iron Body Hydraulic Door Closer 939.00 INR EA 1 939 939 TBSC-P.VI.01

ZSSR S00319 DoubleActionBrassCoverPlate&Body-FloorSp 4114.00 INR EA 1 4114 4114 TBSC-P.VII.02

ZSSR S00320 Heavy duty mortice lock -PC/CP handles 848.00 INR EA 1 848 848 TBSC-P.VIII.01

ZSSR S00321 Heavy duty mortice lock-Brass Handles 2181.00 INR EA 1 2181 2181 TBSC-P.VIII.02

ZSSR S00322 MS-Powder Coated - Door Stoppers 45.00 INR EA 1 45 45 TBSC-P.IX.02


ZSSR S00323 Heavy duty Aluminium Door stopper 58.00 INR EA 1 58 58 TBSC-P.IX.03
ZSSR S00324 Expansion joint filler board 293.00 INR M2 1 293 293 TBSC-Q.VIII-04

ZSSR S00325 Material-White Cement 29.00 INR KG 1 29 29 TBSC-R.I-01


ZSSR S00326 Aluminium anodized Sections 292.00 INR KG 1 292 292 TBSC-R.I-03
ZSSR S00327 Sun Control film 299.00 INR M2 1 299 299 TBSC-R.I-07

ZSSR S00328 Rubber Beading for glass fixing 3.00 INR RMT 1 3 3 TBSC-R.I-11
ZSSR S00329 Planting plants 3.00 INR EA 1 3 TBSC-R.I-41
ZSSR S00330 Maintaining avenues-weeding,watering,et 7.00 INR EA 1 7 TBSC-R.I-43

ZSSR S00331 MachineCharges-Rubbing/ polishing floor 279.00 INR HR 1 279 TBSC-S.I-01


ZSSR S00332 Hire- PowerSawCutter - Hand Operated 130.00 INR HR 1 130 TBSC-S.I-02
ZSSR S00333 Hire- Power Drill - Hand Operated 121.00 INR HR 1 121 TBSC-S.I-03
ZSSR S00334 Labour charges-fixing FlushDoor shutters 426.00 INR M2 1 426 TBSC-T.I-25

ZSSR S00335 Labour Charges-G.I.Plumbing-15mm 62.00 INR EA 1 62 TBSP-G.IV-03

ZSSR S00336 3HP 30-33Stage 3Phase submersible motor 20,500.00 INR NO 1 22000 1.18125 20486.77 MARKET RATE (Repeated
item)

ZSSR S00337 S&F101.6 SWG SP-1pipe upto5'Dep(LessLbr) 178.00 INR RMT 1 491 178 TBSP-A.I-01 (-)
TBSP-A.III-02

ZSSR S00338 S&F101.6 SWG SP-1pipe upto3'Dep(LessLbr) 171.00 INR RMT 1 423 171 TBSP-A.I-02 (-)
TBSP-A.III-01

ZSSR S00339 S&F SWG Bends-100mm dia 95.00 INR EA 1 95 95 TBSP-A.II-23

ZSSR S00340 S&F SWG Junctions - 100 x 100 182.00 INR EA 1 182 182 TBSP-A.II-29

ZSSR S00341 Labour-Laying SWG pipes-any dia-3' Depth 252.00 INR RMT 1 252 TBSP-A.III-01

ZSSR S00342 Labour-Fixing SWG Junctions/Plugs/Bends 33.00 INR EA 1 33 TBSP-A.III-05

ZSSR S00343 Const.(1'6x1'6)BrickCM1:6 prop.Maso 3813.00 INR EA 1 3813 3813 TBSP-B.II-02

ZSSR S00344 Constr Brick masonry chamber (Less Lbr) 343.00 INR EA 1 473 130 343 TBSP-B.II-03 (-) TBSP-B.III-
01

ZSSR S00345 S&F CI Nahany trap grating 20.00 INR EA 1 20 20 TBSP-B.II-07


ZSSR S00346 S&F CI man hole frame (Less Lbr) 1883.00 INR EA 1 2013 130 1883 TBSP-B.II-09 (-) TBSP-B.III-
01
ZSSR S00347 Labour charges for fixing Man hole 130.00 INR EA 1 130

ZSSR S00348 S&F C.I.SoilPipe3"dia(75)SingSoc(LesLbr) 505.00 INR RMT 1 751 246 505 TBSP-C.I-01 (-)
TBSP-C.III-01
ZSSR S00349 S&F-C.I.Pipe-4dia(101.6mm)SingSoc(LesLbr 742.00 INR RMT 1 988 246 742 TBSP-C.I-02(-)
TBSP-C.III-01

ZSSR S00350 S&F-C.I.Pipe-3"dia(75)DoubSoc(LesLbr) 576.00 INR RMT 1 822 246 576 TBSP-C.I-04 (-)
TBSP-C.III-01

ZSSR S00351 S&F-C.I.Pipe-4"dia(101.6)DoubSoc(LesLbr 851.00 INR RMT 1 1097 246 851 TBSP-C.I-05 (-)
TBSP-C.III-01

ZSSR S00352 S&F-CI Plain bends-3"dia(75mm)(Less Lbr 215.00 INR EA 1 293 78 215 TBSP-C.II-01 (-)
TBSP-C.III-02

ZSSR S00353 S&F-CI Plain bends-4"dia(101.6)(LessLbr 294.00 INR EA 1 372 78 294 TBSP-C.II-02 (-)
TBSP-C.III-02

ZSSR S00354 S&F-CI Plug(Door)bend-3"dia(75)(LessLbr 285.00 INR EA 1 363 78 285 TBSP-C.II-04 (-)
TBSP-C.III-02

ZSSR S00355 S&F-CI Plug(Dr)Bend-4"dia(101.6)(LesLbr 372.00 INR EA 1 450 78 372 TBSP-C.II-05 (-)
TBSP-C.III-02

ZSSR S00356 S&F-75(3")CI SoilSingleJunc-Plug(LesLbr 359.00 INR EA 1 457 98 359 TBSP-C.II-07 (-)
TBSP-C.III-03

ZSSR S00357 S&F101.6(4") CISoilSinglJunc-Plug(LesLbr 617.00 INR EA 1 715 98 617 TBSP-C.II-08 (-)
TBSP-C.III-03

ZSSR S00358 S&F 75(3")CISoilPlain SingleJunc(LesLbr 286.00 INR EA 1 384 98 286 TBSP-C.II-10 (-)
TBSP-C.III-03

ZSSR S00359 S&F 101.6(4")CISoilPlainSingJunc(LesLbr 428.00 INR EA 1 526 98 428 TBSP-C.II-11 (-)
TBSP-C.III-03

ZSSR S00360 S&F101.6CISoilPlain DoubJuncPlug(LesLbr) 740.00 INR EA 1 846 106 740 TBSP-C.II-14 (-)
TBSP-C.III-04

ZSSR S00361 S&F101.6(4")CISoilPlain DoubJunc(LesLbr) 684.00 INR EA 1 790 106 684 TBSP-C.II-17 (-)
TBSP-C.III-04

ZSSR S00362 LabourFixingC.I.Single/DoubleSocketPipes 246.00 INR RMT 1 246 TBSP-C.III-01


ZSSR S00363 Labour-Fixing CI Plain/Plug (Door)Bends 78.00 INR EA 1 78 TBSP-C.III-02

ZSSR S00364 Labour-Fixing CI soil single junctions 98.00 INR EA 1 98 TBSP-C.III-03

ZSSR S00365 Labour-Fixing CI soil double junctions 106.00 INR EA 1 106 TBSP-C.III-04

ZSSR S00366 Labour-FixingCISoilCollars,Bends,Offset 49.00 INR EA 1 49 TBSP-C.III-05

ZSSR S00367 Labour-Fixing CI Nahany/ Floor traps 64.00 INR EA 1 64 TBSP-C.III-06

ZSSR S00368 Boxing of Nahany traps in RCC floors 207.00 INR EA 1 207 TBSP-C.III-07
ZSSR S00369 Boxing of W.C Traps in R.C.C floors 415.00 INR EA 1 415 TBSP-C.III-08
ZSSR S00370 S&FOrissa Pan white (Less Lbr) 897.00 INR EA 1 1306 409 897 TBSP-E.I-03 (-)
TBSP-E.VIII-02

ZSSR S00371 S&F European Water Closet (Less Lbr) 1332.00 INR EA 1 1619 287 1332 TBSP-E.II-02 (-)
TBSP-E.VIII-06

ZSSR S00372 S&F PlasticSeat&Lid-Europe WC (Less Lbr) 651.00 INR EA 1 734 83 651 TBSP-E.V-01 (-)
TBSP-E.VIII-07

ZSSR S00373 S&F Flat Back Wash Hand (Less Lbr) 1060.00 INR EA 1 1469 409 1060 TBSP-E.VI-04 (-)
TBSP-E.VIII-08

ZSSR S00374 S&F Pedestal-Wash Hand Basin(Less Lbr) 888.00 INR EA 1 1036 148 888 TBSP-E.VI-12 (-)
TBSP-E.VIII-09
ZSSR S00375 S&F Flat back Bowl urinals (Less Lbr) 604.00 INR EA 1 767 163 604 TBSP-E.VII-01 (-)
TBSP-E.VIII-11

ZSSR S00376 S&F CP finish steel towel rod 360.00 INR EA 1 360 360 TBSP-F.VII-10

ZSSR S00377 S&F CP finish brass soap dish 514.00 INR EA 1 514 514 TBSP-F.VII-21
ZSSR S00378 Labour-Fixing Indian pattern W.C 328.00 INR EA 1 328 TBSP-E.VIII-01

ZSSR S00379 Labour-Fixing Orissa pan W.C 409.00 INR EA 1 409 TBSP-E.VIII-02

ZSSR S00380 Labour-Fixing European Water Closet 287.00 INR EA 1 287 TBSP-E.VIII-06

ZSSR S00381 Labour-Fixing PlasticSeat&Lid-EuropeanWC 83.00 INR EA 1 83 TBSP-E.VIII-07

ZSSR S00382 Labour-Fixing-Wash Hand Basin 409.00 INR EA 1 409 TBSP-E.VIII-08

ZSSR S00383 Labour-Fixing Pedestal-Wash Hand Basin 148.00 INR EA 1 148 TBSP-E.VIII-09
ZSSR S00384 Labour-FixingBottleTrap-Wash HandBasin 57.00 INR EA 1 57 TBSP-E.VIII-10

ZSSR S00385 Labour-Fixing BackBowl/HalfStall Urinals 163.00 INR EA 1 163 TBSP-E.VIII-11

ZSSR S00386 Labour-FixingVitreousChinaPorcelainSinks 409.00 INR EA 1 409 TBSP-E.VIII-12

ZSSR S00387 S&F15 BrassCPFin BibTap-FulTurn(Les Lbr) 172.00 INR EA 1 223 51 172 TBSP-F.I-01 (-)
TBSP-F.VIII-01
ZSSR S00388 S&F15 BrassCPFin BibTap-QtrTurn(Les Lbr) 492.00 INR EA 1 543 51 492 TBSP-F.I-02 (-)
TBSP-F.VIII-01

ZSSR S00389 Labour-Fixing CP TapS&Faucets 51.00 INR EA 1 51 TBSP-F.VIII-01


ZSSR S00390 S&F 15mm NB GIPipe MediumGrade(Less Lbr) 143.00 INR RMT 1 184 41 143 TBSP-G.I-07 (-) 41

ZSSR S00391 S&F 20mm NB GIPipe MediumGrade(Less Lbr) 163.00 INR RMT 1 204 41 163 TBSP-G.I-08 (-) 41

ZSSR S00392 S&F 25mm NB GIPipe MediumGrade(Less Lbr) 227.00 INR RMT 1 268 41 227 TBSP-G.I-09 (-) 41

ZSSR S00393 Placing on Terrace water storage tank 7.00 INR L 1 7 7 TBSP-H.II-01
ZSSR S00394 S&F 40mm NB GIPipe MediumGrade(Less Lbr) 379.00 INR RMT 1 420 41 379 TBSP-G.I-11 (-) 41

ZSSR S00395 S&F 50mm NB GIPipe MediumGrade(Less Lbr) 411.00 INR RMT 1 452 41 411 TBSP-G.I-12 (-) 41

ZSSR S00396 S&F15mm NBBronzGate/GlobeValve(Less Lbr) 515.00 INR EA 1 577 62 515 TBSP-G.III-01 (-)
TBSP-G.IV-03

ZSSR S00397 S&F20mm NBBronzGate/GlobeValve(Less Lbr) 716.00 INR EA 1 778 62 716 TBSP-G.III-02 (-)
TBSP-G.IV-03

ZSSR S00398 S&F25mm NBBronzGate/GlobeValve(Less Lbr) 1057.00 INR EA 1 1119 62 1057 TBSP-G.III-03 (-)
TBSP-G.IV-03

ZSSR S00399 S&F32mm NBBronzGate/GlobeValve(Less Lbr) 1638.00 INR EA 1 1700 62 1638 TBSP-G.III-04 (-)
TBSP-G.IV-03

ZSSR S00400 S&F 15mm NB Bronze Ball valve (Less Lbr) 126.00 INR EA 1 188 62 126 TBSP-G.III-20 (-)
TBSP-G.IV-03

ZSSR S00401 S&F 20mm NB Bronze Ball valve (Less Lbr) 211.00 INR EA 1 273 62 211 TBSP-G.III-21 (-)
TBSP-G.IV-03

ZSSR S00402 S&F 25mm NB Bronze Ball valve (Less Lbr) 322.00 INR EA 1 384 62 322 TBSP-G.III-22 (-)
TBSP-G.IV-03

ZSSR S00403 S&F 32mm NB Bronze Ball valve (Less Lbr) 619.00 INR EA 1 681 62 619 TBSP-G.III-23 (-)
TBSP-G.IV-03

ZSSR S00404 10 Liters capacity Single Flush (Less Lb 1363.00 INR EA 1 1439 76 1363 TBSP-H.II-07 (-)
TBSP-H.IV-01

ZSSR S00405 110 mm dia - Door Bend 107.00 INR EA 1 107 107 TBSP-H.II-15

ZSSR S00406 110 mm dia - Vent Cowl 19.00 INR EA 1 19 19 TBSP-H.II-55


ZSSR S00407 4 (101.6 mm ) Nahany Trap (W/O Jali) 111.00 INR EA 1 111 111 TBSP-H.II-69

ZSSR S00408 Labour-Fixing-PVC pipes 76.00 INR RMT 1 76 TBSP-H.IV-01

ZSSR S00409 Labour-Fixing PPR-upto 40mm Dia 34.00 INR RMT 1 34 TBSP-H.IV-02
ZSSR S00410 Labour-Fixing PPR-above 40mm Dia 57.00 INR RMT 1 57 TBSP-H.IV-03

ZSSR S00411 S&F TV shape mirror(Less Lbr) 350.00 INR EA 1 466 116 350 TBSP-J.I-35 (-)

ZSSR S00412 20mmDia(1.55mmThk) MedGrad FRLS PVC Pipe 18.00 INR M 1 18 116
18 ELEC-1.2.2.a

ZSSR S00413 25mmDia(1.80mmThk) MedGrad FRLS PVC Pipe 24.00 INR M 1 24 24.00 ELEC-1.2.2.b

ZSSR S00414 19/20mm width,12.5mm Ht Casing&Caping 24.00 INR M 1 24 24.00 ELEC-1.2.4.a

ZSSR S00415 25mm width,12.5mm Ht Casing&Caping 30.00 INR M 1 30 30.00 ELEC-1.2.4.b

ZSSR S00416 32mm width,12.5mm Ht Casing&Caping 34.00 INR M 1 34 34.00 ELEC-1.2.4.c

ZSSR S00417 PVC Junction Boxes Deep size 19/20mm 21.00 INR NO 1 21 21.00 ELEC-1.2.9.a
ZSSR S00418 PVC Junction Boxes Deep size 25mm 24.00 INR NO 1 24 24.00 ELEC-1.2.9.b
ZSSR S00419 19/20mm dia 1.5mm thick PVC Bends 5.00 INR NO 1 5 5.00 ELEC-1.2.10.a

ZSSR S00420 25mm dia 1.5mm thick PVC Bends 7.00 INR NO 1 7 7.00 ELEC-1.2.10.b

ZSSR S00421 Supply of 6 Module box 122.00 INR NO 1 122 122.00 ELEC-1.3.1.d
ZSSR S00422 22/0.3mm(1.5Sqmm)FR PVC Copper Cable 1482.00 INR M 100 1482 1482.00 ELEC-1-5-1.b

ZSSR S00423 36/0.3mm (2.5 Sqmm)FR PVC Copper Cable 2391.00 INR M 100 2391 2391.00 ELEC-1-5-1.c

ZSSR S00424 56/0.3mm (4.0 Sqmm)FR PVC Copper Cable 3650.00 INR M 100 3650 3650.00 ELEC-1-5-1.d

ZSSR S00425 84/0.3mm (6.0 Sqmm) FR PVC Copper Cable 5549.00 INR M 100 5549 5549.00 ELEC-1-5-1.e

ZSSR S00426 10Sqmm Weather Proof Twin Core Al.Wire 3387.00 INR M 100 3387 3387.00 ELEC-1.6.2.b

ZSSR S00427 23/0060 twin core/flat heavy Copper wire 953.00 INR M 100 953 953.00 ELEC-1.5.4

ZSSR S00428 Supply of 16A flush type Swich 59.00 INR NO 1 59 59.00 ELEC-1.7.1.h

ZSSR S00429 Stepped type Electronic Regulator 200.00 INR NO 1 200 200.00 ELEC-1.7.1.l

ZSSR S00430 3 Plate Jumbo Ceiling Rose 19.00 INR NO 1 19 19.00 ELEC-1.7.1.m

ZSSR S00431 6A / 10A 1 Way 1 Module Modular Switch 59.00 INR NO 1 59 59.00 ELEC-1.9.2.a

ZSSR S00432 6A/10A3/2 Pin2 Modular Socket-shutter 87.00 INR NO 1 87 87.00 ELEC-1.9.2.d

ZSSR S00433 16A / 20A 1 Way 1 Module Modular Switch 78.00 INR NO 1 78 78.00 ELEC-1.9.2.h

ZSSR S00434 16A/6A 1 way 2 Module Combi Socket 126.00 INR NO 1 126 126.00 ELEC-1.9.2.l
ZSSR S00435 6 Modular Cover Frame 101.00 INR NO 1 101 101.00 ELEC-1.3.3.d

ZSSR S00436 6-32A 10KA SP MCB 193.00 INR NO 1 193 193.00 ELEC-2.13.1.a

ZSSR S00437 Supply of 63A DP Isolator 465.00 INR NO 1 465 465.00 ELEC-2.14.1.c
ZSSR S00438 Supply of 63A FP Isolator 848.00 INR NO 1 848 848.00 ELEC-2.14.1.g
ZSSR S00439 40A DP Isolator 351.00 INR NO 1 351 351.00 ELEC-2.14.1.b
ZSSR S00440 4 Way SPN DB with IP 20 794.00 INR NO 1 794 794.00 ELEC-2.15.1.a

ZSSR S00441 4 Way SPN DB with IP 43 1033.00 INR NO 1 1033 1033.00 ELEC-2.15.1.b

ZSSR S00442 8 Way SPN DB with IP 20 919.00 INR NO 1 919 919.00 ELEC-2.15.1.c

ZSSR S00443 8 Way SPN DB with IP 43 1298.00 INR NO 1 1298 1298.00 ELEC-2.15.1.d

ZSSR S00444 4 Way TPN DB Horizontal with IP 20 1564.00 INR NO 1 1564 1564.00 ELEC-2.16.1.a

ZSSR S00445 4 Way TPN DB Horizontal with IP 43 2598.00 INR NO 1 2598 2598.00 ELEC-2.16.1.b

ZSSR S00446 8 Way TPN DB Horizontal with IP 43 3910.00 INR NO 1 3910 3910.00 ELEC-2.16.1.d

ZSSR S00447 20A SP Plug and Socket 941.00 INR NO 1 941 941.00 ELEC-2.16.8.a

ZSSR S00448 150W SV / MH Street light luminaire 3620.00 INR NO 1 3620 3620.00 ELEC-3.1.3 (rates not
available in 2018-19) (Deleted
in Template

ZSSR S00449 400W MH Flood light luminaire 5438.00 INR NO 1 5438 5438.00 ELEC-3.1.1.a

ZSSR S00450 150W SV Lamp 600.00 INR NO 1 600 600.00 ELEC-3.4.1.d

ZSSR S00451 400W MH Lamp 1301.00 INR NO 1 1301 1301.00 ELEC-3.4.1.l

ZSSR S00452 S&F 1x36/40W Box type Tube Light fitting 651.00 INR NO 1 651 651.00 ELEC-3.6.3.a

ZSSR S00453 2 x 36/40W Box type Tube Light fitting 978.00 INR NO 1 978 978.00 ELEC-3.6.3.b

ZSSR S00454 Supply of HID Lamp holder 43.00 INR NO 1 43 43.00 ELEC-3.6.13

ZSSR S00455 2 x 36W CFL Paralite louvre 2720.00 INR NO 1 2720 2720.00 ELEC-3.6.5(rates not
available in 2018-19) Deleted
in Template
ZSSR S00456 Supply of 40W-60W Lamp 11.00 INR NO 1 11 11.00 ELEC-3.7.1

ZSSR S00457 36/40W fluorescent tube 40.00 INR NO 1 40 40.00 ELEC-3.7.4

ZSSR S00458 48 Sweep Ceiling fan 2432.00 INR NO 1 2432 2432 ELEC-5.1.3
ZSSR S00459 225mm Light duty exhaust fan 1227.00 INR NO 1 1227 1227 ELEC-5.1.9.a

ZSSR S00460 300mm, 900 RPM Heavy dutyexhaust fan 2829.00 INR NO 1 2829 2829 ELEC-5.1.10.a

ZSSR S00461 1.5 TR 5 Star AC 41769.00 INR NO 1 41769 41769 ELEC -6.1.1 d (rates not
available in 2018-19) Not
Adopting in Template

ZSSR S00462 U Nails 30.00 INR NO 100 30 30 ELEC-9.1.4


ZSSR S00463 Hard Coke 20.00 INR KG 1 20 20 ELEC-9.1.10
ZSSR S00464 Salt 15.00 INR KG 1 15 15 ELEC-9.1.11
ZSSR S00465 19 / 20 mm Steel tube fan down rod 83.00 INR M 1 83 83 ELEC-9.1.21
ZSSR S00466 TW / PVC Round Blocks 8.00 INR NO 1 8 8 ELEC-9.1.29
ZSSR S00467 G.I. Strip / Plate / Wire (per K. G) 65.00 INR KG 1 65 65 ELEC-9.3.6
ZSSR S00468 Earth work excacvation (Elect) 250.00 INR M3 1 250 ELEC-9.4.17

ZSSR S00469 Drilling16 Nos 12mm dia holes-G.I pipe 6.00 INR NO 1 6 ELEC-9.4.18
ZSSR S00470 G.I Nuts, Bolts an Washers each set 12.00 INR SET 1 12 12 ELEC-9.4.19
ZSSR S00471 18 dia 2 thick hume pipe ring 250.00 INR NO 1 250 250 ELEC-9.4.20
ZSSR S00472 18 dia 3 thick hume pipe ring 300.00 INR NO 1 300 300 ELEC-9.4.21
ZSSR S00473 2 thick CC cover for hume pipe ring 130.00 INR NO 1 130 130 ELEC-9.4.22
ZSSR S00474 Labour - Skilled Electrician 540 INR NO 1 540 Sl. No.5 of I&CAD
ZSSR S00475 Labour - SemiSkilled Electrician 450 INR NO 1 450 Sl. No.5 of I&CAD
ZSSR S00476 Labour - Skilled Mason 470 INR NO 1 470
ZSSR S00477 Labour - Skilled Welder 500 INR NO 1 500 Sl. No.41 of I&CAD
ZSSR S00478 Labour - Helper (Electrical) 425 INR NO 1 425
ZSSR S00479 Sundries - HDR Req. Blasting (LS) 20.00 INR LS 1 20 adopted previous rates
ZSSR S00480 Rawl Plugs (Elec) 31.00 INR NO 100 31 ELEC-9.1.2
ZSSR S00481 Conveyance-Fixing kadapa slabs (LMR) 6.00 INR LS 1 adopted previous rates
ZSSR S00482 Fixing of 40mm thick kadapa slabs (LMR) 15.00 INR LS 1 adopted previous rates
ZSSR S00483 Labour charges-Filling in the pit (LMR) 10.00 INR LS 1 adopted previous rates
ZSSR S00484 Painting charges - MS grill/Angles (LS) 1.00 INR LS 1 adopted previous rates
ZSSR S00485 Painting charges for MS Y- Angles (LS) 1.00 INR LS 1 adopted previous rates
ZSSR S00486 Paint charges for MSAngles-CM Wall (LS) 1.00 INR LS 1 adopted previous rates
ZSSR S00487 Galvanisation charges 5.18 INR KG 1 CS65 of Transco SSR
ZSSR S00488 Cattle Manure-Filling-Planting (LMR) 350.00 INR M3 1 adopted previous rates
ZSSR S00489 Cost of Plant (LMR) 60.00 INR NO 1 adopted previous rates
ZSSR S00490 Red Soil Spreading Charges (LMR) 5.00 INR M2 1 adopted previous rates
ZSSR S00491 Ploughing (LMR) 0.30 INR M2 1 adopted previous rates
ZSSR S00492 Fixing of G.I. staples steel pins 10.00 INR LS 1 adopted previous rates
ZSSR S00493 Fixing 50mm (2) dia B- class GI pipe 55.00 INR LS 1 adopted previous rates

ZSSR S00494 Paint & Lab Charge for Ltrng (5'x3' BRD) 3.00 INR NO 1 adopted previous rates

ZSSR S00495 "Paint&Lab Charge for Ltrng (2'x1'6"" BR 3.00 INR NO 1 adopted previous rates

ZSSR S00496 "Paint&Lab Charge for Ltrng (6'x18"" BRD 1.50 INR NO 1 adopted previous rates

ZSSR S00497 Cost of PVC soap trays (LMR) 50.00 INR EA 1 60 1.18125 50.79 adopted previous rates
( Deleted in the Template)
ZSSR S00498 S&F long body CP tap(LMR) 260.00 INR EA 1 260 260 LMR

ZSSR S00499 Lab-Drill&Fix 3T BP SBoard -6" x 18"(LS) 10.00 INR LS 1 adopted previous rates

ZSSR S00500 Cost-CC(1:2:4) for NahanyTrap Base (LMR) 35.00 INR LS 1 adopted previous rates
ZSSR S00501 Labour-Fixing in position NahanyTrap 55.00 INR LS 1 adopted previous rates
ZSSR S00502 Con&Erec Charge- Const base to tank (LS) 500.00 INR LS 1 adopted previous rates

ZSSR S00503 Sundries for P.V.C casing and caping (LS 35.00 INR LS 1 adopted previous rates

ZSSR S00504 Sundries-fixing Exhaust fan (LS) 25.00 INR LS 1 adopted previous rates
ZSSR S00505 Transport Charge-UnitCost CeilingFan(LS) 14.00 INR LS 1 adopted previous rates
ZSSR S00506 Unforeseen items for Ceiling Fan (LS) 25.00 INR LS 1 adopted previous rates

ZSSR S00507 Pipe Bending Charges for S.V. Lamp(LS) 10.00 INR LS 1 adopted previous rates
ZSSR S00508 Labour-Fixing 32A Main Switch (LS) 135.00 INR LS 1 adopted previous rates
ZSSR S00509 Labour-Fixing Well Glass VapourProof(LS) 35.00 INR LS 1 adopted previous rates
ZSSR S00510 Labour-Fixing Decor Light Fitting(LS) 35.00 INR LS 1 adopted previous rates
ZSSR S00511 Labour-Fixing 20A IPhase plug&socket(LS) 100.00 INR LS 1 adopted previous rates
ZSSR S00512 Labour-Fixing 400W MH Flood light lum(LS 100.00 INR LS 1 adopted previous rates
ZSSR S00513 Lead--EveryKM beyond 5KM upto 30KM-Earth 12.26 INR M3 1 13.7 1.11765 12.26

ZSSR S00514 Lead-EveryKM beyond 30KM-Earth/Sand/Grav 10.20 INR M3 1 11.4 1.11765 10.2

ZSSR S00515 Lead-upto1KM-Cement/ Steel/RCC poles 18.43 INR TO 1 20.6 1.11765 18.43

ZSSR S00516 Lead-upto2KM-Cement/ Steel/RCC poles 25.86 INR TO 1 28.9 1.11765 25.86

ZSSR S00517 Lead-upto3KM-Cement/ Steel/RCC poles 35.70 INR TO 1 39.9 1.11765 35.7

ZSSR S00518 Lead-upto4KM-Cement/ Steel/RCC poles 43.39 INR TO 1 48.5 1.11765 43.39

ZSSR S00519 Lead-upto5KM-Cement/ Steel/RCC poles 51.09 INR TO 1 57.1 1.11765 51.09

ZSSR S00520 Lead-EveryKM beyond 5KM upto 30KM-Cement 7.69 INR TO 1 8.6 1.11765 7.69

ZSSR S00521 Lead-EveryKM beyond 30KM -Cement/Steel 6.35 INR TO 1 7.1 1.11765 6.35

ZSSR S00522 Lead-upto1KM-PCC/ Shahabad slabs/Wood 43.48 INR M3 1 48.6 1.11765 43.48

ZSSR S00523 Lead-upto2KM-PCC/ Shahabad slabs/Wood 60.84 INR M3 1 68 1.11765 60.84

ZSSR S00524 Lead-upto3KM-PCC/ Shahabad slabs/Wood 84.11 INR M3 1 94 1.11765 84.11

ZSSR S00525 Lead-upto4KM-PCC/ Shahabad slabs/Wood 102.09 INR M3 1 114.1 1.11765 102.09

ZSSR S00526 Lead-upto5KM-PCC/ Shahabad slabs/Wood 120.16 INR M3 1 134.3 1.11765 120.16

ZSSR S00527 Lead-EveryKM beyond 5KM upto 30KM-PCC 17.98 INR M3 1 20.1 1.11765 17.98

ZSSR S00528 Lead-EveryKM beyond 30KM -PCC slabs/Wood 15.03 INR M3 1 16.8 1.11765 15.03

ZSSR S00529 Lead-upto1KM-Water/1000 liters 18.34 INR L 1 20.5 1.11765 18.34

ZSSR S00530 Lead-upto2KM-Water/1000 liters 25.68 INR L 1 28.7 1.11765 25.68


ZSSR S00531 Lead-upto3KM-Water/1000 liters 34.27 INR L 1 38.3 1.11765 34.27

ZSSR S00532 Lead-upto4KM-Water/1000 liters 41.52 INR L 1 46.4 1.11765 41.52

ZSSR S00533 Lead-upto5KM-Water/1000 liters 48.85 INR L 1 54.6 1.11765 48.85

ZSSR S00534 Lead-EveryKM beyond 5KM upto 30KM-Water 7.34 INR L 1 8.2 1.11765 7.34

ZSSR S00535 Lead-EveryKM beyond 30KM -Water/1000 lit 6.08 INR L 1 6.8 1.11765 6.08

ZSSR S00536 Lead-upto1KM-1000 Nos of Bricks 49.30 INR NO 1 55.1 1.11765 49.3

ZSSR S00537 Lead-upto2KM-1000 Nos of Bricks 68.98 INR NO 1 77.1 1.11765 68.98

ZSSR S00538 Lead-upto3KM-1000 Nos of Bricks 91.98 INR NO 1 102.8 1.11765 91.98

ZSSR S00539 Lead-upto4KM-1000 Nos of Bricks 111.66 INR NO 1 124.8 1.11765 111.66

ZSSR S00540 Lead-upto5KM-1000 Nos of Bricks 131.35 INR NO 1 146.8 1.11765 131.35

ZSSR S00541 Lead-EveryKM beyond 5KMupto 30KM- Bricks 19.68 INR NO 1 22 1.11765 19.68

ZSSR S00542 Lead-EveryKM beyond 30KM -Bricks 16.46 INR NO 1 18.4 1.11765 16.46

ZSSR S00543 LoadingCharges-Manual(WO)-Earth/Sand/Gr. 20.49 INR M3 1 22.9 1.11765 20.49

ZSSR S00544 UnLoadingCharge-Manuall(WO) -Earth/Sand 10.24 INR M3 1 11.45 1.11765 10.24

ZSSR S00545 LoadingCharges-Manual(WO)-Rubble stone 40.98 INR M3 1 45.8 1.11765 40.98

ZSSR S00546 UnLoadingCharge-Manuall(WO)-Rubble stone 20.49 INR M3 1 22.9 1.11765 20.49

ZSSR S00547 LoadingCharges-Manual(WO)-Cement 67.55 INR TO 1 75.5 1.11765 67.55

ZSSR S00548 UnLoadingCharge-Manuall(WO) -Cement 67.55 INR TO 1 75.5 1.11765 67.55

ZSSR S00549 LoadingCharges-Manual(WO)-Steel 80.97 INR TO 1 90.5 1.11765 80.97

ZSSR S00550 UnLoadingCharge-Manuall(WO) -Steel 80.97 INR TO 1 90.5 1.11765 80.97

ZSSR S00551 LoadingCharges-Manual(WO)-Brick 56.28 INR NO 1 62.9 1.11765 56.28

ZSSR S00552 UnLoadingCharge-Manuall(WO) -Brick 56.28 INR NO 1 62.9 1.11765 56.28

ZSSR S00553 LoadingCharges-Manual(W)-Earth/Sand/Gr. 110.05 INR M3 1 123 1.11765 110.05 95.41

ZSSR S00554 UnLoadingCharge-Manuall(W) -Earth/Sand 39.99 INR M3 1 44.7 1.11765 39.99

ZSSR S00555 LoadingCharges-Manual(W)-Rubble stone 130.54 INR M3 1 145.9 1.11765 130.54

ZSSR S00556 UnLoadingCharge-Manuall(W)-Rubble stone 65.27 INR M3 1 72.95 1.11765 65.27


ZSSR S00557 LoadingCharges-Manual(W)-Cement 166.06 INR TO 1 185.6 1.11765 166.06

ZSSR S00558 UnLoadingCharge-Manuall(W) -Cement 166.06 INR TO 1 185.6 1.11765 166.06

ZSSR S00559 LoadingCharges-Manual(W)-Steel 179.48 INR TO 1 200.6 1.11765 179.48

ZSSR S00560 UnLoadingCharge-Manuall(W) -Steel 179.48 INR TO 1 200.6 1.11765 179.48

ZSSR S00561 LoadingCharges-Manual(W)-Brick 218.85 INR NO 1 244.6 1.11765 218.85

ZSSR S00562 UnLoadingCharge-Manuall(W) -Brick 218.85 INR NO 1 244.6 1.11765 218.85

ZSSR S00563 Soil investigation-Pile Fdn(LMR) 55000.00 INR EA 1 adopted previous rates
ZSSR S00564 Hire-Agitatorcar/Transitmixer- Machinery 1831.20 INR HR 1 2140.1 308.9 1831.2 Sl.No.1 (Hire Chgs), of Ir
ZSSR S00565 Hire-Agitatorcar/Transitmixer- Labour 308.90 INR HR 1
ZSSR S00566 Hire-AirCompressor 5cmmElec-Machinery 403.10 INR HR 1 588.4 185.3 403.1 Sl.No.2 (Hire Chgs), of Irr
ZSSR S00567 Hire-AirCompressor 5cmmElec-Labour 185.30 INR HR 1
ZSSR S00568 Hire-AirCompressor7cmmelectric-Machinery 525.80 INR HR 1 711.1 185.3 525.8 Sl.No.4 (Hire Chgs), of Irr
ZSSR S00569 Hire-AirCompressor 7cmmelectric-Labour 185.30 INR HR 1
ZSSR S00570 Hire-AirCompres.8.5cmmDiesel-Machinery 1377.30 INR HR 1 1614.4 237.1 1377.3 Sl.No.5 (Hire Chgs), of Irr
ZSSR S00571 Hire-AirCompres.8.5cmmDiesel-Labour 237.10 INR HR 1
ZSSR S00572 Hire-AirCompressor15cmmeletric-Machinery 1243.40 INR HR 1 1441 197.6 1243.4 Sl.No.7 (Hire Chgs), of Irr
ZSSR S00573 Hire-AirCompressor 15cmmelectric-Labour 197.60 INR HR 1
ZSSR S00574 Hire-Angle Dozer 90 hp-Machinery 2403.80 INR HR 1 2661.2 257.4 2403.8 Sl.No.8 (Hire Chgs), of Irr
ZSSR S00575 Hire-Angle Dozer 90 hp-Labour 257.40 INR HR 1
ZSSR S00576 Hire-Batchingplant 2X1.00cum-Machinery 767.90 INR HR 1 1138.5 370.6 767.9 Sl.No.10 (Hire Chgs), of Irr

ZSSR S00577 Hire-Batching plant 2X1.00 cum-Labour 370.60 INR HR 1


ZSSR S00578 Hire-Batchingplant 2X1.5cum-Machinery 959.00 INR HR 1 1329.6 370.6 959 Sl.No.11(Hire Chgs), of Irr
ZSSR S00579 Hire-Batching plant 2X1.50 cum-Labour 370.60 INR HR 1
ZSSR S00580 Hire-Bending maching 3000x12mm-Machinery 172.60 INR HR 1 320.8 148.2 172.6 Sl.No.12 (Hire Chgs), of Irr
ZSSR S00581 Hire--Bending maching 3000x12mm-Labour 148.20 INR HR 1
ZSSR S00582 Hire-Clampsheel&Hoisting ropes-Machinery 5.40 INR HR 1 5.4 5.4 Sl.No.13 (Hire Chgs), of Irr
ZSSR S00584 Hire-Concrete bucket 1.5 cum-Machinery 15.20 INR HR 1 15.2 Sl.No.14 (Hire Chgs), of Irr
ZSSR S00586 Hire-Concretehandmixer45/30ltr-Machinery 5.30 INR HR 1 5.3 Sl.No.15 (Hire Chgs), of Irr,
ZSSR S00588 Hire-ConcreteMixer300/200lt(e)-Machinery 94.30 INR HR 1 341.3 247 94.3 Sl.No.17 (Hire Chgs), of Irr
ZSSR S00589 Hire-ConcreteMixer300/200lt(e)-Labour 247.00 INR HR 1
ZSSR S00590 Hire-ConcreteMixer600/400lt(e)-Machinery 176.60 INR HR 1 423.6 247 176.6 Sl.No.19 (Hire Chgs), of Irr
ZSSR S00591 Hire-ConcreteMixerr600/400ltr(e)--Labour 247.00 INR HR 1
ZSSR S00592 Hire-Concrete paver 100sqm/hr-Machinery 326.40 INR HR 1 800.6 474.2 326.4 Sl.No.20 (Hire Chgs), of Irr
ZSSR S00593 Hire-Concrete paver 100sqm/hr-Labour 474.20 INR HR 1
ZSSR S00594 Hire-Convey muker-Machinery 1095.00 INR HR 1 1292.6 197.6 1095 Sl.No.21 (Hire Chgs), of Irr
ZSSR S00595 Hire-Convey muker-Labour 197.60 INR HR 1
ZSSR S00596 Hire-Core drilling machine-Machinery 611.80 INR HR 1 920.7 308.9 611.8 Sl.No.22 (Hire Chgs), of Ir
ZSSR S00597 Hire-Core drilling machine-Labour 308.90 INR HR 1
ZSSR S00598 Hire-DieselGeneratingSet 50KVA-Machinery 1283.60 INR HR 1 1431.8 148.2 1283.6 Sl.No.24 (Hire Chgs), of Irr
ZSSR S00599 Hire-DieselGeneratingSet 50KVA-Labour 148.20 INR HR 1
ZSSR S00600 Hire-Diesel Loco 45hp-Machinery 1029.50 INR HR 1 1214.8 185.3 1029.5 Sl.No.25 (Hire Chgs), of Irr
ZSSR S00601 Hire-Diesel Loco 45hp-Labour 185.30 INR HR 1
ZSSR S00602 Hire-Dewateringpump5hp(diesel)-Machinery 107.40 INR HR 1 232.2 124.8 107.4 Sl.No.26 (Hire Chgs), of Irr
ZSSR S00603 Hire-Dewateringpump5hp(diesel)-Labour 124.80 INR HR 1
ZSSR S00604 Hire-Dewateringpump5hpelectric-Machinery 47.60 INR HR 1 141.2 93.6 47.6 Sl.No.27 (Hire Chgs), of Irr
ZSSR S00605 Hire-Dewateringpump5hp(electric)-Labour 93.60 INR HR 1
ZSSR S00606 Hire-Dewateringpump10hp(disel)-Machinery 212.90 INR HR 1 337.7 124.8 212.9 Sl.No.28 (Hire Chgs), of Irr
ZSSR S00607 Hire-Dewateringpump10hp(diesel)-Labour 124.80 INR HR 1
ZSSR S00608 Hire-Dewateringpump10hp(elec.)-Machinery 95.70 INR HR 1 189.3 93.6 95.7 Sl.No.29 (Hire Chgs), of Irr
ZSSR S00609 Hire-Dewateringpump10hp(electric)-Labour 93.60 INR HR 1
ZSSR S00610 Hire-Dewateringpump20hp(disel)-Machinery 442.60 INR HR 1 567.4 124.8 442.6 Sl.No.30 (Hire Chgs), of Irr
ZSSR S00611 Hire-Dewateringpump20hp(diesel)-Labour 124.80 INR HR 1
ZSSR S00612 Hire-Dewateringpump20hp(elec.)-Machinery 190.30 INR HR 1 283.9 93.6 190.3 Sl.No.31 (Hire Chgs), of Irr
ZSSR S00613 Hire-Dewateringpump20hp(electric)-Labour 93.60 INR HR 1
ZSSR S00614 Hire-Drifter-Machinery 312.80 INR HR 1 698.9 386.1 312.8 Sl.No.32 (Hire Chgs), of Irr
ZSSR S00615 Hire-Drifter-Labour 386.10 INR HR 1
ZSSR S00616 Hire-Geophysical Elec.meter-Machinery 99.80 INR HR 1 99.8 99.8 Sl.No.35 (Hire Chgs), of Irr
ZSSR S00618 Hire-Grouting pump-Machinery 78.90 INR HR 1 375.3 296.4 78.9 Sl.No.36 (Hire Chgs), of Irr
ZSSR S00619 Hire-Grouting pump-Labour 296.40 INR HR 1
ZSSR S00620 Hire-Guniting/sand blast equip-Machinery 105.90 INR HR 1 352.9 247 105.9 Sl.No.37 (Hire Chgs), of Irr
ZSSR S00621 Hire-Guniting/sand blast equip-Labour 247.00 INR HR 1
ZSSR S00622 Hire-Iceplant & access.30t/day-Machinery 1427.90 INR HR 1 1576.1 148.2 1427.9 Sl.No.38 (Hire Chgs), of Ir
ZSSR S00623 Hire-Iceplant&accessories 30t/day-Labour 148.20 INR HR 1
ZSSR S00624 Hire-Vibrator 60mm-Petrol-Machinery 38.90 INR HR 1 216.7 177.8 38.9 Sl.No.42 (Hire Chgs), of Irr
ZSSR S00625 Hire-Vibrator 60mm-Petrol-Labour 177.80 INR HR 1
ZSSR S00626 Hire-Vibrator 60mm-Electric-Machinery 19.10 INR HR 1 196.9 177.8 19.1 Sl.No.43 (Hire Chgs), of Irr
ZSSR S00627 Hire-Vibrator 60mm-Electric-Labour 177.80 INR HR 1
ZSSR S00628 Hire-Planing machine 4m stroke-Machinery 242.10 INR HR 1 479.2 237.1 242.1 Sl.No.44(Hire Chgs), of Irr
ZSSR S00629 Hire-Planing machine 4m strokeLabour 237.10 INR HR 1
ZSSR S00630 Hire-Plateshearing machine12mm-Machinery 219.80 INR HR 1 374.2 154.4 219.8 Sl.No.45(Hire Chgs), of Irr
ZSSR S00631 Hire-Plateshearing machine12mm-Labour 154.40 INR HR 1
ZSSR S00632 Hire-Pneumatic placer 0.5cum-Machinery 167.40 INR HR 1 264.9 97.5 167.4 Sl.No.46(Hire Chgs), of Irr
ZSSR S00633 Hire-Pneumatic placer 0.5cum-Labour 97.50 INR HR 1
ZSSR S00634 Hire-Pneumatic tamper-Machinery 19.30 INR HR 1 315.7 296.4 19.3 Sl.No.47(Hire Chgs), of Irr
ZSSR S00635 Hire-Pneumatic tamper-Labour 296.40 INR HR 1
ZSSR S00636 Hire-Pug cutting machine-Machinery 11.20 INR HR 1 11.2 11.2 Sl.No.48(Hire Chgs), of Irr
ZSSR S00638 Hire-Pusher leg-Machinery 11.80 INR HR 1 11.8 Sl.No.48(Hire Chgs), of Irr
ZSSR S00640 Hire-Road roller diesel 10t-Machinery 1095.20 INR HR 1 1342.3 247.1 1095.2 Sl.No.50 (Hire Chgs), of Irr
ZSSR S00641 Hire-Road roller diesel 10t-Labour 247.10 INR HR 1
ZSSR S00642 Hire-Shovel 0.5 0cum 75 hp-Machinery 1547.00 INR HR 1 1804.4 257.4 1547 Sl.No.51 (Hire Chgs), of Irr
ZSSR S00643 Hire-Shovel 0.50 cum 75 hp-Labour 257.40 INR HR 1
ZSSR S00644 Hire-Stationery derrick crane-Machinery 79.40 INR HR 1 79.4 79.4 Sl.No.53 (Hire Chgs), of Irr
ZSSR S00646 Hire-Tipping tub 1.5cum-Machinery 66.60 INR HR 1 66.6
ZSSR S00648 Hire-Tower crane 5 tonne-Machinery 1039.20 INR HR 1 1245.8 205.9 1039.9 Sl.No.56 (Hire Chgs), of Irr
ZSSR S00649 Hire-Tower crane 5 tonne-Labour 205.90 INR HR 1
ZSSR S00650 Hire-Transformer 250KVA-Machinery 4737.50 INR HR 1 4737.5
ZSSR S00652 Hire-Truck 10t-Machinery 776.10 INR HR 1 969.2 193.1 776.1 Sl.No.58 (Hire Chgs), of Irr
ZSSR S00653 Hire-Truck 10t-Labour 193.10 INR HR 1
ZSSR S00654 Hire-Truckmounted derickcran5t-Machinery 934.80 INR HR 1 1127.9 193.1 934.8 Sl.No.59 (Hire Chgs), of Irr
ZSSR S00655 Hire-Truckmounted derrickcrane 5t-Labour 193.10 INR HR 1
ZSSR S00656 Hire-Upright drilling machine-Machinery 66.10 INR HR 1 276.7 210.6 66.1 Sl.No.60 (Hire Chgs), of Irr
ZSSR S00657 Hire-Upright drilling machine-Labour 210.60 INR HR 1
ZSSR S00658 Hire-Ventilation fan 20hp-Machinery 189.60 INR HR 1 221.9 32.3 189.6 Sl.No.61 (Hire Chgs), of Irr
ZSSR S00659 Hire-Ventilation fan 20hp-Labour 32.30 INR HR 1
ZSSR S00660 Hire-Vibratorypad footroller8t-Machinery 2582.50 INR HR 1 2878.9 296.4 2582.5 Sl.No.62 (Hire Chgs), of Irr
ZSSR S00661 Hire-Vibratorypad footroller 8t-Labour 296.40 INR HR 1
ZSSR S00662 Hire-Wagon drill-Machinery 177.50 INR HR 1 486.4 308.9 177.5 Sl.No.63 (Hire Chgs), of Irr
ZSSR S00663 Hire-Wagon drill-Labour 308.90 INR HR 1
ZSSR S00664 Hire-Water tanker 8000ltr-Machinery 768.80 INR HR 1 961.9 193.1 768.8 Sl.No.64 (Hire Chgs), of Irr
ZSSR S00665 Hire-Water tanker 8000ltr-Labour 193.10 INR HR 1
ZSSR S00666 Hire-Welding set-Machinery 122.40 INR HR 1 122.4 122.4 Sl.No.65 (Hire Chgs), of Irr
ZSSR S00668 Hire-Winch 35hp (electric)-Machinery 342.30 INR HR 1 638.7 296.4 342.3 Sl.No.66 (Hire Chgs), of Irr
ZSSR S00669 Hire-Winch 35hp (electric)-Labour 296.40 INR HR 1
ZSSR S00670 Hire-Tractor with 2T roller-Machinery 345.00 INR HR 1 345 345 Sl.No.67 (Hire Chgs), of Irr
ZSSR S00672 Hire-Hydraulic Truck Crane 30T-Machinery 2993.20 INR HR 1 3577.3 584.1 2993.2 Sl.No.68 (Hire Chgs), of Irr
ZSSR S00673 Hire-Hydraulic Truck Crane 30T-Labour 584.10 INR HR 1
ZSSR S00674 Hire-Hydraulic Truck Crane 16T-Machinery 2192.70 INR HR 1 2776.8 584.1 2192.7 Sl.No.69 (Hire Chgs), of Irr
ZSSR S00675 Hire-Hydraulic Truck Crane 16T-Labour 584.10 INR HR 1
ZSSR S00676 Hire- Airlesspraypainting euip-Machinery 118.70 INR HR 1 118.7 Sl.No.70(Hire Chgs), of Irr

ZSSR S00678 Hire-Mortor Grader 3601.92 INR HR 1 3601.92 Sl.No.3, R&B Hire Chrgs
ZSSR S00679 Hire-Tractor with ripper attachment 568.23 INR HR 1 568.232 Sl.No.13, R&B Hire Chrgs
ZSSR S00680 Hire- Mechanical broom Hydraulic 399.84 INR HR 1 399.84 Sl.No.16, R&B Hire Chrgs
ZSSR S00681 Hire-Bitumen Pressure Distributor 1677.76 INR HR 1 1677.76 Sl.No.17, R&B Hire Chrgs
ZSSR S00682 Hire-Emulsion Pressure Distributor 963.20 INR HR 1 963.2 Sl.No.18, R&B Hire Chrgs
ZSSR S00683 Hire-Hot mix Plant-120TPH 31556.00 INR HR 1 31556 Sl.No.19, R&B Hire Chrgs
ZSSR S00684 Hire-Hot mix Plant-100TPH 27071.52 INR HR 1 27071.52 Sl.No.20, R&B Hire Chrgs
ZSSR S00685 Hire-Hot mix Plant-60TPH 24268.16 INR HR 1 24268.16 Sl.No.21, R&B Hire Chrgs
ZSSR S00686 Hire-Hot mix Plant-40 to 60 TPH capacity 21414.40 INR HR 1 21414.4 Sl.No.22, R&B Hire Chrgs
ZSSR S00687 Hire-Paver Finisher Hydrostatic 100TPH 3426.65 INR HR 1 3426.6512 Sl.No.23, R&B Hire Chrgs

ZSSR S00688 Hire-Hydraulic Chip Spreader 2875.04 INR HR 1 2875.04 Sl.No.25, R&B Hire Chrgs
ZSSR S00689 Hire-Tandem Road roller 1843.52 INR HR 1 1843.52 Sl.No.26, R&B Hire Chrgs
ZSSR S00690 Hire-Pneumatic Road roller 1436.96 INR HR 1 1436.96 Sl.No.27, R&B Hire Chrgs
ZSSR S00691 Hire-Pot-Hole repair machine 946.40 INR HR 1 946.4 Sl.No.28, R&B Hire Chrgs
ZSSR S00692 Hire-Bitumen boiler oil fired 234.08 INR HR 1 234.08 Sl.No.29, R&B Hire Chrgs
ZSSR S00693 Hire-GSB Plant 50 cum 1280.16 INR HR 1 1280.16 Sl.No.30, R&B Hire Chrgs
ZSSR S00694 Hire-Mastic Cooker 72.80 INR HR 1 72.8 Sl.No.31, R&B Hire Chrgs
ZSSR S00695 Hire-Batching and Mixing Plant (a)30 cum 1379.73 INR HR 1 1379.728 Sl.No.32, R&B Hire Chrgs
ZSSR S00696 Hire-Concrete pump of 45 and 30 cum 899.36 INR HR 1 899.36 Sl.No.34, R&B Hire Chrgs
ZSSR S00697 Hire-Cranes (a)80 tonnes 1311.52 INR HR 1 1311.52 Sl.No.35(a), R&B Hire Chrgs
ZSSR S00698 Hire-Cranes (b)35 tonnes 885.92 INR HR 1 885.92 Sl.No.35(b), R&B Hire Chrgs
ZSSR S00699 Hire-Cranes(d)Cranewithgrabbucket 0.75cu 2419.20 INR HR 1 2419.2 Sl.No.35(d)R&B Hire Chrgs
ZSSR S00700 Hire-Cranes(e)Cranewithgrabbucket 0.1cum 3955.84 INR HR 1 3955.84 Sl.No.35(e)R&B Hire Chrgs
ZSSR S00701 Hire-Kerb casting machine 348.32 INR HR 1 348.32 Sl.No.37,R&B Hire Chrgs
ZSSR S00702 Hire-Concrete mixer (b) 1.0Cum 726.88 INR HR 1 726.88 Sl.No.38,R&B Hire Chrgs
ZSSR S00703 Hire-Concrete paver finisher with 40hp 3248.00 INR HR 1 3248 Sl.No.40,R&B Hire Chrgs
ZSSR S00704 Hire-Integrated stone crusher-100TPH 9757.44 INR HR 1 9757.44 Sl.No.41,R&B Hire Chrgs

ZSSR S00705 Hire-Integrated stone crusher-200TPH 20573.28 INR HR 1 20573.28 Sl.No.41,R&B Hire Chrgs

ZSSR S00706 Hire-Pre stressing jack with pump&access 157.92 INR HR 1 157.92 Sl.No.42,R&B Hire Chrgs
ZSSR S00707 Hire-Generator 250KV 2072.00 INR HR 1 2072 Sl.No.43,R&B Hire Chrgs
ZSSR S00708 Hire-Generator 100KV 1478.40 INR HR 1 1478.4 Sl.No.43,R&B Hire Chrgs
ZSSR S00709 Hire-Pneumatic sinking of Plants 62.72 INR HR 1 62.72 Sl.No.44,R&B Hire Chrgs
ZSSR S00710 Hire-Road marking machine 124.32 INR HR 1 124.32 Sl.No.46,R&B Hire Chrgs
ZSSR S00711 Hire-Mobile slurry seal equipment 1261.12 INR HR 1 1261.12 Sl.No.47,R&B Hire Chrgs
ZSSR S00712 Hire-Plate compacter 53.76 INR HR 1 53.76 Sl.No.48,R&B Hire Chrgs
ZSSR S00713 Labour for fixing Chain Link Mesh(LS) 50.00 INR LS 1 50 adopted previous rates

ZSSR S00714 Labour-Fixing Nom Bore GI Pipe MG (LS) 41.00 INR RMT 1 41 SSR 2014-15

ZSSR S00715 14 mm - Mineral Fiber sheet 600 x 600 535.00 INR M2 1 535 535 TBSC-K.I-05
ZSSR S00716 36 W Pin type CFL lamp 120.00 INR NO 1 120 ELEC-3.7.7.f
ZSSR S00717 Labour for Fixing TV shape mirror 116.00 INR EA 1 116 Adopt Previous Rates
ZSSR S00718 S&F CP finish bib cock (LMR) 300.00 INR EA 1 300 300 LMR

ZSSR S00719 Transport Charges for 110DiaDoorBen 1.00 INR EA 1 1 adopted previous rates
ZSSR S00720 S&F NP Stop cock (LMR) 474.00 INR EA 1 474 474 LMR
ZSSR S00721 Labour-Fix Stop Cock 51.00 INR EA 1 51 TBSP-F.VIII-01
ZSSR S00722 Cost of 32A Main Switch (LMR) 750.00 INR EA 1 880 1.18125 744.97 adopted previous rates
ZSSR S00723 Cost of Elec Rechgble Flouroscent (LMR) 1,000.00 INR EA 1 1175 1.18125 994.71 adopted previous rates
ZSSR S00724 Cost of Well Glass Vapour Proof (LMR) 190.00 INR EA 1 225 1.18125 190.48 adopted previous rates
ZSSR S00725 Cost of Decorative Light Fitting(LMR) 300.00 INR EA 1 350 1.18125 296.3 adopted previous rates
ZSSR S00726 Hire Cent&Scaf-Unsup Ht 7.32M (LMR) 350.00 INR M2 1 350

ZSSR S00727 65mm Dia B Class GI pipe (Less Lbr) 761.00 INR RMT 1 802 41 761 TBSP-G.I-13 (-) 41

ZSSR S00728 50mm Dia B Class GI pipe (Less Lbr) 411.00 INR RMT 1 452 41 411 TBSP-G.I-12 (-) 41

ZSSR S00729 25mm Dia B class GI pipe(Less Lbr) 227.00 INR RMT 1 268 41 227 TBSP-G.I-09 (-) 41

ZSSR S00730 20mm Dia B class GI pipe(Less Lbr) 163.00 INR RMT 1 204 41 163 TBSP-G.I-08 (-) 41

ZSSR S00731 15mm Dia B class GI pipe(Less Lbr) 143.00 INR RMT 1 184 41 143 TBSP-G.I-07 (-) 41
ZSSR S00732 20mm Dia GM peet valve(Less Lbr) 716.00 INR EA 1 778 62 716 TBSP-G.III-02 (-)
TBSP-G.IV-03
ZSSR S00733 50.80 MM GM Peet(Less Lbr) 3303.00 INR EA 1 3365 62 3303 TBSP-G.III-06 (-)
TBSP-G.IV-03
ZSSR S00734 50mm GM Peet valve(Non Return)(Less Lbr) 2024.00 INR EA 1 2086 62 2024 TBSP-G.III-19 (-)
TBSP-G.IV-03

ZSSR S00735 63.5 mm Dia sluice valves 5420.00 INR EA 1 5420 5420 Pg no.110/232 BMW-F.21

ZSSR S00736 110mm dia 3M Single sockect PVC/SWR pipe 479.00 INR EA 1 479 479 TBSP-H.I-03

ZSSR S00737 Synthetic Enamel paint-Material 251.00 INR L 1 251 251 TBSC-G.V-01, Bldg items
SSR

ZSSR S00738 Chain link PVC Coated (3" x 3") 428.00 INR M2 1 428 428 TBSC-E.II-10

ZSSR S00739 Aluminium anodized sections for Doors 292.00 INR KG 1 292 292 TBSC-R.I-03

ZSSR S00740 Prelaminated Bison Designer Board 12mm T 667.00 INR M2 1 667 667 TBSC-H.IV-22
ZSSR S00741 Thermocol 12mm thick sheets 24.00 INR M2 1 24 24 TBSC-K.I-24
ZSSR S00742 Thermocol 19mm thick sheets 42.00 INR M2 1 42 42 TBSC-K.I-25
ZSSR S00743 904.0 mm (3’0”) dia solid block masonry 7338.00 INR EA 1 7338 7338 TBSP-B.I-01

ZSSR S00744 Labour-Gardener/Trained mali 450.00 INR D 1 450 Sl No.II-11


ZSSR S00745 Material-Aggregates 63mm to 45mm 607.63 INR M3 1 432.5 67.00 607.63 R&B S.S.Item.33.f &33.i +
37+36
ZSSR S00746 Material-Aggregates 19mm to 6mm 926.38 INR M3 1 687.5 67.00 926.38 R&B S.S.Item.33.a &33.d +
37+36
ZSSR S00747 Material-Aggregates below 5.6mm 698.25 INR M3 1 505 67.00 698.25 R&B S.S.Item.33.a + 37+36

ZSSR S00748 Chlorpyriphos/ Lindane emulsifiable 207.00 INR L 1 207 207 TBSC-Q.VI-18
ZSSR S00749 9PLY-19mm thick Plywood 1097.00 INR M2 1 1097 1097 TBSC-J.II-07
ZSSR S00750 Washable Oil Bound Distemper 82.00 INR KG 1 82 82 TBSC-G.II-03
ZSSR S00751 Fabrication charges-Heavy Steel 26.00 INR KG 1 26 TBSC-T.I-18

ZSSR S00752 Erection charges-Trusses 23.00 INR KG 1 23 TBSC-T.I-19

ZSSR S00753 "D.O.L Starter 415V, 3 phase, 50Hz" 1450.00 INR NO 1 1450 1450 ELEC-5.4.2 (Rates not
available) Repeated item
ZSSR S00754 5HP 3P CentrifugalPump Self Prim MonoBlk 23240.00 INR NO 1 23240 23240 ELEC-5.9.5.d

ZSSR S00755 3 core x2.5Sqmm Copper cable per meter 114.00 INR RMT 1 114 114 ELEC-1.5.6.g

ZSSR S00756 Voltmeter,Ammeter 2000.00 INR NO 1 2000 2000 ELEC-7.13.2.a


ZSSR S00757 Fab&Erce CRCA sheet 18SWG (24'X18") 3486.00 INR M2 1 3486 3486 ELEC-7.12.1.c

ZSSR S00758 RCC pipe 450mm dia-NP3 class 1479.00 INR M 1 1479 1479 Public Health table 1

ZSSR S00759 Collar 450mm dia-NP3 class 276.00 INR EA 1 276 276 Public Health table 2

ZSSR S00760 Labour-Diploma Engineer/Surveyor 750.00 INR D 1 750 Sl No.IV-4


ZSSR S00761 Material-Aggregates 25mm to 10mm 996.38 INR M3 1 743.5 67.00 996.38 R&B S.S.Item.33.b &33.e +
37+36
ZSSR S00762 Expansion joint filler board 818.00 INR M2 1 818 818 TBSC-Q.VIII-02

ZSSR S00763 PVC Pipe -50mmDia-6Kg - Single Socket 51 INR RMT 1 51 51 As per PH Tbl-17
ZSSR S00764 PVC Pipe -75mmDia-6Kg - Single Socket 112 INR RMT 1 112 112 As per PH Tbl-17
ZSSR S00765 PVC Pipe -110mmDia-6Kg - Single Socket 234 INR RMT 1 234 234 As per PH Tbl-17
ZSSR S00766 PVC Pipe -160mmDia-6Kg - Single Socket 498 INR RMT 1 498 498 As per PH Tbl-17
ZSSR S00767 Venetian blinds Vertical blinds 100 mm 1229.00 INR M2 1 1229 1229 TBSC-R.I-10
ZSSR S00768 602 x 602 mm CI man hole frame LW 30Kg 2998.00 INR EA 1 2998 2998 TBSP-B.II-10

ZSSR S00769 S&F of 50.8cm dia Man hole frame MW 40Kg 2674.00 INR EA 1 2674 2674 TBSP-B.II-13

ZSSR S00770 S&F PVC pipe of 8" dia 6Kg 781.00 INR RMT 1 781 781 Public Health table 17
ZSSR S00771 RCC pipe 450 mm dia -NP2 class 730.00 INR M 1 730 730 Public Health table 1

ZSSR S00772 RCC Collar 450mm dia-NP2 219.00 INR EA 1 219 219 Public Health table 2

ZSSR S00773 20mm dia HvyG 2.10mm thick PVC conduit 23.00 INR M 1 23 23 ELEC-1.2.1.a

ZSSR S00774 8"x10" Decolam Board 73.00 INR NO 1 73 73 ELEC-1.4.2.e


ZSSR S00775 25mm dia HvyG 2.2mm thick PVC conduit 30.00 INR M 1 30 30 ELEC-1.2.1.b

ZSSR S00776 PVC Junction Boxes Deep size 32mm 37.00 INR NO 1 37 37 ELEC-1.2.9.c

ZSSR S00777 32mm dia MedG 2.10mm thick PVC conduit 39.00 INR M 1 39 39 ELEC-1.2.2.c

ZSSR S00778 32mm dia 2.0mm thick PVC Bends 16.00 INR NO 1 16 16 ELEC-1.2.11.c

ZSSR S00779 CI gully trap grating 50.00 INR EA 1 50 50 TBSP-B.II-08


ZSSR S00780 Rubber based acid resistant paint (LMR) 280.00 INR KG 1 330 1.18125 279.37 adopted previous rates
ZSSR S00781 Labour Charge-Fixing Ramco Hylux Brd 318.00 INR M2 1 318 TBSC-T.I-26

ZSSR S00782 Sundries-Fixing Ramco Hylux Brd(LS) 50.00 INR LS 1 50 adopted previous rates
ZSSR S00783 Nylon Rollers-sliding glass/ Al. windows 14.00 INR NO 1 14 14 TBSC-P.IX-07
ZSSR S00784 Top Chan 8' len- Al Sliding Door (LMR) 300 INR NO 1 300 40 adopted previous rates
ZSSR S00785 L-Clamps (LMR) 10 INR NO 1 10 adopted previous rates
ZSSR S00786 Koreion grass with Laying (LMR) 250 INR M2 1 250 adopted previous rates
ZSSR S00787 Neem Cake @ 10Kg/100 Sqm (LMR) 9 INR KG 1 9 LMR
ZSSR S00788 Complex fertilizer @ 1Kg/100Sqm (LMR) 13 INR KG 1 13 LMR
ZSSR S00789 Pesticide(Lindane)@100gms/100 Sqm (LMR) 13 INR KG 1 13 LMR
ZSSR S00790 Maintain Koreion grass Lawn-60 days (LS) 20 INR M2 1 20 adopted previous rates
ZSSR S00791 Transport charges Koreion grass Lawn(LS) 3.5 INR M2 1 3.5 adopted previous rates
ZSSR S00792 Labour-Laying precast concrete block 181.00 INR M2 1 181 TBSC-C.IX-06

ZSSR S00793 Spread & rolling with hand roller(08-09) 368.00 INR M3 1 368 kept as it is

ZSSR S00794 Labour Charges for Fixing kerb wall (LS) 5.00 INR RMT 1 5 adopted previous rates
ZSSR S00795 1 x 28W surface pendent mounting T5 680.00 INR NO 1 680 680 ELEC-3.6.22 (Rate not
available in 2018-19, Not
Adopting in Template)
ZSSR S00796 Tipper 5.5 Cum 6.00 INR TOK 1 6 Sl. No.6 (changed to Hours)
(Don’t Use)
ZSSR S00797 Thread lining-Flooring Plaster (LS) 5.00 INR LS 1 5 adopted previous rates
ZSSR S00798 T.W. Deep Box of Size 6" x 8" 30.00 INR NO 1 30 30 ELEC-1.4.1.d
ZSSR S00799 Hylam Sheet 1.00 INR "2 1 1 ELEC-9.4.14
ZSSR S00800 16A 3P FlushSwt/3P PlugSoc (5in1)(12-13) 146.00 INR EA 1 146 146 As per SSR 2012-13

ZSSR S00801 6A 3/2 pin flush type Socket wit Shutter 24.00 INR NO 1 24 24 ELEC-1.7.1.d

ZSSR S00802 6A 1 Way flush type Switch 16.00 INR NO 1 16 16 ELEC-1.7.1.a

ZSSR S00803 3 Plate Jumbo Ceiling Rose 19.00 INR NO 1 19 19 ELEC-1.7.1.m

ZSSR S00805 6-32A 10KA TP MCB 910.00 INR NO 1 910 910 ELEC-2.13.1.e

ZSSR S00806 ST&F 5 Star Water Heater -SS Tank-15L 8941.00 INR NO 1 8941 8941 ELEC-5.2.1.a

ZSSR S00807 Supply of Remote Bell 408.00 INR NO 1 408 408 ELEC-1.7.2.e

ZSSR S00808 Supply of 4 Module Box 90.00 INR NO 1 90 90 ELEC-1.3.1.c


ZSSR S00809 Supply of 4 Modular Cover Frame 76.00 INR NO 1 76 76 ELEC-1.3.3.c

ZSSR S00810 Supply 32A TP plug & Socket in SS enclos 2086.00 INR NO 1 2086 2086 ELEC-2.16.8.c

ZSSR S00811 32mm dia(2.10mm Thick) medium grade 39.00 INR M 1 39 39 ELEC-1.2.2.c (repeated)

ZSSR S00812 PVC Junction Boxes Deep size 32mm 37.00 INR NO 1 37 37 ELEC-1.2.9.c (repeated)
ZSSR S00813 32mm dia 2.0mm thick PVC Bends 16.00 INR NO 1 16 16 ELEC-1.2.11.c (repeated)

ZSSR S00814 126/0.40 (16 Sqmm) FR PVC Copper Cable 13595.00 INR M 100 13595 13595 ELEC-1.5.1.g

ZSSR S00815 140/0.30 (10.0Sqmm) FR PVC Copper Cable 8597.00 INR M 100 8597 8597 ELEC-1.5.1.f

ZSSR S00816 4 Way VTPN DB 4 Pole incomer (IP 43) 6303.00 INR NO 1 6303 6303 ELEC-2.16.2.a

ZSSR S00817 8 Way VTPN DB 4 Pole incomer (IP 43) 8103.00 INR NO 1 8103 8103 ELEC-2.16.2.b
ZSSR S00804 12 Way SPN DB with IP 43 1571.00 INR NO 1 1571 1571 ELEC-2.15.1.f

ZSSR S00818 Panel fabric 2100x2175x400mm (16G)(LMR) 58200.00 INR SET 1 68733 1.18125 58186.67 adopted previous rates

ZSSR S00819 400A 3 pole MCCB set with Amp meter(LMR) 37300.00 INR SET 1 44028 1.18125 37272.38 adopted previous rates

ZSSR S00820 250A 3 pole MCCB L&T-Brk Cap 36/35 KA 15706.00 INR EA 1 15706 15706 ELEC-2.8.1.g

ZSSR S00821 160A 3 pole MCCB L&T-Brk Cap 25 KA 9350.00 INR EA 1 9350 9350 ELEC-2.8.1.e

ZSSR S00822 125A 3 pole MCCB L&T-Brk Cap 35/36 KA 7051.00 INR EA 1 7051 7051 ELEC-2.8.1.c

ZSSR S00823 400A 3 pole MCCB L&T-Brk Cap 35/36 KA 21257.00 INR NO 1 21257 21257 ELEC-2.8.1.i

ZSSR S00824 Sundries-Cubical panel Mounting (LS) 200.00 INR LS 1 adopted previous rates
ZSSR S00825 300A Porcel Rewire fuse unit-Ext strips 1104.00 INR NO 1 1104 1104 ELEC-2.6.2.b

ZSSR S00826 600x50x2 thick GI perforated cable tray 940.00 INR M 1 940 940 ELEC-4.9.1.b

ZSSR S00827 300x50x2 thick GI perforated cable tray 700.00 INR M 1 700 700 ELEC-4.9.1.d

ZSSR S00828 S&F 4No 9L Cap round bottom bucket&sand 1067.00 INR SET 1 1067 1067 ELEC-10.5.6

ZSSR S00829 S&F Fire bucket Stand-install 2No Bucket 889.00 INR SET 1 889 889 ELEC-10.5.7

ZSSR S00830 S&F 4.5 Kg CO2 type Fire Extinguisher 9689.00 INR NO 1 9689 9689 ELEC-10.5.3.a

ZSSR S00831 Supply of 5 KVA Stabilizer 2880.00 INR NO 1 2880 2880 ELEC-6.7.1.e

ZSSR S00832 120 sqmm 3.5 core armoured Al. cable 637.00 INR M 1 637 637 ELEC-4.1.1.l

ZSSR S00833 M.S.Poles for garden posts-'B' Class 61.00 INR KG 1 61 61 ELEC-7.1.2

ZSSR S00834 Glass doom with reflector 250.00 INR EA 1 250 adopted previous rates
ZSSR S00835 Electrical Dwgs-2C,G+2 Flrs Bldg (LS) 25000.00 INR LS 1 25000 adopted previous rates
ZSSR S00836 S&I Floor Mount Close Coup EWC (LessLbr) 11385.00 INR EA 1 11672 287 11385 TBSP-E.II-05 (-)
TBSP-E.VIII-06

ZSSR S00837 S&F WhiteGl V China Porc Sink (Less Lbr) 3678.00 INR EA 1 4087 409 3678 TBSP-E.VI-09 (-)
TBSP-E.VIII-
12

ZSSR S00838 Labour-Fixing Vitr China Porcelain Sink 409.00 INR EA 1 409 TBSP-E-VIII.12

ZSSR S00839 S&F 15 CP BB Hand Showr&OH Shwr(LessLbr) 3135.00 INR EA 1 3310 175 3135 TBSP-F.V-03 (-)
TBSP-
F.VIII-03

ZSSR S00840 Labour-Fixing Wall taps, Mixer&Diverter 175.00 INR EA 1 175 TBSP-F.VIII-03

ZSSR S00841 S&F 15 CP BB Basin Mixr-H&C Mix(LessLbr) 2311.00 INR EA 1 2486 175 2311 TBSP-F.V-07 (-)
TBSP-
F.VIII-03

ZSSR S00842 S&F 15 CP BB Ovr Hd Shower Arm(LessLbr) 1262.00 INR EA 1 1361 99 1262 TBSP-F.VI-06 (-)
TBSP-F.VIII-04

ZSSR S00843 Labour-Fixing Misc CP Fittings 99.00 INR EA 1 99 TBSP-F.VIII-04

ZSSR S00844 S&F 15 OH 5Flw RoundMasageShowr(LessLbr) 693.00 INR EA 1 792 99 693 TBSP-F.VI-07 (-)
TBSP-F.VIII-04
ZSSR S00845 S&F CP SS Toilet Paper Holder (LessLbr) 693.00 INR EA 1 792 99 693 TBSP-F.VII-25 (-)
TBSP-
F.VIII-04
ZSSR S00846 S&F 15 CPBB Pillar Cock-Aerator(LessLbr) 697.00 INR EA 1 748 51 697 TBSP-F.II-03 (-)
TBSP-F.VIII-01

ZSSR S00847 Supply-SWG Gully Trap (Round&Square) 264.00 INR EA 1 264 264 TBSP-A.II-56

ZSSR S00848 S&F CI Frame & Cover over Gully Traps 124.00 INR EA 1 124 124 TBSP-B.II-06

ZSSR S00849 Plastering for SWG gully Trap (LMR) 35.00 INR LS 1 35 adopted previous rates
ZSSR S00850 S&F SS Soap Container-Wall Mounted 409.00 INR EA 1 409 409 TBSP-F.VII-22

ZSSR S00851 S&F15 CP Concel Stop Val Qtr Trn(LessLbr 452.00 INR EA 1 551 99 452 TBSP-F.IV-05 (-)
TBSP-F.VIII-02

ZSSR S00852 S&F15 CP Pillar Tap Full Trn (LessLbr) 517.00 INR EA 1 568 51 517 TBSP-F.II-01 (-)
TBSP-F.VIII-01

ZSSR S00853 R.C.C.PlainEndedPipes-600mmDiaNP-2Class 1190.00 INR RMT 1 1190 1190 Public Health table 1

ZSSR S00854 R.C.C. COLLARS 600mm Dia NP-2 Class 339.00 INR NO 1 339 339 Public Health table 2

ZSSR S00855 R.C.C.PlainEndedPipes-450mmDiaNP-3Class 1479.00 INR RMT 1 1479 1479 Public Health table 1
ZSSR S00856 R.C.C. COLLARS 450mm Dia NP-3 Class 276.00 INR NO 1 276 276 Public Health table 2

ZSSR S00857 Supply 300mm (12"dia) SWG SP-1pipes 1330.00 INR RMT 1 1330 1330 TBSP-A.II-05

ZSSR S00858 Labour-Laying SWG pipes-any dia-5' Depth 313.00 INR RMT 1 313 TBSP-A.III-02

ZSSR S00859 4" (101.6 mm ) Multi Floor Trap-WithJali 143.00 INR EA 1 143 143 TBSP-H.II-74

ZSSR S00860 12.5mm-Gypsum Board Tiles- 0.595x0.595M 255.00 INR M2 1 255 255 TBSC-K.I-01

ZSSR S00861 S&F Fixed Louvered Ventilator UPVC sect 5990.00 INR M2 1 5990 5990 TBSC-M.III-07

ZSSR S00862 S&F UPVC 3Track Sliding Window with Mesh 6657.00 INR M2 1 6657 6657 TBSC-M.II-11

ZSSR S00863 S&F UPVC 2 Track Sliding Windows 6375.00 INR M2 1 6375 6375 TBSC-M.II-09

ZSSR S00864 Medium Teak Wood Scantling upto 2 M 72620.00 INR M3 1 72620 72620 TBSC-D.I-01
ZSSR S00865 Sundries-Medium Teak Wood scantlings(LS) 7.10 INR LS 1 adopted previous rates
ZSSR S00866 Lab-wrought&Putup-M.Teak Wood-Door Shutr 938.00 INR M2 1 938 TBSC-T.I-31

ZSSR S00867 Sundries-Sand Paper, Wood Putty(LS) 20.00 INR LS 1 adopted previous rates
ZSSR S00868 M.S Z Hold fasts (LMR) 45.00 INR EA 1 adopted previous rates
ZSSR S00869 Brass Tower bolts 10mm Bolt, 200mm Long 315.00 INR EA 1 315 315 TBSC-P-I-03
ZSSR S00870 Brass Butt Hinges - 150mm Long 348.00 INR EA 1 348 348 TBSC-P-II-04
ZSSR S00871 Brass Fancy Handles 150mm long 304.00 INR EA 1 304 304 TBSC-P-III-07
ZSSR S00872 Brass Aldrop - 300mm Long 1164.00 INR EA 1 1164 1164 TBSC-P-IV-01
ZSSR S00873 Brass Door Stopper 180.00 INR EA 1 180 180 TBSC-P-IX-01
ZSSR S00874 Architect&Elevation Dwgs-Off Bld (LS) 100000.00 INR JOB 1 100000.00 adopted previous rates
ZSSR S00875 Rust off cleaner (chemical) ( LMR) 180.00 INR L 1 180.00 adopted previous rates
ZSSR S00876 PVC 25mm Thick pad-expansion joint( LMR) 1200.00 INR M2 1 1200.00 adopted previous rates
ZSSR S00877 G.I.Washers 2.00 INR EA 1 2 2 TBSC-D.VI-17
ZSSR S00878 Bitumen Washers 2.00 INR EA 1 2 2 TBSC-D.VI-19
ZSSR S00879 G.I. 'J' Bolts 8 mm Diameter 10.00 INR EA 1 10 10 TBSC-D.VI-16
ZSSR S00880 Plain/Corrugated G.I Sheets(0.1-0.8mmT) 60.00 INR KG 1 60 60 TBSC-D.VI-04

ZSSR S00881 Labour-Fitter Cl- II 450.00 INR D 1 450 Sl.No.II-09


ZSSR S00882 Medium Teak Wood Scantling 2-3 M 80689.00 INR M3 1 80689 80689 TBSC-D.I-02
ZSSR S00883 Medium Teak Wood Planks 145240.00 INR M3 1 145240 145240 TBSC-D.I-04
ZSSR S00884 Sundries-Medium Teak Wood Planks(LS) 4.10 INR LS 1 adopted previous rates
ZSSR S00885 Lab-wrought&Putup-M.Teak Wood-GLZ&PNL Dr 1858.00 INR M2 1 1858 TBSC-T.I-28

ZSSR S00886 Lab-wrought&Putup-MTeakWd-GLZ-Ventilator 974.00 INR M2 1 974 TBSC-T.I-36

ZSSR S00887 Toughened Plain Glass 12 mm thick 1749.00 INR M2 1 1749 1749 TBSC-F.V-05
ZSSR S00888 Brass Tower bolts 10mm Bolt, 300mm Long 481.00 INR EA 1 481 481 TBSC-P.I-05
ZSSR S00889 Brass Tower bolts 10mm Bolt, 150 mm Lon 236.00 INR EA 1 236 236 TBSC-P.I-02
ZSSR S00890 Brass Fancy Handles 300mm long 948.00 INR EA 1 948 948 TBSC-P.III-10
ZSSR S00891 Brass Butt Hinges - 100mm Long 218.00 INR EA 1 218 218 TBSC-P.II-02
ZSSR S00892 Sundries-PuttyBrads,Ring, IronCleats(LS) 50.00 INR LS 1 adopted previous rates
ZSSR S00893 Material - Detonator Ordinary 6.00 INR NO 1 6 6 Sl.No. 22, Pg.18 of Irg
ZSSR S00894 Material- Detonator delay type 15.00 INR NO 1 15 15 Sl.No. 20, Pg.18 of Irg
ZSSR S00895 38/40mm width,12.5mm Ht Casing&Caping 58.00 INR M 1 58 58 ELEC-1.2.4.d

ZSSR S00896 450mm, 900 RPM Heavy dutyexhaust fan 4360.00 INR NO 1 4360 4360 ELEC-5.1.10.c

ZSSR S00897 Material-1.5m Drill Rod - Hard Rock 23.21 INR RMT 1 23.21 rate as per I&CAD data
ZSSR S00898 Hire-ConcreteMixer600/400lt(D)-Machinery 287.30 INR HR 1 534.3 247 287.3 Sl.No.18 (Hire Chgs), of Irr
ZSSR S00899 Hire-ConcreteMixerr600/400ltr(D)--Labour 247.00 INR HR 1
ZSSR S00900 40-63A 10KA TP MCB 1407.00 INR NO 1 1407 1407 ELEC-2.13.1.f

ZSSR S00901 S&F CPVC Pipes15.90 OD-SDR13.5(Less Lbr) 52.00 INR RMT 1 128 76.0 52.0 TBSP-J.III-01 (-)
TBSP-H.IV-01
ZSSR S00902 S&F CPVC Pipes22.2 OD-SDR13.5(Less Lbr) 70.00 INR RMT 1 146 76.0 70.0 TBSP-J.III-02 (-)
TBSP-H.IV-01
ZSSR S00903 S&F CPVC Pipes28.6 OD-SDR13.5(Less Lbr) 117.00 INR RMT 1 193 76.0 117.0 TBSP-J.III-03 (-)
TBSP-H.IV-01
ZSSR S00904 S&F CPVC Pipes34.9 OD-SDR13.5(Less Lbr) 187.00 INR RMT 1 263 76.0 187.0 TBSP-J.III-04 (-)
TBSP-H.IV-01
Long Text

Labour-Bar Bender, S.No.I-1, Pg.No. 14


Labour-Black smith, S.No.I-2, Pg.No. 14
Labour-Blaster (Licensed), S.No.I-3, Pg.No. 14
Labour-Carpenter-1st class, S.No.I-4, Pg.No. 14
Labour-Fitter Cl- I, S.No.I-6, Pg.No. 14
Labour-Mason 1st class, S.No.I-11, Pg.No. 14
Labour-Operator Concrete, S.No.I-16, Pg.No. 14
Operator Core Drilling Machine, S.No.I-19, Pg.No. 14
Labour-Operator Grouting, S.No.I-22, Pg.No. 14
Labour-Operator Road roller, S.No.I-27, Pg.No. 14
Labour-Concrete vibrator, S.No.I-32, Pg.No. 14
Labour-Painter 1st class, S.No.I-35, Pg.No. 15
Labour-Welder, S.No.I-41, Pg.No. 15
Labour-Carpenter-2nd class, S.No.II-4, Pg.No. 15
Labour-Crowbarman S.No.II-8, Pg.No. 15
Labour-Helper Batching plant, S.No.II-13, Pg.No. 15
Labour-Helper Blasting,S.No.II-14, Pg.No. 15
Labour-Mason 2nd class,S.No.II-35, Pg.No. 16
Labour-Painter 2nd class,S.No.II-37, Pg.No. 14
Labour-Stone breaker,S.No.II-40, Pg.No. 14
Labour-Man Mazdoor (Unskilled), S.No.III-3, Pg.No. 16
Labour-Woman Mazdoor (Unskilled), S.No.III-4, Pg.No. 17
Binding wire, Sl.No. 3, Pg.19 of Irg
LDPE sheet ( Geo membrane ) 500 micron thick, Sl.No. 52 of Irg
Gravel, S.S.Item.34, R&B
Earth, Sl.No. 102 of Irg
For R.R.Masonry works ( granite, dolamite and trap variety, Sl.No. 12+ Sl.No.13, SS Item
22.G, of R&B+Blst Chgs

Coursed Rubble Stone (Granite, dolamite and trap), Sl.No. 14 + Sl.No.17, SS Item 23.a of
R&B+Blst Chgs

Bond stones ( 600 x 200 x 200 mm ), Sl.No. 18, SS Item. 28 of R&B - Each Rs.29/- (ie.
0.024(0.6*0.2*0.2) cum =29, 1cum = 29/0.024 = 1208.33/-
Rough stone for revetment 225mm thick ( including Loading charges but excluding
Seigniorage charges), Sl.No. 3, Miscellaneous Items,Pg.42 of Irg
Stone chips (at dump yard/Spoil)(including loading charges but excluding Seigniorage
charges), Sl.No. 66, Pg.22 of Irg
Aggregates 20mm Nominal size (HB stone of Granite/Dolamite/Dolerite/Trap) (excluding
Seiniorage Charges), Sl.No. 28 + Sl.No.36, SS Item 28.d of R&B+Blst Chgs

Aggregates 13.2/12.5 mm nominal size (excluding Seiniorage Charges), Sl.No. 27 +


Sl.No.36, SS Item 33.c of R&B+Blst Chgs
Aggregates 10 mm nominal size (excluding Seiniorage Charges),Sl.No. 26 + Sl.No.36, SS
Item 33.b of R&B+Blst Chgs

Aggregates 40 mm nominal size (excluding Seiniorage Charges), Sl.No. 30 + Sl.No.36, SS


Item 33.f of R&B+Blst Chgs
Stone crusher dust finer than 3mm with not more than 10% passing 0.075 sieve. (excluding
Seinorage Charges), Sl.No. M-021, of Irg
Gelatin 80%, Sl.No. M-104, Pg.37 of Irg
Detonator Electric, Sl.No. 21, Pg.20 of Irg
JungleWoodPlanks, Sl.No. 47, Pg.21 of Irg
Explosive small dia ( Kelvex-220 or equivalent), Sl.No. 26, Pg.20 of Irg
Detonating fuse coil, Sl.No. 18, Pg.20 of Irg
Use rate of 1.5m drill rod, rate as per I&CAD data - Ordinary HDR & FF
Use rate of hair hose 4 Nos rate as per I&CAD data
Labour-Plumber, S.No.I-36,
Labour-Stone chiseller CI- I, S.No.I-39
Aggregates 6 mm nominal size (excluding Seiniorage Charges), Sl.No. 25 + Sl.No.36, SS
Item 33.a of R&B+Blst Chgs

Hydraulic Excavator, Sl.No.4 (Hire Chgs), of R&B - Machinery


Hydraulic Excavator, Sl.No.4 (Hire Chgs), of R&B - Labour
Air compressor 7 cmm ( diesel ), Sl.No.3 (Hire Chgs), of Irr - Machinery
Air compressor 7 cmm ( diesel ), Sl.No.3 (Hire Chgs), of Irr - Labour
Air compressor 8.5 cmm ( electric), Sl.No.6 (Hire Chgs), of Irr- Machinery
Air compressor 8.5 cmm ( electric), Sl.No.6 (Hire Chgs), of Irr - Labour
Jack hammer, Sl.No.39 (Hire Chgs), of Irr - Machinery
Jack hammer, Sl.No.39 (Hire Chgs), of Irr - Labour
Concrete Mixer 300/200 (Diesel), Sl.No.16 (Hire Chgs), of Irr - Machinery
Concrete Mixer 300/200 (Diesel), Sl.No.16 (Hire Chgs), of Irr - Labour
Needle vibrator 40 mm ( Petrol ), Sl.No.40 (Hire Chgs), of Irr - Machinery
Needle vibrator 40 mm ( Petrol ), Sl.No.40 (Hire Chgs), of Irr - Labour
Dumper 4.5 cum, Sl.No.34 (Hire Chgs), of Irr - Machinery
Dumper 4.5 cum, Sl.No.34 (Hire Chgs), of Irr - Labour
Shovel 0.85 cum 110 hp, Sl.No.52 (Hire Chgs), of Irr - Machinery
Shovel 0.85 cum 110 hp, Sl.No.52 (Hire Chgs), of Irr - Labour
Tipper 5 cum, Sl.No.54 (Hire Chgs), of Irr,- Machinery
Tipper 5 cum, Sl.No.54 (Hire Chgs), of Irr - Labour
Bailing out water for earth work excavation /concrete
for foundation below water level. (For building items
only) - Other than sandy soil - 0.0 M to 1.0 M, TBSC-T.I-01 of Bldg
Bailing out water for earth work excavation /concrete
for foundation below water level. (For building items
only) - Other than sandy soil - 1.0 M to 2.0 M, TBSC-T.I-02 of Bldg
Bailing out water for earth work excavation /concrete
for foundation below water level. (For building items
only) - Other than sandy soil - 2.0 M to 3.0 M, TBSC-T.I-03 of Bldg
Sand Bags
Sl.No.A (Hire Chgs for Centering & Scafolding) of Bldgs. Pg.108, - Footings-Material
Sl.No.A (Hire Chgs for Centering & Scafolding) of Bldgs. Pg.108, - Footings-Labour
Sl.No.B (Hire Chgs for Centering & Scafolding) of Bldgs. Pg.108, - Bed Blocks-Material
Sl.No.B (Hire Chgs for Centering & Scafolding) of Bldgs. Pg.108, - Bed Blocks-Labour
Sl.No.C (Hire Chgs for Centering & Scafolding) of Bldgs. Pg.108, - Pedestal -Material
Sl.No.C (Hire Chgs for Centering & Scafolding) of Bldgs. Pg.108, - Pedestal - Labour
110 mm dia 3 M Single Socket PVC/SWR pipe - 4 Kg/sq.cm, Sl.No.462, TBSP-H.I-03
Needle vibrator 40 mm ( electric ), Sl.No.41 (Hire Chgs), of Irr, Pg.50, - Machinery
Needle vibrator 40 mm ( electric ), Sl.No.41 (Hire Chgs), of Irr, Pg.50, - Labour
Front End Loader, Sl.No.5 (Hire Chgs), of R&B, Pg.23, - Machinery
Front End Loader, Sl.No.5 (Hire Chgs), of R&B, Pg.23, - Labour
Cranes 3 Tonnes-Lifting Purpose, Sl.No.35(c) (Hire Chgs), of R&B, Pg.24, - Machinery

Cranes 3 Tonnes-Lifting Purpose, Sl.No.35(c) (Hire Chgs), of R&B, Pg.24, - Labour


Piling rig with bantonite pump - 0.75 m dia to 1.20 m dia
boring attachment, Sl.No.39 (Hire Chgs), of R&B, Pg.24, - Machinery
Piling rig with bantonite pump - 0.75 m dia to 1.20 m dia
boring attachment, Sl.No.39 (Hire Chgs), of R&B, Pg.24, - Labour
High performance super plasticizer and water reducing
admixture Conforming to IS: 9103-1999, Sl.No.635, TBSC-Q.I-03
Labour charges for fabricating steel works like Window
Grills, Compound Wall Grills, Iron Doors, Windows
including cost of welding rods, power charges, excluding cost of fixing in position, Sl.No.771,
TBSC-T.I-16
Labour charges for fixing Iron Doors, Iron Windows and
Window Grills in position, Sl.No.772, TBSC-T.I-17
Chipping of pile foundation heads mannually by chiseling and barring ( without applying
explosive material) to the required depth for receiving pile cap concrete including disposing
the spoil
Batching plant 0.5 cum ( 6 Cum/hr), Sl.No.9 (Hire Chgs), of Irr, Pg.49, - Machinery
Batching plant 0.5 cum ( 6 Cum/hr), Sl.No.9 (Hire Chgs), of Irr, Pg.49, - Labour
Diesel Generating Set 30KVA, Sl.No.23 (Hire Chgs), of Irr, Pg.49, - Machinery
Diesel Generating Set 30KVA, Sl.No.23 (Hire Chgs), of Irr, Pg.49, - Labour
Structural Steel, Rate as per G.O
Reinforcement Steel, Rate as per G.O
Welding charges, Market Rate
Lowering charges, Local Market Rate
Sand, TSMDC Stockyard rate
Cement, Rate as per G.O
Mobilisation & shifting charges of rig from one leg, Local market rate
Bentonite, Sl.No. M-071, Pg.35 of Irg
Sand, TSMDC Stockyard rate
Water SSR Rate
Cauarinas Balli Props- 4" to 8" diameter-20' Height, Sl.No.747, TBSC-S.I.06 of Bldgs.
Labour-Work Inspector S.No.I-10, Pg.No. 14,
Tractor-Pulling, Sl.No.11 (Hire Chgs), of R&B, Pg.23, - Machinery
Tractor-Pulling, Sl.No.11 (Hire Chgs), of R&B, Pg.23, - Labour
Water tanker 6 Kilolitre, Sl.No.10 (Hire Chgs), of R&B, Pg.23, - Machinery
Water tanker 6 Kilolitre, Sl.No.10 (Hire Chgs), of R&B, Pg.23, - Labour
Smooth wheeled roller 8 tonne, Sl.No.8 (Hire Chgs), of R&B, Pg.23, - Machinery
Smooth wheeled roller 8 tonne, Sl.No.8 (Hire Chgs), of R&B, Pg.23, - Labour
Tractor with rotavator, Sl.No.12 (Hire Chgs), of R&B, Pg.23, - Machinery
Tractor with rotavator, Sl.No.12 (Hire Chgs), of R&B, Pg.23, - Labour
Dozer( D 50 ), Sl.No.2 (Hire Chgs), of R&B, Pg.23, - Machinery
Dozer( D 50 ), Sl.No.2 (Hire Chgs), of R&B, Pg.23, - Labour
Site Investigation to locate Borewell Point, (as per RWS estimate rate)

Drilling of bore well 163mm dia - Depth up to 90 Running meters ( As per RWS estimate rate)

Labour charges for Fabrication of stainless steel railing works using stainless steel welding
rods including buffing, polishing, lacquer finishing, to present seamless finish, Sl.No.775,
TBSC-T.I-20
Manufacture, Supply and Delivery of Unplasticised PVCs Pipes for potable water supplies
conforming to IS : 4985/2000 (3rd revision) with bell ends (Socket) as per specification in light
Grey/Natural Ivory Grey/ Any other
Color (except White) inclusive of transportation to the sub-divisional stores anywhere in TG
excluding Excise duty and Sales Tax etc., Public Health, pg.No.60 of - 180mm dia,10
Kg/Sqcm
Manufacture, Supply and Delivery of Unplasticised PVCs Pipes for potable water supplies
conforming to IS : 4985/2000 (3rd revision) with bell ends (Socket) as per specification in light
Grey/Natural Ivory Grey/ Any other
Color (except White) inclusive of transportation to the sub-divisional stores anywhere in TG
excluding Excise duty and Sales Tax etc., Public Health, pg.No.60 of - 180mm dia,6
Kg/Sqcm
Labour for fixing PVC Pipe (LS)
S&F 32 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 ISI
mark with GI fittings including the cost of pipe & its fittings & labour charges complete,
Sl.No.402, TBSP-G.I-10, ( less labour for fixing=41)
Manufacture, Supply, & Delivery of HDPE Pipes conforming to IS 4984 - 1995 including
transportation to any where in T.S, excluding excise duty, sale tax and specials etc.,
complete. (supply upto 90 mm diain coil & above 90 mm dia straight length in 6 m.), Public
Health, pg.No.56 of - 32mm dia,12.5Kg/Sqcm
Laying, jointing of PVC/HDPE pipes as per BIS No.7634 part-III/75 for PVC and BIS No.7634
part-II/75 for HDPE pipes including testing-filling with water with water lead.. Sl.No. 12(b),
pg.No.6 of - 32mm diameter
MS Bore Cover, Rate as per Local Market rate
MS Clamps, (As per Sl. No 1287 of SSR 14-15)
Supply of PVC insulated 3 core 2.5 Sqmm sheathed flexible copper cable for voltage up to
1100V as per IS 694/1990. Makes : Finolex / RR Kabel / Havells / Polycab / GM / Million / V-
Guard / Gold Medal / Kundancab / HPL / RPG / Nandicab / Nakoda., Sl.No.137, ELEC-1.5.6.g

Labour for fixing Copper Cable, Rate as per Local Market (LS per RM)
Supply and Transportation of 3.00HP 30-33 Stage Three phase ISI submersible motor
pumpset suitable for 6.5" Bore well.Makes: Kirloskar / Crompton / Texmo / CRI ( As per local
market rate)
Supply and Transportation of control panel for single phase submersible motors up to 3 HP @
220V 50Hz operating range between 80 to 240V including supply and fixing of Direct - on -
Line LTLK / SIEMENS / CROMPTON make Volt meter and Ammeter with starting and
running capacitors assembled with ISI mark contactors and fitted with Legrand make ISI mark
MCB etc., complete.., Sl.No.618, ELEC-5.10.1
Supply & Fixing of D.O.L Starter 415V, 3 phase, 50Hz. enclosed with no volt coil and overload
protection with necessary materials, etc., complete suitable upto 7.5.HP.Makes: Siemens /
Crompton / L&T., Sl.No.584, ELEC-5.4.2
Installation charges and conveyance charges-Motor , Rate as per Local Market

(Lead) charges for trucks and tippers for Earth / Sand /Gravel / Murrum/ Lime/ Surki/ per
cu.meter - Lead up to 1 km (Exclusive of 11.765% Contractor Profit and Over Head charges)

(Lead) charges for trucks and tippers for Earth / Sand /Gravel / Murrum/ Lime/ Surki/ per
cu.meter - Lead up to 2 km (Exclusive of 11.765% Contractor Profit and Over Head charges)

(Lead) charges for trucks and tippers for Earth / Sand /Gravel / Murrum/ Lime/ Surki/ per
cu.meter - Lead up to 3 km (Exclusive of 11.765% Contractor Profit and Over Head charges)

(Lead) charges for trucks and tippers for Earth / Sand /Gravel / Murrum/ Lime/ Surki/ per
cu.meter - Lead up to 4 km (Exclusive of 11.765% Contractor Profit and Over Head charges)

(Lead) charges for trucks and tippers for Earth / Sand /Gravel / Murrum/ Lime/ Surki/ per
cu.meter - Lead up to 5 km (Exclusive of 11.765% Contractor Profit and Over Head charges)

(Lead) charges for trucks and tippers for Rubble/Size stones/ Cut Stones/ Coarse aggregate
per cu.meter - Lead up to 1 km (Exclusive of 11.765% Contractor Profit and Over Head
charges)
(Lead) charges for trucks and tippers for Rubble/Size stones/ Cut Stones/ Coarse aggregate
per cu.meter - Lead up to 2 km (Exclusive of 11.765% Contractor Profit and Over Head
charges)
(Lead) charges for trucks and tippers for Rubble/Size stones/ Cut Stones/ Coarse aggregate
per cu.meter - Lead up to 3 km (Exclusive of 11.765%Contractor Profit and Over Head
charges)
(Lead) charges for trucks and tippers for Rubble/Size stones/ Cut Stones/ Coarse aggregate
per cu.meter - Lead up to 4 km (Exclusive of 11.765% Contractor Profit and Over Head
charges)
(Lead) charges for trucks and tippers for Rubble/Size stones/ Cut Stones/ Coarse aggregate
per cu.meter - Lead up to 5 km (Exclusive of 11.765% Contractor Profit and Over Head
charges)
(Lead) charges for trucks and tippers for Rubble/Size stones/ Cut Stones/ Coarse aggregate
per cu.meter - for Every km beyond 5 km up to 30 km (Exclusive of 11.765% Contractor Profit
and Over Head charges)
(Lead) charges for trucks and tippers for Rubble/Size stones/ Cut Stones/ Coarse aggregate
per cu.meter - for Every km beyond 30 km (Exclusive of 11.765% Contractor Profit and Over
Head charges)
Loading Charges by mechanical means (including idle hire charges of trucks - Earth /Sand
/Gravel Murrum/ Surki (Exclusive of 11.765% Contractor Profit and Over Head charges)

UnLoading Charges by mechanical means (including idle hire charges of trucks - Earth /Sand
/Gravel Murrum/ Surki (Exclusive of 11.765% Contractor Profit and Over Head charges)
Loading Charges by mechanical means (including idle hire charges of trucks - Rubble/ size
stone/ cut stone/ Coarse aggregate/ Lime (Exclusive of 11.765% Contractor Profit and Over
Head charges)
UnLoading Charges by mechanical means (including idle hire charges of trucks - Rubble/ size
stone/ cut stone/ Coarse aggregate/ Lime (Exclusive of 11.765% Contractor Profit and Over
Head charges)
Use rate of Chain link wire mesh as per I & CAD data 2018-19
50% of Sl.No.D (Hire Chgs for Centering & Scafolding) of Bldgs. Pg.108, - Plinth Beam-
Material
50% of Sl.No.D (Hire Chgs for Centering & Scafolding) of Bldgs. Pg.108, - Plinth Beam -
Labour
CENTERING & SCAFFOLDING CHARGES- for Casuarinas Ballies, Bamboos, Wooden
Reapers, Runners, Wood Posts, Wall Plates etc.,, for unsupported height 3.66M of Bldgs.
Pg.108, - Lintel - Material
CENTERING & SCAFFOLDING CHARGES- for Casuarinas Ballies, Bamboos, Wooden
Reapers, Runners, Wood Posts, Wall Plates etc.,, for unsupported height 3.66M of Bldgs.
Pg.108, - Lintel - Labour
CENTERING & SCAFFOLDING CHARGES- for Casuarinas Ballies, Bamboos, Wooden
Reapers, Runners, Wood Posts, Wall Plates etc.,, for unsupported height 3.66M of Bldgs.
Pg.108, - Sunshade - Material
CENTERING & SCAFFOLDING CHARGES- for Casuarinas Ballies, Bamboos, Wooden
Reapers, Runners, Wood Posts, Wall Plates etc.,, for unsupported height 3.66M of Bldgs.
Pg.108, - Sunshade - Labour
CENTERING & SCAFFOLDING CHARGES- for Casuarinas Ballies, Bamboos, Wooden
Reapers, Runners, Wood Posts, Wall Plates etc.,, for unsupported height 3.66M of Bldgs.
Pg.108, - Columns - Material
CENTERING & SCAFFOLDING CHARGES- for Casuarinas Ballies, Bamboos, Wooden
Reapers, Runners, Wood Posts, Wall Plates etc.,, for unsupported height 3.66M of Bldgs.
Pg.108, - Columns - Labour
CENTERING & SCAFFOLDING CHARGES- for Casuarinas Ballies, Bamboos, Wooden
Reapers, Runners, Wood Posts, Wall Plates etc.,, for unsupported height 3.66M of Bldgs.
Pg.108, - Beams - Material
CENTERING & SCAFFOLDING CHARGES- for Casuarinas Ballies, Bamboos, Wooden
Reapers, Runners, Wood Posts, Wall Plates etc.,, for unsupported height 3.66M of Bldgs.
Pg.108, - Beams - Labour
CENTERING & SCAFFOLDING CHARGES- for Casuarinas Ballies, Bamboos, Wooden
Reapers, Runners, Wood Posts, Wall Plates etc.,, for unsupported height 3.66M of Bldgs.
Pg.108, - Slab upto 150mm Thick - Material
CENTERING & SCAFFOLDING CHARGES- for Casuarinas Ballies, Bamboos, Wooden
Reapers, Runners, Wood Posts, Wall Plates etc.,, for unsupported height 3.66M of Bldgs.
Pg.108, - Slab upto 150mm Thick - Labour
CENTERING & SCAFFOLDING CHARGES- for Casuarinas Ballies, Bamboos, Wooden
Reapers, Runners, Wood Posts, Wall Plates etc.,, for unsupported height 3.66M of Bldgs.
Pg.108, - Slab above 150 mm - Up to 300 mm thick - Material
CENTERING & SCAFFOLDING CHARGES- for Casuarinas Ballies, Bamboos, Wooden
Reapers, Runners, Wood Posts, Wall Plates etc.,, for unsupported height 3.66M of Bldgs.
Pg.108, - Slab above 150 mm - Up to 300 mm thick - Labour
Centring and scaffolding charges for RCC members including all materials and labour
charges for forming and dismantling.., RCC vertical walls of plane surface including both
sides of wall.of Public Health, Sl.No.31.b.4, Pg.8,
Centring and scaffolding charges for RCC members including all materials and labour
charges for forming and dismantling.., RCC vertical walls of plane surface including both
sides of wall.of Public Health, Sl.No.31.b.4, Pg.8, - Material
Centring and scaffolding charges for RCC members including all materials and labour
charges for forming and dismantling.., RCC vertical walls of plane surface including both
sides of wall.of Public Health, Sl.No.31.b.4, Pg.8, - Labour
Hand rolling charges with stone roller 2T capacity (LS)
Anti-weed Treatment -Material (As per Market Rate)
Anti-weed Treatment - Labour (As per Market Rate)
180 GSM LDPE sheet (LMR)
Supplying and fixing 15 mm nominal size PVC connection with brass union nut C.P coated,
TBSP-J.I-32
Add for PCC(1:2:4) gauge blocks of size100mmX100mmX100mm (Approx)
Common burnt clay bricks of class as per Table-1 of
IS:1077-1992 Non-Modular or traditional size 23 x 11 x
7 cm (ex-quarry price - excluding cost of conveyance,
loading & unloading), Sl.No.1, TBSC-A.I-01
Manufacture, Supply and Delivery of R.C.C. Plain ended pipes conforming to B.I.S458/2003 ,
Ex-factory, Excluding transportation, taxes & duties, Public Health Table.1 of - 300mm
dia,NP - 2 Class
Manufacture, Supply and Delivery of R.C.C. Collars conforming to B.I.S.458/2003 (rate per
each collar) suitable for R.C.C. Plain ended pipes including transportation but excluding taxes
& duties,Public Health Table.2 of - 300mm dia,NP - 2 Class
Lowering the RCC plain ended pipes carefully into the trench laying them true to alignment
and gradient, jointing RCC pipes with cement joinap including curing, the cost of jointing
materials i.e., Cement Mortar (1:1.5), hemp yarn etc., and testing including filling with water
with a water lead upto 500 metres excluding cost of rubber rings as per BIS No.783/85. Sl.No.
11(a), of Public Health - per every 25mm diameter
HIRE CHARGES FOR ACCESS SCAFFOLDING - upto 3.66 M using Casuarinas Ballies,
Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates etc., for BRICK MASONRY/
STONE MASONRY - 1 sqm (Wall Area) Pg.109, - Material-Ground Floor

HIRE CHARGES FOR ACCESS SCAFFOLDING - upto 3.66 M using Casuarinas Ballies,
Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates etc., for BRICK MASONRY/
STONE MASONRY - 1 sqm (Wall Area) Pg.109, - Labour-Ground Floor

HIRE CHARGES FOR ACCESS SCAFFOLDING - upto 3.66 M using Casuarinas Ballies,
Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates etc., for PLASTERING to
WALLS - 1 sqm (Wall Area) Pg.109, - Material-Ground Floor
HIRE CHARGES FOR ACCESS SCAFFOLDING - upto 3.66 M using Casuarinas Ballies,
Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates etc., for PLASTERING to
WALLS - 1 sqm (Wall Area) Pg.109, - Labour-Ground Floor
HIRE CHARGES FOR ACCESS SCAFFOLDING - upto 3.66 M using Casuarinas Ballies,
Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates etc., for CEILING
PLASTERING - 1 sqm (Wall Area) Pg.109, - Material-Ground Floor
HIRE CHARGES FOR ACCESS SCAFFOLDING - upto 3.66 M using Casuarinas Ballies,
Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates etc., for CEILING
PLASTERING - 1 sqm (Wall Area) Pg.109, - Labour-Ground Floor
Supply of paint grade lime for white / colour wash, Sl.No.205, TBSC-G.II-01
Supply and fixing of 6mm thick MS Chekered plate, ELEC-9.4.8
Transportation & laying Charges for MS Chekered plate (LS)
Supply of Water proof cement Paint, TBSC-G.II-04
Supply of Nano polished soluble salt porcelain vitrified tiles screen printed of size 800 x 800
mm and thickness between 9-11 mm 1st quality conforming to IS:13711, IS:13712, IS:13630
(Parts 1 to 15) of any colour and
finish in all shades and designs, Sl.No.45, TBSC-C.II-04
For R.R.Masonry works ( other than Granite, Dolomite and Trap), Sl.No.1 + Sl.No.13, SS Item
22.a, of R&B+Blst Chgs
Coursed Rubble Stone (For other varieties), Sl.No. 15 + Sl.No.17, SS Item 23.b of R&B+Blst
Chgs

Credit for excavated rock found suitable for use, Sl.No. 101 of Irg
Hard Broken Stone of Granite Trap Dolerite and Dolamite - 2.36 mm to 5 mm size ( IRC,
MORTH &MORD), Sl.No. 45 + Sl.No.56 + Sl.No.57, SS Item 33.a of R&B+Blst Chgs +
Machine Crushing

Hard Broken Stone of Granite Trap Dolerite and Dolamite - 5 mm to 7 mm size ( IRC,
MORTH &MORD), Sl.No. 46 + Sl.No.56 + Sl.No.57, SS Item 33.b of R&B+Blst Chgs +
Machine Crushing

Hard Broken Stone of Granite Trap Dolerite and Dolamite - 9.5 mm to 11.2 mm size ( IRC,
MORTH &MORD), Sl.No. 47 + Sl.No.56 + Sl.No.57, SS Item 33.c of R&B+Blst Chgs +
Machine Crushing
Hard Broken Stone of Granite Trap Dolerite and Dolamite - 12mm to 14 mm size ( IRC,
MORTH &MORD), Sl.No. 48 + Sl.No.56 + Sl.No.57, SS Item 33.d of R&B+Blst Chgs +
Machine Crushing

Hard Broken Stone of Granite Trap Dolerite and Dolamite - 19 mm to 22 mm size ( IRC,
MORTH &MORD), Sl.No. 49 + Sl.No.56 + Sl.No.57, SS Item 33.e of R&B+Blst Chgs +
Machine Crushing

Hard Broken Stone of Granite Trap Dolerite and Dolamite - 25 mm to 27 mm size ( IRC,
MORTH &MORD), Sl.No. 50 + Sl.No.56 + Sl.No.57, SS Item 33.f of R&B+Blst Chgs +
Machine Crushing

Hard Broken Stone of Granite Trap Dolerite and Dolamite - 40 mm to 45 mm size ( IRC,
MORTH &MORD), Sl.No. 51 + Sl.No.56 + Sl.No.57, SS Item 33.g of R&B+Blst Chgs +
Machine Crushing

Hard Broken Stone of Granite Trap Dolerite and Dolamite - 40 mm to 45 mm size ( IRC,
MORTH &MORD), Sl.No. 51 + Sl.No.56, SS Item 33.g of R&B+Blst Chgs

Hard Broken Stone of Granite Trap Dolerite and Dolamite - 50 mm to 55 mm size ( IRC,
MORTH &MORD), Sl.No. 52 + Sl.No.56 + Sl.No.57, SS Item 33.h of R&B+Blst Chgs +
Machine Crushing

Hard Broken Stone of Granite Trap Dolerite and Dolamite - 60 mm to 63 mm size ( IRC,
MORTH &MORD), Sl.No. 53 + Sl.No.56 + Sl.No.57, SS Item 33.i of R&B+Blst Chgs +
Machine Crushing

Hard Broken Stone of Granite Trap Dolerite and Dolamite - 60 mm to 63 mm size ( IRC,
MORTH &MORD), Sl.No. 53 + Sl.No.56, SS Item 33.i of R&B+Blst Chgs
Hard Broken Stone of Granite Trap Dolerite and Dolamite - 65 mm size ( IRC, MORTH
&MORD), Sl.No. 54 + Sl.No.56 + Sl.No.57, SS Item 33.j of R&B+Blst Chgs + Machine
Crushing

Hard Broken Stone of Granite Trap Dolerite and Dolamite - 75 mm size ( IRC, MORTH
&MORD), Sl.No. 55 + Sl.No.56 + Sl.No.57, SS Item 33.k of R&B+Blst Chgs + Machine
Crushing

Vibratory roller 8 tonne, Sl.No.62 (Hire Chgs), of Irg


Wet mix plant 60 TPH, Sl.No.15 (Hire Chgs), of R&B, Pg.23,

Paver finisher Mechanical 100, Sl.No.24 (Hire Chgs), of R&B, Pg.23,

Generator - 125 KVA, Sl.No.43(b) (Hire Chgs), of R&B, Pg.24,

Batching plant 0.5 cum ( 6 Cum/hr), Sl.No.9 (Hire Chgs), of Irr, Pg.49,
Diesel Generating Set 30KVA, Sl.No.23 (Hire Chgs), of Irr, Pg.49,
Needle vibrator 40 mm ( Petrol ), Sl.No.40 (Hire Chgs), of Irr, Pg.50,
Dozer( D 50 ), Sl.No.2 (Hire Chgs), of R&B, Pg.23,
Hydraulic Excavator, Sl.No.4 (Hire Chgs), of R&B, Pg.23,
Front End Loader, Sl.No.5 (Hire Chgs), of R&B, Pg.23,
Smooth wheeled roller 8 tonne, Sl.No.8 (Hire Chgs), of R&B, Pg.23,
Water tanker 6 Kilolitre, Sl.No.10 (Hire Chgs), of R&B, Pg.23,

Tractor-Pulling, Sl.No.11 (Hire Chgs), of R&B, Pg.23,

Tractor with rotavator, Sl.No.12 (Hire Chgs), of R&B, Pg.23,

Cranes 3 Tonnes-Lifting Purpose, Sl.No.35(c) (Hire Chgs), of R&B, Pg.24,

Piling rig with bantonite pump - 0.75 m dia to 1.20 m dia


boring attachment, Sl.No.39 (Hire Chgs), of R&B, Pg.24,
CENTERING & SCAFFOLDING CHARGES- for Steel scaffolding pipes, jack Props, Steel
Centering Plates,etc., for unsupported height 3.66M of Bldgs. Pg.110, - Columns - Material-
GF
CENTERING & SCAFFOLDING CHARGES- for Steel scaffolding pipes, jack Props, Steel
Centering Plates,etc., for unsupported height 3.66M of Bldgs. Pg.110, - Columns - Labour-
Ground Floor
CENTERING & SCAFFOLDING CHARGES- for Steel scaffolding pipes, jack Props, Steel
Centering Plates,etc., for unsupported height 3.66M of Bldgs. Pg.110, - Columns - Labour-
First Floor
CENTERING & SCAFFOLDING CHARGES- for Steel scaffolding pipes, jack Props, Steel
Centering Plates,etc., for unsupported height 3.66M of Bldgs. Pg.110, - Columns - Labour-
Second Floor
CENTERING & SCAFFOLDING CHARGES- for Steel scaffolding pipes, jack Props, Steel
Centering Plates,etc., for unsupported height 3.66M of Bldgs. Pg.110, - Columns - Labour-
Third Floor
CENTERING & SCAFFOLDING CHARGES- for Steel scaffolding pipes, jack Props, Steel
Centering Plates,etc., for unsupported height 3.66M of Bldgs. Pg.110, - Beams - Material-GF

CENTERING & SCAFFOLDING CHARGES- for Steel scaffolding pipes, jack Props, Steel
Centering Plates,etc., for unsupported height 3.66M of Bldgs. Pg.110, - Beams - Labour-
Ground Floor
CENTERING & SCAFFOLDING CHARGES- for Steel scaffolding pipes, jack Props, Steel
Centering Plates,etc., for unsupported height 3.66M of Bldgs. Pg.110, - Beams - Labour-First
Floor
CENTERING & SCAFFOLDING CHARGES- for Steel scaffolding pipes, jack Props, Steel
Centering Plates,etc., for unsupported height 3.66M of Bldgs. Pg.110, - Beams - Labour-
Second Floor
CENTERING & SCAFFOLDING CHARGES- for Steel scaffolding pipes, jack Props, Steel
Centering Plates,etc., for unsupported height 3.66M of Bldgs. Pg.110, - Beams - Labour-Third
Floor
CENTERING & SCAFFOLDING CHARGES- for Steel scaffolding pipes, jack Props, Steel
Centering Plates,etc., for unsupported height 3.66M of Bldgs. Pg.110, - Slab-Upto150mm
Thick - Material-GF
CENTERING & SCAFFOLDING CHARGES- for Steel scaffolding pipes, jack Props, Steel
Centering Plates,etc., for unsupported height 3.66M of Bldgs. Pg.110, - Slab-Upto150mm
Thick - Labour-Ground Floor
CENTERING & SCAFFOLDING CHARGES- for Steel scaffolding pipes, jack Props, Steel
Centering Plates,etc., for unsupported height 3.66M of Bldgs. Pg.110, - Slab-Upto150mm
Thick - Labour-First Floor
CENTERING & SCAFFOLDING CHARGES- for Steel scaffolding pipes, jack Props, Steel
Centering Plates,etc., for unsupported height 3.66M of Bldgs. Pg.110, - Slab-Upto150mm
Thick - Labour-Second Floor
CENTERING & SCAFFOLDING CHARGES- for Steel scaffolding pipes, jack Props, Steel
Centering Plates,etc., for unsupported height 3.66M of Bldgs. Pg.110, - Slab-Upto150mm
Thick - Labour-Third Floor
CENTERING & SCAFFOLDING CHARGES- for Steel scaffolding pipes, jack Props, Steel
Centering Plates,etc., for unsupported height 3.66M of Bldgs. Pg.110, - Slab-Above 150mm-
upto 300mm Thick- Material-GF
CENTERING & SCAFFOLDING CHARGES- for Steel scaffolding pipes, jack Props, Steel
Centering Plates,etc., for unsupported height 3.66M of Bldgs. Pg.110, - Slab-Above 150mm-
upto 300mm Thick - Labour-Ground Floor
CENTERING & SCAFFOLDING CHARGES- for Steel scaffolding pipes, jack Props, Steel
Centering Plates,etc., for unsupported height 3.66M of Bldgs. Pg.110, - Slab-Above 150mm-
upto 300mm Thick - Labour-First Floor
CENTERING & SCAFFOLDING CHARGES- for Steel scaffolding pipes, jack Props, Steel
Centering Plates,etc., for unsupported height 3.66M of Bldgs. Pg.110, - Slab-Above 150mm-
upto 300mm Thick - Labour-Second Floor
CENTERING & SCAFFOLDING CHARGES- for Steel scaffolding pipes, jack Props, Steel
Centering Plates,etc., for unsupported height 3.66M of Bldgs. Pg.110, - Slab-Above 150mm-
upto 300mm Thick- Labour-Third Floor
CENTERING & SCAFFOLDING CHARGES- for Steel scaffolding pipes, jack Props, Steel
Centering Plates,etc., for unsupported height 3.66M of Bldgs. Pg.110, - Lintel- Material-GF

CENTERING & SCAFFOLDING CHARGES- for Steel scaffolding pipes, jack Props, Steel
Centering Plates,etc., for unsupported height 3.66M of Bldgs. Pg.110, - Lintel- Labour-Ground
Floor
CENTERING & SCAFFOLDING CHARGES- for Steel scaffolding pipes, jack Props, Steel
Centering Plates,etc., for unsupported height 3.66M of Bldgs. Pg.110, - Lintel - Labour-First
Floor
CENTERING & SCAFFOLDING CHARGES- for Steel scaffolding pipes, jack Props, Steel
Centering Plates,etc., for unsupported height 3.66M of Bldgs. Pg.110, - Lintel - Labour-
Second Floor
CENTERING & SCAFFOLDING CHARGES- for Steel scaffolding pipes, jack Props, Steel
Centering Plates,etc., for unsupported height 3.66M of Bldgs. Pg.110, - Lintel - Labour-Third
Floor
CENTERING & SCAFFOLDING CHARGES- for Steel scaffolding pipes, jack Props, Steel
Centering Plates,etc., for unsupported height 3.66M of Bldgs. Pg.110, - Sunshade- Material-
GF
CENTERING & SCAFFOLDING CHARGES- for Steel scaffolding pipes, jack Props, Steel
Centering Plates,etc., for unsupported height 3.66M of Bldgs. Pg.110, - Sunshade- Labour-
Ground Floor
CENTERING & SCAFFOLDING CHARGES- for Steel scaffolding pipes, jack Props, Steel
Centering Plates,etc., for unsupported height 3.66M of Bldgs. Pg.110, - Sunshade - Labour-
First Floor
CENTERING & SCAFFOLDING CHARGES- for Steel scaffolding pipes, jack Props, Steel
Centering Plates,etc., for unsupported height 3.66M of Bldgs. Pg.110, - Sunshade - Labour-
Second Floor
CENTERING & SCAFFOLDING CHARGES- for Steel scaffolding pipes, jack Props, Steel
Centering Plates,etc., for unsupported height 3.66M of Bldgs. Pg.110, - Sunshade - Labour-
Third Floor
Polished Shahabad/ Tandur stone slabs of all sizes
between 15 - 18 mm thickness, Sl.No.23,TBSC-B.I-03
Kadapa slabs of 40 mm thick of all sizes,Sl.No.24,TBSC-B.I-04
Polished Marble slabs of Dongari/ Adanga/ Marodh/ Rajgangpur etc., variety of thickness
between 16 mm to 20 mm of sizes up to 600 mm, Sl.No.31,TBSC-B.II-02
Polished Marble slabs of any variety and gang saw cut (Such as Dongari/ Adanga/ Marodh/
Rajgangpur etc) 16 mm to 20 mm (average) thick ( 0.610 M width of any length),
Sl.No.32,TBSC-B.II-03
High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) other than black and regular
colours, Sl.No.35,TBSC-B.III-02
Supply of Non-skid red or white full body Ceramic floor tiles of size 300 x 300 mm and
thickness between 7-8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to
15) of any colour and finish in all shades and designs, Sl.No.38, TBSC-C.I-01
Supply of Non-skid red or white full body Ceramic floor tiles of size 400 x 400 mm and
thickness between 7-8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to
15) of any colour and finish in all shades and designs, Sl.No.39, TBSC-C.I-02
Supply of Non-skid red or white full body Ceramic floor tiles of size 600 x 600 mm and
thickness between 8-10 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1
to 15) of any colour and finish in all shades and designs, Sl.No.40, TBSC-C.I-03 of

Supply of Non-skid red or white full body Ceramic floor tiles of scratch free-stain free and
scratch free-nano finish of size 600 x 600 mm and thickness between 8-10mm 1st quality
conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all
shades and designs, Sl.No.41, TBSC-C.I-04 of
Supply of precast concrete blocks for paving of M-40 grade and thickness not less than 80
mm for Medium traffic areas conforming to IS 15658:2006 in all shapes and designs as per
the manufacturer's specification, Sl.No.95, TBSC-C.IX-03
Vinyl Flooring Sheets or tiles having a nominal total thickness of 1.5 mm with a wearing
surface impregnated polyurethane homogeneous mixture of
PVC, Plasticizers, Urethane, color pigments with wearing resistance and Fire Resistance as
per standards, Sl.No.101, TBSC-C.X-03 of
Supply & fixing of Rolling shutter made of 80 x 1.25 mm machine rolled CRCA laths,
interlocked together through their entire length and jointed together at the ends by end-locks,
mounted on specially designed pipe shaft of 50mm Diameter nominal bore MS B class pipe
with brackets, plates, guide channels, stoppers, bottom locking plates and arrangements for
inside & outside locking with push-pull operations including cost of hood cover and springs
complete, painted with one coat of approved steel primer, locks, ball bearings, all accessories
etc complete for finished item of work as per special Spec: 1108, Sl.No.137, TBSC-E.I-01 of

Supplying & fixing collapsible steel shutters with vertical, double channel of 20 x10x2 mm of
100 mm centre ,Bracers with flat iron 40x40x6 mm with 38 mm Diameter steel pulleys, the
top, bottom and side vertical frames of the collapsible gate with 65x65mmx8mm MS Angle
and middle guide rail at site height with 65mmx8mm MS flat for the pulleys to guide and fixed
with necessary hold fasts, bolts, nuts, rivets, locking arrangements, stoppers, handles, all
accessories all fixtures and painted with one coat of approved steel primer etc., complete for
finished item of work as per special Spec 1105, Sl.No.138, TBSC-E.I-02 of

Rabbit wire mesh (chicken mesh) of not less than 30 gauge, Sl.No.148, TBSC-E.I-12 of
Supplying Galvanized Steel Barbed wire conforming to IS 278 - 1978 : Type B - Glidden Type
Designation as per standard specification, Sl.No.153, TBSC-E.II-02 of
Hot dipped Galvanized Iron Chain link mesh 8 gauge -(4.0 mm) as per IS: 2721-1979: 3"x3"
(76 mm x 76 mm) - 8 Gauge, Sl.No.157, TBSC-E.II-06 of
Stainless Steel Tubes, sections, plates, sheets & pipes of all sizes & Diameters for - 304
Grade, Sl.No.163, TBSC-E.III-01 of
Plain Float Glass 5 mm thick, Sl.No.166, TBSC-F.I-02 of
Pin headed Glass 5 mm thick, Sl.No.172, TBSC-F.II-02 of
Supply of water based Cement Primer of Interior Grade- 1, Sl.No.186, TBSC-G.I-01 of
Supply of water based Cement Primer of Exterior Grade-2, Sl.No.187, TBSC-G.I-02 of
Supply of wall putty of White Cement or Polymer or Cement based, Sl.No.188, TBSC-G.I-03
of
Supply of Red Oxide Primer Paint for iron works of Grade -1, Sl.No.190, TBSC-G.I-05 of

Supply of Wood Primer, Sl.No.192, TBSC-G.I-07 of


Supply of acrylic emulsion paint interior grade having VOC (Volatile Organic Compound)
content less than 50 grams/ liter., Sl.No.209, TBSC-G.III-01 of
Supply of acrylic emulsion paint exterior grade with silicon additives having VOC (Volatile
Organic Compound) content less than 50 grams/ liter., Sl.No.209, TBSC-G.III-02 of

Supply of ready mixed Synthetic Enamel paints in all shades Grade - I having VOC (Volatile
Organic Compound) content less than 50 grams/ liter., Sl.No.214, TBSC-G.V-01 of

Pre-laminated cement bonded particle board- 12 mm thick, Sl.No.311, TBSC-H.IV-22 of

Supply of glazed red or white full body Ceramic wall tiles for external cladding of any size
and thickness between 5-7mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts
1 to 15) of any colour and finish in all shades and designs, TBSC-C.VI-02
Calcium Silicate Boards - 8mm thick, Sl.No.363, TBSC-K.I-21 of
Supply of Thermocol 12 mm thick sheets, Sl.No.366, TBSC-K.I-24of
Supply of Thermocol 19 mm thick sheets, Sl.No.367, TBSC-K.I-25 of
G.I. Ceiling Angle - 25 mm x 10 mm x 0.55 mm, Sl.No.373, TBSC-K.II-01 of
G.I. Ceiling Section 51.5 mm x 26 mm x 10.5 mm x 0.55 mm thick, Sl.No.374, TBSC-K.II-02
of
G.I. intermediate Section 45 mm x 15 mm x 15 mm x 0.9 mm, Sl.No.375, TBSC-K.II-03 of

G.I. Perimeter Channel - 20 mm x 27 mm x 30 mm (web) of 0.55 mm thick, Sl.No.376, TBSC-


K.II-04 of
G.I.-Precoated Fine line Grid 25 mm x 25 mm x 0.7 mm, Sl.No.377, TBSC-K.II-05 of
G.I.-Precoated Fine line Grid 15 mm x 25 mm x 0.7 mm, Sl.No.378, TBSC-K.II-06 of
GI - Precoated - T-Sec- 24 mm x 38 mm x 0.7 mm thick, Sl.No.379, TBSC-K.II-07 of
Hot dipped GI Angle - Precoated - Grid: 19 mm x 19 mm, Sl.No.380, TBSC-K.II-08 of
Polyester painted GI - T Section - 24 x 32 mm, Sl.No.381, TBSC-K.II-09 of
Polyester painted GI - T Section - 24 x 25 mm, Sl.No.382, TBSC-K.II-10 of
Polyester painted GI - T Section - 24 mm x 27 mm, Sl.No.383, TBSC-K.II-11 of
Aluminium Angle : 24 mm x 24 mm, Sl.No.384, TBSC-K.II-12 of
Anodized Aluminium T Section : 24 x 24.5 x 2.4 mm, Sl.No.385, TBSC-K.II-13 of
Connecting Clips, Sl.No.386, TBSC-K.II-14 of
Rawl Plug, Sl.No.387, TBSC-K.II-15 of
6 mm Nylon Rawl Plug, Sl.No.388, TBSC-K.II-16 of
Soffit Cleats, Sl.No.389, TBSC-K.II-17 of
Drywall Screws - 25 mm, Sl.No.390, TBSC-K.II-18 of
Jointing Compound, Sl.No.391, TBSC-K.II-19 of
Jointing Paper Tape, Sl.No.392, TBSC-K.II-20 of
Drywall Top Coat, Sl.No.393, TBSC-K.II-21 of
Universal Holding Clips, Sl.No.394, TBSC-K.II-22 of
4 mm Diameter GI Connecting Rod, Sl.No.395, TBSC-K.II-23 of
2 mm Diameter GI Connecting Rod, Sl.No.396, TBSC-K.II-24 of
Supply and fixing of door frame made of hollow extruded PVC section having dimensions of
40 X 57mm with the wall thickness of 2mm +/- 0.2mm duly reinforced with seasoned wood
plank at the hinges side. The door frame top 2 corners shall be metri-cut/ welded. PVC DOOR
FRAME, Sl.No.431,TBSC-L.I-05 of
Supply & fixing of Door frames made of all formed sections of 1.25mm thick CRCA section,
size should be 50x60mm with 32mm rebate. The corner of the frame should be welded. The
frame should be painted with one coat of primer and finished painted with pure polyester
paint. The frame should be provided with approved quality butt hinges of 3 Nos. complete for
finished item.: Single shutter 3'-0" x 7'-0" (914.4x2133.6mm) outer frame section size of 50 x
60 mm, Sl.No.433,TBSC-L.I-07 of

Flush door shutters, solid bond wood block board type with teak veneer on one face and
commercial ply on another face (lipping): 30 mm thick conforming to IS:2202,
Sl.No.452,TBSC-L.II-10 of

Supply and fixing of door shutters made of rigid PVC extruded hollow section of 20mm X 200
mm with the wall thickness of 1.0mm +/- 0.1mm equally divided into 4 no's with tongue and
groove locking arrangements. The shutter frame is made of 30mm X 79mm with the wall
thickness of 1.5mm +/-0.15mm section mitre-cut and joined at 4 corners with 125mm X
225mm plastic brackets. The shutter shall be horizontally reinforced with 2 no's of 8mm PVC
rods. Teak wood batons shall be reinforced inside the door shutter during the fabrication of
the door shutter at those points wherever the hardware is fixed onto the door shutter.,
Sl.No.480,TBSC-L.III-14 of

Aluminium Tower Bolt-10 mm Bolt (IS:204) 100 mm Long, Sl.No.554,TBSC-P.I-07 of


MS-Powder Coated Tower Bolt-10 mm Bolt (IS:204) 300 mm Long, Sl.No.565,TBSC-P.I-18
of
Aluminium Tower Bolt-10 mm Bolt (IS:204) 300 mm Long, Sl.No.558,TBSC-P.I-11 of
Aluminium Butt hinges (IS:205)- 75 mm Long, Sl.No.570,TBSC-P.II-05 of
Aluminium Door Handles (IS:208) 125 mm Long, Sl.No.585,TBSC-P.III-03 of
Aluminium Door Handles (IS:208) 150 mm Long, Sl.No.586,TBSC-P.III-04 of
MS-Powder Coated Door Handles (IS:208) 125 mm Long, Sl.No.587,TBSC-P.III-05 of
MS-Powder Coated Door Handles (IS:208) 150 mm Long, Sl.No.588,TBSC-P.III-06 of
MS-Powder Coated Aldrop (IS:2681) 200 mm long, Sl.No.588,TBSC-P.IV-07 of
Providing and fixing Cast Iron Body Bottle Type Hydraulic Door Closer (IS: 3564) with double
speed adjustment, with necessary accessories and screws etc.complete, Sl.No.613,TBSC-
P.VI-01 of
Double action Brass cover plate and cast brass body floor spring (IS 6315- Table-1),
Sl.No.618,TBSC-P.VII-02 of
Heavy duty mortice lock 6/7 levers (IS:2209) with PC or CP handles complete set,
Sl.No.622,TBSC-P.VIII-01 of
Heavy duty mortice lock 6/7 levers (IS:2209) with brass heavy handles, Sl.No.623,TBSC-
P.VIII-02 of
MS-Powder Coated - Door Stoppers, Sl.No.625,TBSC-P.IX-02 of
Heavy duty Aluminium Door stopper, Sl.No.626,TBSC-P.IX-03 of
Supply of expansion joint filler board conforming to IS: 1838 for buildings, columns, beams
and slabs 20 mm THICK, Sl.No.685, TBSC-Q.VIII-04 of
Supply of White Cement conforming to IS:8042-1989, Sl.No.693, TBSC-R.I-01 of
Supply of Aluminium anodized Sections for Doors, partitions, windows, Ventilators (including
annodization cost) conforming to IS: 11857 - 1986, Sl.No.695, TBSC-R.I-03 of
Supply of Sun Control film to the glazed windows partition including labour charges.,
Sl.No.699, TBSC-R.I-07 of
Supply of Rubber Beading for glass fixing, Sl.No.703, TBSC-R.I-11 of
Planting plants, Sl.No.733, TBSC-R.I-41 of
Maintaining avenues including fencing, weeding, mulching, watering etc per plant., Sl.No.735,
TBSC-R.I-43 of
Machine charges of rubbing/ polishing floor, Sl.No.742, TBSC-S.I-01 of
Power Saw Cutter - Hand Operated - Hire charges, Sl.No.743, TBSC-S.I-02 of
Power Drill - Hand Operated - Hire Charges, Sl.No.744, TBSC-S.I-03 of
Labour charges for fixing Flush door shutters of any thickness to the existing door frame
including fixing the fixtures to the door shutter excluding cost of shutter, Sl.No.780, TBSC-T.I-
25 of
Taking branch water connection from the existing 15 mm nominal size GI pipe including
cutting threading, etc, complete with fitting. TBSP-G.IV-03
Supply and Transportation of 3.00HP 30-33 Stage Three phase ISI submersible motor
pumpset suitable for 4" Bore well.Makes: Kirloskar / Crompton / Texmo / CRI / KSB. (Local
Market Rate)

Supplying, laying, jointing and testing 101.6 mm SWG SP-1pipes of ISI make conforming to
ISI 651 & 4127 with airtight cement joints in CM 1.5:1 prop. Including excavation of trenches
and socket pits in any soil (except rock requiring blasting) up to 1524 mm(5'0") depth and
refilling with watering and tamping., Sl.No.01, TBSP-A.I-01, (Deduct Labour charges for
laying TBSP-A.III-02- 313)
Supplying, laying, jointing and testing 101.6 mm SWG SP-1 pipes of ISI make conforming to
ISI 651 & 4127 with airtight cement joints in CM 1:5:1 prop. including excavation of trenches
and socket pits in any soil (except rock requiring blasting) up to 914.4 mm (3'0") depth and
refilling with watering and tamping., Sl.No.02, TBSP-A.I-02 , (Deduct Labour charge for
laying TBSP-A.III-01 - 252)
Supply of SWG Bends conforming to IS standards -100 mm dia, Sl.No.32, TBSP-A.II-23,

Supply of SWG Junctions (T's & Y's) conforming to IS standards with length of barrel 60 cm
for - 100 x 100, Sl.No.38, TBSP-A.II-29,
Labour charges only for laying, jointing and testing SWG pipes of any dia with airtight cement
joints including excavation of trenches and socket pits in any soil up to 914.4 mm (3'0") depth
(except rock requiring blasting) and refilling with watering and tamping., Sl.No.69, TBSP-A.III-
01,
Labour charges only for fixing and laying the SWG Junctions/ Plugs/ Bends of any dia,
Sl.No.73, TBSP-A.III-05,
Constructing 457.2 mm x 457.2 mm (1'6"x1'6") brick in CM 1:6 prop. Masonry. Inspection
chamber up to 914.4 mm (3'0") and fitted with light weight 457.2 mm x 457.2 mm (1'6"x1'6")
C.I frame and cover of 20 Kg., Sl.No.79, TBSP-B.II-02,
Constructing Brick masonry chamber over the gully trap or peet valve and fitted with 304.8 x
228.6 m size CI frame and hinged cover., Sl.No.80, TBSP-B.II-03, (Deduct Labour Charges
for Fixing TBSP-B.III-01 - 130)
Supplying & fixing CI Nahany trap grating, Sl.No.84, TBSP-B.II-07,
Supplying & fixing 914.4 x 457.2 mm CI man hole frame and cover (light weight) 30 Kgs,
Sl.No.86, TBSP-B.II-09, (Deduct Labour Charges for Fixing TBSP-B.III-01 - 130)
Making drainage connection from a drainage line in to an existing inspection chamber/
manhole including making a hole in to the chambers, placing necessary pipes in the
connection and making good the junction in and out of the chambers including cost of
necessary cement, sand and aggregate etc.,, Sl.No.91, TBSP-B.III-01,
Supplying and fixing of C.I. soil pipes ISI marked conforming to IS:1729-1979 of approved
make with cement caulked joints and fixing as per site requirements including painting black
with Japan paint and fixing with necessary wooden blocks fixed in the masonry walls in
cement mortar (1½:1) including fixing of M.S. clamps if necessary with required no. of
Bombay nails etc., complete for 3" dia (75 mm nominal size) Single Socket, Sl.No.92, TBSP-
C.I-01, (Deduct Labour Charges for Fixing TBSP-C.III-01- 246)
Supplying and fixing of C.I. soil pipes ISI marked conforming to IS:1729-1979 of approved
make with cement caulked joints and fixing as per site requirements including painting black
with Japan paint and fixing with necessary wooden blocks fixed in the masonry walls in
cement mortar (1½:1) including fixing of M.S. clamps if necessary with required no. of
Bombay nails etc., complete for 4" dia (101.6mm) Single Socket, Sl.No.93, TBSP-C.I-02,
(Deduct Labour Charges for Fixing TBSP-C.III-01- 246)

Supplying and fixing of C.I. soil pipes ISI marked conforming to IS:1729-1979 of approved
make with cement caulked joints and fixing as per site requirements including painting black
with Japan paint and fixing with necessary wooden blocks fixed in the masonry walls in
cement mortar (1½:1) including fixing of M.S. clamps if necessary with required no. of
Bombay nails etc., complete for 3" dia (75 mm nominal size) Double Socket, Sl.No.95, TBSP-
C.I-04, (Deduct Labour Charges for FixingTBSP-C.III-01- 246)

Supplying and fixing of C.I. soil pipes ISI marked conforming to IS:1729-1979 of approved
make with cement caulked joints and fixing as per site requirements including painting black
with Japan paint and fixing with necessary wooden blocks fixed in the masonry walls in
cement mortar (1½:1) including fixing of M.S. clamps if necessary with required no. of
Bombay nails etc., complete for 4" dia (101.6mm) Double Socket, Sl.No.96, TBSP-C.I-05,
(Deduct Labour Charges for Fixing TBSP-C.III-01- 246)

Supplying & fixing CI Plain bends Ist quality ISI marked conforming to IS:1729-1979 with
cement caulked joints and fixing as per site requirements with standard pra ctice for 3" dia (75
mm nominal size), Sl.No.98, TBSP-C.II-01, (Deduct Labour Charges for Fixing TBSP-C.III-
02 -78)
Supplying & fixing CI Plain bends Ist quality ISI marked conforming to IS:1729-1979 with
cement caulked joints and fixing as per site requirements with standard practice for 4" dia
(101.6 mm), Sl.No.99, TBSP-C.II-02, (Deduct Labour Charges for Fixing TBSP-C.III-02 -78)

Supplying & fixing CI Plug (Door) bends Ist quality ISI marked conforming to IS:1729-1979
with cement caulked joints and fixing as per site requirements with standard practice for 3" dia
(75 mm nominal size), Sl.No.101, TBSP-C.II-04, (Deduct Labour Charges for Fixing TBSP-
C.III-02-78)
Supplying & fixing CI Plug (Door) bends Ist quality ISI marked conforming to IS:1729-1979
with cement caulked joints and fixing as per site requirements with standard practice for 4" dia
(101.6 mm), Sl.No.102, TBSP-C.II-05, (Deduct Labour Charges for FixingTBSP-C.III-02 -78)

Supplying and fixing of 75 mm nominal size (3") CI soil single junction with plug : conforming
to IS:1729-1979 with cement caulked joints and fixing, Sl.No.104, TBSP-C.II-07, (Deduct
Labour Charges for FixingTBSP-C.III-03 -98)
Supplying and fixing of 101.6 mm (4") CI soil single junction with plug : conforming to IS:1729-
1979 with cement caulked joints and fixing, Sl.No.105, TBSP-C.II-08, (Deduct Labour
Charges for Fixing TBSP-C.III-03-98)
Supplying and fixing of 75 mm nominal size (3") CI soil plain single junction : conforming to
IS:1729-1979 with cement caulked joints and fixing, Sl.No.107, TBSP-C.II-10, (Deduct
Labour Charges for Fixing TBSP-C.III-03 -98)
Supplying and fixing of 101.6 mm (4") CI soil plain single junction : conforming to IS:1729-
1979 with cement caulked joints and fixing, Sl.No.108, TBSP-C.II-11, (Deduct Labour
Charges for Fixing TBSP-C.III-03-98)
Supplying and Fixing of 101.6 mm (4") CI soil Double junction with plug : conforming to
IS:1729-1979 with cement caulked joints and fixing, Sl.No.111, TBSP-C.II-14, (Deduct
Labour Charges for Fixing TBSP-C.III-04-106)
Supplying and Fixing of 101.6 mm (4") CI soil plain Double junction : conforming to IS:1729-
1979 with cement caulked joints and fixing, Sl.No.114, TBSP-C.II-17, (Deduct Labour
Charges for Fixing TBSP-C.III-04-106)
Labour charges only for fixing of C.I. Single/ Double Socket soil pipes of any dia with cement
caulked joints and fixing as per site requirements including painting black with Japan paint
and fixing with necessary wooden blocks fixed in the masonry walls in cement mortar and
including fixing of M.S. clamps if necessary with required nails, Sl.No.131, TBSP-C.III-01,
Labour charges only for fixing CI Plain/ Plug (Door) bends with cement caulked joints and
fixing as per site requirements with standard practice, Sl.No.132, TBSP-C.III-02,
Labour charges only fixing CI soil single junctions with cement caulked joints and fixing as per
site requirements with standard practice, Sl.No.133, TBSP-C.III-03,
Labour charges only fixing CI soil Double junctions with cement caulked joints and fixing as
per site requirements with standard practice, Sl.No.134, TBSP-C.III-04,
Labour charges only fixing CI soil Collars, Bends, Offsets etc., with cement caulked joints and
fixing as per site requirements with standard practice, Sl.No.135, TBSP-C.III-05,

Labour charges only for fixing CI Nahany/ Floor traps with C.P. Grating fixing with white
cement as per site requirements with standard practice, Sl.No.136, TBSP-C.III-06,
Boxing of Nahany traps in RCC floors, Sl.No.137, TBSP-C.III-07,
Boxing of W.C Traps in R.C.C floors, Sl.No.138, TBSP-C.III-08,
Supplying & fixing approved make Orissa Pan white glazed W.C 1st quality ISI marked
conforming to IS:2556-Part-3-2004 with "P" or "S" trap: 580 mm x 440 mm, Sl.No.249, TBSP-
E.I-03, (Deduct Labour for Fixing Charges TBSP-E.VIII-02 -409)
Supplying and fixing approved make wash down European Water Closet of 1st quality
conforming to IS:2556-Part-2-2004 of white glazed with 'S' trap, Sl.No.255, TBSP-E.II-02,
(Deduct Labour for Fixing Charges TBSP-E.VIII-06-287)
Supplying and Fixing best Indian make plastic seat and lid for European water closets with
rubber or plastic Buffers as per IS 2548-1996, Sl.No.266, TBSP-E.V-01, (Deduct Labour for
Fixing Charges TBSP-E.VIII-07-83)
Supplying & Fixing Indian make Flat Back Wash Hand Basin 1st quality conforming to
IS:2556-Part-4:1972 with waste fittings like rubber plug, chain, 32 mm nominal size C.P.
Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal
bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams complete with
standard CI brackets including wooden block: 550 x 400 mm - Single C.P. Pillar cock,
Sl.No.271, TBSP-E.VI-04, (Deduct Labour for Fixing Charges TBSP-E.VIII-08-409)

Supplying and Fixing Pedestal for Wash Hand Basin, Sl.No.279, TBSP-E.VI-12, (Deduct
Labour for Fixing Charges TBSP-E.VIII-09-148)
Supplying & Fixing white glazed flat back Bowl urinals of size 440 mm x 265 mm x 315 mm
with internal flushing rim fixed with screws complete Indian make conforming to IS:2556-
1995, Sl.No.284, TBSP-E.VII-01, (Deduct Labour for Fixing Charges TBSP-E.VIII-11-163)

S&F CP finish steel towel rod of 600 mm long and 20 mm dia with brackets, Sl.No.356,
TBSP-F.VII-10,
S&F CP finish brass soap dish, Sl.No.367, TBSP-F.VII-21,
Labour charges only for fixing Indian pattern W.C with "P" or "S" trap, Sl.No.288, TBSP-E.VIII-
01,
Labour charges only Fixing Orissa pan W.C with "P" or "S" trap, Sl.No.289, TBSP-E.VIII-02,

Labour charges only for fixing European Water Closet with 'P' or 'S' trap as per standard
practice, Sl.No.293, TBSP-E.VIII-06,
Labour charges only for fixing plastic seat and lid for
European water closet, Sl.No.294, TBSP-E.VIII-07,
Labour charges only for fixing Indian make Flat Back Wash Hand Basin with waste fittings like
rubber plug, chain, 32 mm nominal size C.P. Fitting Pillar Taps complete with standard CI
brackets including wooden block, Sl.No.295, TBSP-E.VIII-08,
Labour charges only for fixing pedestal for wash hand basin, Sl.No.296, TBSP-E.VIII-09,
Labour charges only for fixing bottle trap to the wash hand basin, Sl.No.297, TBSP-E.VIII-10,

Labour charges only Fixing flat back Bowl/ Half stall urinals with fixing C.P. Spreader and
screws complete, Sl.No.298, TBSP-E.VIII-11,
Labour charges only for fixing Vitreous china porcelain sinks with waste fittings, rubber plug,
chain, cantilever brackets etc., Sl.No.299, TBSP-E.VIII-12,
S&F of 15 mm brass body CP finish bib tap of not less than 300 grams weight screw type (full
turn) with internal / external threaded connection conforming to IS 8931, Sl.No.300, TBSP-F.I-
01, (Deduct Labour for Fixing Charges TBSP-F.VIII-01-51)
S&F of 15 mm brass body CP finish bib tap of not less than 300 grams weight with quarter
turn spindle with either internal or external threaded connection conforming to IS 8931,
Sl.No.301, TBSP-F.I-02, (Deduct Labour for Fixing Charges TBSP-F.VIII-01-51)

Labour charges for fixing all types of CP Taps & Faucets, Sl.No.388, TBSP-F.VIII-01,
S&F 15 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 ISI
mark with GI fittings including the cost of pipe & its fittings & labour charges complete,
Sl.No.399, TBSP-G.I-07, (Deduct Labour for Fixing Charges-41)
S&F 20 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 ISI
mark with GI fittings including the cost of pipe & its fittings & labour charges complete,
Sl.No.400, TBSP-G.I-08, (Deduct Labour for Fixing Charges-41)
S&F 25 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 ISI
mark with GI fittings including the cost of pipe & its fittings & labour charges complete,
Sl.No.401, TBSP-G.I-09, (Deduct Labour for Fixing Charges-41)
Providing & Placing on Terrace (at all floor levels) polyethylene water storage tank with
Double layer approved brand & manufacture with cover and suitable
S&F 40 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 ISI
locking arrangement
mark with & makingthe
GI fittings including necessary holes
cost of pipe for fittings
& its inlet &outlets and
& labour over flow
charges pipes but
complete,
without fittings & base support for tanks, Sl.No.504, TBSP-H.II-01 of
Sl.No.403, TBSP-G.I-11, (Deduct Labour for Fixing Charges-41)
S&F 50 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 ISI
mark with GI fittings including the cost of pipe & its fittings & labour charges complete,
Sl.No.404, TBSP-G.I-12, (Deduct Labour for Fixing Charges-41)
S&F Bronze Gate/ Globe valve as per IS - 778 Class - I, Indian make heavy type - 15 mm NB
Size, Sl.No.430, TBSP-G.III-01, (Deduct Labour for Fixing Charges TBSP-G.IV-03=62)

S&F Bronze Gate/ Globe valve as per IS - 778 Class - I, Indian make heavy type - 20 mm NB
Size, Sl.No.431,TBSP-G.III-02, (Deduct Labour for Fixing Charges TBSP-G.IV-03=62)

S&F Bronze Gate/ Globe valve as per IS - 778 Class - I, Indian make heavy type - 25 mm NB
Size, Sl.No.432, TBSP-G.III-03, (Deduct Labour for Fixing Charges TBSP-G.IV-03=62)

S&F Bronze Gate/ Globe valve as per IS - 778 Class - I, Indian make heavy type - 32 mm NB
Size, Sl.No.433, TBSP-G.III-04, (Deduct Labour for Fixing Charges TBSP-G.IV-03=62)

S&F Bronze Ball valve with SS Ball and SS Spindle as per IS - Class - I, Indian make heavy
type - 15 mm NB Size, Sl.No.449, TBSP-G.III-20, (Deduct Labour for Fixing Charges TBSP-
G.IV-03=62)
S&F Bronze Ball valve with SS Ball and SS Spindle as per IS - Class - I, Indian make heavy
type - 20 mm NB Size, Sl.No.450, TBSP-G.III-21, (Deduct Labour for Fixing Charges TBSP-
G.IV-03=62)
S&F Bronze Ball valve with SS Ball and SS Spindle as per IS - Class - I, Indian make heavy
type - 25 mm NB Size, Sl.No.451, TBSP-G.III-22, (Deduct Labour for Fixing Charges TBSP-
G.IV-03=62)
S&F Bronze Ball valve with SS Ball and SS Spindle as per IS - Class - I, Indian make heavy
type - 32 mm NB Size, Sl.No.452, TBSP-G.III-23, (Deduct Labour for Fixing Charges TBSP-
G.IV-03=62)
Supply & fixing of PVC low level system with internal components & short bend: 10 Liters
capacity Single Flush, Sl.No.510, TBSP-H.II-07 of (Deduct Labour for Fixing Charges TBSP-
H.IV-01-71)
110 mm dia - Door Bend 87.5 Degree - UPVC/SWR Pipe fittings, Sl.No.518, TBSP-H.II-15

110 mm dia - Vent Cowl - UPVC/SWR Pipe fittings, Sl.No.558, TBSP-H.II-55


4" (101.6 mm ) Nahany Trap ( Without Jali with inlet)UPVC/SWR Pipe fittings, Sl.No.572,
TBSP-H.II-69 of
Labour charges for laying, fixing and commissioning the PVC pipes including couplers/
bends/ tees etc any diameter including fixing necessary fittings like bends, plugs, couplers,
junctions, tees, etc with solvent jointing as per standard practice, Sl.No.610, TBSP-H.IV-01,

Labour charges for laying, joining, welding, fixing and commissioning the PPR pipes including
all specials such as couplers/ bends/ tees etc including fixing necessary fittings like bends,
plugs, couplers, junctions, tees, etc with welding the joint as per standard practice - up to 40
mm dia, Sl.No.611, TBSP-H.IV-02,
Labour charges for laying, joining, welding, fixing and commissioning the PPR pipes including
all specials such as couplers/ bends/ tees etc including fixing necessary fittings like bends,
plugs, couplers, junctions, tees, etc with welding the joint as per standard practice - above 40
mm dia, Sl.No.612, TBSP-H.IV-03,
Supplying and fixing TV shape mirror with plastic frame size 609.6 mm x 457 .2 mm,
Sl.No.647, TBSP-J.I-35 (Less Labour for Fixing -116)
Supply of ISI 20mm outer dia medium (1.55mm thickness) grade, FRLS with IS:9537 part 3
regid PVC pipe.Makes : Sudhakar / GM / Modi / AKG / VIP., ELEC-1.2.2.a
Supply of ISI 25mm outer dia medium (1.80mm thickness) grade, FRLS with IS:9537 part 3
regid PVC pipe.Makes : Sudhakar / GM / Modi / AKG / VIP., ELEC-1.2.2.b
Supply of 19/20mm width and 12.5mm height Casing and Caping.,Makes : Modi with ISI
ELEC-1.2.4.a
Supply of 25mm width and 12.5mm height Casing and Caping.,Makes : Modi with ISI ELEC-
1.2.4.b
Supply of 32mm width and 12.5mm height Casing and Caping.,Makes : Modi with ISI ELEC-
1.2.4.c
Supply of PVC Junction Boxes Deep size 19/20mm., ELEC-1.2.9.a
Supply of PVC Junction Boxes Deep size 25mm., ELEC-1.2.9.b
Supply of 19/20mm dia 1.5mm thick PVC Bends.Makes : Sudhakar / GM / Modi / AKG / VIP.,
ELEC-1.2.10.a
Supply of 25mm dia 1.5mm thick PVC Bends.Makes : Sudhakar / GM / Modi / AKG / VIP.,
ELEC-1.2.10.b
Supply of 6 Module box, ELEC-1.3.1.d
Supply of 22/0.3mm (1.5 Sqmm) FRLS / HFFR PVC insulated 1100V grade as per
IS:694/1990 specification for Copper cable.,Makes : Finolex / RR kabel / Havells.ELEC-1-5-
1.b
Supply of 36/0.3mm (2.5 Sqmm) FRLS / HFFR PVC insulated 1100V grade as per
IS:694/1990 specification for Copper cable.,Makes : Finolex / RR kabel / Havells. ELEC-1-5-
1.c
Supply of 56/0.3mm (4.0 Sqmm) FRLS / HFFR PVC insulated 1100V grade as per
IS:694/1990 specification for Copper cable..,Makes : Finolex / RR kabel / Havells.ELEC-1-5-
1.d
Supply of 84/0.3mm (6.0 Sqmm) FRLS / HFFR PVC insulated 1100V grade as per
IS:694/1990 specification for Copper cable.,Makes : Finolex / RR kabel / Havells. ELEC-1-5-
1.e
Supply of 10 Sqmm WPTC (Weather Proof Twin Core) ISI Alluminium Wire.,Makes : Finolex /
RR Kabel / Havells / Polycab / GM / Million / V-Guard / Gold Medal / Kundancab / HPL /
RPG / Nandicab / Nakoda.ELEC-1.6.2.b
Supply of 23 / 0060 twin core twisted / flat heavy Copper wire.,Makes : Finolex / RR Kabel /
Havells / Polycab / GM / Million / V-Guard / Gold Medal / Kundancab / HPL / RPG /
Nandicab / Nakoda.ELEC-1.5.4
Supply of 16A flush type Swich. Makes : GM G Home / Gold Medal Olive / Million Zoom /
Anchor Penta Cherry / Great white Omega, ELEC-1.7.1.h
Supply of stepped type Electronic Regulator. Makes : GM G Home / Gold Medal Olive /
Million Zoom / Anchor Penta Cherry / Great white Omega, ELEC-1.7.1.l
Supply of 3 Plate Jumbo Ceiling Rose. Makes : Anchor / Gold Medal Olive / Million Zoom.,
ELEC-1.7.1.m
Supply of 6A / 10A 1 Way 1 Module Modular Switch. Makes : Legrand Myrius / Cabtree
Thames Platinum / Million Logus / Gold Medal Curve / Anchor Roma viola / CPL., ELEC-
1.9.2.a
Supply of 6A / 10A 3/2 Pin 2 Module Modular Socket with shutter. Makes : Legrand Myrius /
Cabtree Thames Platinum / Million Logus / Gold Medal Curve / Anchor Roma viola / CPL.,
ELEC-1.9.2.d
Supply of 16A / 20A 1 Way 1 Module Modular Switch. Makes : Legrand Myrius / Cabtree
Thames Platinum / Million Logus / Gold Medal Curve / Anchor Roma viola / CPL., ELEC-
1.9.2.h
Supply of 16A/6A 1 way 2 Module Combi Socket Modular Socket with shutter. Makes :
Legrand Myrius / Cabtree Thames Platinum / Million Logus / Gold Medal Curve / Anchor
Roma viola / CPL., ELEC-1.9.2.l
Supply of 6 Modular Cover Frame. Makes : Legrand Myrius / Cabtree Thames Platinum /
Million Logus / Gold Medal Curve / Anchor Roma viola
/ CPL., ELEC-1.3.3.d
Supply of 6-32A 10KA SP MCB, C/D Curve ISI Mark. Makes : Legrand-DX3 / Schneider-
Acti9., ELEC-2.13.1.a
Supply of 63A DP Isolator . Makes : Legrand-DX3 / Schneider-Acti9., ELEC-2.14.1.c
Supply of 63A FP Isolator. Makes : Legrand-DX3 / Schneider-Acti9., ELEC-2.14.1.g
Supply of 40A DP Isolator. Makes : Legrand-DX3 / Schneider-Acti9., ELEC-2.14.1.b
Supply of 4 Way SPN DB with IP 20 Protection as per IS:13032 and suitable for 4Nos S.P out
goings and for 1 No Incommer etc complete. Makes : Legrand / Schneider., ELEC-2.15.1.a

Supply of 4 Way SPN DB with IP 43 Protection as per IS:13032 and suitable for 4Nos S.P out
goings and for 1 No Incommer etc complete. Makes : Makes : Legrand / Schneider.,
Sl.No.320, ELEC-2.15.1.b
Supply of 8 Way SPN DB with IP 20 Protection as per IS:13032 and suitable for 8Nos S.P out
goings and for 1 No Incommer etc complete. Makes : Makes : Legrand / Schneider., ELEC-
2.15.1.c
Supply of 8 Way SPN DB with IP 43 Protection as per IS:13032 and suitable for 8Nos S.P out
goings and for 1 No Incommer etc complete. Makes : Makes : Legrand / Schneider., ELEC-
2.15.1.d
Supply of 4 Way TPN DB Horizontal with IP 20 Protection as per IS:13032 and suitable for 12
Nos S.P. out goings and for 1 No 4 pole Incommer etc complete of makes Legrand /
Schneider. Makes : Makes : Legrand / Schneider., ELEC-2.16.1.a
Supply of 4 Way TPN DB Horizontal with IP 43 Protection as per IS:13032 and suitable for 12
Nos S.P. out goings and for 1 No 4 pole Incommer etc complete of makes Legrand /
Schneider. Makes : Makes : Legrand / Schneider., ELEC-2.16.1.b
Supply of 8 Way TPN DB Horizontal with IP 43 Protection as per IS:13032 and suitable for 24
Nos S.P. out goings and for 1 No 4 pole Incommer etc complete. Makes : Makes : Legrand /
Schneider., ELEC-2.16.1.d
Supply of 20A SP Plug and Socket with SS enclosure. Makes :Makes : Legrand / Schneider,
ELEC-2.16.8.a
Supply of 150W SV / MH Street light luminaire integral with pressure diecast alluminium
housing having pot optics with IP66 protection with all standard
accessories etc.Makes : Wipro / G.E. / Phillips / Bajaj / Crompton / Surya / Venture / Halonix.,
ELEC-3.1.3
Supply of 400W MH Flood light luminaire with Non - integral weather proof diecast alluminium
housing with IP66 protection with Control Gear Box without lamp.Makes : Wipro / G.E. /
Phillips / Bajaj / Crompton / Surya / Venture / Halonix., ELEC-3.1.1.a
Supply of 150W SV Lamp with ISI mark. Makes : Phillips / Osram / Crompton / Bajaj / Surya /
Venture / HPL / Havells / Halonix., ELEC-3.4.1.d
Supply of 400W MH Lamp with ISI mark. Makes : Phillips / Osram / Crompton / Bajaj / Surya /
Venture / HPL / Havells / Halonix., ELEC-3.4.1.l
Supply of 1 x 36/40W Box type tube light luminaire powder coated CRCA sheet steel housing
with Electronic Ballast Chokes and all standard accessories. Makes : Wipro / G.E. / Phillips /
Crompton / Bajaj ., ELEC-3.6.3.a
Supply of 2 x 36/40W Box type tube light luminaire powder coated CRCA sheet steel housing
with Electronic Ballast Chokes and all standard
accessories of Makes : Wipro / G.E. / Phillips / Crompton / Bajaj ., ELEC-3.6.3.b

Supply of HID Lamp holder. Makes : Phillips / Crompton / Bajaj / Surya / HPL /Havells.,
ELEC-3.6.13
Supply of 2 x 36W CFL Paralite louvre (P5) Surface / Recessed low glare Mirror Optic
luminaire comprising bright anodised alluminium reflector with Electronic Ballst. Makes :
Phillips / Crompton / Bajaj / Surya / HPL / Havells.,ELEC-3.6.5
Supply of 40W-60W Lamp. Makes : Phillips / Crompton / Bajaj / Surya / Style Lamp / Mahita
Electro / Capart., ELEC-3.7.1
Supply of 36/40W fluorescent tube. Makes : Phillips / Crompton / Bajaj / Surya., ELEC-3.7.4

Supply of 48" (1200mm) Sweep 5 Star rated Ceiling Fan without Regulator. Makes :
Crompton High Speed Decora / Bajaj Regal star / Havells Fusion 50 / Orient Summer Crown /
Usha technix decorative, ELEC-5.1.3
Supply of 9" (225mm), Light duty exhaust fan with double ball bearing and wire guard etc
complete. Makes : Crompton / Bajaj Bahar WG / Havells Ventil Air-DS / Orient hill air., ELEC-
5.1.9.a
Supply of 12" (300mm) ISI, 900 RPM Heavy duty exhaust fan with metallic blades with Mark.
Makes : Crompton / Almounard / Havells Turbo Force., ELEC-5.1.10.a
1.5 TR 5 Star capable of delivering 18000 BTU/hr and above with operating on refrigerant R-
32 / R-410A with COP not less than 3.6 w/w makes Daikin FTF50QRV16 or its equivalent
model of Carrier / Blue Star., ELEC -6.1.1 d

U Nails, Sl.No.875, ELEC-9.1.4


Hard Coke, Sl.No.854, ELEC-9.1.10
Salt, Sl.No.855, ELEC-9.1.11
19 / 20 mm Steel tube fan down rod, Sl.No.865, ELEC-9.1.21
TW / PVC Round Blocks, Sl.No.872, ELEC-9.1.29
G.I. Strip / Plate / Wire (per K. G), Sl.No.884, ELEC-9.3.6
Earth work excacvation including all soils for trench, Pole Pit and Earth Pit., ELEC-9.4.17

Drilling of 16 Nos through holes of 12mm dia to G.I pipe,ELEC-9.4.18


G.I Nuts, Bolts an Washers each set, ELEC-9.4.19
18" dia 2" thick hume pipe ring, ELEC-9.4.20
18" dia 3" hume pipe ring, ELEC-9.4.21
2" thick CC cover for hume pipe ring with handle., ELEC-9.4.22
Skilled Electrician
Semi Skilled Electrician
Skilled Mason
Skilled Welder
Helper (Electrical)
Labour Charges for Sundries - HDR require Blasting (LS)
Rawl Plug, ELEC-9.1.2
Conveyance for fixing kadapa slabs (local market rate)
Fixing of 40mm thick kadapa slabs (local market rate)
Labour charges for mixing and filling in the pit per No.(as per local market rate)
Painting charges for MS grill/Angles/gates (Local market rate)
Painting charges for MS Y- Angles (Local market rate)
Painting charges for MS- Angles embedded in Compound Wall (Local market rate)
Galvanisation charges, Sl.No.33, CS65 of TSTransco SSR
Cattle Manure-Filling-Planting as per Local Market Rate
Cost of Plant as per Local Market Rate
Red Soil Spreading Charges as per Local Market Rate
Ploughing as per Local Market Rate
Fixing of G.I. staples steel pins or binding wire (Local market rate)
Labour charges for Fixing 50mm (2") dia B- class GI pipe properties & weight as per IS 1239
ISI mark with cap for chain link mesh (Local Market rate)
Cost of paint and labour for lettering (LMR) for 3mm thick BP sheet Board of size 5'0"x3'0"
(Local Market Rate per 1 No.)
Cost of paint and labour for lettering (LMR) for 3mm thick BP sheet Board of size 2'0"x1'6"
(Local Market Rate per 1 No.)
Cost of paint and labour for lettering (LMR) for 3mm thick BP sheet Board of size 6" x 18"
(Local Market Rate per 1 No.)
Cost of PVC soap trays (as per Local Market Rate)

Supplying and fixing long body C.P. Taps and accessories like waste water pipe (as per Local
Market Rate)
Labour for drilling & fixing in position 3mm thick BP sheet Board of size 6" x 18" including cost
of wire (LS)
Cost of CC(1:2:4) for fixing 4" dia 101.6 mm dia PVC Nahani Trap (Local market rate)
Labour for Fixing 4" dia 101.6 mm dia PVC Nahani Trap (Local market rate)
Conveyance charges, erection charges by constructing suitable base to keep the tank &
giving necessary fittings (LS)
Sundries such as screws, Rawal Plugs, Gutting, Cement, Sand and Rounding off for P.V.C
casing and caping (LS)
Cost of Sundries such as Sand, Bolt, Nuts etc., (LS) for \fixing Heavy duty Exhaust fan
Transportation Charges on Unit Cost for fixing of ceiling fan (LS)
Unforseen item works such as painting to down rod, screws etc., for fixing ceiling fan (LS)

Pipe bending charges for fixing Bajaj 150 Watts S.V. Lamp (LS)
Labour charges towards fixing in position 32A. Main Switch (LS)
Labour charges for fixing of Well Glass Vapour proof (LS)
Labour charges towards fixing of decorative portico type (LS)
Labour charges towards fixing of 20A single phase plug and socket (LS)
Labour Charges for Fixing of 400W MH Flood light luminaire (LS)
(Lead) charges for trucks and tippers for Earth / Sand
/Gravel / Murrum/ Lime/ Surki/ per cu.meter - Lead for Every km beyond 5 km up to 30
km(Exclusive of 11.765% Contractor Profit and Over Head charges)
(Lead) charges for trucks and tippers for Earth / Sand
/Gravel / Murrum/ Lime/ Surki/ per cu.meter - for EveryKM beyond 30KM (Exclusive of
11.765% Contractor Profit and Over Head charges)
(Lead) charges for trucks and tippers for Cement/Steel/
RCC poles/AC & GI sheets/Packed materials/tonne - Lead up to 1 km (Exclusive of
11.765%Contractor Profit and Over Head charges)
(Lead) charges for trucks and tippers for Cement/Steel/
RCC poles/AC & GI sheets/Packed materials/tonne` - Lead up to 2 km (Exclusive of 11.765%
Contractor Profit and Over Head charges)
(Lead) charges for trucks and tippers for Rubble/Size
stones/ Cut Stones/ Coarse aggregate per cu.meter - Lead up to 3 km (Exclusive of 11.765%
Contractor Profit and Over Head charges)
(Lead) charges for trucks and tippers for Cement/Steel/
RCC poles/AC & GI sheets/Packed materials/tonne - Lead up to 4 km (Exclusive of 11.765%
Contractor Profit and Over Head charges)
(Lead) charges for trucks and tippers for Cement/Steel/
RCC poles/AC & GI sheets/Packed materials/tonne - Lead up to 5 km (Exclusive of 11.765%
Contractor Profit and Over Head charges)
(Lead) charges for trucks and tippers for Cement/Steel/
RCC poles/AC & GI sheets/Packed materials/tonne - for Every km beyond 5 km up to 30 km
(Exclusive of 11.765% Contractor Profit and Over Head charges)
(Lead) charges for trucks and tippers for Cement/Steel/
RCC poles/AC & GI sheets/Packed materials/tonne - for Every km beyond 30 km (Exclusive
of 11.765% Contractor Profit and Over Head charges)
(Lead) charges for trucks and tippers per cu.meter for PCC slabs/Shahabad slabs/CC &
Laterite blocks/Wood/Cum - Lead up to 1 km (Exclusive of 11.765% Contractor Profit and
Over Head charges)
(Lead) charges for trucks and tippers forper cu.meter for PCC slabs/Shahabad slabs/CC &
Laterite blocks/Wood/Cum` - Lead up to 2 km (Exclusive of 11.765% Contractor Profit and
Over Head charges)
(Lead) charges for trucks and tippers for Rubble/Size
stones/ Cut Stones/ Coarse aggregate per cu.meter - Lead up to 3 km (Exclusive of 11.765%
Contractor Profit and Over Head charges)
(Lead) charges for trucks and tippers for Cement/Steel/
RCC poles/AC & GI sheets/Packed materials/tonne - Lead up to 4 km (Exclusive of 11.765%
Contractor Profit and Over Head charges)
(Lead) charges for trucks and tippers forper cu.meter for PCC slabs/Shahabad slabs/CC &
Laterite blocks/Wood/Cum - Lead up to 5 km (Exclusive of 11.765% Contractor Profit and
Over Head charges)
(Lead) charges for trucks and tippers per cu.meter for PCC slabs/Shahabad slabs/CC &
Laterite blocks/Wood/Cum - for Every km beyond 5 km up to 30 km (Exclusive of 11.765%
Contractor Profit and Over Head charges)
(Lead) charges for trucks and tippers per cu.meter for PCC slabs/Shahabad slabs/CC &
Laterite blocks/Wood/Cum - for Every km beyond 30 km (Exclusive of 11.765% Contractor
Profit and Over Head charges)
(Lead) charges for trucks and tippers per cu.meter water/1000 liters - Lead up to 1 km
(Exclusive of 11.765% Contractor Profit and Over Head charges)
(Lead) charges for trucks and tippers per cu.meter water/1000 liters` - Lead up to 2 km
(Exclusive of 11.765% Contractor Profit and Over Head charges)
(Lead) charges for trucks and tippers per cu.meter water/1000 liters - Lead up to 3 km
(Exclusive of 11.765% Contractor Profit and Over Head charges)
(Lead) charges for trucks and tippers per cu.meter water/1000 liters - Lead up to 4 km
(Exclusive of 11.765% Contractor Profit and Over Head charges)
(Lead) charges for trucks and tippers per cu.meter water/1000 liters - Lead up to 5 km
(Exclusive of 11.765% Contractor Profit and Over Head charges)
(Lead) charges for trucks and tippers per cu.meter water/1000 liters - for Every km beyond 5
km up to 30 km (Exclusive of 11.765% Contractor Profit and Over Head charges)

(Lead) charges for trucks and tippers per cu.meter water/1000 liters - for Every km beyond
30 km (Exclusive of 11.765% Contractor Profit and Over Head charges)
(Lead) charges for trucks per 1000 nos. of bricks - Lead up to 1 km (Exclusive of 11.765%
Contractor Profit and Over Head charges)
(Lead) charges for trucks per 1000 nos. of bricks - Lead up to 2 km (Exclusive of 11.765%
Contractor Profit and Over Head charges)
(Lead) charges for trucks per 1000 nos. of bricks - Lead up to 3 km (Exclusive of 11.765%
Contractor Profit and Over Head charges)
(Lead) charges for trucks per 1000 nos. of bricks - Lead up to 4 km (Exclusive of 11.765%
Contractor Profit and Over Head charges)
(Lead) charges for trucks per 1000 nos. of bricks - Lead up to 5 km (Exclusive of 11.765%
Contractor Profit and Over Head charges)
(Lead) charges for trucks per 1000 nos. of bricks - for Every km beyond 5 km up to 30 km
(Exclusive of 11.765% Contractor Profit and Over Head charges)
(Lead) charges for trucksper 1000 nos. of bricks - for Every km beyond 30 km (Exclusive of
11.765% Contractor Profit and Over Head charges)
Loading Charges by manual means ( idle hire charges of trucks are not added) - Earth
/Sand /Gravel Murrum/ Surki (Exclusive of 11.765% Contractor Profit and Over Head
charges)
UnLoading Charges by manual means ( idle hire charges of trucks are not added) - Earth
/Sand /Gravel Murrum/ Surki (Exclusive of 11.765% Contractor Profit and Over Head
charges)
Loading Charges by manual means ( idle hire charges of trucks are not added) - Rubble/Size
stone/cut stone/Coarse aggregate,lime (Exclusive of 11.765% Contractor Profit and Over
Head charges)
UnLoading Charges by manual means ( idle hire charges of trucks are not added) -
Rubble/Size stone/cut stone/Coarse aggregate,lime (Exclusive of 11.765% Contractor Profit
and Over Head charges)
Loading Charges by manual means ( idle hire charges of trucks are not added) -Cement
(Exclusive of 11.765% Contractor Profit and Over Head charges)
UnLoading Charges by manual means ( idle hire charges of trucks are not added) -
Cement(Exclusive of 11.765% Contractor Profit and Over Head charges)
Loading Charges by manual means ( idle hire charges of trucks are not added) -Steel
(Exclusive of 11.765% Contractor Profit and Over Head charges)
UnLoading Charges by manual means ( idle hire charges of trucks are not added) - Steel
(Exclusive of 11.765% Contractor Profit and Over Head charges)
Loading Charges by manual means ( idle hire charges of trucks are not added) -Brick
(Exclusive of 11.765% Contractor Profit and Over Head charges)
UnLoading Charges by manual means ( idle hire charges of trucks are not added) -Brick
(Exclusive of 11.765% Contractor Profit and Over Head charges)
Loading Charges by manual means ( idle hire charges of trucks are not added) - Earth
/Sand /Gravel Murrum/ Surki (Exclusive of 11.765% Contractor Profit and Over Head
charges)
UnLoading Charges by manual means ( idle hire charges of trucks are not added) - Earth
/Sand /Gravel Murrum/ Surki (Exclusive of 11.765% Contractor Profit and Over Head
charges)
Loading Charges by manual means ( idle hire charges of trucks are not added) - Rubble/Size
stone/cut stone/Coarse aggregate,lime (Exclusive of 11.765% Contractor Profit and Over
Head charges)
UnLoading Charges by manual means ( idle hire charges of trucks are not added) -
Rubble/Size stone/cut stone/Coarse aggregate,lime (Exclusive of 11.765% Contractor Profit
and Over Head charges)
Loading Charges by manual means ( idle hire charges of trucks are not added) -Cement
(Exclusive of 11.765% Contractor Profit and Over Head charges)
UnLoading Charges by manual means ( idle hire charges of trucks are not added) -
Cement(Exclusive of 11.765% Contractor Profit and Over Head charges)
Loading Charges by manual means ( idle hire charges of trucks are not added) -Steel
(Exclusive of 11.765% Contractor Profit and Over Head charges)
UnLoading Charges by manual means ( idle hire charges of trucks are not added) - Steel
(Exclusive of 11.765% Contractor Profit and Over Head charges)
Loading Charges by manual means ( idle hire charges of trucks are not added) -Brick
(Exclusive of 11.765% Contractor Profit and Over Head charges)
UnLoading Charges by manual means ( idle hire charges of trucks are not added) -Brick
(Exclusive of 11.765% Contractor Profit and Over Head charges)
Soil investigation-Pile Foundation (LMR)
Hire-Agitator car/Transit mixer 2 cum Sl.No.1 (Hire Chgs), of Irr, Pg.49, - Machinery
Hire-Agitator car/Transit mixer 2 cum Sl.No.1 (Hire Chgs), of Irr, Pg.49, - Labour
Air compressor 5 cmm ( diesel ), Sl.No.2 (Hire Chgs), of Irr, Pg.49, - Machinery
Air compressor 5 cmm ( diesel ), Sl.No.2 (Hire Chgs), of Irr, Pg.49, - Labour
Air compressor 7 cmm ( electric), Sl.No.4 (Hire Chgs), of Irr, Pg.49, - Machinery
Air compressor 5 cmm ( electric ), Sl.No.4 (Hire Chgs), of Irr, Pg.49, - Labour
Air compressor 8.5 cmm (Diesel), Sl.No.5 (Hire Chgs), of Irr, Pg.49, - Machinery
Air compressor 8.5 cmm ( Diesel), Sl.No.5 (Hire Chgs), of Irr, Pg.49, - Labour
Air compressor 15 cmm (electric), Sl.No.7 (Hire Chgs), of Irr, Pg.49, - Machinery
Air compressor 15 cmm (electric), Sl.No.7 (Hire Chgs), of Irr, Pg.49, - Labour
Angle Dozer 90 hp, Sl.No.8 (Hire Chgs), of Irr, Pg.49, - Machinery
Angle Dozer 90 hp, Sl.No.8 (Hire Chgs), of Irr, Pg.49, - Labour
Batching plant 2X1.00 cum ( 15 Cum/hr), Sl.No.10 (Hire Chgs), of Irr, Pg.49,- Machinery

Batching plant 2X1.00 cum ( 15 Cum/hr), Sl.No.10 (Hire Chgs), of Irr, Pg.49, - Labour
Batching plant 2X1.50 cum ( 50 Cum/hr), Sl.No.11(Hire Chgs), of Irr, Pg.49,- Machinery
Batching plant 2X1.50 cum ( 50 Cum/hr), Sl.No.11 (Hire Chgs), of Irr, Pg.49, - Labour
Bending maching 3000x12mm, Sl.No.12 (Hire Chgs), of Irr, Pg.49, - Machinery
Bending maching 3000x12mm, Sl.No.12 (Hire Chgs), of Irr, Pg.49, - Labour
Clamp sheel and Hoisting ropes, Sl.No.13 (Hire Chgs), of Irr, Pg.49, - Machinery
Hire-Concrete bucket 1.5 cum, Sl.No.14 (Hire Chgs), of Irr, Pg.49, - Machinery
Concrete hand mixer 45/30 ltr, Sl.No.15 (Hire Chgs), of Irr, Pg.49, - Machinery
Concrete Mixer 300/200 ltr (electric), Sl.No.17 (Hire Chgs), of Irr, Pg.49, - Machinery
Concrete Mixer 300/200 ltr (electric), Sl.No.17 (Hire Chgs), of Irr, Pg.49, - Labour
Concrete Mixer 600/400 ltr (electric), Sl.No.19 (Hire Chgs), of Irr, Pg.49, - Machinery
Concrete Mixer 600/400 ltr (electric), Sl.No.19 (Hire Chgs), of Irr, Pg.49, - Labour
Concrete paver 100 sqm/hr, Sl.No.20 (Hire Chgs), of Irr, Pg.49, - Machinery
Concrete paver 100 sqm/hr, Sl.No.20 (Hire Chgs), of Irr, Pg.49, - Labour
Convey muker, Sl.No.21 (Hire Chgs), of Irr, Pg.49, - Machinery
Convey muker, Sl.No.21 (Hire Chgs), of Irr, Pg.49, - Labour
Core drilling machine, Sl.No.22 (Hire Chgs), of Irr, Pg.49, - Machinery
Core drilling machine, Sl.No.22 (Hire Chgs), of Irr, Pg.49, - Labour
Diesel Generating Set 50KVA, Sl.No.24 (Hire Chgs), of Irr, Pg.49, - Machinery
Diesel Generating Set 50KVA, Sl.No.24 (Hire Chgs), of Irr, Pg.49, - Labour
Diesel Loco 45hp, Sl.No.25 (Hire Chgs), of Irr, Pg.49, - Machinery
Diesel Loco 45hp, Sl.No.25 (Hire Chgs), of Irr, Pg.49, - Labour
Dewatering pump 5hp (diesel), Sl.No.26 (Hire Chgs), of Irr, Pg.49, - Machinery
Dewatering pump 5hp (diesel), Sl.No.26 (Hire Chgs), of Irr, Pg.49, - Labour
Dewatering pump 5hp (diesel), Sl.No.27 (Hire Chgs), of Irr, Pg.49, - Machinery
Dewatering pump 5hp (diesel), Sl.No.27 (Hire Chgs), of Irr, Pg.49, - Labour
Dewatering pump 10hp (diesel), Sl.No.28 (Hire Chgs), of Irr, Pg.49, - Machinery
Dewatering pump 10hp (diesel), Sl.No.28 (Hire Chgs), of Irr, Pg.49, - Labour
Dewatering pump 10hp (electric), Sl.No.29 (Hire Chgs), of Irr, Pg.50, - Machinery
Dewatering pump 10hp (electric), Sl.No.29 (Hire Chgs), of Irr, Pg.50, - Labour
Dewatering pump 20hp (diesel), Sl.No.30 (Hire Chgs), of Irr, Pg.50, - Machinery
Dewatering pump 20hp (diesel), Sl.No.30 (Hire Chgs), of Irr, Pg.50, - Labour
Dewatering pump 20hp (electric), Sl.No.31 (Hire Chgs), of Irr, Pg.50, - Machinery
Dewatering pump 20hp (electric), Sl.No.31 (Hire Chgs), of Irr, Pg.50, - Labour
Drifter, Sl.No.32 (Hire Chgs), of Irr, Pg.50, - Machinery
Drifter, Sl.No.32 (Hire Chgs), of Irr, Pg.50, -Labour
Geophysical Electric resistivity meter, Sl.No.35 (Hire Chgs), of Irr, Pg.50, -Machinery
Grouting pump,Sl.No.36 (Hire Chgs), of Irr, Pg.50, -Machinery
Grouting pump, Sl.No.36 (Hire Chgs), of Irr, Pg.50, - Labour
Guniting/sand blast equipment,Sl.No.37 (Hire Chgs), of Irr, Pg.50, -Machinery
Guniting/sand blast equipment, Sl.No.37 (Hire Chgs), of Irr, Pg.50, - Labour
Ice plant & accessories 30t/day,Sl.No.38 (Hire Chgs), of Irr, Pg.50, -Machinery
Ice plant & accessories 30t/day, Sl.No.38 (Hire Chgs), of Irr, Pg.50, - Labour
Needle vibrator 60 mm ( Petrol ), Sl.No.42 (Hire Chgs), of Irr, Pg.50, - Machinery
Needle vibrator 60 mm ( Petrol ), Sl.No.42 (Hire Chgs), of Irr, Pg.50, - Labour
Needle vibrator 60 mm ( Electric ), Sl.No.43 (Hire Chgs), of Irr, Pg.50, - Machinery
Needle vibrator 60 mm ( Electric), Sl.No.43 (Hire Chgs), of Irr, Pg.50, - Labour
Planing machine 4m stroke, Sl.No.44(Hire Chgs), of Irr, Pg.50, - Machinery
Planing machine 4m stroke, Sl.No.44(Hire Chgs), of Irr, Pg.50, - Labour
Plate shearing machine upto 12mm, Sl.No.45(Hire Chgs), of Irr, Pg.50, - Machinery
Plate shearing machine upto 12mm, Sl.No.45(Hire Chgs), of Irr, Pg.50, - Labour
Pneumatic placer 0.5cum, Sl.No.46(Hire Chgs), of Irr, Pg.50, - Machinery
Pneumatic placer 0.5cum, Sl.No.46(Hire Chgs), of Irr, Pg.50, - Labour
Pneumatic tamper, Sl.No.47(Hire Chgs), of Irr, Pg.50, - Machinery
Pneumatic tamper, Sl.No.47(Hire Chgs), of Irr, Pg.50, - Labour
Pug cutting machine, Sl.No.48(Hire Chgs), of Irr, Pg.50, - Machinery
Pusher leg, Sl.No.49(Hire Chgs), of Irr, Pg.50, - Machinery
Road roller diesel 10t, Sl.No.50 (Hire Chgs), of Irr, Pg.50, - Machinery
Road roller diesel 10t-, Sl.No.50 (Hire Chgs), of Irr, Pg.50, - Labour
Shovel 0.5 0cum 75 hp, Sl.No.51 (Hire Chgs), of Irr, Pg.50, - Machinery
Shovel 0.5 0cum 75 hp, Sl.No.51 (Hire Chgs), of Irr, Pg.50, - Labour
Stationery derrick crane, Sl.No.53 (Hire Chgs), of Irr, Pg.50, - Machinery
Tipping tub 1.5cum, Sl.No.55 (Hire Chgs), of Irr, Pg.50, - Machinery
Tower crane 5 tonne, Sl.No.56 (Hire Chgs), of Irr, Pg.50, - Machinery
Tower crane 5 tonne, Sl.No.56 (Hire Chgs), of Irr, Pg.50, - Labour
Transformer 250KVA, Sl.No.57 (Hire Chgs), of Irr, Pg.50, - Machinery
Truck 10t, Sl.No.58 (Hire Chgs), of Irr, Pg.50, - Machinery
Truck 10t, Sl.No.58 (Hire Chgs), of Irr, Pg.50, - Labour
Truck mounted derrick crane 5t, Sl.No.59 (Hire Chgs), of Irr, Pg.50, - Machinery
Truck mounted derrick crane 5t, Sl.No.59 (Hire Chgs), of Irr, Pg.50, - Labour
Upright drilling machine/grinder, Sl.No.60 (Hire Chgs), of Irr, Pg.50, - Machinery
Upright drilling machine/grinder, Sl.No.60 (Hire Chgs), of Irr, Pg.50, - Labour
Ventilation fan 20hp, Sl.No.61 (Hire Chgs), of Irr, Pg.50, - Machinery
Ventilation fan 20hp, Sl.No.61 (Hire Chgs), of Irr, Pg.50, - Labour
Vibratory pad foot roller 8t, Sl.No.62 (Hire Chgs), of Irr, Pg.51, - Machinery
Vibratory pad foot roller 8t, Sl.No.62 (Hire Chgs), of Irr, Pg.51, - Labour
Wagon drill, Sl.No.63 (Hire Chgs), of Irr, Pg.51, - Machinery
Wagon drill, Sl.No.63 (Hire Chgs), of Irr, Pg.51, - Labour
Water tanker 8000ltr, Sl.No.64 (Hire Chgs), of Irr, Pg.51, - Machinery
Water tanker 8000ltr, Sl.No.64 (Hire Chgs), of Irr, Pg.51, - Labour
Welding set, Sl.No.65 (Hire Chgs), of Irr, Pg.51, - Machinery
Winch 35hp (electric), Sl.No.66 (Hire Chgs), of Irr, Pg.51, - Machinery
Winch 35hp (electric), Sl.No.66 (Hire Chgs), of Irr, Pg.51, - Labour
Tractor with 2T roller, Sl.No.67 (Hire Chgs), of Irr, Pg.51, - Machinery
Hydraulic Truck Crane 30T, Sl.No.68 (Hire Chgs), of Irr, Pg.51, - Machinery
Hydraulic Truck Crane 30T, Sl.No.68 (Hire Chgs), of Irr, Pg.51, - Labour
Hydraulic Truck Crane 16T, Sl.No.69 (Hire Chgs), of Irr, Pg.51, - Machinery
Hydraulic Truck Crane 16T, Sl.No.69 (Hire Chgs), of Irr, Pg.51, - Labour
Heavy Duty Airless Spray Painting equipment, Sl.No.70(Hire Chgs), of Irr, Pg.51, - Machinery

Mortor Grader, Sl.No.3 (Hire Chgs), of R&B, Pg.28,


Tractor with ripper attachment, Sl.No.13 (Hire Chgs), of R&B, Pg.28,
Mechanical broom Hydraulict, Sl.No.16 (Hire Chgs), of R&B, Pg.28,
Bitumen Pressure Distributor, Sl.No.17 (Hire Chgs), of R&B, Pg.28,
Emulsion Pressure Distributor, Sl.No.18 (Hire Chgs), of R&B, Pg.28,
Hire-Hot mix Plant-120TPH, Sl.No.19 (Hire Chgs), of R&B, Pg.28,
Hire-Hot mix Plant-100TPH, Sl.No.20 (Hire Chgs), of R&B, Pg.28,
Hire-Hot mix Plant-60TPH, Sl.No.21 (Hire Chgs), of R&B, Pg.28,
Hire-Hot mix Plant-40 to 60TPH capacity, Sl.No.22 (Hire Chgs), of R&B, Pg.28,
Paver Finisher Hydrostatic with sensor control 100TPH, Sl.No.23 (Hire Chgs), of R&B, Pg.28,

Hydraulic Chip Spreader, Sl.No.25 (Hire Chgs), of R&B, Pg.28,


Tandem Road roller, Sl.No.26 (Hire Chgs), of R&B, Pg.29,
Pneumatic Road roller, Sl.No.27(Hire Chgs), of R&B, Pg.29,
Pot-Hole repair machine, Sl.No.28(Hire Chgs), of R&B, Pg.29,
Bitumen boiler oil fired, Sl.No.29(Hire Chgs), of R&B, Pg.29,
GSB Plant 50 cum, Sl.No.30(Hire Chgs), of R&B, Pg.29,
Mastic Cooker, Sl.No.31(Hire Chgs), of R&B, Pg.29,
Batching and Mixing Plant a) 30 cum capacity, Sl.No.32(Hire Chgs), of R&B, Pg.29,
Concrete pump of 45 and 30 cum, Sl.No.34(Hire Chgs), of R&B, Pg.29,
Cranes (a)80 tonnes, Sl.No.35(Hire Chgs), of R&B, Pg.29,
Cranes (b)35 tonnes, Sl.No.35(Hire Chgs), of R&B, Pg.29,
Cranes ©Crane with grab bucket 0.75cum, Sl.No.35(Hire Chgs), of R&B, Pg.29,
Cranes ©Crane with grab bucket 0.1cum, Sl.No.35(Hire Chgs), of R&B, Pg.29,
Kerb casting machine, Sl.No.37(Hire Chgs), of R&B, Pg.29,
Concrete mixer (b) 1.0cum, Sl.No.38(Hire Chgs), of R&B, Pg.29,
Concrete paver finisher with 40hp motor, Sl.No.40(Hire Chgs), of R&B, Pg.29,
Integrated stone crusher (Crusher of spalls 100TPH), Sl.No.41(Hire Chgs), of R&B, Pg.29,

Integrated stone crusher (Crusher of spalls 200TPH), Sl.No.41(Hire Chgs), of R&B, Pg.29,

Pre stressing jack with pump and access, Sl.No.42(Hire Chgs), of R&B, Pg.29,
Generator 250KV, Sl.No.43(Hire Chgs), of R&B, Pg.29,
Generator 100KV, Sl.No.43(Hire Chgs), of R&B, Pg.29,
Pneumatic sinking of Plants, Sl.No.44(Hire Chgs), of R&B, Pg.29,
Road marking machine, Sl.No.46(Hire Chgs), of R&B, Pg.30,
Mobile slurry seal equipment, Sl.No.47(Hire Chgs), of R&B, Pg.30,
Plate compacter, Sl.No.48(Hire Chgs), of R&B, Pg.30,
Labour for fixing in position Chain Link Mesh including conveyance charges of materials and
GI wire (LumpSum)
Labour for Fixing Nominal Bore GI pipe MediumGrade (Rate deducted from cost of pipe)

14mm mineral fibre sheet 600x600 TBSC-K.I-05


Supply of 36 W Pin type CFL lamp, ELEC-3.7.7.f
Labour Charges for Fixing TV shape mirror
Supply & Fixing of 15 mm brass body CP finish bib cock of not less than 300 grams weight
Indian make heavy duty (Local Market Rate)

Transportation Charges for 110DiaDoorBend (LS)


Supply & Fixing of NP stop cock (Local Market Rate)
Labour for fixing 12.7 mm NP stop cock Indian make heavy duty, as per TBSP-F.VIII-01
Cost of 32A Main Switch (LMR)
Cost of rechargeable flouroscent fitting with tube as per Local market Rate
Cost of Well Glass Vapour proof resistant fitting with bulb as per Local market Rate
Cost of Decorative Type light fitting with bulb as per Local market Rate
HIRE CHARGES FOR CENTERING & SCAFFOLDING - Unsupported Height upto 7.32 M as
per Local market Rate
Supply & laying 65mm Dia B Class GI pipe at all levels of the building including jointing, fixing
testing and commissioning G.I pipes, TBSP-G.I-13 (Deduct Labour Charges - 41)
Supply & laying 50mm Dia B Class GI pipe at all levels of the building including jointing, fixing
testing and commissioning G.I pipes, TBSP-G.I-12 (Deduct Labour Charges - 41)
Supply & laying 25mm Dia B class GI pipe at all levels of the building including jointing, fixing
testing and commissioning G.I pipes, TBSP-G.I-09 (Deduct Labour Charges - 41)
Supply & laying 20mm Dia B class GI pipe at all levels of the building including jointing, fixing
testing and commissioning G.I pipes, TBSP-G.I-08 (Deduct Labour Charges - 41)
Supply & laying 15mm Dia B class GI pipe at all levels of the building including jointing, fixing
testing and commissioning G.I pipes, TBSP-G.I-07 (Deduct Labour Charges - 41)
Supplying and fixing in position 20mm Dia GM peet valve of Kirlosker/Zelota make at all
levels of the buildings (Deduct Labour Charges - 62, TBSP-G.IV-03)
Supplying and fixing in position 50.80 MM GM Peet of Kirlosker/Zelota make at all levels of
the buildings TBSP-G.III-06 (Deduct Labour Charges - 62, TBSP-G.IV-03)
Supplying and fixing in position 50mm GM Peet valve (Non Return) of Kirlosker/Zelota make
at all levels of the buildings, TBSP-G.III-19 (Deduct Labour Charges - 62, TBSP-G.IV-03)

Supplying and fixing in position 63.5 mm Dia sluice valves of Kirlosker/Zelota make at all
levels of the buildings
110 mm dia 3 M Single sockect PVC/SWR pipe- 4Kg/Sq.cm Pg.No.148/S.No.462,TBSP-H.I-
03
Supply of Ready mixed Synthetic Enamel paints in all shades Grade-I having VOC (volatile
organic compound) content less than 50 grams/ Liter.TBSC-G.V-01,Sl.No.214,Pg.No.32

Hot dipped Galvanized Iron Chain link mesh 8 gauge - (4.0 mm) as per IS: 2721-1979 - PVC
Coated - 3"x3" (76 mm x 76 mm) - 8 Gauge, TBSC-E.II-10
Supply of Aluminium anodized sections for Doors,partitions,windows, Ventilatores (including
annodization cost) conforming to IS:11857-1986 TBSC-R.I.03
Prelaminated Cement bonded particle Board 12mm thick -TBSC-H.IV-22
Supply of Thermocol 12mm thick sheets, TBSC-K.I-24
Supply of Thermocol 19mm thicksheets, TBSC-K.I-25
Constructing 904.0 mm (3’0”) dia solid block masonry inspection chamber as per IS - 4111:
Part-1:1986 with cement mortar (1:6) prop using fly-ash blocks of 225 mm thick from
approved source having a minimum crushing strength of 10 N/sq.mm including plastering with
cement mortar 1:3 prop; ½” thick both inside and outside fitted with 20” dia RCC manhole
covers and frames including excavating pits up to a depth of 904 mm (3'-0") in all sorts of
soils (excluding rock) and laying cement concrete (1:4:8) 150 mm thick using 40 mm HBG
Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification
and including cost and conveyance of all materials like cement, sand, bricks, water etc., to
site, cost of seigniorage charges on all materials and all incidental and operational, labour
charges like mixing cement mortar, constructing masonry, lift charges, curing etc.,complete
for finished item of work as per Standardspecification.(TBSP-B.I-01,S.No.74,Pg.No.125)

Labour-Gardener/Trained mali, S.No.II-11


Aggregates 63mm to 45mm (HB stone of Granite/Dolamite/Dolerite/Trap) (excluding
Seiniorage Charges), R&B S.S.Item.33.f &33.i + 37+36
Aggregates 19 mm to 6mm (HB stone of Granite/Dolamite/Dolerite/Trap) (excluding
Seiniorage Charges), R&B S.S.Item.33.a &33.d + 37+36
Aggregates below 5.6mm (HB stone of Granite/Dolamite/Dolerite/Trap) (excluding
Seiniorage Charges), R&B S.S.Item.33.a + 37+36
Chlorpyriphos/ Lindane emulsifiable concentrate of 20%, TBSC-Q.VI-18
9PLY-19mm thick Plywood conforming to IS-303 BWR gradeTBSC-J.II-07,Sl.No.328
Supply of arylic based oil bound washable Distemper, TBSC-G.II-03
Labour charges for fabricationg all structural steel works like heavy steel works like
trusses,stanchions, Heavy Beams and Girders including cost of welding rods,power charges,
etc exculding cost of fixing position TBSC-T.I-18
Labour charges for erectiong & fixing all structural steel works like heavy iron grills, Trusses,
stanchions, heavy beams and Griders erecting in position and fixing by using chain pulley
blocks ,derek pole arrangement and cranes etc., TBSC-T.I-19/Sl.no784

D.O.L Starter 415V, 3 phase, 50Hz.. enclosed with no volt coil and overload protection with
necessary materials, etc., complete suitable upto 7.5.HP.ELEC-5.4.2
Supply and Tranportation of 5.00HP Three phase ISI self priming Mono block 1p22 motor
pumpset (80x80). Makes:kiloskar/Cromptom/Texmo/CRI/KSB.ELEC-5.9.5.d
Supply of 3 core x2.5Sqmm FRLS armoured copper cable as per IS.7098/Part-I/1988
including all taxes etc., complete.ELEC-1.5.6.g
Supply and erection of 0-100/200/400/600/1000 Analog Ammeter of size 96x96mm on
existing box/panel board including connections etc., complete ELEC-7.13.2.a
Fabrication and erection of 18SWG CRCA sheet steel enclosure for power control cubicle
panel/boxes etc., including cutting bending drilling welding and reveting etc., complete with
cleaning with 7 tank process and painting with powder coating including cost and conveyance
of all materials and labour charges. ELEC-7.12.1.c

Manufacture,supply and Delivery of R.C.C Plain ended pipe 450mm dia-NP3 class
conforming to B.I.s 458/2003,Ex-factory ,Excluding transportation,taxes & duties,S.No.1,
Pg.24
Manufacture,supply and Delivery of R.C.C Collars 450mm dia-NP3 class conforming to B.I.S
458/2003(rate per each collar) suitable for R.C.C plain ended pipes including transportation
but exculding taxes & duties S.No.1, Pg.25
Diploma Engineer/Surveyor(S.No.IV-34 Pg.No. 17, )
Aggregates 25mm to 10mm (excluding Seiniorage Charges), R&B S.S.Item.33.b &33.e +
37+36
Supply of high performance expansion joint filler board conforming to IS-1838-20mm thick,
Sl.No.684, TBSC-Q.VIII-03 of
50 mm dia PVC pipe - 6 Kg/sq.cm Single Socket - Prince/Sudhakar or any ISI Brand
75 mm dia PVC pipe - 6 Kg/sq.cm Single Socket - Prince/Sudhakar or any ISI Brand
110 mm dia PVC pipe - 6 Kg/sq.cm Single Socket - Prince/Sudhakar or any ISI Brand
160 mm dia PVC pipe - 6 Kg/sq.cm Single Socket - Prince/Sudhakar or any ISI Brand
Supply of Venetian blinds Vertical blinds 100 mm wide with all accessories.
Supplying and fixing of 602 x 602 mm CI man hole frame and cover (light weight)-30 Kgs,
Sl.No.87, TBSP-B-II-10, .
Supplying and fixing of 50.8 cm dia CI man hole fram & cover for 914.4 mm dia chamber
(medium weight 40 Kg), Sl. No.90, TBSP-B-II-13,
Supply & fixing PVC pipe of 8" dia (200mm) with standing to a pressure of 6kg/sqcm
Manufacture,supply and Delivery of R.C.C Plain ended pipe 450 mm dia -NP2 class
conforming to B.I.s 458/2003,Ex-factory ,Excluding transportation,taxes & duties,S.No.1,
Pg.24
Manufacture,supply and Delivery of R.C.Ccollars 450mm dia-NP2 conforming to B.I.S
458/2003(rate per each collar) suitable for R.C.C plain ended pipes including transportation
but exculding taxes & duties S.No.1, Pg.25
Supply of ISI 20mm outer dia heavy (2.10mm thickness) grade,FRLS with IS:9577 part 3
regid PVC pipe, Makes : Sudhakar / Finolex / Modi / VIP / Precision/ Universal/ Million Plast,
Sl.No.53, ELEC-1.2.1.a
Supply of Decolam Board of Size 8"x10" Sl.No.116, ELEC-1.4.2.e
Supply of ISI 25mm outer dia heavy (2.20mm thickness) grage,FRLS with IS:9537 part 3
regid PVC pipe, Makes : Sudhakar / Finolex / Modi / VIP / Precision/ Universal/ Million Plast,
Sl.No.55, ELEC-1.2.1.b
Supply of PVC Junction Boxes Deep size 32mm., Makes : Sudhakar / Finolex / Modi / VIP /
Precision, Sl.No.84, ELEC-1.2.9.c
Supply of ISI 32mm outer dia Medium (2.10mm thickness) grage,FRLS with IS:9537 part 3
regid PVC pipe, Makes : Sudhakar / Finolex / Modi / VIP / Precision/ Universal/ Million Plast,
Sl.No.56, ELEC-1.2.2.c
Supply of 32mm dia 2.0mm thick PVC Bends. Makes : Sudhakar / Finolex / Modi / VIP /
Precision/ Universal., Sl.No.89, ELEC-1.2.11.c
Supply & fixing CI gully trap grating,TBSP-B.II-08,Pg.No.127,S.No.85,
Rubber based acid resistant paint (Local Market Rate)
Labour Charges for fixing glass panes of any thickness to the existing door/ window panes
including fixing the beading excluding cost of beading , TBSC-T.I-26
Sundries-Fixing Ramco hylux wall panelling (LS)
Nylon Rollers for sliding glass/ Aluminium windows, TBSC-P.IX-07
Top Channel 8' length for Aluminium Sliding Door (LMR)
L-Clamps Local Market Rate
Koreion grass with Laying (LMR)
Neem Cake @ 10Kg/100 Sqm (LMR)
Complex fertilizer (17:17:17) @ 1Kg/100Sqm (LMR)
Pesticide (Lindane) @ 100 grams/100 Sqm (LMR)
Maintenance Koreion grass Lawn for 60 days (LS)
Transportation charges for laying Koreion grass Lawn (LS)
Labour charges for laying & fixing of precast concrete blocks for paving of all grades, any
thickness, all sizes & shapes including all labour charges for loading & unloading, laying to
desired lines and levels complete excluding cost of cement, sand, water, electricity etc,
Sl.No.98, TBSC-C.IX-06
Add for spreading and rolling with hand roller vide Sl.No.349 SSR 08-09 Add 60% extra for

Labour Charges for Fixing kerb wall (LS)


Supply of 1 x 28W surface pendent mounting T5 Luminaire Box type with
CRCA housing with Electronic Ballast and all standard accessories. Makes : Phillips /
Crompton / Bajaj / Surya / Havells, Sl.No.391, ELEC-3.6.22
Hire: Tipper 5.5 Cum, Sl. No.6, per Ton per Km

Thread lining for Flooring plastering - (Local Market Rate) - LS per Sqm
Supply of T.W. Deep Box of Size 6" x 8", Sl.No. 108, ELEC-1.4.1.d
Hylam Sheet, Sl.No. 881, ELEC--9.4.14
Supply of 16A 3 pin Flush type switch / 6A 3pin Plug socket with indicator lamp, fuse unit (5
in 1), Sl.No. 203, SSR 2012-13
Supply of 6A 3/2 pin flush type Socket with Shutter, Makes: GM G Home/ Gold Medal Olive/
Million Zoom/ Anchor Penta Cherry/ Great White Omega, Sl.No. 155, ELEC-1.7.1.d

Supply of 6A 1 Way flush type Switch, Makes: GM G Home/ Gold Medal Olive/ Million Zoom/
Anchor Penta Cherry/ Great White Omega, SlNo. 152,ELEC-1.7.1.a
Supply of 3 Plate Jumbo Ceiling Rose, Makes: Anchor / Gold Medal Olive / Million Zoom,
SlNo. 164, ELEC-1.7.1.m
Supply of 6-32A 10KA TP MCB, C/D Curve ISI Mark. Makes : Legrand-DX3 / Schneider-
Acti9., Sl.No.266, ELEC 2.13.1.e
Supply, Transportation and fixing of storage / Pressure type Vertical / Horizontal 230/250V
single phase 2000 watts ISI mark 5 Star rated water heater with SS tank and ABS plastic
body of 15 Ltrs capacity to withstand up to 6.5 bar of water pressure including cost of 2 Nos
SS flexible braided pipe, testing and all labour charges etc., complete. Makes : Crompton
model No. solarium plus SWH 725,Class 1 rated or its equivalent make of Jaquar / Venus /
Racold / AO smith/ Havells, Sl. No. 577, ELEC- 5.2.1.a

Supply of Remote Bell, Makes: GM/ Million/ Gold Metal/ Maru/ Anchor/ Grat White, S.No.175,
ELEC-1.7.2.e
Supply of 4 Module Box, Sl. No.95, ELEC-1.3.1.c
Supply of 4 Modular Cover Frame, Makes: Legrand Myrius / Cabtre4e Thames Platinum/
Million Logus/ Gold Medal Curve/ Anchor Roma Viola / CPL, Sl. No. 213, ELEC-1.3.3.c

Supply of 32A TP plug & Socket in SS enclosure.,Makes : Legrand / Schneider / Siemens /


L&T / Cabtree Xpro, Sl.No.322, ELEC-2.16.8.c
Supply of ISI 32mm outer dia medium (2.10mm thickness) grade, FRLS with IS:9537 part 3
regid PVC pipe.Makes : Sudhakar / GM / Modi / AKG / VIP., Sl.No.56, ELEC-1.2.2.c

Supply of PVC Junction Boxes Deep size 32mm., Sl.No.84, ELEC-1.2.9.c


Supply of 32mm dia 2.0mm thick PVC Bends.Makes : Sudhakar / GM / Modi / AKG / VIP.,
Sl.No.89,ELEC-1.2.11.c
Supply of 126/0.40 (16 Sqmm) FRLS / HFFR PVC insulated flexible Copper cable.,Makes :
Finolex / RR kabel / Havells.Sl.No.136,ELEC-1.5.1.g
Supply of 140/0.30 (10.0Sqmm) FRLS / HFFR PVC insulated flexible Copper cable.,Makes :
Finolex / RR kabel / Havells.Sl.No.135, ELEC-1.5.1.f
Supply of 4 Way VTPN DB suitable for accommodating 1 No 4 pole incomer with IP 43
Protection as per IS:13032 and suitable for TP / SP out goings etc complete. Makes : Legrand
/ Schneider / Siemens / L&T, S. No. 315, ELEC-2.16.2.a

Supply of 8 Way VTPN DB suitable for accommodating 1 No 4 pole incomer with IP 43


Protection as per IS:13032 and suitable for T.P. out goings etc complete. Makes : Legrand /
Schneider / Siemens / L&T, S. No. 318, ELEC-2.16.5.b
Supply of 12 Way SPN DB with IP 43 Protection as per IS:13032 and suitable for 12Nos S.P
out goings and for 1 No Incommer etc complete. Makes : Legrand / Schneider / Siemens /
L&T, S. No. 312, ELEC-2.15.1.f

Panel fabrication and bus bar 2100x2175x400 mm (16 gauge) with required angles and
copper earthings etc., for incoming and outgoing feeders (as per local market rate)
Supply of 1 No. 400 A 3 pole MCCB L&T make set with Amp meter, volt meter, indicator
lamps etc., (as per local market rate)
Supply of 250 A 3 pole MCCB, Adjustable, confirms to IS/IEC 60947-2 having breaking
capacity 35/36 KA with thermal magnetic release Panel Mounted, Makes: L&T/ Schneider/
Seimens/ Legrand/ Hager/ ABB ,S.No. 376, ELEC-2.8.1.g
Supply of 160 A 3 pole MCCB, Adjustable, confirms to IS/IEC 60947-2 having breaking
capacity 25 KA with thermal magnetic release Panel Mounted, Makes: L&T/ Schneider/
Seimens/ Legrand/ Hager/ ABB ,S.No. 374, ELEC-2.8.1.e
Supply of 125 A 3 pole MCCB, Adjustable, confirms to IS/IEC 60947-2 having breaking
capacity 35/36 KA with thermal magnetic release Panel Mounted, Makes: L&T/ Schneider/
Seimens/ Legrand/ Hager/ ABB ,S.No. 373, ELEC-2.8.1.d
Supply of 400 A 3 pole MCCB, Adjustable, confirms to IS/IEC 60947-2 having breaking
capacity 35/36 KA with thermal magnetic release Panel Mounted, Makes: L&T/ Schneider/
Seimens/ Legrand/ Hager/ ABB ,S.No. 378, ELEC-2.8.1.i
Sundries such as hardware for Panel Mounting Cubical Type (LS)
Supply of 300A 415V Porcelain Rewirable fuse units with extension strips, Sl.No. 250,ELEC-
2.6.2.b
Supply and Installation of 600mm x 50mm x 2mm thick GI perforated cable tray without cover
along with required angle supports, with coupler plates, Anchor bolts and nuts etc complete
and the tray should be fitted on the WaLL/Ceiling etc complete, Sl.No. 556,ELEC-4.9.1.b

Supply and Installation of 300mm x 50mm x 2mm thick GI perforated cable tray without cover
along with required angle supports, with coupler plates, Anchor bolts and nuts etc complete
and the tray should be fitted on the WaLL/Ceiling etc complete, Sl.No. 558,ELEC-4.9.1.d

Supply and fixing of 4Nos 9 lit capacity round bottom bucket with sand, duly painted with
enamel white inside & red out side and letter FIRE with black colour, Sl.No. 951, ELEC-10.5.6

Supply and fixing of Fire bucket Stand fabricated by M.S. Angles to install for two numbers of
buckets as per local fire officers standards, Sl.No. 952,ELEC-10.5.7
Supply & fixing of 4.5 Kg CO2 type Fire Extinguisher, Trolley Mounted, Easy Weight
Management, Used Unused Mechanism, Squeeze Grip, Weight 19.1 Kg, Empty Weight 14.6
Kg, Can Height 860mm, Diameter 140mm, Discharge time minimum 13 secs, Controllable
discharge mechanism, Range mechanism 2 metres, Applicable on Class B, C & electrically
started Fire, B Rating 13B, Can Construction: Hot Spining / Forging, Valve Construction :
Forging & Machining, Internal Coating of Can: Not Applicable, External Coating of Can: Spray
Painting, Sheet Metal thickeness: 4.5mm, ISI & CE Approved, 2 Years Warranty including
Transporattion, all taxes and all labour charges etc complete, Makes: Cease Fire / Minimax,
Sl.No. 948, ELEC-10.5.3.a

Supply of 5 KVA Stabilizer,Make: V-Guard/ Real Guard/ Uni Stab/ ITL, Sl.No. 686, ELEC-
6.7.1.e
Supply of 120 sqmm 3.5 core XLPE insulated, 1100V grade armoured alluminium cable as
per specification conforming to IS:7098 (Part-I) Makes : Torrent/ Universal/ Polycab/ Havells/
Unicab, Sl.No. 496, ELEC-4.1.1.l
Fabrication and supply of M.S.Poles for garden posts with 'B' Class 60.25mm outer dia with
base plate and suitable pole cap including cost and conveyance of all material including fixing
of luminaire and labour charges etc., complete. (Rate as per Kg), Sl.No. 709, ELEC-7.1.2

Glass doom with reflector and 18 watt CFL (as per Local market Rate)
Supply of Electrical Drawings for wiring for 2 cellars, G+2 floors building with detailed
estimate (LS)
Supply, Installation and commissioning approved make floor mounted Close Coupled wash
down EWC conforming to IS:2556 (Part 8)-2004 suit with 'P' or 'S' trap with dual flush
porcelain cistern fixed on wash down EWC with all internal parts of dual flush cistern, ultra
solid seat cover of approved make with rubber buffer and cap & 15 mm angle stop cock & 450
mm long PVC inter connection pipe wall flanges all of approved make etc. complete in all
respects: Coloured - Grade - I/Grade - II, Sl.No.258, TBSP-E.II-05, (Deduct Labour Charges
for Fixing TBSP-E.VIII-06- 287)

Supplying and fixing Indian Make White Glazed Vitreous China Porcelain Sink Conforming to
IS: 2556-Part-5-1994 on Cantilever brackets with waste fittings like rubber plug, chain, 32 mm
nominal size C.P. Fitting with parallel pipe thread conforming to IS 2963-1979: 600 x 400 x
250, Sl.No.276, TBSP-E.VI-09, (Deduct Labour Charges for Fixing TBSP-E.VIII-12 - 409)

Labour charges only for fixing Vitreous China Porcelain Sink with with waste fittings, rubber
plug, chain, cantilever brackets, Sl.No.299, TBSP-E.VIII-12
Supplying and fixing of 15 mm premium variety Chromium plated finish brass body wall mixer
with hand shower with a provision for over head shower with 115 mm long bend pipe on
upper side, onnecting legs & wall flanges conforming to IS 8931 with 7 - 10 years warranty,
Sl.No.332, TBSP-F.V-03 (Deduct Labour Charges for Fixing TBSP-F.VIII-03- 175)

Labour Charges for Fixing all types of Wall combination taps, Mixerr & Diverters, Sl.No.390,
TBSP-F.VIII-03,
Supplying and fixing of 15 mm central hole Chromium plated finish brass body basin mixer
450 mm long pipe for hot & cold water mixing conforming to IS 8931 and with 7 - 10 years
warranty, Sl.No.336, TBSP-F.V-07,(Deduct Labour Charges for Fixing TBSP-F.VIII-03- 175)

Supplying and fixing of 15 mm nominal size Chromium plated finish brass over head shower
arm of 450 mm long with 90 degree bend & wall flange suitable for rain shower and with 10
years Warranty, Sl.No.344, TBSP-F.VI-06, (Deduct Labour Charges for Fixing TBSP-F.VIII-
04 - 99)
Labour Charges for Fixing all types of Miscellaneous CP Fittings, Sl.No.391, TBSP-F.VIII-04,

Supplying and fixing of 15 mm nominal size over head 5 flow round massage shower,
Sl.No.345, TBSP-F.VI-07, (Deduct Labour Charges for Fixing TBSP-F.VIII-04 - 99)
Supplying and fixing Chromium plated finish stainless steel body Toilet paper holder with 7 -
10 years warranty, Sl.No.371, TBSP-F.VII-25, (Deduct Labour Charges for Fixing TBSP-
F.VIII-04- 99)
Supplying and fixing 15mm brass body premium variety Chromium plated finish pillar cock
with aerator of not less than 500 grams weight quarter turn spindle conforming to IS 8931
and with 7 - 10 years warranty, Sl.No.310, TBSP-F.II-03, (Deduct Labour Charges for Fixing
TBSP-F.VIII-01- 51)
Supply of SWG Gully Traps (Round & Square) conforming to IS Standard 150 x 100 mm, Sl.
No.65, TBSP-A.II-56
Supplying & Fixing 304.8 x 228.6 mm CI Frame & Cover over Gully Traps, Sl. No. 83, TBSP-
B.II-06
Cost of Plastering for SWG gully Trap (LMR) Lumpsum
Supplying and fixing stainless steel liquid soap container wall mounted and bottle type,
Sl.No.368, TBSP-F.VII-22
Supplying and fixing of 15 mm CP finish brass concealed stop valve of not less than 400
grams weight quarter turn spindle conforming to IS 8931, Sl.No.328, TBSP-F.IV-05 (Deduct
Labour Charges for Fixing TBSP-F.VIII-02-99)
Supplying and fixing of 15 mm brass body CP finish pillar tap of not less than 300 grams
weight screw type (full turn) conforming to IS 8931, Sl.No.308, TBSP-F.II-01, (Deduct Labour
Charges for Fixing TBSP-F.VIII-01- 51)
Manufacture, Supply and Delivery of R.C.C. Plain ended pipes conforming to B.I.S458/2003 ,
Ex-factory, Excluding transportation, taxes & duties, Public Health, - 600mm dia,NP - 2 Class

Manufacture, Supply and Delivery of R.C.C. Collars conforming to B.I.S.458/2003 (rate per
each collar) suitable for R.C.C. Plain ended pipes including transportation but excluding taxes
& duties, Public Health, - 600mm dia,NP - 2 Class
Manufacture, Supply and Delivery of R.C.C. Plain ended pipes conforming to B.I.S458/2003 ,
Ex-factory, Excluding transportation, taxes & duties, Public Health, - 450mm dia,NP - 3 Class
Manufacture, Supply and Delivery of R.C.C. Collars conforming to B.I.S.458/2003 (rate per
each collar) suitable for R.C.C. Plain ended pipes including transportation but excluding taxes
& duties, Public Health, - 450mm dia,NP - 3 Class
Supply of SWG SP-I pipe conforming to ISI 651 - 12" Dia (300 mm), Sl.No.14, TBSP-A.II-05

Labour charges only for laying, jointing and testing SWG pipes of any dia with airtight cement
joints including excavation of trenches and socket pits in any soil up to 1524 mm (5'0") depth
(except rock requiring blasting) and refilling with watering and tamping., Sl.No.70, TBSP-A.III-
02
4" (101.6 mm ) Multi floor trap with Jali - UPVC/SWR Pipe fittings, Sl.No.577, TBSP-H.II-74

Gypsum Board Tiles of size not less than 0.595 M x 0.595 M of 12.5 mm thick as per 2095-
1992, Sl.No.343, TBSC-K.I-01
Providing, supplying & fixing of Fixed Louvered Ventilator made out of multi chambered uPVC
sections with TPV gaskets having isolated drainage and reinforced with Galvanized Iron
profiles throughout the window. The outer frame having an overall size of 60 x 55 mm with
reinforcement of 1 mm thickness and Mullion with overall size of 74 x 60 mm with
reinforcement of 1 mm thickness. Ventilator shall be provided with 4.5 mm Pin Head glass,
standard hardware. Wall thickness of frame & Mullion shall be 2.0mm, Sl.No.539, TBSC-M.III-
07

Supplying and fixing of Unplasticised Poly Vinyl Chloride (UPVC) sliding windows three track
- two glass shutters sliding and one mesh shutter duly manufactured using UPVC reinforced
profiles of (94 mmx 45 mm)/(80 mm x 52 mm) / (88 mm x 52 mm) x 2.0mm for outer frames,
(58 mm x 39 mm)/(54 mm x 38mm) / (88 mm x 42 mm)x 2.0 mm for sliding shutter frames
capable of mounting single glazing system structurally reinforced with hot dip galvanized up
to 50 microns of minimum thickness of 1.2 mm prefabricated & welded through fusion welding
the window sash shall be fitted with 5 mm thick clear float glass of reputed make and mesh
shutter frame shall be (42 mm x 25 mm)/58 mm x 28 mm)/ (52 mm x 21.5 mm) x 2 mm fitted
with nylon/ polymer mesh on rollers/ pulley duly fixed with TPV Gaskets/ EPDM weathering
seal resistant accessories like locking system 1 No., per set of sashes and the system is to be
installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at
site etc., including cost and conveyance of all materials, accessories, labour charges for
transportation, erection at site with templates for casement sizing complete for finished item of
work, Sl.No.531, TBSC-M.II-11

Supplying and fixing of Unplasticised Poly Vinyl Chloride (UPVC) sliding windows two track
sliding duly manufactured using UPVC reinforced profiles of (62 mm x 60 mm)/(60 mm x 45
mm)/ (60 mm x 52mm) x 2.0 mm for outer frames, (66 mm x 38 mm)/(58mm x 39 mm)/ (60
mm x 42 mm) x 2.0 mm for sliding shutter frames capable of mounting single glazing system,
structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.2
mm prefabricated & welded through fusion welding the window sash shall be fitted with 5 mm
thick clear float glass of reputed make duly fixed with TPV Gaskets/ EPDM weathering seal
resistant accessories like locking system 1 No., per set of sashes and the system is to be
installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at
site etc.,including cost and conveyance of all materials, accessories, labour charges for
transportation, erectionat site with templates for casement sizing complete for finished item of
work, Sl.No.529, TBSC-M.II-09

Medium Teak Wood Scantling upto 2 M, S.No.102, TBSC-DI.01


Sundries for Medium Teak Wood scantlings including nails, screws etc. (Lumpsum)
Labour charges for wrought and putup including fixing in position for Teakwood Flush type
door shutter including frame, TBSC-T.I-31
Sundries for sand paper wood filler, putty for wood etc (Lump Sum)
M.S Z Hold fasts (LMR)
Brass Tower bolts 10mm Bolt (IS:204) 200mm Long, Sl. No. 550, TBSC-P.I-03
Brass Butt Hinges (IS: 205) - 150mm Long, Sl.No. 569, TBSC-P.II-04
Brass Fancy Handles 150mm long, Sl.No. 589, TBSC-P.III-07
Brass Aldrop (IS: 2681) 300mm Long, Sl.No. 596, TBSC-P.IV-01
Brass Door Stopper, Sl.No. 624, TBSC-P.IX-01
Architect&Elevation Dwgs-Off Bld (LS)
Rust off cleaner (chemical) ( LMR)
PVC 25mm Thick pad-expansion joint( LMR)
G.I.Washers, TBSC-D.VI-17
Bitumen Washers, TBSC-D.VI-19
G.I. 'J' Bolts 8 mm Diameter, TBSC-D.VI-16
Plain or Corrugated Galvanized iron sheets as per IS 277 (0.1 mm to 0.8 mm thickness),
TBSC-D.VI-04
Labour-Fitter Cl- II, Sl.No.II-09
Medium Teak Wood scantlings: 2.0 to 3.0 M, TBSC-D.I-02
Medium Teak Wood Planks: any thickness, TBSC-D.I-04
Sundries-Medium Teak Wood Planks(LS)
Labour charges for wrought and put up including fixing in position for Teak wood Glazed and
panelled doors including fixing glass including frame, TBSC-T.I-28
Labour charges for wrought and put up including fixing in position for Teak wood Ventilators
glazed, fixed with double frame with wire netting including frame, TBSC-T.I-36

Toughened Plain Glass 12 mm (including Glass), TBSC-F.V-05


Brass Tower Bolt-10 mm Bolt (IS:204) 300 mm Long, TBSC-P.I-05
Brass Tower Bolt-10 mm Bolt (IS:204) 150 mm Long, TBSC-P.I-02
Aluminium Tower Bolt-10 mm Bolt (IS:204) 250mm Long, TBSC-P.III-10
Brass Butt hinges (IS:205)- 100 mm Long, TBSC-P.II-02
Sundries-PuttyBrads,Ring, IronCleats(LS)
Ordinary Detonator, Sl.No. 22, Pg.18 of Irg
Detonator delay type, Sl.No. 20, Pg.18 of Irg
Supply of 38/40mm width and 12.5mm height Casing and Caping. Makes : Modi with ISI,
S.No.64, ELEC-1.2.4.d
Supply of 18" (450mm) ISI, 900 RPM Heavy duty exhaust fan with metallic blades with Mark.
Makes : Crompton / Almounard / Havells Turbo Force., Sl.No.576, ELEC-5.1.10.c
Use rate of 1.5m drill rod, rate as per I&CAD data - Hard Rock
Concrete Mixer 600/400 ltr (diesel) - MACHINERY, Sl.No.18 (Hire Chgs), of Irr, Pg.49
Concrete Mixer 600/400 ltr (diesel) - LABOUR, Sl.No.18 (Hire Chgs), of Irr, Pg.49
Supply of 40-63A 10KA TP MCB, C/D Curve ISI Mark. Makes : Legrand-DX3 / Schneider-
Acti9., Sl.No.287, ELEC-2.13.1.f
S&F Premium make CPVC Pipes of 15.90mm OD Pipe - SDR 13.5, S.No.670, TBSP-J.III-01
(Deduct Labour for Fixing Charges-70, TBSP-H.IV-01)
S&F Premium make CPVC Pipes of 22.20mm OD Pipe - SDR 13.5, S.No.671, TBSP-J.III-02
(Deduct Labour for Fixing Charges-70, TBSP-H.IV-01)
S&F Premium make CPVC Pipes of 28.6mm OD Pipe - SDR 13.5, S.No.672, TBSP-J.III-03
(Deduct Labour for Fixing Charges-70, TBSP-H.IV-01)
S&F Premium make CPVC Pipes of 34.90mm OD Pipe - SDR 13.5, S.No.673, TBSP-J.III-04
(Deduct Labour for Fixing Charges-70, TBSP-H.IV-01)

You might also like