You are on page 1of 57

Bagmane Neon External Development Works

Bagmane
BOQ - External Development Works

Qty with
S.No Description Unit Qty Remarks
Buffer

1.00 Aggrregate Filling on Podium


Providing & Filling with aggregates of 20mm & below down graded aggregates,
whereever as directed by EIC, including watering and consolidating in 50mm
1.01 thick layer, etc., as per specification complete, The rate shall be including all Sqm 8287.65 8703.00
labours,tools & tackels,all leads & lifts,etc.complete as per directions of
Engineer-in-charge.

Geo Fabric : Providing & Laying of 150 GSM geo fabric of approved
manufacturer / Make as per BDPL Approval, whereever as directed etc., as per
1.02 Sqm 8287.65 8703.00
specification complete, The rate shall be including all labours,tools & tackels,all
leads & lifts,etc.complete as per directions of Engineer-in-charge.

2.00 Pathway around Building

Providing and laying PCC 100mm thick M10 using 20mm down size aggregates
150 mm or 100 mm or 75 mm or 40mm thick below raft, flooring, SSM ,
retaining wall , UG sump, STP, Grade slab etc., including base preparation,
compaction, shuttering if necessary, curing etc. complete. including cost of
2.01 materials, labour, Wastages, HOM, Tools & Tackles, cleaning, curing, house Cum 87.89 93.00
keeping etc., complete. all as per specifications, directions & instructions of
Engineer-in-charge. including working at all heights with lead & lift.etc.
complete.

Providing and constructing 150mm thick Solid concrete block work in walls,
piers and architectural features at all levels using approved Solid blocks of
strength 35kg/sqcm in cement mortar 1:6 including raking of joints,curing, steel
2.02 Sqm 166.95 176.00
scaffolding, staging, leads and lifts. Cost to include all leads and lifts and as
directed by Architect/Engineer in charge.
Note : The Base course should be done with 50mm gap between the blocks

Geo Fabric : Providing & Laying of 150 GSM geo fabric of approved
manufacturer / Make as per BDPL Approval, whereever as directed etc., as per
2.03 specification complete, The rate shall be including all labours,tools & tackels,all Sqm 550.95 579.00
leads & lifts,etc.complete as per directions of Engineer-in-charge.

Providing and filling Quarry dust as per BDPL Approval, whereever as directed
2.04 etc., as per specification complete, The rate shall be including all labours,tools & Cum 23.97 26.00
tackels,all leads & lifts,etc.complete as per directions of Engineer-in-charge.

Providing and Laying of Providing and laying HDPE sheet of 500 Micron over
compacted GSB, below Grade slab, P.C.C, Raft slab etc., to the required levels,
including supply,loading and unloading, storing, tranportation, laying, sealing of
2.05 junctions and overlaps etc.,complete, including cost of materials, labour, Sqm 798.96 839.00
Wastages, HOM, Tools & Tackles, cleaning, curing, house keeping etc.,
complete. all as per specifications, directions & instructions of Engineer-in-
charge. including working at all heights with lead & lift.etc. complete.

Providing and Fixing of 40mm thk Flamed Sadarahalli Granite as per BDPL
Approved Granite for Walkway Infill of approved colour & sizes with necessary
grooves as indicated on the drawings, fixing in cement mortar 1:4 with Cebex
112 as detailed above at all the levels with all edges of the panels as per design
and detail all complete. including cutting, sealing the joints with weather
2.06 sealant of approved colour, keeping the completed granite covered with 1 720.97 758.00
Bubble sheet for protection and cleaning of the same till handing over, including
cost of materials, labour, Wastages, HOM, Tools & Tackles, cleaning, curing,
house keeping etc., complete. all as per specifications, directions & instructions
of Engineer-in-charge. including working at all heights with lead & lift.etc.
complete.

Providing and Fixing of 40mm thk Pre Polished Steel Grey as per BDPL of
approved colour & sizes with necessary Grooves as indicated on the drawings,
fixing in cement mortar 1:4 with Cebex 112 as detailed above at all the levels
with all edges of the panels to have mirror polished as per design and detail all
complete. including cutting, sealing the joints with weather sealant of approved
2.07 colour, keeping the completed granite covered with Bubble sheet for
protection and cleaning of the same till handing over, including cost of
materials, labour, Wastages, HOM, Tools & Tackles, cleaning, curing, house
keeping etc., complete. all as per specifications, directions & instructions of
Engineer-in-charge. including working at all heights with lead & lift.etc.
complete.

a 200mm Band Rmt 174.00 183.00


b 500mm Band Sqm 43.19 46.00

3.00 Pathway near Seating Plaza - South Side Podium

Page 1 of 57
Bagmane Neon External Development Works

Bagmane
BOQ - External Development Works

Qty with
S.No Description Unit Qty Remarks
Buffer

Providing and laying PCC 100mm thick M10 using 20mm down size aggregates
150 mm or 100 mm or 75 mm or 40mm thick below raft, flooring, SSM ,
retaining wall , UG sump, STP, Grade slab etc., including base preparation,
compaction, shuttering if necessary, curing etc. complete. including cost of
3.01 materials, labour, Wastages, HOM, Tools & Tackles, cleaning, curing, house Cum 55.34 59.00
keeping etc., complete. all as per specifications, directions & instructions of
Engineer-in-charge. including working at all heights with lead & lift.etc.
complete.

Providing and constructing 150mm thick Solid concrete block work in walls,
piers and architectural features at all levels using approved Solid blocks of
strength 35kg/sqcm in cement mortar 1:6 including raking of joints,curing, steel
3.02 Sqm 85.35 90.00
scaffolding, staging, leads and lifts. Cost to include all leads and lifts and as
directed by Architect/Engineer in charge.
Note : The Base course should be done with 50mm gap between the blocks

Geo Fabric : Providing & Laying of 150 GSM geo fabric of approved
manufacturer / Make as per BDPL Approval, whereever as directed etc., as per
3.03 specification complete, The rate shall be including all labours,tools & tackels,all Sqm 256.04 269.00
leads & lifts,etc.complete as per directions of Engineer-in-charge.

Providing and filling Quarry dust as per BDPL Approval, whereever as directed
3.04 etc., as per specification complete, The rate shall be including all labours,tools & Cum 5.03 6.00
tackels,all leads & lifts,etc.complete as per directions of Engineer-in-charge.

Providing and Laying of Providing and laying HDPE sheet of 500 Micron over
compacted GSB, below Grade slab, P.C.C, Raft slab etc., to the required levels,
including supply,loading and unloading, storing, tranportation, laying, sealing of
3.05 junctions and overlaps etc.,complete, including cost of materials, labour, Sqm 503.11 529.00
Wastages, HOM, Tools & Tackles, cleaning, curing, house keeping etc.,
complete. all as per specifications, directions & instructions of Engineer-in-
charge. including working at all heights with lead & lift.etc. complete.

Providing and Fixing of 20mm thk Flamed Sadarahalli Granite as per BDPL
Approved Granite for Walkway Infill of approved colour & sizes with necessary
grooves as indicated on the drawings, fixing in cement mortar 1:4 with Cebex
112 as detailed above at all the levels with all edges of the panels as per design
and detail all complete. including cutting, sealing the joints with weather
3.05 sealant of approved colour, keeping the completed granite covered with Sqm 475.01 499.00
Bubble sheet for protection and cleaning of the same till handing over, including
cost of materials, labour, Wastages, HOM, Tools & Tackles, cleaning, curing,
house keeping etc., complete. all as per specifications, directions & instructions
of Engineer-in-charge. including working at all heights with lead & lift.etc.
complete.

Providing and Fixing of 20mm thk Pre Polished Steel Grey as per BDPL of
approved colour & sizes with necessary Grooves as indicated on the drawings,
fixing in cement mortar 1:4 with Cebex 112 as detailed above at all the levels
with all edges of the panels to have mirror polished as per design and detail all
complete. including cutting, sealing the joints with weather sealant of approved
3.06 colour, keeping the completed granite covered with Bubble sheet for
protection and cleaning of the same till handing over, including cost of
materials, labour, Wastages, HOM, Tools & Tackles, cleaning, curing, house
keeping etc., complete. all as per specifications, directions & instructions of
Engineer-in-charge. including working at all heights with lead & lift.etc.
complete.

a 200mm Band Rmt 138.00 145.00

4.00 Pathway - West Side Podium

Providing and laying PCC 100mm thick M10 using 20mm down size aggregates
150 mm or 100 mm or 75 mm or 40mm thick below raft, flooring, SSM ,
retaining wall , UG sump, STP, Grade slab etc., including base preparation,
compaction, shuttering if necessary, curing etc. complete. including cost of
4.01 materials, labour, Wastages, HOM, Tools & Tackles, cleaning, curing, house Cum 25.63 27.00
keeping etc., complete. all as per specifications, directions & instructions of
Engineer-in-charge. including working at all heights with lead & lift.etc.
complete.

Providing and constructing 150mm thick Solid concrete block work in walls,
piers and architectural features at all levels using approved Solid blocks of
strength 35kg/sqcm in cement mortar 1:6 including raking of joints,curing, steel
4.02 Sqm 47.40 50.00
scaffolding, staging, leads and lifts. Cost to include all leads and lifts and as
directed by Architect/Engineer in charge.
Note : The Base course should be done with 50mm gap between the blocks

Page 2 of 57
Bagmane Neon External Development Works

Bagmane
BOQ - External Development Works

Qty with
S.No Description Unit Qty Remarks
Buffer
Geo Fabric : Providing & Laying of 150 GSM geo fabric of approved
manufacturer / Make as per BDPL Approval, whereever as directed etc., as per
4.03 specification complete, The rate shall be including all labours,tools & tackels,all Sqm 142.20 150.00
leads & lifts,etc.complete as per directions of Engineer-in-charge.

Providing and filling Quarry dust as per BDPL Approval, whereever as directed
4.04 etc., as per specification complete, The rate shall be including all labours,tools & Cum 2.33 3.00
tackels,all leads & lifts,etc.complete as per directions of Engineer-in-charge.

Providing and Laying of Providing and laying HDPE sheet of 500 Micron over
compacted GSB, below Grade slab, P.C.C, Raft slab etc., to the required levels,
including supply,loading and unloading, storing, tranportation, laying, sealing of
4.05 junctions and overlaps etc.,complete, including cost of materials, labour, Sqm 233.04 245.00
Wastages, HOM, Tools & Tackles, cleaning, curing, house keeping etc.,
complete. all as per specifications, directions & instructions of Engineer-in-
charge. including working at all heights with lead & lift.etc. complete.

Providing and Fixing of 20mm thk Flamed Sadarahalli Granite as per BDPL
Approved Granite for Walkway Infill of approved colour & sizes with necessary
grooves as indicated on the drawings, fixing in cement mortar 1:4 with Cebex
112 as detailed above at all the levels with all edges of the panels as per design
and detail all complete. including cutting, sealing the joints with weather
4.06 sealant of approved colour, keeping the completed granite covered with Sqm 212.22 223.00
Bubble sheet for protection and cleaning of the same till handing over, including
cost of materials, labour, Wastages, HOM, Tools & Tackles, cleaning, curing,
house keeping etc., complete. all as per specifications, directions & instructions
of Engineer-in-charge. including working at all heights with lead & lift.etc.
complete.

Providing and Fixing of 20mm thk Pre Polished Steel Grey as per BDPL of
approved colour & sizes with necessary Grooves as indicated on the drawings,
fixing in cement mortar 1:4 with Cebex 112 as detailed above at all the levels
with all edges of the panels to have mirror polished as per design and detail all
complete. including cutting, sealing the joints with weather sealant of approved
4.07 colour, keeping the completed granite covered with Bubble sheet for
protection and cleaning of the same till handing over, including cost of
materials, labour, Wastages, HOM, Tools & Tackles, cleaning, curing, house
keeping etc., complete. all as per specifications, directions & instructions of
Engineer-in-charge. including working at all heights with lead & lift.etc.
complete.

a 200mm Band Rmt 104.10 110.00

5.00 Rear Lobby

Providing and laying PCC 100mm thick M10 using 20mm down size aggregates
150 mm or 100 mm or 75 mm or 40mm thick below raft, flooring, SSM ,
retaining wall , UG sump, STP, Grade slab etc., including base preparation,
compaction, shuttering if necessary, curing etc. complete. including cost of
5.01 Cum 18.40 20.00
materials, labour, Wastages, HOM, Tools & Tackles, cleaning, curing, house
keeping etc., complete. all as per specifications, directions & instructions of
Engineer-in-charge. including working at all heights with lead & lift.etc.
complete.

Geo Fabric : Providing & Laying of 150 GSM geo fabric of approved
manufacturer / Make as per BDPL Approval, whereever as directed etc., as per
5.02 Sqm 167.29 176.00
specification complete, The rate shall be including all labours,tools & tackels,all
leads & lifts,etc.complete as per directions of Engineer-in-charge.

Providing & Filling with Cinder as approved, whereever as directed by EIC,


including consolidating in 100mm thick layer, etc., as per specification
5.03 complete, The rate shall be including all labours,tools & tackels,all leads & Cum 51.86 55.00
lifts,etc.complete as per directions of Engineer-in-charge.

Providing and Laying of Providing and laying HDPE sheet of 500 Micron over
compacted GSB, below Grade slab, P.C.C, Raft slab etc., to the required levels,
including supply,loading and unloading, storing, tranportation, laying, sealing of
5.04 junctions and overlaps etc.,complete, including cost of materials, labour, Sqm 167.29 176.00
Wastages, HOM, Tools & Tackles, cleaning, curing, house keeping etc.,
complete. all as per specifications, directions & instructions of Engineer-in-
charge. including working at all heights with lead & lift.etc. complete.

Page 3 of 57
Bagmane Neon External Development Works

Bagmane
BOQ - External Development Works

Qty with
S.No Description Unit Qty Remarks
Buffer

Providing and Fixing of 20mm thk Flamed Sadarahalli Granite as per BDPL
Approved Granite for Walkway Infill of approved colour & sizes with necessary
grooves as indicated on the drawings, fixing in cement mortar 1:4 with Cebex
112 as detailed above at all the levels with all edges of the panels as per design
and detail all complete. including cutting, sealing the joints with weather
5.05 sealant of approved colour, keeping the completed granite covered with Sqm 130.87 138.00
Bubble sheet for protection and cleaning of the same till handing over, including
cost of materials, labour, Wastages, HOM, Tools & Tackles, cleaning, curing,
house keeping etc., complete. all as per specifications, directions & instructions
of Engineer-in-charge. including working at all heights with lead & lift.etc.
complete.

Providing and Fixing of 20mm thk Pre Polished Steel Grey as per BDPL of
approved colour & sizes with necessary Grooves as indicated on the drawings,
fixing in cement mortar 1:4 with Cebex 112 as detailed above at all the levels
with all edges of the panels to have mirror polished as per design and detail all
complete. including cutting, sealing the joints with weather sealant of approved
5.06 colour, keeping the completed granite covered with Bubble sheet for
protection and cleaning of the same till handing over, including cost of
materials, labour, Wastages, HOM, Tools & Tackles, cleaning, curing, house
keeping etc., complete. all as per specifications, directions & instructions of
Engineer-in-charge. including working at all heights with lead & lift.etc.
complete.

a 500mm Band Sqm 36.42 39.00

6.00 Driveway under Grasscell

Providing and filling Quarry dust as per BDPL Approval, whereever as directed
6.01 etc., as per specification complete, The rate shall be including all labours,tools & Cum 284.83 300.00
tackels,all leads & lifts,etc.complete as per directions of Engineer-in-charge.

Grass Cell Pavers: Supply and fixing of 38mm thk PVC grass cell pavers on 50mm
thk sand bed for fire driveway as per specification, cost including all materials at
6.02 site, necessary machineries, all labour charges and other necessary charges to Sqm 2278.67 2393.00
complete.

7.00 Planter Around Building

Providing and laying M30 Reinforced cement concrete with 53 grade cement,
coarse and fine aggregate conforming to IS 383, maximum size of coarse
aggregate not exceeding 25mm, , mixed in a batching and mixing plant as per
approved mix design, transported to site , including curing, finishing to lines
7.01 and grades as per drawing. incl materials, labour, Wastages, HOM, Tools &
Tackles, cleaning, curing, house keeping etc., complete. all as per specifications,
directions & instructions of Engineer-in-charge. including working at all heights
with lead & lift.etc. complete. [ Excluding Reinforcement, centering, shuttering,
strutting, propping, scaffolding,staging etc - will be paid seperatly]

a) Raft Cum 39.22 42.00


b) Wall Cum 45.75 49.00

Fabricating & fixing in position reinforcement for RCC work with high yield
strength ribbed cold twisted tor steel (HSD) bar of various diameters and grade
of steel as specified below conforming to IS specification including cutting,
bending, hoisting, fabricating and placing in position according to drawings and
7.02 binding the reinforcement with galvanized annealed binding wire of double
fold of 18 gauge and providing PVC cover blocks for placing the reinforcements
in position and for maintaining the cover specified and/or according to relevant
IS. The rate shall be including all labours,tools & tackels,all leads &
lifts,etc.complete as per directions of incharge

Note : Unless noted otherwise the measurements in accordance with IS 1200.


However reinforcement shall be measured only in lengths of bars as actually
placed in position on standard weight basis, no allowance being made in the
weight for rolling margin. Authorized laps and splices only will be measured.
Chairs of any shape & profile, Spacer bar of any shape & profile, cover block,
wastage and binding wire will not be measured and shall be included in the
quoted rates. Quoted rate shall be deemed to have considered the above
stipulation. Quoted rate to include lead, lift, placing at all levels and as directed.

Fe 500 MT 7.65 9.00

Page 4 of 57
Bagmane Neon External Development Works

Bagmane
BOQ - External Development Works

Qty with
S.No Description Unit Qty Remarks
Buffer

Formwork – Providing centring, shuttering, strutting, propping, scaffolding,


staging etc., and removal of formwork for vertical surfaces such as wall at any
7.03
thickness, including cost of all materials, labour, equipment, tools & tackles, all
leads and lift etc. all complete as per the specification and directions of EIC.

a) Raft Sqm 130.73 138.00


b) Wall Sqm 610.06 641.00

Providing and laying of pre-polished 20mm thk. Granite slab of 250mm width
for coping in panel @ LEDGE / Sill and other area as specied by Client /
Architect., sizes as indicated in the drawings and as per BDPL Approval, set in
cement mortar 1:4 with necessary Chamfering and Edge polishing. The rate
quoted shall including making holes for grill fixing, The joints are finished /
7.04 pointing neatly with pigment to match the colour of stone, keeping the Rmt 435.76 458.00
completed granite covered with Plaster of Paris for protection and cleaning of
the same till handing over, including cost of materials, labour, Wastages, HOM,
Tools & Tackles, cleaning, curing, house keeping etc., complete. all as per
specifications, directions & instructions of Engineer-in-charge. including
working at all heights with lead & lift.etc. complete.

Option 1

Providing and laying of 20mm THK GRANITE Cladding in panel sizes as indicated
on the drawings in cement mortar 1:4 as detailed above at all the levels with all
edges of the panels to have mirror polished as per design with necessary
Groove cutting and detail all complete. including clamp, pins, anchor fasteners,
drilling , cutting, necessary scaffolding etc, sealing the joints with weather
7.05 sealant of approved colour, keeping the completed granite covered with Sqm 263.11 277.00
Bubble sheet for protection and cleaning of the same till handing over, including
cost of materials, labour, Wastages, HOM, Tools & Tackles, cleaning, curing,
house keeping etc., complete. all as per specifications, directions & instructions
of Engineer-in-charge. including working at all heights with lead & lift.etc.
complete.

Option 2

Providing and laying of 20mm THK Steel Grey Granite Skirting of 100mm height
in cement mortar 1:4 as detailed above at all the levels with all edges to have
Chamfered & mirror polished as per design with necessary Groove cutting and
detail all complete. including clamp, pins, anchor fasteners, drilling , cutting,
necessary scaffolding etc, sealing the joints with weather sealant of approved
7.06 colour, keeping the completed granite covered with Bubble sheet for Rmt 440.16 454.00
protection and cleaning of the same till handing over, including cost of
materials, labour, Wastages, HOM, Tools & Tackles, cleaning, curing, house
keeping etc., complete. all as per specifications, directions & instructions of
Engineer-in-charge. including working at all heights with lead & lift.etc.
complete.

Providing waterproof sand faced plaster to external walls, columns, beams ,


pergola beams and any projections,plaster bands as per drawing etc. in
waterproof cement mortar 1:4 (using approved waterproofing compound of
approve equivalent added as per manufacturers instructions) applied in two
coats, first coat of 12mm thick, second coat of 8mm with water proof
compound to be applied for both coats, finished to line and level to approved
7.07 sand faced texture, including all leads, lifts, scaffolding and curing complete. The Sqm 219.09 226.00
rate is inclusive of forming of drip moulds as with all lead and lift and as directed
by Engineer in charge including providing and fixing in position galvanised
expanded metal mesh 20 gauge (ARPITHA make) at junctions of concrete and
masonry and other locations as called for including fixing with GI nails.fixing
approved column / wall corner beads, making groove , plaster band and
cornices as called for etc., complete.

Texture Painting: Painting for plastered surface in texture paint finish of


7.08 approved shade and make and as per manufacturer specification, cost including Sqm 219.09 226.00
all materials at site, all labor charges and other necessary charges to complete

8.00 Planter Cum Seaters - 1600mm x 1600mm - 15 No.s

Page 5 of 57
Bagmane Neon External Development Works

Bagmane
BOQ - External Development Works

Qty with
S.No Description Unit Qty Remarks
Buffer

Providing and laying M30 Reinforced cement concrete with 53 grade cement,
coarse and fine aggregate conforming to IS 383, maximum size of coarse
aggregate not exceeding 25mm, , mixed in a batching and mixing plant as per
approved mix design, transported to site , including curing, finishing to lines
8.01 and grades as per drawing. incl materials, labour, Wastages, HOM, Tools &
Tackles, cleaning, curing, house keeping etc., complete. all as per specifications,
directions & instructions of Engineer-in-charge. including working at all heights
with lead & lift.etc. complete. [ Excluding Reinforcement, centering, shuttering,
strutting, propping, scaffolding,staging etc - will be paid seperatly]

a) Bottom Slab Cum 5.76 7.00


b) Wall Cum 7.83 9.00

Fabricating & fixing in position reinforcement for RCC work with high yield
strength ribbed cold twisted tor steel (HSD) bar of various diameters and grade
of steel as specified below conforming to IS specification including cutting,
bending, hoisting, fabricating and placing in position according to drawings and
8.02 binding the reinforcement with galvanized annealed binding wire of double
fold of 18 gauge and providing PVC cover blocks for placing the reinforcements
in position and for maintaining the cover specified and/or according to relevant
IS. The rate shall be including all labours,tools & tackels,all leads &
lifts,etc.complete as per directions of incharge

Note : Unless noted otherwise the measurements in accordance with IS 1200.


However reinforcement shall be measured only in lengths of bars as actually
placed in position on standard weight basis, no allowance being made in the
weight for rolling margin. Authorized laps and splices only will be measured.
Chairs of any shape & profile, Spacer bar of any shape & profile, cover block,
wastage and binding wire will not be measured and shall be included in the
quoted rates. Quoted rate shall be deemed to have considered the above
stipulation. Quoted rate to include lead, lift, placing at all levels and as directed.

Fe 500 MT 1.22 2.00

Formwork – Providing centring, shuttering, strutting, propping, scaffolding,


staging etc., and removal of formwork for vertical surfaces such as wall at any
8.03
thickness, including cost of all materials, labour, equipment, tools & tackles, all
leads and lift etc. all complete as per the specification and directions of EIC.

a) Bottom Slab Sqm 14.40 16.00


b) Wall Sqm 104.40 110.00

Providing and constructing 150mm thick Solid concrete block work in walls,
piers and architectural features at all levels using approved Solid blocks of
strength 35kg/sqcm in cement mortar 1:6 including raking of joints,curing, steel
8.04 Sqm 57.60 61.00
scaffolding, staging, leads and lifts. Cost to include all leads and lifts and as
directed by Architect/Engineer in charge.

Providing waterproof plaster 15mm thick for Block, RCC Surface etc. at all levels
in waterproof cement mortar 1:6 (using approved waterproofing compound
8.05 Sqm 57.60 61.00
added as per manufacturers instructions), finished to line and level to approved
texture, including all leads, lifts, scaffolding and curing etc., complete.

Providing and laying of pre-polished 20mm thk. Granite slab for coping in
panel @ LEDGE / Sill and other area as specied by Client / Architect., sizes as
indicated in the drawings and as per BDPL Approval, set in cement mortar 1:4
with necessary Chamfering and Edge polishing. The rate quoted shall including
making holes for grill fixing, The joints are finished / pointing neatly with
8.06 pigment to match the colour of stone, keeping the completed granite covered Sqm 20.59 22.00
with Plaster of Paris for protection and cleaning of the same till handing over,
including cost of materials, labour, Wastages, HOM, Tools & Tackles, cleaning,
curing, house keeping etc., complete. all as per specifications, directions &
instructions of Engineer-in-charge. including working at all heights with lead &
lift.etc. complete.

Option 1

Page 6 of 57
Bagmane Neon External Development Works

Bagmane
BOQ - External Development Works

Qty with
S.No Description Unit Qty Remarks
Buffer

Providing and laying of 20mm THK GRANITE Cladding in panel sizes as indicated
on the drawings in cement mortar 1:4 as detailed above at all the levels with all
edges of the panels to have mirror polished as per design with necessary
Groove cutting and detail all complete. including clamp, pins, anchor fasteners,
drilling , cutting, necessary scaffolding etc, sealing the joints with weather
8.07 sealant of approved colour, keeping the completed granite covered with Sqm 72.00 76.00
Bubble sheet for protection and cleaning of the same till handing over, including
cost of materials, labour, Wastages, HOM, Tools & Tackles, cleaning, curing,
house keeping etc., complete. all as per specifications, directions & instructions
of Engineer-in-charge. including working at all heights with lead & lift.etc.
complete.

Option 2

Providing and laying of 20mm THK Steel Grey Granite Skirting of 100mm height
in cement mortar 1:4 as detailed above at all the levels with all edges to have
Chamfered & mirror polished as per design with necessary Groove cutting and
detail all complete. including clamp, pins, anchor fasteners, drilling , cutting,
necessary scaffolding etc, sealing the joints with weather sealant of approved
8.08 colour, keeping the completed granite covered with Bubble sheet for Rmt 96.00 99.00
protection and cleaning of the same till handing over, including cost of
materials, labour, Wastages, HOM, Tools & Tackles, cleaning, curing, house
keeping etc., complete. all as per specifications, directions & instructions of
Engineer-in-charge. including working at all heights with lead & lift.etc.
complete.

Providing waterproof sand faced plaster to external walls, columns, beams ,


pergola beams and any projections,plaster bands as per drawing etc. in
waterproof cement mortar 1:4 (using approved waterproofing compound of
approve equivalent added as per manufacturers instructions) applied in two
coats, first coat of 12mm thick, second coat of 8mm with water proof
compound to be applied for both coats, finished to line and level to approved
8.09 sand faced texture, including all leads, lifts, scaffolding and curing complete. The Sqm 62.40 65.00
rate is inclusive of forming of drip moulds as with all lead and lift and as directed
by Engineer in charge including providing and fixing in position galvanised
expanded metal mesh 20 gauge (ARPITHA make) at junctions of concrete and
masonry and other locations as called for including fixing with GI nails.fixing
approved column / wall corner beads, making groove , plaster band and
cornices as called for etc., complete.

Texture Painting: Painting for plastered surface in texture paint finish of


8.1 approved shade and make and as per manufacturer specification, cost including Sqm 62.40 65.00
all materials at site, all labor charges and other necessary charges to complete

9.00 Planter Cum Seaters - 3600mm x 1600mm - 7 No.s

Providing and laying M30 Reinforced cement concrete with 53 grade cement,
coarse and fine aggregate conforming to IS 383, maximum size of coarse
aggregate not exceeding 25mm, , mixed in a batching and mixing plant as per
approved mix design, transported to site , including curing, finishing to lines
9.01 and grades as per drawing. incl materials, labour, Wastages, HOM, Tools &
Tackles, cleaning, curing, house keeping etc., complete. all as per specifications,
directions & instructions of Engineer-in-charge. including working at all heights
with lead & lift.etc. complete. [ Excluding Reinforcement, centering, shuttering,
strutting, propping, scaffolding,staging etc - will be paid seperatly]

a) Bottom Slab Cum 6.05 7.00


b) Wall Cum 6.36 7.00

Fabricating & fixing in position reinforcement for RCC work with high yield
strength ribbed cold twisted tor steel (HSD) bar of various diameters and grade
of steel as specified below conforming to IS specification including cutting,
bending, hoisting, fabricating and placing in position according to drawings and
9.02 binding the reinforcement with galvanized annealed binding wire of double
fold of 18 gauge and providing PVC cover blocks for placing the reinforcements
in position and for maintaining the cover specified and/or according to relevant
IS. The rate shall be including all labours,tools & tackels,all leads &
lifts,etc.complete as per directions of incharge

Page 7 of 57
Bagmane Neon External Development Works

Bagmane
BOQ - External Development Works

Qty with
S.No Description Unit Qty Remarks
Buffer

Note : Unless noted otherwise the measurements in accordance with IS 1200.


However reinforcement shall be measured only in lengths of bars as actually
placed in position on standard weight basis, no allowance being made in the
weight for rolling margin. Authorized laps and splices only will be measured.
Chairs of any shape & profile, Spacer bar of any shape & profile, cover block,
wastage and binding wire will not be measured and shall be included in the
quoted rates. Quoted rate shall be deemed to have considered the above
stipulation. Quoted rate to include lead, lift, placing at all levels and as directed.

Fe 500 MT 1.12 2.00

Formwork – Providing centring, shuttering, strutting, propping, scaffolding,


staging etc., and removal of formwork for vertical surfaces such as wall at any
9.03
thickness, including cost of all materials, labour, equipment, tools & tackles, all
leads and lift etc. all complete as per the specification and directions of EIC.

a) Bottom Slab Sqm 10.92 12.00


b) Wall Sqm 87.36 92.00

Providing and constructing 150mm thick Solid concrete block work in walls,
piers and architectural features at all levels using approved Solid blocks of
strength 35kg/sqcm in cement mortar 1:6 including raking of joints,curing, steel
9.04 Sqm 30.24 32.00
scaffolding, staging, leads and lifts. Cost to include all leads and lifts and as
directed by Architect/Engineer in charge.

Providing waterproof plaster 15mm thick for Block, RCC Surface etc. at all levels
in waterproof cement mortar 1:6 (using approved waterproofing compound
9.05 Sqm 30.24 32.00
added as per manufacturers instructions), finished to line and level to approved
texture, including all leads, lifts, scaffolding and curing etc., complete.

Providing and laying of pre-polished 20mm thk. Granite slab for coping in
panel @ LEDGE / Sill and other area as specied by Client / Architect., sizes as
indicated in the drawings and as per BDPL Approval, set in cement mortar 1:4
with necessary Chamfering and Edge polishing. The rate quoted shall including
making holes for grill fixing, The joints are finished / pointing neatly with
9.04 pigment to match the colour of stone, keeping the completed granite covered Sqm 19.43 21.00
with Plaster of Paris for protection and cleaning of the same till handing over,
including cost of materials, labour, Wastages, HOM, Tools & Tackles, cleaning,
curing, house keeping etc., complete. all as per specifications, directions &
instructions of Engineer-in-charge. including working at all heights with lead &
lift.etc. complete.

Option 1

Providing and laying of 20mm THK GRANITE Cladding in panel sizes as indicated
on the drawings in cement mortar 1:4 as detailed above at all the levels with all
edges of the panels to have mirror polished as per design with necessary
Groove cutting and detail all complete. including clamp, pins, anchor fasteners,
drilling , cutting, necessary scaffolding etc, sealing the joints with weather
9.05 sealant of approved colour, keeping the completed granite covered with Sqm 75.60 80.00
Bubble sheet for protection and cleaning of the same till handing over, including
cost of materials, labour, Wastages, HOM, Tools & Tackles, cleaning, curing,
house keeping etc., complete. all as per specifications, directions & instructions
of Engineer-in-charge. including working at all heights with lead & lift.etc.
complete.

Option 2

Providing and laying of 20mm THK Steel Grey Granite Skirting of 100mm height
in cement mortar 1:4 as detailed above at all the levels with all edges to have
Chamfered & mirror polished as per design with necessary Groove cutting and
detail all complete. including clamp, pins, anchor fasteners, drilling , cutting,
necessary scaffolding etc, sealing the joints with weather sealant of approved
9.06 colour, keeping the completed granite covered with Bubble sheet for Rmt 100.80 104.00
protection and cleaning of the same till handing over, including cost of
materials, labour, Wastages, HOM, Tools & Tackles, cleaning, curing, house
keeping etc., complete. all as per specifications, directions & instructions of
Engineer-in-charge. including working at all heights with lead & lift.etc.
complete.

Page 8 of 57
Bagmane Neon External Development Works

Bagmane
BOQ - External Development Works

Qty with
S.No Description Unit Qty Remarks
Buffer

Providing waterproof sand faced plaster to external walls, columns, beams ,


pergola beams and any projections,plaster bands as per drawing etc. in
waterproof cement mortar 1:4 (using approved waterproofing compound of
approve equivalent added as per manufacturers instructions) applied in two
coats, first coat of 12mm thick, second coat of 8mm with water proof
compound to be applied for both coats, finished to line and level to approved
9.07 sand faced texture, including all leads, lifts, scaffolding and curing complete. The Sqm 65.52 68.00
rate is inclusive of forming of drip moulds as with all lead and lift and as directed
by Engineer in charge including providing and fixing in position galvanised
expanded metal mesh 20 gauge (ARPITHA make) at junctions of concrete and
masonry and other locations as called for including fixing with GI nails.fixing
approved column / wall corner beads, making groove , plaster band and
cornices as called for etc., complete.

Texture Painting: Painting for plastered surface in texture paint finish of


9.08 approved shade and make and as per manufacturer specification, cost including Sqm 65.52 68.00
all materials at site, all labor charges and other necessary charges to complete

10.00 Planter Cum Seaters - 3000mm x 3000mm - 3 No.s

Providing and laying M30 Reinforced cement concrete with 53 grade cement,
coarse and fine aggregate conforming to IS 383, maximum size of coarse
aggregate not exceeding 25mm, , mixed in a batching and mixing plant as per
approved mix design, transported to site , including curing, finishing to lines
10.01 and grades as per drawing. incl materials, labour, Wastages, HOM, Tools &
Tackles, cleaning, curing, house keeping etc., complete. all as per specifications,
directions & instructions of Engineer-in-charge. including working at all heights
with lead & lift.etc. complete. [ Excluding Reinforcement, centering, shuttering,
strutting, propping, scaffolding,staging etc - will be paid seperatly]

a) Bottom Slab Cum 4.05 5.00


b) Wall Cum 3.16 4.00

Fabricating & fixing in position reinforcement for RCC work with high yield
strength ribbed cold twisted tor steel (HSD) bar of various diameters and grade
of steel as specified below conforming to IS specification including cutting,
bending, hoisting, fabricating and placing in position according to drawings and
10.02 binding the reinforcement with galvanized annealed binding wire of double
fold of 18 gauge and providing PVC cover blocks for placing the reinforcements
in position and for maintaining the cover specified and/or according to relevant
IS. The rate shall be including all labours,tools & tackels,all leads &
lifts,etc.complete as per directions of incharge

Note : Unless noted otherwise the measurements in accordance with IS 1200.


However reinforcement shall be measured only in lengths of bars as actually
placed in position on standard weight basis, no allowance being made in the
weight for rolling margin. Authorized laps and splices only will be measured.
Chairs of any shape & profile, Spacer bar of any shape & profile, cover block,
wastage and binding wire will not be measured and shall be included in the
quoted rates. Quoted rate shall be deemed to have considered the above
stipulation. Quoted rate to include lead, lift, placing at all levels and as directed.

Fe 500 MT 0.65 1.00

Formwork – Providing centring, shuttering, strutting, propping, scaffolding,


staging etc., and removal of formwork for vertical surfaces such as wall at any
10.03
thickness, including cost of all materials, labour, equipment, tools & tackles, all
leads and lift etc. all complete as per the specification and directions of EIC.

a) Bottom Slab Sqm 5.40 6.00


b) Wall Sqm 43.20 46.00

Providing and constructing 150mm thick Solid concrete block work in walls,
piers and architectural features at all levels using approved Solid blocks of
strength 35kg/sqcm in cement mortar 1:6 including raking of joints,curing, steel
10.04 Sqm 43.20 46.00
scaffolding, staging, leads and lifts. Cost to include all leads and lifts and as
directed by Architect/Engineer in charge.

Providing waterproof plaster 15mm thick for Block, RCC Surface etc. at all levels
in waterproof cement mortar 1:6 (using approved waterproofing compound
10.05 Sqm 43.20 46.00
added as per manufacturers instructions), finished to line and level to approved
texture, including all leads, lifts, scaffolding and curing etc., complete.

Page 9 of 57
Bagmane Neon External Development Works

Bagmane
BOQ - External Development Works

Qty with
S.No Description Unit Qty Remarks
Buffer

Providing and laying of pre-polished 20mm thk. Granite slab for coping in
panel @ LEDGE / Sill and other area as specied by Client / Architect., sizes as
indicated in the drawings and as per BDPL Approval, set in cement mortar 1:4
with necessary Chamfering and Edge polishing. The rate quoted shall including
making holes for grill fixing, The joints are finished / pointing neatly with
10.04 pigment to match the colour of stone, keeping the completed granite covered Sqm 11.87 13.00
with Plaster of Paris for protection and cleaning of the same till handing over,
including cost of materials, labour, Wastages, HOM, Tools & Tackles, cleaning,
curing, house keeping etc., complete. all as per specifications, directions &
instructions of Engineer-in-charge. including working at all heights with lead &
lift.etc. complete.

Option 1

Providing and laying of 20mm THK GRANITE Cladding in panel sizes as indicated
on the drawings in cement mortar 1:4 as detailed above at all the levels with all
edges of the panels to have mirror polished as per design with necessary
Groove cutting and detail all complete. including clamp, pins, anchor fasteners,
drilling , cutting, necessary scaffolding etc, sealing the joints with weather
10.05 sealant of approved colour, keeping the completed granite covered with Sqm 27.00 29.00
Bubble sheet for protection and cleaning of the same till handing over, including
cost of materials, labour, Wastages, HOM, Tools & Tackles, cleaning, curing,
house keeping etc., complete. all as per specifications, directions & instructions
of Engineer-in-charge. including working at all heights with lead & lift.etc.
complete.

Option 2

Providing and laying of 20mm THK Steel Grey Granite Skirting of 100mm height
in cement mortar 1:4 as detailed above at all the levels with all edges to have
Chamfered & mirror polished as per design with necessary Groove cutting and
detail all complete. including clamp, pins, anchor fasteners, drilling , cutting,
necessary scaffolding etc, sealing the joints with weather sealant of approved
10.06 colour, keeping the completed granite covered with Bubble sheet for Rmt 36.00 38.00
protection and cleaning of the same till handing over, including cost of
materials, labour, Wastages, HOM, Tools & Tackles, cleaning, curing, house
keeping etc., complete. all as per specifications, directions & instructions of
Engineer-in-charge. including working at all heights with lead & lift.etc.
complete.

Providing waterproof sand faced plaster to external walls, columns, beams ,


pergola beams and any projections,plaster bands as per drawing etc. in
waterproof cement mortar 1:4 (using approved waterproofing compound of
approve equivalent added as per manufacturers instructions) applied in two
coats, first coat of 12mm thick, second coat of 8mm with water proof
compound to be applied for both coats, finished to line and level to approved
10.07 sand faced texture, including all leads, lifts, scaffolding and curing complete. The Sqm 23.40 25.00
rate is inclusive of forming of drip moulds as with all lead and lift and as directed
by Engineer in charge including providing and fixing in position galvanised
expanded metal mesh 20 gauge (ARPITHA make) at junctions of concrete and
masonry and other locations as called for including fixing with GI nails.fixing
approved column / wall corner beads, making groove , plaster band and
cornices as called for etc., complete.

Texture Painting: Painting for plastered surface in texture paint finish of


10.08 approved shade and make and as per manufacturer specification, cost including Sqm 23.40 25.00
all materials at site, all labor charges and other necessary charges to complete

11.00 Amphitheatre

Providing and laying M30 Reinforced cement concrete with 53 grade cement,
coarse and fine aggregate conforming to IS 383, maximum size of coarse
aggregate not exceeding 25mm, , mixed in a batching and mixing plant as per
approved mix design, transported to site , including curing, finishing to lines
11.01 and grades as per drawing. incl materials, labour, Wastages, HOM, Tools &
Tackles, cleaning, curing, house keeping etc., complete. all as per specifications,
directions & instructions of Engineer-in-charge. including working at all heights
with lead & lift.etc. complete. [ Excluding Reinforcement, centering, shuttering,
strutting, propping, scaffolding,staging etc - will be paid seperatly]

a Top Slab Cum 4.60 5.00

Page 10 of 57
Bagmane Neon External Development Works

Bagmane
BOQ - External Development Works

Qty with
S.No Description Unit Qty Remarks
Buffer

Formwork – Providing centring, shuttering, strutting, propping, scaffolding,


staging etc., and removal of formwork for vertical surfaces such as wall at any
11.02
thickness, including cost of all materials, labour, equipment, tools & tackles, all
leads and lift etc. all complete as per the specification and directions of EIC.

a Top Slab Sqm 15.39 17.00

Providing and constructing 200mm thick Solid concrete block work in walls,
piers and architectural features at all levels using approved Solid blocks of
strength 35kg/sqcm in cement mortar 1:6 including raking of joints,curing, steel
11.03 Sqm 38.18 41.00
scaffolding, staging, leads and lifts. Cost to include all leads and lifts and as
directed by Architect/Engineer in charge.

Providing and Laying of Providing and laying HDPE sheet of 500 Micron over
compacted GSB, below Grade slab, P.C.C, Raft slab etc., to the required levels,
including supply,loading and unloading, storing, tranportation, laying, sealing of
11.04 junctions and overlaps etc.,complete, including cost of materials, labour, Sqm 27.95 30.00
Wastages, HOM, Tools & Tackles, cleaning, curing, house keeping etc.,
complete. all as per specifications, directions & instructions of Engineer-in-
charge. including working at all heights with lead & lift.etc. complete.

Fabricating & fixing in position reinforcement for RCC work with high yield
strength ribbed cold twisted tor steel (HSD) bar of various diameters and grade
of steel as specified below conforming to IS specification including cutting,
bending, hoisting, fabricating and placing in position according to drawings and
11.05 binding the reinforcement with galvanized annealed binding wire of double
fold of 18 gauge and providing PVC cover blocks for placing the reinforcements
in position and for maintaining the cover specified and/or according to relevant
IS. The rate shall be including all labours,tools & tackels,all leads &
lifts,etc.complete as per directions of incharge

Note : Unless noted otherwise the measurements in accordance with IS 1200.


However reinforcement shall be measured only in lengths of bars as actually
placed in position on standard weight basis, no allowance being made in the
weight for rolling margin. Authorized laps and splices only will be measured.
Chairs of any shape & profile, Spacer bar of any shape & profile, cover block,
wastage and binding wire will not be measured and shall be included in the
quoted rates. Quoted rate shall be deemed to have considered the above
stipulation. Quoted rate to include lead, lift, placing at all levels and as directed.

Fe 500 MT 0.41 1.00


Providing & Filling with Cinder as approved, whereever as directed by EIC,
including consolidating in 100mm thick layer, etc., as per specification
11.06 Cum 23.55 25.00
complete, The rate shall be including all labours,tools & tackels,all leads &
lifts,etc.complete as per directions of Engineer-in-charge.

Providing and laying of pre-polished 20mm thk. Granite slab for coping in
panel @ LEDGE / Sill and other area as specied by Client / Architect., sizes as
indicated in the drawings and as per BDPL Approval, set in cement mortar 1:4
with necessary Chamfering and Edge polishing. The rate quoted shall including
making holes for grill fixing, The joints are finished / pointing neatly with
11.07 pigment to match the colour of stone, keeping the completed granite covered Sqm 27.95 30.00
with Plaster of Paris for protection and cleaning of the same till handing over,
including cost of materials, labour, Wastages, HOM, Tools & Tackles, cleaning,
curing, house keeping etc., complete. all as per specifications, directions &
instructions of Engineer-in-charge. including working at all heights with lead &
lift.etc. complete.

Providing and laying of 20mm THK GRANITE Cladding in panel sizes as indicated
on the drawings in cement mortar 1:4 as detailed above at all the levels with all
edges of the panels to have mirror polished as per design with necessary
Groove cutting and detail all complete. including clamp, pins, anchor fasteners,
drilling , cutting, necessary scaffolding etc, sealing the joints with weather
11.08 sealant of approved colour, keeping the completed granite covered with Sqm 14.97 16.00
Bubble sheet for protection and cleaning of the same till handing over, including
cost of materials, labour, Wastages, HOM, Tools & Tackles, cleaning, curing,
house keeping etc., complete. all as per specifications, directions & instructions
of Engineer-in-charge. including working at all heights with lead & lift.etc.
complete.

Page 11 of 57
Bagmane Neon External Development Works

Bagmane
BOQ - External Development Works

Qty with
S.No Description Unit Qty Remarks
Buffer

Providing waterproof sand faced plaster to external walls, columns, beams ,


pergola beams and any projections,plaster bands as per drawing etc. in
waterproof cement mortar 1:4 (using approved waterproofing compound of
approve equivalent added as per manufacturers instructions) applied in two
coats, first coat of 12mm thick, second coat of 8mm with water proof
compound to be applied for both coats, finished to line and level to approved
11.09 sand faced texture, including all leads, lifts, scaffolding and curing complete. The Sqm 2.70 3.00
rate is inclusive of forming of drip moulds as with all lead and lift and as directed
by Engineer in charge including providing and fixing in position galvanised
expanded metal mesh 20 gauge (ARPITHA make) at junctions of concrete and
masonry and other locations as called for including fixing with GI nails.fixing
approved column / wall corner beads, making groove , plaster band and
cornices as called for etc., complete.

Texture Painting: Painting for plastered surface in texture paint finish of


11.10 approved shade and make and as per manufacturer specification, cost including Sqm 2.70 3.00
all materials at site, all labor charges and other necessary charges to complete

12.00 MUGA

Providing and laying M30 Reinforced cement concrete with 53 grade cement,
coarse and fine aggregate conforming to IS 383, maximum size of coarse
aggregate not exceeding 25mm, , mixed in a batching and mixing plant as per
approved mix design, transported to site , including curing, finishing to lines
12.01 and grades as per drawing. incl materials, labour, Wastages, HOM, Tools &
Tackles, cleaning, curing, house keeping etc., complete. all as per specifications,
directions & instructions of Engineer-in-charge. including working at all heights
with lead & lift.etc. complete. [ Excluding Reinforcement, centering, shuttering,
strutting, propping, scaffolding,staging etc - will be paid seperatly]

a Raft Cum 6.86 8.00


b Wall Cum 6.86 8.00

Formwork – Providing centring, shuttering, strutting, propping, scaffolding,


staging etc., and removal of formwork for vertical surfaces such as wall at any
12.02
thickness, including cost of all materials, labour, equipment, tools & tackles, all
leads and lift etc. all complete as per the specification and directions of EIC.

a Raft Sqm 22.88 25.00


b Wall Sqm 68.64 73.00

Fabricating & fixing in position reinforcement for RCC work with high yield
strength ribbed cold twisted tor steel (HSD) bar of various diameters and grade
of steel as specified below conforming to IS specification including cutting,
bending, hoisting, fabricating and placing in position according to drawings and
12.03 binding the reinforcement with galvanized annealed binding wire of double
fold of 18 gauge and providing PVC cover blocks for placing the reinforcements
in position and for maintaining the cover specified and/or according to relevant
IS. The rate shall be including all labours,tools & tackels,all leads &
lifts,etc.complete as per directions of incharge

Note : Unless noted otherwise the measurements in accordance with IS 1200.


However reinforcement shall be measured only in lengths of bars as actually
placed in position on standard weight basis, no allowance being made in the
weight for rolling margin. Authorized laps and splices only will be measured.
Chairs of any shape & profile, Spacer bar of any shape & profile, cover block,
wastage and binding wire will not be measured and shall be included in the
quoted rates. Quoted rate shall be deemed to have considered the above
stipulation. Quoted rate to include lead, lift, placing at all levels and as directed.

Fe 500 MT 1.24 2.00


Providing & Filling with Quarry Dust as approved, whereever as directed by EIC,
including watering and consolidating in 100mm thick layer, etc., as per
12.04 specification complete, The rate shall be including all labours,tools & tackels,all Cum 26.78 29.00
leads & lifts,etc.complete as per directions of Engineer-in-charge.

Providing and Laying of Providing and laying HDPE sheet of 500 Micron over
compacted GSB, below Grade slab, P.C.C, Raft slab etc., to the required levels,
including supply,loading and unloading, storing, tranportation, laying, sealing of
12.05 junctions and overlaps etc.,complete, including cost of materials, labour, Sqm 178.56 188.00
Wastages, HOM, Tools & Tackles, cleaning, curing, house keeping etc.,
complete. all as per specifications, directions & instructions of Engineer-in-
charge. including working at all heights with lead & lift.etc. complete.

Page 12 of 57
Bagmane Neon External Development Works

Bagmane
BOQ - External Development Works

Qty with
S.No Description Unit Qty Remarks
Buffer

Providing and laying Screed Concrete thick M10 using 20mm down size
aggregates 150 mm or 100 mm or 75 mm or 40mm thick below raft, flooring,
SSM , retaining wall , UG sump, STP, Grade slab etc., including base preparation,
compaction, shuttering if necessary, curing etc. complete. including cost of
12.06 materials, labour, Wastages, HOM, Tools & Tackles, cleaning, curing, house Cum 35.71 38.00
keeping etc., complete. all as per specifications, directions & instructions of
Engineer-in-charge. including working at all heights with lead & lift.etc.
complete.

Extra for carrying out Power floater treatment in concrete floors, well
compacted, mechanically vibrated, finished to required levels, floated with neat
cement and power trowelled with broom finish, over a leveling course,
12.07 Sqm 178.56 188.00
including MS shuttering, curing etc complete. The rate shall include all labour,
material, tools, equipments, other incidental necessary to complete the work as
per the directions of Engineer in charge

Providing and appying the non metallic surface hardener @ 2.5 to 3 Kg/Sqm as
per manufacture specification of approved make (FOSROC or equivalent).
including cost of materials, labour, Wastages, HOM, Tools & Tackles, cleaning,
12.08 Sqm 178.56 188.00
curing, house keeping etc., complete. all as per specifications, directions &
instructions of Engineer-in-charge. including working at all heights with lead &
lift.etc. complete.

Groove Cutting - Providing and making groove cutting of 8mm on Concrete floor
with minimum 1/3 of the Thickness of concrete - including cost of materials,
12.09 labour, Wastages, HOM, Tools & Tackles, cleaning, curing, house keeping etc., Rmt 168.60 178.00
complete. all as per specifications, directions & instructions of Engineer-in-
charge. including working at all heights with lead & lift.etc. complete.
Fabrication : Providing, fabricating, handling and erecting Structural steel
members in position as specified in the drawings made out of standard MS
sections conforming to IS 226/2062/800 for Inserts, Trusses, Stairs, Trench
covers etc. Cost to include fabricating necessary Gusset Plates, Stiffener plates,
Brackets, Bolts, Cleats, seating angle, Chequered plates etc., to the required
size, shape, alignment etc., complete as per the drawings. Cost to include
12.10 welding of members using structural steel welding electrodes as per IS MT 6.70 8.00
814/816/817, a coat of anti corrosive primer (non flammable ) to the exposed
surfaces & two coats of approved enamel paint, testing as per IS 7307 (PART1),
necessary equipment, tools and tackles, shuttering, staging, scaffolding required
etc., complete all as per design, details, drawings, specifications etc. with all
lead & lift for all materials & labour and as directed, at all heights & locations.

Providing, Fabrication and fixing of GI Chain Link - Mesh fencing, using 50 x 50 x


3mm chainlink weld mesh fixed on 40 x 40 x 6mm MS Angle, erected between
existing Vertical MS Poles , all as per Drawing - including cost of materials,
wastages, labour, hiring of machinery, tools and tackles, curing, cleaning &
12.11 Sqm 228.80 241.00
house keeping etc. complete, including working at all heights with lead &
lift.etc, including one coat of Zinc rich chromite Primer & two coats of enamel
paint of approved make & colour (as per BDPL Standards), all as per direction
and instructions of Engineer-in-charge.

Providing and laying of pre-polished 20mm thk. Granite slab for coping in
panel @ LEDGE / Sill and other area as specied by Client / Architect., sizes as
indicated in the drawings and as per BDPL Approval, set in cement mortar 1:4
with necessary Chamfering and Edge polishing. The rate quoted shall including
making holes for grill fixing, The joints are finished / pointing neatly with
12.12 pigment to match the colour of stone, keeping the completed granite covered Sqm 17.16 19.00
with Plaster of Paris for protection and cleaning of the same till handing over,
including cost of materials, labour, Wastages, HOM, Tools & Tackles, cleaning,
curing, house keeping etc., complete. all as per specifications, directions &
instructions of Engineer-in-charge. including working at all heights with lead &
lift.etc. complete.

Page 13 of 57
Bagmane Neon External Development Works

Bagmane
BOQ - External Development Works

Qty with
S.No Description Unit Qty Remarks
Buffer

Providing waterproof sand faced plaster to external walls, columns, beams ,


pergola beams and any projections,plaster bands as per drawing etc. in
waterproof cement mortar 1:4 (using approved waterproofing compound of
approve equivalent added as per manufacturers instructions) applied in two
coats, first coat of 12mm thick, second coat of 8mm with water proof
compound to be applied for both coats, finished to line and level to approved
12.13 sand faced texture, including all leads, lifts, scaffolding and curing complete. The Sqm 54.34 58.00
rate is inclusive of forming of drip moulds as with all lead and lift and as directed
by Engineer in charge including providing and fixing in position galvanised
expanded metal mesh 20 gauge (ARPITHA make) at junctions of concrete and
masonry and other locations as called for including fixing with GI nails.fixing
approved column / wall corner beads, making groove , plaster band and
cornices as called for etc., complete.

Texture Painting: Painting for plastered surface in texture paint finish of


12.14 approved shade and make and as per manufacturer specification, cost including Sqm 54.34 58.00
all materials at site, all labor charges and other necessary charges to complete

13.00 Saucer Drain

Providing and laying PCC 100mm thick M10 using 20mm down size aggregates
150 mm or 100 mm or 75 mm or 40mm thick below raft, flooring, SSM ,
retaining wall , UG sump, STP, Grade slab etc., including base preparation,
compaction, shuttering if necessary, curing etc. complete. including cost of
13.01 materials, labour, Wastages, HOM, Tools & Tackles, cleaning, curing, house Cum 13.05 14.00
keeping etc., complete. all as per specifications, directions & instructions of
Engineer-in-charge. including working at all heights with lead & lift.etc.
complete.

Providing and constructing 150mm thick Solid concrete block work in walls,
piers and architectural features at all levels using approved Solid blocks of
strength 35kg/sqcm in cement mortar 1:6 including raking of joints,curing, steel
13.02 Sqm 217.55 229.00
scaffolding, staging, leads and lifts. Cost to include all leads and lifts and as
directed by Architect/Engineer in charge.
Note : The Base course should be done with 50mm gap between the blocks

Haunching :-Finishing of internal walls with haunching on both the sides using
cement mortar 1:3 with cebex 112, including cost of materials, labour, hiring of
machinery, tools and tackles, joint less finish, including necessary scaffolding,
13.03 Rmt 870.19 914.00
curing, cleaning & house keeping etc. complete, all as per drawing, direction
and instructions of Engineer-in-charge,including working at all heights with lead
& lift.etc, complete.

Providing waterproof plaster 15mm thick for Block, RCC Surface etc. at all levels
in waterproof cement mortar 1:6 (using approved waterproofing compound
13.04 Sqm 174.04 183.00
added as per manufacturers instructions), finished to line and level to approved
texture, including all leads, lifts, scaffolding and curing etc., complete.

Providing and laying of pre-polished 20mm thk. Granite slab of 250mm width
for coping in panel @ LEDGE / Sill and other area as specied by Client /
Architect., sizes as indicated in the drawings and as per BDPL Approval, set in
cement mortar 1:4 with necessary Chamfering and Edge polishing. The rate
quoted shall including making holes for grill fixing, The joints are finished /
13.05 pointing neatly with pigment to match the colour of stone, keeping the Rmt 870.19 914.00
completed granite covered with Plaster of Paris for protection and cleaning of
the same till handing over, including cost of materials, labour, Wastages, HOM,
Tools & Tackles, cleaning, curing, house keeping etc., complete. all as per
specifications, directions & instructions of Engineer-in-charge. including
working at all heights with lead & lift.etc. complete.

14.00 Steps Connecting to Building

Providing and constructing 300mm thick Solid concrete block work in walls,
piers and architectural features at all levels using approved Solid blocks of
strength 35kg/sqcm in cement mortar 1:6 including raking of joints,curing, steel
14.01 scaffolding, staging, leads and lifts. Cost to include all leads and lifts and as Cum 10.48 12.00
directed by Architect/Engineer in charge.
Note : The Base course should be done with 50mm gap between the blocks

Providing & Filling with Cinder as approved, whereever as directed by EIC,


including consolidating in 100mm thick layer, etc., as per specification
14.02 Cum 9.95 11.00
complete, The rate shall be including all labours,tools & tackels,all leads &
lifts,etc.complete as per directions of Engineer-in-charge.

Page 14 of 57
Bagmane Neon External Development Works

Bagmane
BOQ - External Development Works

Qty with
S.No Description Unit Qty Remarks
Buffer
Providing and Laying of Providing and laying HDPE sheet of 500 Micron over
compacted GSB, below Grade slab, P.C.C, Raft slab etc., to the required levels,
including supply, loading and unloading, storing, tranportation, laying, sealing of
14.03 junctions and overlaps etc., complete, including cost of materials, labour, Sqm 33.15 35.00
Wastages, HOM, Tools & Tackles, cleaning, curing, house keeping etc.,
complete. all as per specifications, directions & instructions of Engineer-in-
charge. including working at all heights with lead & lift.etc. complete.

Providing and laying Screed Concrete M10 Grade using 20mm down size
aggregates 150 mm or 100 mm or 75 mm or 40mm thick below raft, flooring,
SSM , retaining wall , UG sump, STP, Grade slab etc., including base preparation,
compaction, shuttering if necessary, curing etc. complete. including cost of
14.04 materials, labour, Wastages, HOM, Tools & Tackles, cleaning, curing, house Cum 4.97 6.00
keeping etc., complete. all as per specifications, directions & instructions of
Engineer-in-charge. including working at all heights with lead & lift.etc.
complete.

Providing and laying Pre -Polished 20mm thk Granite stone of BDPL Approved,
for Flooring and Steps (at all levels) fixed over a bed of 20mm thick CM 1:4
inclusive of joints are finished / pointing neatly with pigment to match the
colour of stone, making holes for grill fixing, curing etc., complete at all levels, as
14.05 per drawings. including cost of materials, labour, Wastages, HOM, Tools &
Tackles, cleaning, curing, house keeping etc., complete. all as per specifications,
directions & instructions of Engineer-in-charge. including working at all heights
with lead & lift.etc. complete.

a Threads with 3no.s Anti skid Grooves, Chamfering & Chamfering and Edge polishi Sqm 27.54 29.00
b Risers - 150mm High Rmt 128.27 135.00
c Landing & Flooring Sqm 64.95 69.00

15.00 Ramp Connecting to Basement


Earth excavation in all types of soil for levelling & lowering the ground including
for foundations upto the required level as per detail, including soft disintegrated
rocks but excluding hard rock, stacking the excavated earth & disposable
material where ever indicated in site, Excluding back filling, But including filling
depressions wherever necessary, watering, consolidating, Transporting surplus
Excavated earth away from the site after backfilling, verticle/slope cut earth
during the excavation process to prevent the sliding by providing suitable
15.01
shoring in slope using wooden planks / MS sheets and poles etc to the soil
surface as per site condition and soil consultant recommendations, bailing out
water, Slush removal etc. complete. Contractor shall get aquented with site
conditions and soil report and submit method statement for dewatering and
getting the surface reasonably dry .( rate shall also include Dewatering & Slush
removal) - The rate shall be including all labours,tools & tackels,all leads &
lifts,etc.complete as per directions of Engineer-in-charge.
In all types of materials where excavation can be done using Mechanical means
- Excavator, backhoe or JCB / poclain or manual means.
From 0 to 1.5M Cum 300.00 315.00 Tentative
Earth filling below Raft, flooring, sides of foundation retaining wall, trenches,
liftpits, External area beyond retaining wall , else where as directed including
15.02 watering and consolidating in 250mm thick layers, etc., as per specification Cum 300.00 315.00 Tentative
complete, The rate shall be including all labours,tools & tackels,all leads &
lifts,etc.complete as per directions of Engineer-in-charge.
Preparing and formation of road as per drawing to the required slope / gradient
using 8-10 tonne Capacity Vibratory road Roller - spreading in uniform layers
with manually on prepared surface watering, rolling and compacting with
15.03 vibratory power roller at OMC to achieve the desired density. including cost of Sqm 1029.98 1082.00
Labour, Wastages, HOM, Tools & Tackles, cleaning, curing, house keeping etc.,
complete. all as per specifications, directions & instructions of Engineer-in-
charge. including working at all heights with lead & lift.etc. complete.

Page 15 of 57
Bagmane Neon External Development Works

Bagmane
BOQ - External Development Works

Qty with
S.No Description Unit Qty Remarks
Buffer

MURRAM Sub-Base:
Construction of Granular Sub Base - using approved Quality of Murrum / Gravel
as per drawing to the required slope by providing close graded Material,
15.04 carriage of mixed Material to work site, spreading in uniform layers with Cum 328.88 346.00
manually on prepared surface watering, rolling and compacting with vibratory
power roller at OMC to achieve the desired density. including cost of materials,
labour, Wastages, HOM, Tools & Tackles, cleaning, curing, house keeping etc.,
complete. all as per specifications, directions & instructions of Engineer-in-
charge. including working at all heights with lead & lift.etc. complete. [ 300mm
consolidated thick]
Granular Sub - Base
Providing and laying of Granular Sub Base in two layers, using approved Quality
of GSB as per drawing to the required slope, by providing close graded
Material, carriage of mixed Material to work site, spreading in uniform layers
15.05 with manually on prepared surface watering, rolling and compacting with Cum 328.88 346.00
vibratory power roller at OMC to achieve the desired density.The rate shall be
including all labours,tools & tackels,all leads & lifts,etc.complete as per
directions of incharge. [ 300mm consolidated thick]
Providing and Laying of Providing and laying HDPE sheet of 500 Micron over
compacted GSB, below Grade slab, P.C.C, Raft slab etc., to the required levels,
including supply,loading and unloading, storing, tranportation, laying, sealing of
15.06 junctions and overlaps etc.,complete, including cost of materials, labour, Sqm 1029.98 1082.00
Wastages, HOM, Tools & Tackles, cleaning, curing, house keeping etc.,
complete. all as per specifications, directions & instructions of Engineer-in-
charge. including working at all heights with lead & lift.etc. complete.
15.07 REINFORCEMENT STEEL :
Fabricating & fixing in position reinforcement for RCC work with high yield
strength ribbed cold twisted tor steel (HSD) bar of various diameters and grade
of steel as specified below conforming to IS specification including cutting,
bending, hoisting, fabricating and placing in position according to drawings and
binding the reinforcement with galvanized annealed binding wire of double
fold of 18 gauge and providing PVC cover blocks for placing the reinforcements
in position and for maintaining the cover specified and/or according to relevant
IS. The rate shall be including all labours,tools & tackels,all leads &
lifts,etc.complete as per directions of incharge
Note : Unless noted otherwise the measurements in accordance with IS 1200.
However reinforcement shall be measured only in lengths of bars as actually
placed in position on standard weight basis, no allowance being made in the
weight for rolling margin. Authorized laps and splices only will be measured.
Chairs of any shape & profile, Spacer bar of any shape & profile, cover block,
wastage and binding wire will not be measured and shall be included in the
quoted rates. Quoted rate shall be deemed to have considered the above
stipulation. Quoted rate to include lead, lift, placing at all levels and as directed.
Fe 500 MT 6.18 7.00
Cement concrete.
Providing and laying M30 Reinforced cement concrete pavement over a
prepared sub base with 53 grade cement, coarse and fine aggregate conforming
to IS 383, maximum size of coarse aggregate not exceeding 25 mm, , mixed in a
batching and mixing plant as per approved mix design, transported to site ,
15.08 including necessary shuttering, curing, finishing to lines and grades as per Cum 206.00 217.00
drawing. including cost of materials, labour, Wastages, HOM, Tools & Tackles,
cleaning, curing, house keeping etc., complete. all as per specifications,
directions & instructions of Engineer-in-charge. including working at all heights
with lead & lift.etc. complete.
Extra for carrying out Power floater treatment in concrete floors, well
compacted, mechanically vibrated, finished to required levels, floated with neat
cement and power trowelled with broom finish, over a leveling course,
15.09 Sqm 1029.98 1082.00
including MS shuttering, curing etc complete. The rate shall include all labour,
material, tools, equipments, other incidental necessary to complete the work as
per the directions of Engineer in charge
Providing and appying the non metallic surface hardener @ 2.5 to 3 Kg/Sqm as
per manufacture specification of approved make (FOSROC or equivalent).
including cost of materials, labour, Wastages, HOM, Tools & Tackles, cleaning,
15.10 Sqm 1029.98 1082.00
curing, house keeping etc., complete. all as per specifications, directions &
instructions of Engineer-in-charge. including working at all heights with lead &
lift.etc. complete.

Page 16 of 57
Bagmane Neon External Development Works

Bagmane
BOQ - External Development Works

Qty with
S.No Description Unit Qty Remarks
Buffer
Groove Cutting - Providing and making groove cutting of 8mm on Concrete floor
with minimum 1/3 of the Thickness of concrete - including cost of materials,
15.11 labour, Wastages, HOM, Tools & Tackles, cleaning, curing, house keeping etc., Rmt 321.38 338.00
complete. all as per specifications, directions & instructions of Engineer-in-
charge. including working at all heights with lead & lift.etc. complete.
Providing and Fixing of 60mm thk Flag Stone shot blasted as per BDPL
Approved for Walkway Infill of approved colour & sizes as indicated on the
drawings, fixing in cement mortar 1:4 with Cebex 112 as detailed above at all
the levels with all edges of the panels as per design and detail all complete.
including cutting, sealing the joints with weather sealant of approved colour,
15.12 Sqm 116.40 123.00
keeping the completed granite covered with Bubble sheet for protection and
cleaning of the same till handing over, including cost of materials, labour,
Wastages, HOM, Tools & Tackles, cleaning, curing, house keeping etc.,
complete. all as per specifications, directions & instructions of Engineer-in-
charge. including working at all heights with lead & lift.etc. complete.
Providing and Fixing precast Kerbs stones of 600 x 125 x 350 mm including
225 mm wide , 100 mm thick PCC ( 1:3:6) bed.However concrete for behind
kerbstone will be payable under PCC item.i.e., Triangle portion 150 mm width,
100 mm height. etc. the rate includes CM pointing with cebex 112 etc.
complete as detailed in drawing (Note: the kerb is to be exposed in its natural
15.13 color use cement only at the joints (Recessed joints) no cement on kerb surface Rmt 250.96 264.00
- including cost of materials, labour, Wastages, HOM, Tools & Tackles, cleaning,
curing, house keeping etc., rate qouted to be inclusive of carting away material
generated during the entire process , inclusive of all transportation cost,all
complete all as per specifications, directions & instructions of Engineer-in-
charge. including working at all heights with lead & lift.etc. complete.

16.00 Sky light Finishing Works

Providing and laying of pre-polished 20mm thk. Granite slab for coping in panel
@ LEDGE / Sill and other area as specied by Client / Architect., sizes as indicated
in the drawings and as per BDPL Approval, set in cement mortar 1:4 with
necessary Chamfering and Edge polishing. The rate quoted shall including
making holes for grill fixing, The joints are finished / pointing neatly with
16.01 pigment to match the colour of stone, keeping the completed granite covered Sqm 177.90 187.00
with Plaster of Paris for protection and cleaning of the same till handing over,
including cost of materials, labour, Wastages, HOM, Tools & Tackles, cleaning,
curing, house keeping etc., complete. all as per specifications, directions &
instructions of Engineer-in-charge. including working at all heights with lead &
lift.etc. complete.

Providing and laying of 20mm THK GRANITE Cladding in panel sizes as indicated
on the drawings in cement mortar 1:4 as detailed above at all the levels with all
edges of the panels to have mirror polished as per design with necessary
Groove cutting and detail all complete. including clamp, pins, anchor fasteners,
drilling , cutting, necessary scaffolding etc, sealing the joints with weather
16.02 sealant of approved colour, keeping the completed granite covered with Sqm 186.80 197.00
Bubble sheet for protection and cleaning of the same till handing over, including
cost of materials, labour, Wastages, HOM, Tools & Tackles, cleaning, curing,
house keeping etc., complete. all as per specifications, directions & instructions
of Engineer-in-charge. including working at all heights with lead & lift.etc.
complete.

17.00 Pathway To Security Cabin

Page 17 of 57
Bagmane Neon External Development Works

Bagmane
BOQ - External Development Works

Qty with
S.No Description Unit Qty Remarks
Buffer
Earth excavation in all types of soil for levelling & lowering the ground including
for foundations upto the required level as per detail, including soft disintegrated
rocks but excluding hard rock, stacking the excavated earth & disposable
material where ever indicated in site, Excluding back filling, But including filling
depressions wherever necessary, watering, consolidating, Transporting surplus
Excavated earth away from the site after backfilling, verticle/slope cut earth
during the excavation process to prevent the sliding by providing suitable
17.01
shoring in slope using wooden planks / MS sheets and poles etc to the soil
surface as per site condition and soil consultant recommendations, bailing out
water, Slush removal etc. complete. Contractor shall get aquented with site
conditions and soil report and submit method statement for dewatering and
getting the surface reasonably dry .( rate shall also include Dewatering & Slush
removal) - The rate shall be including all labours,tools & tackels,all leads &
lifts,etc.complete as per directions of Engineer-in-charge.
In all types of materials where excavation can be done using Mechanical means
- Excavator, backhoe or JCB / poclain or manual means.
From 0 to 1.5M Cum 15.00 16.00 Tentative
Earth filling below Raft, flooring, sides of foundation retaining wall, trenches,
liftpits, External area beyond retaining wall , else where as directed including
17.02 watering and consolidating in 250mm thick layers, etc., as per specification Cum 5.00 6.00 Tentative
complete, The rate shall be including all labours,tools & tackels,all leads &
lifts,etc.complete as per directions of Engineer-in-charge.
Preparing and formation of road as per drawing to the required slope / gradient
using 8-10 tonne Capacity Vibratory road Roller - spreading in uniform layers
with manually on prepared surface watering, rolling and compacting with
17.03 vibratory power roller at OMC to achieve the desired density. including cost of Sqm 50.00 53.00
Labour, Wastages, HOM, Tools & Tackles, cleaning, curing, house keeping etc.,
complete. all as per specifications, directions & instructions of Engineer-in-
charge. including working at all heights with lead & lift.etc. complete.

MURRAM Sub-Base:
Construction of Granular Sub Base - using approved Quality of Murrum / Gravel
as per drawing to the required slope by providing close graded Material,
17.04 carriage of mixed Material to work site, spreading in uniform layers with Cum 16.50 18.00
manually on prepared surface watering, rolling and compacting with vibratory
power roller at OMC to achieve the desired density. including cost of materials,
labour, Wastages, HOM, Tools & Tackles, cleaning, curing, house keeping etc.,
complete. all as per specifications, directions & instructions of Engineer-in-
charge. including working at all heights with lead & lift.etc. complete. [ 300mm
consolidated thick]
Granular Sub - Base
Providing and laying of Granular Sub Base in two layers, using approved Quality
of GSB as per drawing to the required slope, by providing close graded
Material, carriage of mixed Material to work site, spreading in uniform layers
17.05 with manually on prepared surface watering, rolling and compacting with Cum 16.50 18.00
vibratory power roller at OMC to achieve the desired density.The rate shall be
including all labours,tools & tackels,all leads & lifts,etc.complete as per
directions of incharge. [ 300mm consolidated thick]
Providing and Laying of Providing and laying HDPE sheet of 500 Micron over
compacted GSB, below Grade slab, P.C.C, Raft slab etc., to the required levels,
including supply,loading and unloading, storing, tranportation, laying, sealing of
17.06 junctions and overlaps etc.,complete, including cost of materials, labour, Sqm 50.00 53.00
Wastages, HOM, Tools & Tackles, cleaning, curing, house keeping etc.,
complete. all as per specifications, directions & instructions of Engineer-in-
charge. including working at all heights with lead & lift.etc. complete.
17.07 REINFORCEMENT STEEL :
Fabricating & fixing in position reinforcement for RCC work with high yield
strength ribbed cold twisted tor steel (HSD) bar of various diameters and grade
of steel as specified below conforming to IS specification including cutting,
bending, hoisting, fabricating and placing in position according to drawings and
binding the reinforcement with galvanized annealed binding wire of double
fold of 18 gauge and providing PVC cover blocks for placing the reinforcements
in position and for maintaining the cover specified and/or according to relevant
IS. The rate shall be including all labours,tools & tackels,all leads &
lifts,etc.complete as per directions of incharge

Page 18 of 57
Bagmane Neon External Development Works

Bagmane
BOQ - External Development Works

Qty with
S.No Description Unit Qty Remarks
Buffer
Note : Unless noted otherwise the measurements in accordance with IS 1200.
However reinforcement shall be measured only in lengths of bars as actually
placed in position on standard weight basis, no allowance being made in the
weight for rolling margin. Authorized laps and splices only will be measured.
Chairs of any shape & profile, Spacer bar of any shape & profile, cover block,
wastage and binding wire will not be measured and shall be included in the
quoted rates. Quoted rate shall be deemed to have considered the above
stipulation. Quoted rate to include lead, lift, placing at all levels and as directed.
Fe 500 MT 0.30 1.00
Cement concrete.
Providing and laying M20 Reinforced cement concrete pavement over a
prepared sub base with 53 grade cement, coarse and fine aggregate conforming
to IS 383, maximum size of coarse aggregate not exceeding 25 mm, , mixed in a
batching and mixing plant as per approved mix design, transported to site ,
17.08 including necessary shuttering, curing, finishing to lines and grades as per Cum 10.00 11.00
drawing. including cost of materials, labour, Wastages, HOM, Tools & Tackles,
cleaning, curing, house keeping etc., complete. all as per specifications,
directions & instructions of Engineer-in-charge. including working at all heights
with lead & lift.etc. complete.

Providing and laying PCC 100mm thick M10 using 20mm down size aggregates
150 mm or 100 mm or 75 mm or 40mm thick below raft, flooring, SSM ,
retaining wall , UG sump, STP, Grade slab etc., including base preparation,
compaction, shuttering if necessary, curing etc. complete. including cost of
17.09 Cum 5.00 6.00
materials, labour, Wastages, HOM, Tools & Tackles, cleaning, curing, house
keeping etc., complete. all as per specifications, directions & instructions of
Engineer-in-charge. including working at all heights with lead & lift.etc.
complete.

Providing and constructing 150mm thick Solid concrete block work in walls,
piers and architectural features at all levels using approved Solid blocks of
strength 35kg/sqcm in cement mortar 1:6 including raking of joints,curing, steel
17.10 scaffolding, staging, leads and lifts. Cost to include all leads and lifts and as Sqm 17.38 19.00
directed by Architect/Engineer in charge.
Note : The Base course should be done with 50mm gap between the blocks

Providing and Fixing of 20mm thk Flamed Sadarahalli Granite as per BDPL
Approved Granite for Walkway Infill of approved colour & sizes with necessary
grooves as indicated on the drawings, fixing in cement mortar 1:4 with Cebex
112 as detailed above at all the levels with all edges of the panels as per design
and detail all complete. including cutting, sealing the joints with weather
17.11 sealant of approved colour, keeping the completed granite covered with Sqm 35.17 37.00
Bubble sheet for protection and cleaning of the same till handing over, including
cost of materials, labour, Wastages, HOM, Tools & Tackles, cleaning, curing,
house keeping etc., complete. all as per specifications, directions & instructions
of Engineer-in-charge. including working at all heights with lead & lift.etc.
complete.

18.00 Miscallaneous Works

Supply,Fabrication,erection and installation of SS 304 grade stainless steel


18.01 handrail as per detailed drawings. The rate shall be including all labours,tools & Rmt 43.00 46.00
tackels,all leads & lifts,etc.complete as per directions of Engineer-in-charge.

19.00 Service Related Civil Works

Providing and constructing 150mm thick Solid concrete block work in walls,
piers and architectural features at all levels using approved Solid blocks of
strength 35kg/sqcm in cement mortar 1:6 including raking of joints,curing, steel
19.01 scaffolding, staging, leads and lifts. Cost to include all leads and lifts and as Sqm 66.30 70.00
directed by Architect/Engineer in charge.
Note : The Base course should be done with 50mm gap between the blocks

Providing waterproof plaster 15mm thick for Block, RCC Surface etc. at all levels
in waterproof cement mortar 1:6 (using approved waterproofing compound
19.02 added as per manufacturers instructions), finished to line and level to approved Sqm 124.80 132.00
texture, including all leads, lifts, scaffolding and curing etc., complete.

Page 19 of 57
Bagmane Neon External Development Works

Bagmane
BOQ - External Development Works

Qty with
S.No Description Unit Qty Remarks
Buffer

Providing and Fixing of FRP Cover of Approved Thickness / Size / Pattern / Shade
as per BDPL Spec / drawing, including cost of materials, labour, hiring of
machinery, tools and tackles, joint less finish, including scaffolding, curing,
19.03
cleaning & house keeping etc. complete, all as per drawing, direction and
instructions of Engineer-in-charge,including working at all heights with lead &
lift.etc

a Chamber of Size 600 x 600mm of 2.5T Capacity No.s 26.00 28.00

Providing and laying Screed Concrete thick M10 using 20mm down size
aggregates 150 mm or 100 mm or 75 mm or 40mm thick below raft, flooring,
SSM , retaining wall , UG sump, STP, Grade slab etc., including base preparation,
compaction, shuttering if necessary, curing etc. complete. including cost of
19.04 materials, labour, Wastages, HOM, Tools & Tackles, cleaning, curing, house Cum 2.81 3.00
keeping etc., complete. all as per specifications, directions & instructions of
Engineer-in-charge. including working at all heights with lead & lift.etc.
complete.

Providing and laying in position the DWC Pipes of approved Dia quality and
make including collars, necessary Excavation, PCC 1:2:4 supports, M.Sand
cushion of 150mm on all sides Refilling, 150mm thk M10 encasing Concrete
allround the pipe, Compaction and making good the level, alignment etc.,
19.05
complete. including cost of materials, labour, Wastages, HOM, Tools & Tackles,
cleaning, house keeping etc., complete. all as per specifications, directions &
instructions of Engineer-in-charge. including working at all heights with lead &
lift.etc. complete

a 200mm Dia Rmt 372.00 391.00


b 150mm Dia Rmt 48.00 51.00

Supplying, fixing, testing & commisioning of PVC pressure pipes (6Kg/sqcm)


confirming to IS 4985 for Drain Pipes, Electrical & Irrigation Crossings, with
solvent cement joints, including all the fittings, laid above false ceiling concealed
19.06
in wall etc, the work shall include wall chase and making good the same in
cement mortar etc.,The quoted rate should include necessary supports like
hanger supports, grip bolts and clamps etc.,

a 110mm Dia Rmt 60.00 63.00


b 100mm Dia Rmt 55.80 59.00

Providing & fixing of FRP Drain with Gratings of 20T Capacity of size (450mm x
450mm x 450mm thk ) as per BDPL specification / BOQ over on drain & finish it
smoothly with CM 1;4 with cebex 112, including cost of materials, labour,
19.07 Wastages, curing, HOM, Tools & Tackles, cleaning, house keeping, welding if No.s 6.00 7.00
necessary, with necessary precautionary safety measures etc., complete. all as
per specifications, directions & instructions of Engineer-in-charge. ,

20.00 Smoking Zone

Providing and laying M 20 Reinforced cement concrete with 53 grade cement,


coarse and fine aggregate conforming to IS 383, maximum size of coarse
aggregate not exceeding 25mm, , mixed in a batching and mixing plant as per
approved mix design, transported to site , including curing, finishing to lines
20.01 and grades as per drawing. incl materials, labour, Wastages, HOM, Tools &
Tackles, cleaning, curing, house keeping etc., complete. all as per specifications,
directions & instructions of Engineer-in-charge. including working at all heights
with lead & lift.etc. complete. [ Excluding Reinforcement, centering, shuttering,
strutting, propping, scaffolding,staging etc - will be paid seperatly]

a Raft Cum 2.75 3.00


b Wall Cum 3.60 4.00
c Top Slab Cum 2.75 3.00

Formwork – Providing centring, shuttering, strutting, propping, scaffolding,


staging etc., and removal of formwork for vertical surfaces such as wall at any
20.02
thickness, including cost of all materials, labour, equipment, tools & tackles, all
leads and lift etc. all complete as per the specification and directions of EIC.

a Raft Sqm 2.85 3.00


b Wall Sqm 36.04 38.00
c Top Slab Sqm 21.21 23.00

Page 20 of 57
Bagmane Neon External Development Works

Bagmane
BOQ - External Development Works

Qty with
S.No Description Unit Qty Remarks
Buffer

Fabricating & fixing in position reinforcement for RCC work with high yield
strength ribbed cold twisted tor steel (HSD) bar of various diameters and grade
of steel as specified below conforming to IS specification including cutting,
bending, hoisting, fabricating and placing in position according to drawings and
20.03 binding the reinforcement with galvanized annealed binding wire of double
fold of 18 gauge and providing PVC cover blocks for placing the reinforcements
in position and for maintaining the cover specified and/or according to relevant
IS. The rate shall be including all labours,tools & tackels,all leads &
lifts,etc.complete as per directions of incharge

Note : Unless noted otherwise the measurements in accordance with IS 1200.


However reinforcement shall be measured only in lengths of bars as actually
placed in position on standard weight basis, no allowance being made in the
weight for rolling margin. Authorized laps and splices only will be measured.
Chairs of any shape & profile, Spacer bar of any shape & profile, cover block,
wastage and binding wire will not be measured and shall be included in the
quoted rates. Quoted rate shall be deemed to have considered the above
stipulation. Quoted rate to include lead, lift, placing at all levels and as directed.

Fe 500 MT 0.82 1.00

Providing and constructing 150mm thick Solid concrete block work in walls,
piers and architectural features at all levels using approved Solid blocks of
strength 35kg/sqcm in cement mortar 1:6 including raking of joints,curing, steel
20.04 Sqm 5.18 6.00
scaffolding, staging, leads and lifts. Cost to include all leads and lifts and as
directed by Architect/Engineer in charge.
Note : The Base course should be done with 50mm gap between the blocks

Providing & Filling with Quarry Dust as approved, whereever as directed by EIC,
including watering and consolidating in 100mm thick layer, etc., as per
20.05 specification complete, The rate shall be including all labours,tools & tackels,all Cum 2.29 3.00
leads & lifts,etc.complete as per directions of Engineer-in-charge.

Providing and Laying of Providing and laying HDPE sheet of 500 Micron over
compacted GSB, below Grade slab, P.C.C, Raft slab etc., to the required levels,
including supply,loading and unloading, storing, tranportation, laying, sealing of
20.06 junctions and overlaps etc.,complete, including cost of materials, labour, Sqm 18.36 20.00
Wastages, HOM, Tools & Tackles, cleaning, curing, house keeping etc.,
complete. all as per specifications, directions & instructions of Engineer-in-
charge. including working at all heights with lead & lift.etc. complete.

Providing and laying Screed Concrete thick M10 using 20mm down size
aggregates 150 mm or 100 mm or 75 mm or 40mm thick below raft, flooring,
SSM , retaining wall , UG sump, STP, Grade slab etc., including base preparation,
compaction, shuttering if necessary, curing etc. complete. including cost of
20.07 Cum 1.84 2.00
materials, labour, Wastages, HOM, Tools & Tackles, cleaning, curing, house
keeping etc., complete. all as per specifications, directions & instructions of
Engineer-in-charge. including working at all heights with lead & lift.etc.
complete.

Providing and laying Antiskid floor tiles in different sizes (thickness to be


specified by the manufacturer) of approved make in all colours and shades, laid
on 20mm thick cement mortar 1:4 (1 Cement : 4 river sand/M'sand mixed with
cebex 112) including grouting the joints with epoxy tile grout of approved make
as per detailed Architectural drawings and as directed by Architect. (Base rate
of Ceramic Tile Rs. /sft. and Vitrified Tile Rs. /- Sqft inclusive of duties and
20.08 taxes) Sqm 16.50 18.00
Rate shall includes PVC, corner beedings, spacers of 2 - 3mm, necessary slopes,
proper finishing around the floor trap etc.
Rate shall include final cleaning of the cladding work before hading over shall
be in scope of the cladding contractor. The contractor shall submit drawings for
Architects/EIC approval before proceeding with installation works.

Providing and laying of 20mm THK Steel Grey Granite Skirting in cement mortar
1:4 as detailed above at all the levels with all edges to have Chamfered &
mirror polished as per design with necessary Groove cutting and detail all
complete. including clamp, pins, anchor fasteners, drilling , cutting, necessary
scaffolding etc, sealing the joints with weather sealant of approved colour,
20.09 keeping the completed granite covered with Bubble sheet for protection and
cleaning of the same till handing over, including cost of materials, labour,
Wastages, HOM, Tools & Tackles, cleaning, curing, house keeping etc.,
complete. all as per specifications, directions & instructions of Engineer-in-
charge. including working at all heights with lead & lift.etc. complete.

a 100 mm High Rmt 6.80 8.00

Page 21 of 57
Bagmane Neon External Development Works

Bagmane
BOQ - External Development Works

Qty with
S.No Description Unit Qty Remarks
Buffer
b 150mm High Rmt 12.20 13.00
c 100mm Band without chamfering & Edge Polishing Rmt 19.00 20.00

Providing waterproof sand faced plaster to external walls, columns, beams ,


pergola beams and any projections,plaster bands as per drawing etc. in
waterproof cement mortar 1:4 (using approved waterproofing compound of
approve equivalent added as per manufacturers instructions) applied in two
coats, first coat of 12mm thick, second coat of 8mm with water proof
compound to be applied for both coats, finished to line and level to approved
20.10 sand faced texture, including all leads, lifts, scaffolding and curing complete. The Sqm 43.65 46.00
rate is inclusive of forming of drip moulds as with all lead and lift and as directed
by Engineer in charge including providing and fixing in position galvanised
expanded metal mesh 20 gauge (ARPITHA make) at junctions of concrete and
masonry and other locations as called for including fixing with GI nails.fixing
approved column / wall corner beads, making groove , plaster band and
cornices as called for etc., complete.

Texture Painting: Painting for plastered surface in texture paint finish of


20.11 approved shade and make and as per manufacturer specification, cost including Sqm 43.65 46.00
all materials at site, all labor charges and other necessary charges to complete

Providing plastering to ceilings / soffits , in cement mortar 1:4, 12mm thick,


finishing to line and level without lime rendering finished smooth, at all levels &
20.12 lifts, including lead and lift of materials, applying to concrete surface, Sqm 18.36 20.00
scaffolding, curing, etc., complete. etc. ceiling

Providing and painting two coats of Acrylic Smooth exterior emulsion paint of
approved shade and make including preparation of base, a coat of exterior
cement primer after two coats of putty up to a minimum thickness of 2mm over
20.13 plastered surface to prepare the surface even and smooth with necessary Sqm 18.36 20.00
scaffolding, etc all complete as per detailed Architectural drawings and as
directed by Architect.
As per Approved BDPL revised BOQ specs.

EPOXY COATING: Supply and applying of a Bostik Moisture seal waterproof


epoxy coating, which shall be applied to the concrete minimum thickness of 0.5
mm, for services rooms application after cleaning the surface of lumps, potting
etc., and clearing the surface of loose particles by using a vacuum assisted shot
blasting machine or scarifying. The cleaned/prepared surface shall be provided
with 2 coats of priming coat. The prepared sub-strata shall be applied with
approved epoxy coating. Application of coating shall only be carried out by an
approved specialist applicator. Quoted price shall include making good of any
potholes or undulation. Make shall be of fosroc or approved equivalent make.

Page 22 of 57
Bagmane Neon M.Sheet - Ext Development Works

S.No Description Unit No.s L B D Qty Remarks

1.00 Aggregate Filling on Podium


Total Area Sqm 16176.00
Pline in Drawing Takeoff 1
Building Area Sqm 7888.35
Filling Area Sqm 8287.65

2.00 Pathway around Building


PCC Cum 1.1 798.96 0.10 87.89 Pline in Drawing Takeoff 1
Block Work 166.95 Pline in Drawing Takeoff 2-
Taken Around Grass Cell
North east Sqm 1 39.68 0.20 7.94
North West Sqm 1 145.64 0.20 29.13
East Sqm 1 172.26 0.20 34.45
South
Sqm 1 55.61 0.20 11.12
Sqm 1 53.61 0.20 10.72
Sqm 1 55.28 0.20 11.06
Sqm 1 50.15 0.20 10.03
Sqm 1 63.96 0.20 12.79
Sqm 1 33.01 0.20 6.60
West
Sqm 1 26.88 0.20 5.38
Sqm 1 52.85 0.20 10.57
Sqm 1 52.05 0.20 10.41
Sqm 1 33.79 0.20 6.76

Below Paving Area


Geo Fabric Sheet Sqm 1.1 834.77 0.60 550.95 considered in item 1

Slab RL-100, FFL - 100.35,


Dust Filling Cum 1 798.96 0.03 23.97 Granite - 70mm, PCC
-100mm, Aggregate -
50mm- RCC 100mm
Granite - Sadharahalli Sqm 1 720.97 720.97 Pline in Drawing Takeoff 1
Granite - Steel Grey
200mm Band Rmt 1 174.00 174.00
500mm Band Rmt 1 86.38 86.38

3.00 Pathway near Seating Plaza


PCC Cum 1.1 503.11 0.10 55.34 Pline in Drawing Takeoff 1
Block Work Sqm 85.35 Pline in Drawing Takeoff 2
Seating Plaza 1 Sqm 1 76.46 0.20 15.29
Seating Plaza 2 Sqm 1 71.29 0.20 14.26
Seating Plaza 3 Sqm 1 96.18 0.20 19.24
Seating Plaza 3 (inside) Sqm 1 32.00 0.20 6.40
Seating Plaza 4 Sqm 1 66.78 0.20 13.36
Seating Plaza 5 Sqm 1 60.03 0.20 12.01
Seating Plaza 5 (Inside) Sqm 1 24.00 0.20 4.80

Geo Fabric Sheet Sqm 1 426.74 0.60 256.04


Slab RL-100, FFL - 100.3,
Dust Filling Cum 1 503.11 0.01 5.03 Granite - 70mm, PCC
-100mm, Aggregate -
50mm- RCC 100mm
Granite Sadharahalli Sqm 1 475.01 475.01
Granite Steel Grey
200mm Band Rmt 1 138.00 138.00
500mm Band Rmt 1 1.00

4.00 Pathway near MUGA & Security


PCC Cum 1.1 233.04 0.10 25.63 Pline in Drawing Takeoff 1
Block Work 47.40
Around MUGA Sqm 1 147.00 0.20 29.40 Pline in Drawing Takeoff 1
Around Amphitheatre Sqm 1 90.00 0.20 18.00 Pline in Drawing Takeoff 1
Geofabric Sheet Sqm 1 237.00 0.60 142.20
Slab RL-100, FFL - 100.3,
Granite - 70mm, PCC
Dust Filling Cum 1 233.04 0.01 2.33 -100mm, Aggregate -
50mm- RCC 100mm
Granite Sadharahalli Sqm 1 212.22 212.22 Pline in Drawing Takeoff 1
Granite Steel Grey
200mm Band Rmt 1 104.10 104.10

Page 23 of 57
Bagmane Neon M.Sheet - Ext Development Works

S.No Description Unit No.s L B D Qty Remarks

5.00 Rear Lift Lobby


PCC Cum 1.1 167.29 0.10 18.40 Pline in Drawing Takeoff 1
Geofabric Sheet Sqm 1 167.29 167.29
Slab RL-100.35, FFL - 100.9,
Granite - 70mm, PCC
Cinder filling Cum 1 167.29 0.31 51.86 -100mm, Aggregate - 50mm,
PCC 100mm
Granite Sadharahalli Sqm 1 130.87 130.87 Pline in Drawing Takeoff 1
Granite Steel Grey
500mm Band Rmt 1 72.84 72.84

6.00 Driveway
Sand Filling 284.83

North east Cum 1 287.04 0.12 35.88


North West Cum 1 504.24 0.12 63.03
East Cum 1 470.63 0.12 58.83
South 0.12
Cum 1 127.58 0.12 15.95
Cum 1 119.44 0.12 14.93
Slab RL-100, FFL - 100.3,
Cum 1 127.66 0.12 15.96 25mm Top Cover
Cum 1 109.40 0.12 13.67 Grass Cell - 50mm,
Cum 1 161.89 0.12 20.24 Sand 50 mm
Aggregate - 50mm
Cum 1 58.60 0.12 7.32
West 0.12
Cum 1 45.12 0.12 5.64
Cum 1 119.86 0.12 14.98
Cum 1 115.03 0.12 14.38
Cum 1 32.18 0.12 4.02

7.00 PlanterAround Building Pline in Drawing Takeoff 1


Raft Cum 1 435.76 0.60 0.15 39.22
RC Wall Cum 1 435.76 0.15 0.70 45.75
Reinforcement MT 1 7.65 Considered 90Kgs/Cum
Formwork 740.79
Raft Sqm 2 435.76 0.15 130.73
RC Wall Sqm 2 435.76 0.70 610.06
Coping - 250mm Wide Rmt 1 435.76 435.76
Cladding 263.11
Cladding - Inner side - 100mm Sqm 1 430.28 0.10 43.03
Cladding Outer Side side - 100mm Sqm 1 440.16 0.50 220.08

Option 2
Skirting Rmt 1 440.16 440.16
Plastering Sqm 1 430.28 0.10 43.03
Sqm 1 440.16 0.40 176.06
219.09

8.00 Planter cum Seaters - 1600 x 1600


Bottom Slab Cum 15 1.60 1.60 0.15 5.76
RC Wall Cum 15 5.80 0.15 0.60 7.83
Formwork - Bottom Slab Sqm 15 6.40 0.15 14.40
Formwork - RC Wall Sqm 30 5.80 0.60 104.40
Reinforcement MT 15 1.22
Block Work - 150mm Sqm 30 3.20 0.60 57.60
Plastering Sqm 30 3.20 0.60 57.60
Coping Sqm 15 2.85 0.35 14.96
Sqm 15 2.50 0.15 5.63
20.59
Cladding Sqm 15 6.40 0.75 72.00

Option 2
Skirting Rmt 15 6.40 96.00
Plastering Sqm 15 6.40 0.65 62.40

9.00 Planter cum Seaters - 3600 x 1600


Bottom Slab Cum 7 3.60 1.60 0.15 6.05
RC Wall Cum 7 10.10 0.15 0.60 6.36
Formwork - Bottom Slab Sqm 7 10.40 0.15 10.92
Formwork - RC Wall Sqm 14 10.40 0.60 87.36
Reinforcement MT 7 1.12

Page 24 of 57
Bagmane Neon M.Sheet - Ext Development Works

S.No Description Unit No.s L B D Qty Remarks


Block Work - 150mm Sqm 14 3.60 0.60 30.24
Plastering Sqm 14 3.60 0.60 30.24
Coping Sqm 7 3.60 0.35 8.82
Sqm 7 10.10 0.15 10.61
19.43
Cladding Sqm 7 14.40 0.75 75.60

Option 2
Skirting Rmt 7 14.40 100.80
Plastering Sqm 7 14.40 0.65 65.52
10.00 Planter cum Seaters - 3000 x 3000
Bottom Slab Cum 3 3.00 3.00 0.15 4.05
RC Wall Cum 3 11.70 0.15 0.60 3.16
Formwork - Bottom Slab Sqm 3 12.00 0.15 5.40
Formwork - RC Wall Sqm 6 12.00 0.60 43.20
Reinforcement MT 3 0.65
Block Work - 150mm Sqm 6 12.00 0.60 43.20
Plastering Sqm 6 12.00 0.60 43.20
Coping Sqm 3 11.30 0.35 11.87
Cladding Sqm 3 12.00 0.75 27.00

Option 2
Skirting Rmt 3 12.00 36.00
Plastering Sqm 3 12.00 0.65 23.40
11.00 Amphitheatre
Bottom Slab Cum 1 30.67 0.15 4.60
Block Walls
1st Step Wall Cum 1 11.61 0.36 4.18
2nd Step Wall Cum 1 12.47 0.66 8.23
3rd Step Wall Cum 1 13.34 0.81 10.80
4th Step Wall - Backside Cum 1 13.86 0.81 11.22
Edge Walls - Planter Edge Cum 2 0.75 0.66 0.99
Cum 2 1.20 0.81 1.94
Planter Inside Walls Cum 2 0.75 0.30 0.45
Planter Inside Walls Cum 2 1.20 0.15 0.36
38.18
Top Slab
1st Step Cum 1 11.28 0.15 1.69
2nd Step Cum 1 9.68 0.15 1.45
3rd Step Cum 1 6.12 0.15 0.92
Below Planter Cum 2 1.20 1.50 0.15 0.54
4.60
Form work
Bottom Slab Cum 1 35.36 0.15 5.30
RC Walls
1st Step Wall Cum 2 11.61 0.36 8.36
2nd Step Wall Cum 2 12.47 0.66 16.46
3rd Step Wall Cum 2 13.34 0.81 21.61
4th Step Wall - Backside Cum 2 13.86 0.81 22.45
Edge Walls - Planter Edge Cum 4 0.75 0.66 1.98
Cum 4 1.20 0.81 3.89
Planter Inside Walls Cum 4 0.75 0.30 0.90
Planter Inside Walls Cum 4 1.20 0.15 0.72
76.36
Top Slab
1st Step Cum 1 25.57 0.15 3.84
2nd Step Cum 1 27.31 0.15 4.10
3rd Step Cum 1 28.09 0.15 4.21
Below Planter Cum 4 1.20 1.50 0.15 3.24
15.39
Light Weight Filling
Cum 1 15.70 1.50 23.55
Coping
1st Step Sqm 1 9.03 9.03
2nd Step Sqm 1 9.68 9.68
3rd Step Sqm 1 6.12 6.12
Planter on 1st Step Sqm 2 3.00 0.20 1.20
Planter on 2nd Step Sqm 2 4.80 0.20 1.92
27.95
Cladding
1st Step Wall Sqm 1 11.61 0.30 3.48
2nd Step Wall Sqm 1 12.47 0.30 3.74

Page 25 of 57
Bagmane Neon M.Sheet - Ext Development Works

S.No Description Unit No.s L B D Qty Remarks


3rd Step Wall Sqm 1 13.34 0.15 2.00
4th Step Wall - Backside Sqm 1 13.86 0.20 2.77
Planter Internal
1st Planter Sqm 2 0.75 0.30 0.45
2nd Planter Sqm 2 1.20 0.15 0.36
Planter Front Side
1st Planter Sqm 2 1.50 0.60 1.80
2nd Planter Sqm 2 1.20 0.15 0.36
14.97
Texture Painting
Edges - Planter External
1st Planter Sqm 2 0.75 0.60 0.90
2nd Planter Sqm 2 1.20 0.75 1.80
2.70
12.00 MUGA
Raft Cum 1 57.20 0.60 0.20 6.86
Retaining Wall Cum 1 57.20 0.20 0.60 6.86
Form work - Raft Sqm 2 57.20 0.20 22.88
Form work - Retaining Wall Sqm 2 57.20 0.60 68.64
Light Weight Filling Cum 1 178.56 0.15 26.78
Polythene Sheet Sqm 1 178.56 178.56
Screed Cum 1 178.56 0.20 35.71
Broom Finish Sqm 1 178.56 178.56
Hardnerer Sqm 1 178.56 178.56
Groove Cutting Rmt 7 18.60 130.20
4 9.60 38.40
168.60
MS Structure - 100 x 100 SHS 5mm tk
Verticals Rmt 24 4.85 116.40
Rmt 34 4.85 164.90
Horizontal Rmt 3 57.20 171.60
452.90
MS Structure in MT MT 1 452.90 14.80 6.70
Chainlink Mesh Sqm 1 57.20 4.00 228.80
Coping - 300mm Rmt 1 57.20 57.20
Cladding - internal Sqm 1 57.20 0.50 28.60
Cladding - External Sqm 1 57.20 0.45 25.74
54.34

13.00 Saucer Drain


Block Work Sqm 1 870.19 0.25 217.55
Haunching Rmt 1 870.19 870.19
Plastering Rmt 1 870.19 0.20 174.04
Coping - 250mm Rmt 1 870.19 870.19

14.00 Step Connecting to Building


Threads
Starting from Northeast Corner
Connection to S lift lobby Sqm 2 1.20 0.30 0.72
Connection to Staircase Sqm 2 4.20 0.30 2.52
Connection to Staircase Sqm 2 1.50 0.30 0.90
Connection to Staircase Sqm 4 1.80 0.30 2.16
Rear Lobby Sqm 3 11.84 0.30 10.66
Connection to Staircase Sqm 4 1.70 0.30 2.04
Connection to Pump Room Sqm 2 7.29 0.30 4.37
Connection to Staircase Sqm 2 1.50 0.30 0.90
Connection to Staircase Sqm 2 4.20 0.30 2.52
Connection to S lift lobby Sqm 2 1.25 0.30 0.75
27.54
Risers
Starting from Northeast Corner
Connection to S lift lobby Rmt 3 1.20 3.60
Connection to Staircase Rmt 3 4.20 12.60
Connection to Staircase Rmt 3 1.50 4.50
Connection to Staircase Rmt 5 1.80 9.00
Rear Lobby Rmt 4 11.84 47.36
Connection to Staircase Rmt 5 1.70 8.50
Connection to Pump Room Rmt 3 7.29 21.86
Connection to Staircase Rmt 3 1.50 4.50
Connection to Staircase Rmt 3 4.20 12.60
Connection to S lift lobby Rmt 3 1.25 3.75
128.27

Page 26 of 57
Bagmane Neon M.Sheet - Ext Development Works

S.No Description Unit No.s L B D Qty Remarks


Landing
Starting from Northeast Corner
Connection to S lift lobby Sqm 1 1.50 1.20 1.80
Sqm 1 2.40 5.30 12.72
Sqm 1 1.20 0.90 1.08
Connection to Staircase Sqm 1 4.20 0.90 3.78
Connection to Staircase Sqm 1 1.50 0.90 1.35
Connection to Pump Room Sqm 1 7.29 2.90 21.09
Connection to Staircase Sqm 1 1.50 0.90 1.35
Connection to Staircase Sqm 1 4.20 0.90 3.78
Connection to S lift lobby Sqm 1 1.25 1.50 1.88
Sqm 1 1.25 0.90 1.13
Sqm 1 6.00 2.50 15.00
64.95
Block Work - 300mm
Starting from Northeast Corner
Connection to S lift lobby Cum 1 1.20 0.15 0.30 0.05
Cum 1 1.20 0.30 0.30 0.11
Cum 1 1.20 0.45 0.30 0.16
Connection to Staircase Cum 1 4.20 0.15 0.30 0.19
Cum 1 4.20 0.30 0.30 0.38
Cum 1 4.20 0.45 0.30 0.57
Connection to Staircase Cum 1 1.50 0.15 0.30 0.07
Cum 1 1.50 0.30 0.30 0.14
Cum 1 1.50 0.45 0.30 0.20
Connection to Staircase Cum 1 1.80 0.15 0.30 0.08
Cum 1 1.80 0.30 0.30 0.16
Cum 1 1.80 0.45 0.30 0.24
Cum 1 1.80 0.60 0.30 0.32
Rear Lobby Cum 1 11.84 0.15 0.30 0.53
Cum 1 11.84 0.30 0.30 1.07
Cum 1 11.84 0.45 0.30 1.60
Connection to Staircase Cum 1 1.70 0.15 0.30 0.08
Cum 1 1.70 0.30 0.30 0.15
Cum 1 1.70 0.45 0.30 0.23
Cum 1 1.70 0.60 0.30 0.31
Connection to Pump Room Cum 1 7.29 0.15 0.30 0.33
Cum 1 7.29 0.30 0.30 0.66
Cum 1 7.29 0.45 0.30 0.98
Connection to Staircase Cum 1 1.50 0.15 0.30 0.07
Cum 1 1.50 0.30 0.30 0.14
Cum 1 1.50 0.45 0.30 0.20
Connection to Staircase Cum 1 4.20 0.15 0.30 0.19
Cum 1 4.20 0.30 0.30 0.38
Cum 1 4.20 0.45 0.30 0.57
Connection to S lift lobby Cum 1 1.25 0.15 0.30 0.06
Cum 1 1.25 0.30 0.30 0.11
Cum 1 1.25 0.45 0.30 0.17
10.48
Dust Filling
Starting from Northeast Corner Cum
Connection to S lift lobby Cum 0.5 1.20 1.50 0.30 0.27
Connection to Staircase Cum 1 4.20 0.90 0.30 1.13
Connection to Staircase Cum 1 1.50 0.90 0.30 0.41
Connection to Staircase Cum 0 0.00
Rear Lobby Cum 0 0.00
Connection to Staircase Cum 0 0.00
Connection to Pump Room Cum 1 7.29 2.90 0.30 6.33
Connection to Staircase Cum 1 1.50 0.90 0.30 0.41
Connection to Staircase Cum 1 4.20 0.90 0.30 1.13
Connection to S lift lobby Cum 0.5 1.20 1.50 0.30 0.27
9.95
HDPE Sheet
Starting from Northeast Corner Sqm
Connection to S lift lobby Sqm 0.5 1.20 1.50 0.90
Connection to Staircase Sqm 1 4.20 0.90 3.78
Connection to Staircase Sqm 1 1.50 0.90 1.35
Connection to Staircase Sqm 0 0.00
Rear Lobby Sqm 0 0.00
Connection to Staircase Sqm 0 0.00
Connection to Pump Room Sqm 1 7.29 2.90 21.09
Connection to Staircase Sqm 1 1.50 0.90 1.35

Page 27 of 57
Bagmane Neon M.Sheet - Ext Development Works

S.No Description Unit No.s L B D Qty Remarks


Connection to Staircase Sqm 1 4.20 0.90 3.78
Connection to S lift lobby Sqm 0.5 1.20 1.50 0.90
33.15
Screed Concrete
Starting from Northeast Corner Cum
Connection to S lift lobby Cum 0.5 1.20 1.50 0.15 0.14
Connection to Staircase Cum 1 4.20 0.90 0.15 0.57
Connection to Staircase Cum 1 1.50 0.90 0.15 0.20
Connection to Staircase Cum 0 0.00
Rear Lobby Cum 0 0.00
Connection to Staircase Cum 0 0.00
Connection to Pump Room Cum 1 7.29 2.90 0.15 3.16
Connection to Staircase Cum 1 1.50 0.90 0.15 0.20
Connection to Staircase Cum 1 4.20 0.90 0.15 0.57
Connection to S lift lobby Cum 0.5 1.20 1.50 0.15 0.14
4.97
15.00 Ramp Connecting to Basement
Murram Cum 1.1 936.34 0.30 328.88
GSB Cum 1.1 936.34 0.30 328.88
RCC Cum 1.1 936.34 0.20 206.00
Broom Finish Cum 1.1 936.34 1029.98
Hardnerer Cum 1.1 936.34 1029.98
Groove Cutting
Center Rmt 1 127.38 127.38
At Transistions Rmt 6 7.50 45.00
16 8.00 128.00
6 3.50 21.00
321.38
60mm tk Flag Stone Sqm 6 7.50 0.60 27.00
16 8.00 0.60 76.80
6 3.50 0.60 12.60
116.40
Kerb Rmt 1 250.96 250.96

16.00 Cutout Finishing Works


Coping
Near Seating Area - 250mm Wide Rmt 3 17.20 51.60
Rmt 6 19.60 117.60
Rmt 1 8.70 8.70
177.90
Cladding Sqm 3 17.20 1.05 54.18
Sqm 6 19.60 1.05 123.48
Sqm 1 8.70 1.05 9.13
186.80

19.00 Service Related Civil Works


Block Work for Catch Basins
Around Building Sqm 52 0.60 0.85 26.52
Sqm 52 0.90 0.85 39.78
66.30
Plastering
Inside Sqm 26 2.40 0.65 40.56
Outside Sqm 26 3.60 0.90 84.24
124.80
FRP Cover - 600 x 600 No.s 26 26.00
Levelling Screed Cum 26 0.60 0.60 0.30 2.81
200 Dia DWC Pipes
Through Catch Basins around Building Rmt 1 308.00 308.00
From FRP CB to Main Rmt 1 64.00 64.00
372.00
150 Dia DWC Pipes Rmt 4 12.00 48.00
100 Dia PVC 6 kg Pipe - Drain Crossings
Rmt 1 13.20 13.20
Rmt 1 7.00 7.00
Rmt 1 7.00 7.00
Rmt 1 1.00 1.00
Rmt 1 7.00 7.00
Rmt 1 1.00 1.00
Rmt 1 2.00 2.00
Rmt 1 2.50 2.50
Rmt 1 7.50 7.50
Rmt 1 2.50 2.50

Page 28 of 57
Bagmane Neon M.Sheet - Ext Development Works

S.No Description Unit No.s L B D Qty Remarks


Rmt 1 5.10 5.10
55.80
110 Dia PVC for Electrical and irrigation line
Crossings
Starting from south east corner Rmt 2 1.00 2.00
2 1.50 3.00
2 1.00 2.00
2 1.50 3.00
2 1.00 2.00
2 6.50 13.00
2 1.00 2.00
2 1.50 3.00
2 1.00 2.00
4 2.50 10.00
2 1.50 3.00
2 1.50 3.00
2 1.50 3.00
2 1.50 3.00
2 1.50 3.00
2 1.50 3.00
60.00

FRP Catch Basins - 450mm x 450mm No.s 6 6.00

20.00 Smoking Zone


RCC
Bottom Slab Cum 1 18.36 0.15 2.75
Wall Cum 1 6.80 0.20 2.65 3.60
Top Slab Cum 1 18.36 0.15 2.75
9.11
Formwork
Bottom Slab Cum 1 19.00 0.15 2.85
Wall Cum 2 6.80 2.65 36.04
Top Slab Cum 1 18.36 18.36
1 19.00 0.15 2.85
60.10
150mm Block Work Sqm 1 12.20 0.42 5.18
Quarry Dust Cum 1 18.36 0.12 2.29
HDPE Sheet Sqm 1 18.36 18.36
Screed Cum 1 18.36 0.10 1.84
Plastering Sqm 2 6.80 3.00 40.80
Sqm 1 19.00 0.15 2.85
43.65
Ceiling Plastering Sqm 1 18.36 18.36
Tile Flooring TL 01/01 Sqm 1 16.50 16.50
100 Wide Band - Steel grey Rmt 1 19.00 19.00
100mm Skirting Steel Grey Rmt 1 6.80 6.80
150mm Steel Grey Band Rmt 1 12.20 12.20

Page 29 of 57
Bagmane Luxor Page 30 External Development Qty For Luxor 11-09-2019

Bagmane Luxor
BOQ - External Development Works

S.No Description Unit Colliers Qty Remarks


Total Qty South Tower North Tower

1.00 Drive way around Building

Providing and laying M30 Reinforced cement concrete with 53 grade cement,
coarse and fine aggregate conforming to IS 383, maximum size of coarse
aggregate not exceeding 25mm, , mixed in a batching and mixing plant as per
approved mix design, transported to site , including curing, finishing to lines
1.01 and grades as per drawing. incl materials, labour, Wastages, HOM, Tools & Cum 738.32 352.86 385.46
Tackles, cleaning, curing, house keeping etc., complete. all as per specifications,
directions & instructions of Engineer-in-charge. including working at all heights
with lead & lift.etc. complete. [ Excluding Reinforcement, centering, shuttering,
strutting, propping, scaffolding,staging etc - will be paid seperatly]

Providing and filling Quarry dust as per BDPL Approval, whereever as directed
1.02 etc., as per specification complete, The rate shall be including all labours,tools & Cum 1199.58 627.55 572.03
tackels,all leads & lifts,etc.complete as per directions of Engineer-in-charge.

Providing and Laying of Providing and laying HDPE sheet of 300 Micron over
compacted GSB, below Grade slab, P.C.C, Raft slab etc., to the required levels,
including supply,loading and unloading, storing, tranportation, laying, sealing of
1.03 junctions and overlaps etc.,complete, including cost of materials, labour, Sqm 7383.16 4451.99 2931.17
Wastages, HOM, Tools & Tackles, cleaning, curing, house keeping etc.,
complete. all as per specifications, directions & instructions of Engineer-in-
charge. including working at all heights with lead & lift.etc. complete.

Extra for carrying out Power floater treatment in concrete floors, well
compacted, mechanically vibrated, finished to required levels, floated with neat
cement and power trowelled with broom finish, over a leveling course,
1.04 Sqm 4396.45 1574.57 2821.88
including MS shuttering, curing etc complete. The rate shall include all labour,
material, tools, equipments, other incidental necessary to complete the work as
per the directions of Engineer in charge

Groove Cutting - Providing and making groove cutting of 8mm on Concrete floor
with minimum 1/3 of the Thickness of concrete - including cost of materials,
1.05 labour, Wastages, HOM, Tools & Tackles, cleaning, curing, house keeping etc., Rmt 4475.63 1396.45 3079.18
complete. all as per specifications, directions & instructions of Engineer-in-
charge. including working at all heights with lead & lift.etc. complete.

Fabricating & fixing in position reinforcement for RCC work with high yield
strength ribbed cold twisted tor steel (HSD) bar of various diameters and grade
of steel as specified below conforming to IS specification including cutting,
bending, hoisting, fabricating and placing in position according to drawings and
1.06 binding the reinforcement with galvanized annealed binding wire of double
fold of 18 gauge and providing PVC cover blocks for placing the reinforcements
in position and for maintaining the cover specified and/or according to relevant
IS. The rate shall be including all labours,tools & tackels,all leads &
lifts,etc.complete as per directions of incharge

Note : Unless noted otherwise the measurements in accordance with IS 1200.


However reinforcement shall be measured only in lengths of bars as actually
placed in position on standard weight basis, no allowance being made in the
weight for rolling margin. Authorized laps and splices only will be measured.
Chairs of any shape & profile, Spacer bar of any shape & profile, cover block,
wastage and binding wire will not be measured and shall be included in the
quoted rates. Quoted rate shall be deemed to have considered the above
stipulation. Quoted rate to include lead, lift, placing at all levels and as directed.

Fe 500 MT 29.53 14.11 15.42

Providing and Fixing of 40mm thk Pre Polished Steel Grey as per BDPL of
approved colour & sizes with necessary Grooves as indicated on the drawings,
fixing in cement mortar 1:4 with Cebex 112 as detailed above at all the levels
with all edges of the panels to have mirror polished as per design and detail all
complete. including cutting, sealing the joints with weather sealant of approved
1.06 colour, keeping the completed granite covered with Bubble sheet for
protection and cleaning of the same till handing over, including cost of
materials, labour, Wastages, HOM, Tools & Tackles, cleaning, curing, house
keeping etc., complete. all as per specifications, directions & instructions of
Engineer-in-charge. including working at all heights with lead & lift.etc.
complete.

a 200mm Band Rmt 916.88 450.04 466.84


b 400mm Band Sqm 188.87 57.89 130.98

2.00 Pathway around Building

Page 30 of 57
Bagmane Luxor Page 31 External Development Qty For Luxor 11-09-2019

Bagmane Luxor
BOQ - External Development Works

S.No Description Unit Colliers Qty Remarks

Providing and laying M30 Reinforced cement concrete with 53 grade cement,
coarse and fine aggregate conforming to IS 383, maximum size of coarse
aggregate not exceeding 25mm, , mixed in a batching and mixing plant as per
approved mix design, transported to site , including curing, finishing to lines
2.01 and grades as per drawing. incl materials, labour, Wastages, HOM, Tools & Cum 47.95 47.95
Tackles, cleaning, curing, house keeping etc., complete. all as per specifications,
directions & instructions of Engineer-in-charge. including working at all heights
with lead & lift.etc. complete. [ Excluding Reinforcement, centering, shuttering,
strutting, propping, scaffolding,staging etc - will be paid seperatly]

Providing and filling Quarry dust as per BDPL Approval, whereever as directed
2.02 etc., as per specification complete, The rate shall be including all labours,tools & Cum 73.29 16.93 56.36
tackels,all leads & lifts,etc.complete as per directions of Engineer-in-charge.

Providing and Laying of Providing and laying HDPE sheet of 300 Micron over
compacted GSB, below Grade slab, P.C.C, Raft slab etc., to the required levels,
including supply,loading and unloading, storing, tranportation, laying, sealing of
2.03 junctions and overlaps etc.,complete, including cost of materials, labour, Sqm 479.45 479.45
Wastages, HOM, Tools & Tackles, cleaning, curing, house keeping etc.,
complete. all as per specifications, directions & instructions of Engineer-in-
charge. including working at all heights with lead & lift.etc. complete.

Fabricating & fixing in position reinforcement for RCC work with high yield
strength ribbed cold twisted tor steel (HSD) bar of various diameters and grade
of steel as specified below conforming to IS specification including cutting,
bending, hoisting, fabricating and placing in position according to drawings and
2.04 binding the reinforcement with galvanized annealed binding wire of double
fold of 18 gauge and providing PVC cover blocks for placing the reinforcements
in position and for maintaining the cover specified and/or according to relevant
IS. The rate shall be including all labours,tools & tackels,all leads &
lifts,etc.complete as per directions of incharge

Note : Unless noted otherwise the measurements in accordance with IS 1200.


However reinforcement shall be measured only in lengths of bars as actually
placed in position on standard weight basis, no allowance being made in the
weight for rolling margin. Authorized laps and splices only will be measured.
Chairs of any shape & profile, Spacer bar of any shape & profile, cover block,
wastage and binding wire will not be measured and shall be included in the
quoted rates. Quoted rate shall be deemed to have considered the above
stipulation. Quoted rate to include lead, lift, placing at all levels and as directed.

Fe 500 MT 1.92 1.92

Providing and constructing 150mm thick Solid concrete block work in walls,
piers and architectural features at all levels using approved Solid blocks of
strength 35kg/sqcm in cement mortar 1:6 including raking of joints,curing, steel
2.05 scaffolding, staging, leads and lifts. Cost to include all leads and lifts and as Sqm 219.54 89.17 130.37
directed by Architect/Engineer in charge.
Note : The Base course should be done with 50mm gap between the blocks

Providing waterproofing Plastering , in cement mortar 1:4, 12mm thick,


finishing to line and level without lime rendering finished smooth, at all levels &
2.06 Sqm 512.25 190.95 321.31
lifts, including lead and lift of materials, applying to concrete surface,
scaffolding, curing, etc., complete. etc. ceiling

Providing and laying Screed Concrete M10 Grade using 20mm down size
aggregates 150 mm or 100 mm or 75 mm or 40mm thick on seater area etc.,
including base preparation, compaction, shuttering if necessary, curing etc.
2.06 complete. including cost of materials, labour, Wastages, HOM, Tools & Tackles, Cum 46.80 33.59 13.21
cleaning, curing, house keeping etc., complete. all as per specifications,
directions & instructions of Engineer-in-charge. including working at all heights
with lead & lift.etc. complete.

Providing and Fixing of 30mm thk Riverwash Steelgray Granite as per BDPL
Approved Granite for Walkway Infill of approved colour & sizes with necessary
grooves as indicated on the drawings, fixing in cement mortar 1:4 with Cebex
112 as detailed above at all the levels with all edges of the panels as per design
and detail all complete. including cutting, sealing the joints with weather
2.07 sealant of approved colour, keeping the completed granite covered with Sqm 625.93 284.94 340.99
Bubble sheet for protection and cleaning of the same till handing over, including
cost of materials, labour, Wastages, HOM, Tools & Tackles, cleaning, curing,
house keeping etc., complete. all as per specifications, directions & instructions
of Engineer-in-charge. including working at all heights with lead & lift.etc.
complete.

Providing and Fixing of 20mm thk Riverwash Steel Grey as per BDPL of
approved colour & sizes with necessary Grooves as indicated on the drawings,
fixing in cement mortar 1:4 with Cebex 112 as detailed above at all the levels
with all edges of the panels to have mirror polished as per design and detail all
complete. including cutting, sealing the joints with weather sealant of approved
2.08 colour, keeping the completed granite covered with Bubble sheet for
protection and cleaning of the same till handing over, including cost of
materials, labour, Wastages, HOM, Tools & Tackles, cleaning, curing, house
keeping etc., complete. all as per specifications, directions & instructions of
Engineer-in-charge. including working at all heights with lead & lift.etc.
complete.

Page 31 of 57
Bagmane Luxor Page 32 External Development Qty For Luxor 11-09-2019

Bagmane Luxor
BOQ - External Development Works

S.No Description Unit Colliers Qty Remarks


a 200mm Band Rmt 600.59 236.08 364.51

3.00 Lawn Area

Providing & Filling with aggregates of 20mm & below down graded aggregates,
whereever as directed by EIC, including watering and consolidating in 50mm
3.01 thick layer, etc., as per specification complete, The rate shall be including all Cum 198.96 107.79 91.17
labours,tools & tackels,all leads & lifts,etc.complete as per directions of
Engineer-in-charge.

Providing & Filling with Cinder as approved, whereever as directed by EIC,


including consolidating in 100mm thick layer, etc., as per specification
3.02 complete, The rate shall be including all labours,tools & tackels,all leads & Cum 361.63 207.18 154.45
lifts,etc.complete as per directions of Engineer-in-charge.

4.00 Flag Stone

Providing and laying RCC 150mm thick M20 using 20mm down size aggregates
150 mm or 100 mm or 75 mm or 40mm thick below raft, flooring, SSM ,
retaining wall , UG sump, STP, Grade slab etc., including base preparation,
4.01 compaction, shuttering if necessary, curing etc. complete. including cost of Cum 57.08 36.41 20.67
materials, labour, Wastages, HOM, Tools & Tackles, cleaning, curing, house
keeping etc., complete. all as per specifications, directions & instructions of
Engineer-in-charge. including working at all heights with lead & lift.etc.
complete.

Providing and Fixing of 60mm thk Flag Stone shot blasted as per BDPL
Approved for Pathway Infill of approved colour & sizes as indicated on the
drawings, fixing in cement mortar 1:4 with Cebex 112 as detailed above at all
the levels with all edges of the panels as per design and detail all complete.
including cutting, sealing the joints with weather sealant of approved colour,
4.02 Sqm 282.37 144.59 137.78
keeping the completed granite covered with Bubble sheet for protection and
cleaning of the same till handing over, including cost of materials, labour,
Wastages, HOM, Tools & Tackles, cleaning, curing, house keeping etc.,
complete. all as per specifications, directions & instructions of Engineer-in-
charge. including working at all heights with lead & lift.etc. complete.

Providing and laying of 30mm thk. Riverwash Steel gray Granite slab for
driveway in panel @ LEDGE / Sill and other area as specied by Client /
Architect., sizes as indicated in the drawings and as per BDPL Approval, set in
cement mortar 1:4 . The rate quoted shall including making holes for grill fixing,
The joints are finished / pointing neatly with pigment to match the colour of
4.03 stone, keeping the completed granite covered with Plaster of Paris for Sqm 98.18 98.18
protection and cleaning of the same till handing over, including cost of
materials, labour, Wastages, HOM, Tools & Tackles, cleaning, curing, house
keeping etc., complete. all as per specifications, directions & instructions of
Engineer-in-charge. including working at all heights with lead & lift.etc.
complete.

5.00 Middle plaza

Extra for carrying out Power floater treatment in concrete floors, well
compacted, mechanically vibrated, finished to required levels, floated with neat
cement and power trowelled with broom finish, over a leveling course,
5.01 Sqm 420.28 420.28
including MS shuttering, curing etc complete. The rate shall include all labour,
material, tools, equipments, other incidental necessary to complete the work as
per the directions of Engineer in charge

Providing and Fixing of 20mm thk Polished Steel Grey Granite as per BDPL of
approved colour & sizes with necessary Grooves as indicated on the drawings,
fixing in cement mortar 1:4 with Cebex 112 as detailed above at all the levels
with all edges of the panels to have mirror polished as per design and detail all
complete. including cutting, sealing the joints with weather sealant of approved
5.02 colour, keeping the completed granite covered with Bubble sheet for
protection and cleaning of the same till handing over, including cost of
materials, labour, Wastages, HOM, Tools & Tackles, cleaning, curing, house
keeping etc., complete. all as per specifications, directions & instructions of
Engineer-in-charge. including working at all heights with lead & lift.etc.
complete.

a 200mm Band Rmt 433.59 433.59

6.00 Planter Cum Seaters

Providing and constructing 150mm thick Solid concrete block work in walls,
piers and architectural features at all levels using approved Solid blocks of
6.01 strength 35kg/sqcm in cement mortar 1:6 including raking of joints,curing, steel Sqm 104.00 59.98 44.03
scaffolding, staging, leads and lifts. Cost to include all leads and lifts and as
directed by Architect/Engineer in charge.
Note : The Base course should be done with 50mm gap between the blocks

Page 32 of 57
Bagmane Luxor Page 33 External Development Qty For Luxor 11-09-2019

Bagmane Luxor
BOQ - External Development Works

S.No Description Unit Colliers Qty Remarks

Providing waterproof plastering to Seater wall , in cement mortar 1:4, 12mm


thick, finishing to line and level without lime rendering finished smooth, at all
6.02 Sqm 104.00 59.98 44.03
levels & lifts, including lead and lift of materials, applying to concrete surface,
scaffolding, curing, etc., complete. etc. ceiling

Providing and laying of 30mm thk. Riverwash Steel gray Granite slab for coping
in panel @ LEDGE / Sill and other area as specied by Client / Architect., sizes as
indicated in the drawings and as per BDPL Approval, set in cement mortar 1:4
with necessary Chamfering and Edge polishing. The rate quoted shall including
making holes for grill fixing, The joints are finished / pointing neatly with
6.03 pigment to match the colour of stone, keeping the completed granite covered
with Plaster of Paris for protection and cleaning of the same till handing over,
including cost of materials, labour, Wastages, HOM, Tools & Tackles, cleaning,
curing, house keeping etc., complete. all as per specifications, directions &
instructions of Engineer-in-charge. including working at all heights with lead &
lift.etc. complete.

Coping Less than 300mm Rmt 1939.02 861.95 1077.07


Coping Sqm 180.02 126.20 53.82

Providing and laying of 20mm THK GRANITE Cladding in panel sizes as indicated
on the drawings in cement mortar 1:4 as detailed above at all the levels with all
edges of the panels to have mirror polished as per design with necessary
Groove cutting and detail all complete. including clamp, pins, anchor fasteners,
drilling , cutting, necessary scaffolding etc, sealing the joints with weather
6.04 sealant of approved colour, keeping the completed granite covered with
Bubble sheet for protection and cleaning of the same till handing over, including
cost of materials, labour, Wastages, HOM, Tools & Tackles, cleaning, curing,
house keeping etc., complete. all as per specifications, directions & instructions
of Engineer-in-charge. including working at all heights with lead & lift.etc.
complete.

Cladding Less than 300mm Rmt 677.15 229.94 447.21


Cladding Sqm 359.71 152.34 207.37

Providing and laying of 20mm THK Riverwash Steel Grey Granite Skirting of
100mm height in cement mortar 1:4 as detailed above at all the levels with all
edges to have Chamfered & mirror polished as per design with necessary
Groove cutting and detail all complete. including clamp, pins, anchor fasteners,
drilling , cutting, necessary scaffolding etc, sealing the joints with weather
6.05 sealant of approved colour, keeping the completed granite covered with Rmt 2126.23 622.99 1503.24
Bubble sheet for protection and cleaning of the same till handing over, including
cost of materials, labour, Wastages, HOM, Tools & Tackles, cleaning, curing,
house keeping etc., complete. all as per specifications, directions & instructions
of Engineer-in-charge. including working at all heights with lead & lift.etc.
complete.

Plaster Painting:Exterior Emulsion


Providing and applying for External surfaces with 2 coat of putty and 1 coat of
exterior grade primer and 2 coats of Exterior Emulsion Paint with necessary
6.06 surface preparation etc., complete, with necessary scaffolding, Curing, etc., Sqm 1793.41 745.54 1047.87
complete as per manufacturers specification and as per the instructions of the
Engineer in charge at site. External Works Location :- For outside planter wall
and Ramp wall.

Texture Painting: Painting for plastered surface in texture paint finish of


6.07 approved shade and make and as per manufacturer specification, cost including Sqm 1006.42 507.76 498.66
all materials at site, all labor charges and other necessary charges to complete

7.00 Waterbody and Cascade wall

Providing and laying of 20mm thk. POlished Steel gray Granite slab for coping
in panel @ LEDGE / Sill and other area as specied by Client / Architect., sizes as
indicated in the drawings and as per BDPL Approval, set in cement mortar 1:4
with necessary Chamfering and Edge polishing. The rate quoted shall including
making holes for grill fixing, The joints are finished / pointing neatly with
7.01 pigment to match the colour of stone, keeping the completed granite covered
with Plaster of Paris for protection and cleaning of the same till handing over,
including cost of materials, labour, Wastages, HOM, Tools & Tackles, cleaning,
curing, house keeping etc., complete. all as per specifications, directions &
instructions of Engineer-in-charge. including working at all heights with lead &
lift.etc. complete.

Coping Rmt 47.93 47.93

Providing and laying of 30mm thk. Riverwash Steel gray Granite slab for coping
in panel @ LEDGE / Sill and other area as specied by Client / Architect., sizes as
indicated in the drawings and as per BDPL Approval, set in cement mortar 1:4
with necessary Chamfering and Edge polishing. The rate quoted shall including
making holes for grill fixing, The joints are finished / pointing neatly with
7.02 pigment to match the colour of stone, keeping the completed granite covered
with Plaster of Paris for protection and cleaning of the same till handing over,
including cost of materials, labour, Wastages, HOM, Tools & Tackles, cleaning,
curing, house keeping etc., complete. all as per specifications, directions &
instructions of Engineer-in-charge. including working at all heights with lead &
lift.etc. complete.

Coping Rmt 8.09 8.09

Page 33 of 57
Bagmane Luxor Page 34 External Development Qty For Luxor 11-09-2019

Bagmane Luxor
BOQ - External Development Works

S.No Description Unit Colliers Qty Remarks

Providing and laying of 20mm thk. Polished Steel gray Granite slab for Base in
panel @ LEDGE / Sill and other area as specied by Client / Architect., sizes as
indicated in the drawings and as per BDPL Approval, set in cement mortar 1:4
with necessary Chamfering and Edge polishing. The rate quoted shall including
making holes for grill fixing, The joints are finished / pointing neatly with
7.03 pigment to match the colour of stone, keeping the completed granite covered
with Plaster of Paris for protection and cleaning of the same till handing over,
including cost of materials, labour, Wastages, HOM, Tools & Tackles, cleaning,
curing, house keeping etc., complete. all as per specifications, directions &
instructions of Engineer-in-charge. including working at all heights with lead &
lift.etc. complete. (Location:cascade steps and waterbody base)

Base Sqm 2.00 2.00

Providing and laying of 6mm thk. Bizzasa Tile for Base in panel @ LEDGE / Sill
and other area as specied by Client / Architect., sizes as indicated in the
drawings and as per BDPL Approval, set in cement mortar 1:4 with necessary
Chamfering and Edge polishing. The rate quoted shall including making holes
for grill fixing, The joints are finished / pointing neatly with pigment to match
7.04 the colour of stone, keeping the completed granite covered with Plaster of Paris
for protection and cleaning of the same till handing over, including cost of
materials, labour, Wastages, HOM, Tools & Tackles, cleaning, curing, house
keeping etc., complete. all as per specifications, directions & instructions of
Engineer-in-charge. including working at all heights with lead & lift.etc.
complete.

Base Sqm 98.13 98.13

Providing and laying of 40mm THK STEEL GRAY SARRATED GRANITE Cladding in
panel sizes as indicated on the drawings in cement mortar 1:4 as detailed above
at all the levels with all edges of the panels to have mirror polished as per
design with necessary Groove cutting and detail all complete. including clamp,
pins, anchor fasteners, drilling , cutting, necessary scaffolding etc, sealing the
7.05 joints with weather sealant of approved colour, keeping the completed granite
covered with Bubble sheet for protection and cleaning of the same till handing
over, including cost of materials, labour, Wastages, HOM, Tools & Tackles,
cleaning, curing, house keeping etc., complete. all as per specifications,
directions & instructions of Engineer-in-charge. including working at all heights
with lead & lift.etc. complete.

Cladding Sqm 98.53 98.53

Providing and laying of Cladding inside the waterbody in panel sizes as


indicated on the drawings in cement mortar 1:4 as detailed above at all the
levels with all edges of the panels to have mirror polished as per design with
necessary Groove cutting and detail all complete. including clamp, pins, anchor
fasteners, drilling , cutting, necessary scaffolding etc, sealing the joints with
7.06 weather sealant of approved colour, keeping the completed granite covered
with Bubble sheet for protection and cleaning of the same till handing over,
including cost of materials, labour, Wastages, HOM, Tools & Tackles, cleaning,
curing, house keeping etc., complete. all as per specifications, directions &
instructions of Engineer-in-charge. including working at all heights with lead &
lift.etc. complete.

Cladding Inside 6mm Thick Bizzasa Tile (upto water Level) Sqm 50.48 50.48
Cladding Outside 20mm thick Riverwash steel Gray Granite ( Above water Level) Sqm 11.51 11.51

Providing and Fixing of 20mm thk Polished Steel Grey Granite as per BDPL of
approved colour & sizes with necessary Grooves as indicated on the drawings,
fixing in cement mortar 1:4 with Cebex 112 as detailed above at all the levels
with all edges of the panels to have mirror polished as per design and detail all
complete. including cutting, sealing the joints with weather sealant of approved
7.07 colour, keeping the completed granite covered with Bubble sheet for
protection and cleaning of the same till handing over, including cost of
materials, labour, Wastages, HOM, Tools & Tackles, cleaning, curing, house
keeping etc., complete. all as per specifications, directions & instructions of
Engineer-in-charge. including working at all heights with lead & lift.etc.
complete.

a 200mm Band Rmt 24.55 24.55


Fabrication : Providing, fabricating, handling and erecting Structural steel
members in position as specified in the drawings made out of standard MS
sections conforming to IS 226/2062/800 for Inserts, Trusses, Stairs, Trench
covers etc. Cost to include fabricating necessary Gusset Plates, Stiffener plates,
Brackets, Bolts, Cleats, seating angle, Chequered plates etc., to the required
size, shape, alignment etc., complete as per the drawings. Cost to include
7.08 welding of members using structural steel welding electrodes as per IS MT 8.31 3.33 4.97
814/816/817, a coat of anti corrosive primer (non flammable ) to the exposed
surfaces & two coats of approved enamel paint, testing as per IS 7307 (PART1),
necessary equipment, tools and tackles, shuttering, staging, scaffolding required
etc., complete all as per design, details, drawings, specifications etc. with all
lead & lift for all materials & labour and as directed, at all heights & locations.

8.00 Pedestrian Ramp and arrival Plaza

Page 34 of 57
Bagmane Luxor Page 35 External Development Qty For Luxor 11-09-2019

Bagmane Luxor
BOQ - External Development Works

S.No Description Unit Colliers Qty Remarks

Providing and laying 20mm thk sira Gray Leather Finish of BDPL Approved, for
Flooring and Steps (at all levels) fixed over a bed of 20mm thick CM 1:4
inclusive of joints are finished / pointing neatly with pigment to match the
colour of stone, making holes for grill fixing, curing etc., complete at all levels, as
8.01
per drawings. including cost of materials, labour, Wastages, HOM, Tools &
Tackles, cleaning, curing, house keeping etc., complete. all as per specifications,
directions & instructions of Engineer-in-charge. including working at all heights
with lead & lift.etc. complete.

a Treads with 3no.s Anti skid Grooves, Chamfering & Chamfering and Edge polishin Sqm 145.11 145.11
b Risers - Rmt 318.63 318.63
c Landing & Flooring Sqm 231.60 231.60

Providing and laying of 20mm thk. Polished Steel gray Granite slab for Base in
panel @ LEDGE / Sill and other area as specied by Client / Architect., sizes as
indicated in the drawings and as per BDPL Approval, set in cement mortar 1:4
with necessary Chamfering and Edge polishing. The rate quoted shall including
making holes for grill fixing, The joints are finished / pointing neatly with
8.02 pigment to match the colour of stone, keeping the completed granite covered
with Plaster of Paris for protection and cleaning of the same till handing over,
including cost of materials, labour, Wastages, HOM, Tools & Tackles, cleaning,
curing, house keeping etc., complete. all as per specifications, directions &
instructions of Engineer-in-charge. including working at all heights with lead &
lift.etc. complete. (Location:cascade steps )

Treads with 3no.s Anti skid Grooves, Chamfering & Chamfering and Edge
Sqm 14.18 14.18
polishing
Risers - Rmt 63.00 63.00

Providing and laying of 30mm thk. Riverwash Steel gray Granite slab for coping
in panel @ LEDGE / Sill and other area as specied by Client / Architect., sizes as
indicated in the drawings and as per BDPL Approval, set in cement mortar 1:4
with necessary Chamfering and Edge polishing. The rate quoted shall including
making holes for grill fixing, The joints are finished / pointing neatly with
8.03 pigment to match the colour of stone, keeping the completed granite covered
with Plaster of Paris for protection and cleaning of the same till handing over,
including cost of materials, labour, Wastages, HOM, Tools & Tackles, cleaning,
curing, house keeping etc., complete. all as per specifications, directions &
instructions of Engineer-in-charge. including working at all heights with lead &
lift.etc. complete.

Coping Sqm 8.83 8.83

Texture Painting: Painting for plastered surface in texture paint finish of


8.04 approved shade and make and as per manufacturer specification, cost including Sqm 58.06 58.06
all materials at site, all labor charges and other necessary charges to complete

Providing and Fixing of 20mm thk Polished Steel Grey Granite as per BDPL of
approved colour & sizes with necessary Grooves as indicated on the drawings,
fixing in cement mortar 1:4 with Cebex 112 as detailed above at all the levels
with all edges of the panels to have mirror polished as per design and detail all
complete. including cutting, sealing the joints with weather sealant of approved
8.05 colour, keeping the completed granite covered with Bubble sheet for
protection and cleaning of the same till handing over, including cost of
materials, labour, Wastages, HOM, Tools & Tackles, cleaning, curing, house
keeping etc., complete. all as per specifications, directions & instructions of
Engineer-in-charge. including working at all heights with lead & lift.etc.
complete.

a 200mm Band Rmt 17.43 17.43

Providing and Fixing of 20mm thk sira Gray Leather Finish as per BDPL for
walkway Infill including cutting, sealing the joints with weather sealant of
approved colour, keeping the completed granite covered with Bubble sheet for
protection and cleaning of the same till handing over, including cost of
8.06 materials, labour, Wastages, HOM, Tools & Tackles, cleaning, curing, house Sqm 67.69 67.69
keeping etc., complete. all as per specifications, directions & instructions of
Engineer-in-charge. including working at all heights with lead & lift.etc.
complete.

9.00 Aco Drain


Supply and installation of drain made of Polymer Concrete Channel body DIN EN
1433 with boltless drainlock®, V-profile, zero water absorption, excellent
surface smoothness with integrated edge protection in cast iron/galvanised
steel/stainless steel, with ACO DRAIN safety groove (SF), tongue and groove
joints, with built-in slopes; With integrated lip labyrinth sealing for liquid-tight
connection to ground line, with lateral pre-shapes for corner-, T- and cross
9.01 connections, universal front wall, with edge protection; internal width 150mm Rmt 623.06 226.46 396.60
depth as per design.
For external driveway

10.00 Pergola

Page 35 of 57
Bagmane Luxor Page 36 External Development Qty For Luxor 11-09-2019

Bagmane Luxor
BOQ - External Development Works

S.No Description Unit Colliers Qty Remarks

Providing and laying M 20 Reinforced cement concrete with 53 grade cement,


coarse and fine aggregate conforming to IS 383, maximum size of coarse
aggregate not exceeding 25mm, , mixed in a batching and mixing plant as per
approved mix design, transported to site , including curing, finishing to lines
10.01 and grades as per drawing. incl materials, labour, Wastages, HOM, Tools &
Tackles, cleaning, curing, house keeping etc., complete. all as per specifications,
directions & instructions of Engineer-in-charge. including working at all heights
with lead & lift.etc. complete. [ Excluding Reinforcement, centering, shuttering,
strutting, propping, scaffolding,staging etc - will be paid seperatly]

a Footing Cum 2.49 0.76 1.74

Formwork – Providing centring, shuttering, strutting, propping, scaffolding,


staging etc., and removal of formwork for vertical surfaces such as wall at any
10.02 thickness, including cost of all materials, labour, equipment, tools & tackles, all
leads and lift etc. all complete as per the specification and directions of EIC.

a Footing Sqm 16.63 5.04 11.59

Fabricating & fixing in position reinforcement for RCC work with high yield
strength ribbed cold twisted tor steel (HSD) bar of various diameters and grade
of steel as specified below conforming to IS specification including cutting,
bending, hoisting, fabricating and placing in position according to drawings and
10.03 binding the reinforcement with galvanized annealed binding wire of double
fold of 18 gauge and providing PVC cover blocks for placing the reinforcements
in position and for maintaining the cover specified and/or according to relevant
IS. The rate shall be including all labours,tools & tackels,all leads &
lifts,etc.complete as per directions of incharge

Note : Unless noted otherwise the measurements in accordance with IS 1200.


However reinforcement shall be measured only in lengths of bars as actually
placed in position on standard weight basis, no allowance being made in the
weight for rolling margin. Authorized laps and splices only will be measured.
Chairs of any shape & profile, Spacer bar of any shape & profile, cover block,
wastage and binding wire will not be measured and shall be included in the
quoted rates. Quoted rate shall be deemed to have considered the above
stipulation. Quoted rate to include lead, lift, placing at all levels and as directed.

Fe 500 MT 0.37 0.11 0.26


10.04 Chemical Anchoring- 16mm Dia Nos 139.00 42.00 97
11.00 Light Pole
Providing and laying M 30 Reinforced cement concrete Size of
11.01
450*450*450mm
a Footing Nos 67.00 67.00

Providing and laying of 20mm thk. POlished Steel gray Granite slab for coping
in panel @ LEDGE / Sill and other area as specied by Client / Architect., sizes as
indicated in the drawings and as per BDPL Approval, set in cement mortar 1:4
with necessary Chamfering and Edge polishing. The rate quoted shall including
making holes for grill fixing, The joints are finished / pointing neatly with
11.02 pigment to match the colour of stone, keeping the completed granite covered
with Plaster of Paris for protection and cleaning of the same till handing over,
including cost of materials, labour, Wastages, HOM, Tools & Tackles, cleaning,
curing, house keeping etc., complete. all as per specifications, directions &
instructions of Engineer-in-charge. including working at all heights with lead &
lift.etc. complete.

Coping Sqm 11.26 11.26

Providing and laying of 20mm thk. POlished Steel gray Granite Cladding in
panel sizes as indicated on the drawings in cement mortar 1:4 as detailed above
at all the levels with all edges of the panels to have mirror polished as per
design with necessary Groove cutting and detail all complete. including clamp,
pins, anchor fasteners, drilling , cutting, necessary scaffolding etc, sealing the
11.03 joints with weather sealant of approved colour, keeping the completed granite
covered with Bubble sheet for protection and cleaning of the same till handing
over, including cost of materials, labour, Wastages, HOM, Tools & Tackles,
cleaning, curing, house keeping etc., complete. all as per specifications,
directions & instructions of Engineer-in-charge. including working at all heights
with lead & lift.etc. complete.

Cladding Sqm 50.65 50.65


11.04 Chemical Anchoring- 16mm Dia Nos 281.40 281
12.00 Miscallaneous Works

Supply,Fabrication,erection and installation of SS 304 grade stainless steel


12.01 handrail as per detailed drawings. The rate shall be including all labours,tools & Rmt 40.38 40.38
tackels,all leads & lifts,etc.complete as per directions of Engineer-in-charge.

Supply,Fabrication,erection and installation of SS 304 grade stainless steel


12.02 handrail as per detailed drawings. The rate shall be including all labours,tools & Sqmt 18.29 18.29
tackels,all leads & lifts,etc.complete as per directions of Engineer-in-charge.

SS wire work: Supply & fixing of 4mmØ - 316 grade Stainless steel flexible type
12.03 wire as per dwg & spec, cost including all materials to site, all labour charges Rmt 4660.07 4660.07
and other necessary charges to complete

Page 36 of 57
Bagmane Luxor Page 37 External Development Qty For Luxor 11-09-2019

Bagmane Luxor
BOQ - External Development Works

S.No Description Unit Colliers Qty Remarks

SS Brackets: Supplying and fixing of 316 grade Stainless steel brackets as per
12.04 landscape Arcts spec & detail, cost including all materials at site, all labour Nos 3507.00 3507.00
charges and other necessary charges to complete

Supplying, fabricating, delivering at site, hoisting and fixing in position and


making all structural steel work in accordance with the design drawings
prepared by the consultants. The structural steel work shall include welded and
12.05 built up sections, trusses, built-up work shall include welded and built up MT 5.08 5.08
sections, trusses, built-up purlins, frame work welded and/or bolted, girders,
gusset plates, base plates, cleats etc., as per drawings. The rate shall include
two coat of Zinc ridge epoxy primer and shall include bolts, washers, 1:3 cement
and grouting for bolts etc.complete.

EPOXY COATING: Supply and applying of a Bostik Moisture seal waterproof


epoxy coating, which shall be applied to the concrete minimum thickness of 0.5
mm, for services rooms application after cleaning the surface of lumps, potting
etc., and clearing the surface of loose particles by using a vacuum assisted shot
12.06 blasting machine or scarifying. The cleaned/prepared surface shall be provided Sqmt 1148.21 644.67 503.54
with 2 coats of priming coat. The prepared sub-strata shall be applied with
approved epoxy coating. Application of coating shall only be carried out by an
approved specialist applicator. Quoted price shall include making good of any
potholes or undulation. Make shall be of fosroc or approved equivalent make.
Consider -0.3kg/Sqmt

Providing and laying Screed Concrete M20 Grade using 20mm down size
aggregates 150 mm or 100 mm or 75 mm or 40mm thick on podium etc.,
including base preparation, compaction, shuttering if necessary, curing etc.
12.07 complete. including cost of materials, labour, Wastages, HOM, Tools & Tackles, Cum 274.56 159.55 115.01
cleaning, curing, house keeping etc., complete. all as per specifications,
directions & instructions of Engineer-in-charge. including working at all heights
with lead & lift.etc. complete.

Note:
5% Buffer Qty is consider for all activities
Reinforcement 4kg/Sqm is consider for pathway and Drive way

Page 37 of 57
PROJECT: BAGMANE LUXOR
SUMMARY SHEET

Sl no Description Unit Material Code Qty Remarks


1 Drive way
Quarry Dust cum 572.03
HDPE Sheet Sqm 2,931.17
RCC Concrete cum 385.46
Groove cutting Rmt 3,079.18
Reinforcement MT 15.42
Band
400mm Sqm GR-02/02- 30MM THICK 130.98
POLISHED STEEL GREY GRANITE
200mm Rmt 466.84
Infill Power float Treatment Sqm PV-01/01-100MM BROOM 2,821.88
FINISHED CONCRETE

2 Path way
Quarry Dust cum 56.36
HDPE Sheet Sqm 479.45
RCC Concrete cum 47.95
Reinforcement MT 1.92
150mm Blockwork sqm 130.37
waterproofing Plastering for
sqm 321.31
Seater Blockwork
Screed concrete Cum 13.21
Band

GR-01/01-20MM THICK
200mm Rmt RIVERWASH STEEL GREY 364.51
GRANITE.
GR-02/02- 30MM THICK
Infill Sqm RIVERWASH STEEL GRAY 340.99
GRANITE

3 Lawn area
Cinder cum 154.45
Aggregate cum 91.17
Screed for sloping rectification cum 115.01
4 Flagstone
RCC Concrete cum 20.67

5 Middle Plaza

GR-01/02- 20MM THICK


Band Rmt 433.59
POLISHED STEEL GREY GRANITE

PV-01/01-100MM BROOM
Infill Power float Treatment Sqm 420.28
FINISHED CONCRETE

Page 38 of 57
PROJECT: BAGMANE LUXOR
SUMMARY SHEET

Sl no Description Unit Material Code Qty Remarks


6 Flag stone Sqm GR-01/04- 60MM thick Flag Stone 137.78
Planter wall in podium
GR-02/01- 30MM THICK
Coping Rmt RIVERWASH STEEL GRAY 863.56
GRANITE
GR-02/01- 30MM THICK
Coping Sqmt RIVERWASH STEEL GRAY 49.85
GRANITE
GR-01/01-20MM THICK
Cladding Sqmt RIVERWASH STEEL GREY 185.15
GRANITE.
GR-01/01-20MM THICK
Cladding Rmt RIVERWASH STEEL GREY 410.14
GRANITE.
GR-01/01-20MM THICK
Skirting Rmt RIVERWASH STEEL GREY 1,296.57
GRANITE.
Texture Paint Sqmt TP-01/01-TEXTURE PAINT 498.66
Plaster Paint Sqmt PT-01/01- PLASTER PAINT 895.37
150mm Blockwork Sqmt 44.03
waterproofing Plastering for
Sqmt 44.03
Seater Blockwork
7 Planter wall outside
GR-02/01- 30MM THICK
Coping Rmt RIVERWASH STEEL GRAY 131.46
GRANITE
Cladding Sqmt PT-01/01- PLASTER PAINT 152.49
GR-01/01-20MM THICK
Skirting Rmt RIVERWASH STEEL GREY 130.83
GRANITE.
8 Drain
Aco Drain Rmt 396.60
9 Trellis

GR-02/01- 30MM THICK


Coping Rmt RIVERWASH STEEL GRAY 82.05
GRANITE
GR-01/01-20MM THICK
Cladding Rmt RIVERWASH STEEL GREY 37.07
GRANITE.
GR-01/01-20MM THICK
Cladding Sqmt RIVERWASH STEEL GREY 22.22
GRANITE.
GR-01/01-20MM THICK
Skirting Rmt RIVERWASH STEEL GREY 75.84
GRANITE.

Page 39 of 57
PROJECT: BAGMANE LUXOR
SUMMARY SHEET

Sl no Description Unit Material Code Qty Remarks


10 Pedestrian Ramp

GR-02/01- 30MM THICK


Coping Sqmt RIVERWASH STEEL GRAY 8.83
GRANITE
Cladding Sqmt TP-01/01-TEXTURE PAINT 58.06
Band Rmt GR-01/02- 20MM THICK 17.43
POLISHED STEEL GREY GRANITE
Infill Sqmt PV-01/02- 20MM THICK SIRA 67.69
GRAY LEATHER FINISH
11 Pergola
Footing concrete Cum 1.74
Footing Shuttering Sqmt 11.59
Column KG 199.20
Lower Beam KG 1,401.91
Primary Beam KG 1,589.47
Upper Beam KG 1,445.71
Aluminium channel or wooden
KG 335.81
Members

GR-02/01- 30MM THICK


Seater Top material Sqmt RIVERWASH STEEL GRAY 3.97
GRANITE
SS wire Rmt 4,660.07
SS Bracket Nos 3,507
MS Support for SS wire Angle at
KG 2,620.46
Top
MS Support for SS wire Channel
KG 2,461.07
at Bottom
12 Light pole
Footing NOs 67.00

GR-01/02- 20MM THICK


Coping Sqmt 11.26
POLISHED STEEL GREY GRANITE

GR-01/02- 20MM THICK


Cladding Sqmt 50.65
POLISHED STEEL GREY GRANITE

Page 40 of 57
PROJECT: BAGMANE LUXOR
EXTERNAL DEVELOPMENT WORKS

LEGEND: PAVING FINISH TEXTURE PAINT


PV-01/01-100MM BROOM FINISHED CONCRETE TR-01/01-TEXTURE PAINT
PV-01/02- 20MM THICK KOTA STONE PT-01/01- PLASTER PAINT
PV-01/03- 75MM THICK INTERLOCKING STONE
GRANITE FINISH MILD STEEL
GR-01/01-20MM THICK RIVERWASH STEEL GREY
MS-01/01-MILD STEEL
GRANITE.
GR-02/01- 30MM THICK RIVERWASH STEEL GRAY
GRANITE

GR-01/02- 20MM THICK POLISHED STEEL GREY GRANITE

GR-02/02- 30MM THICK POLISHED STEEL GREY GRANITE

GR-01/03- 6MM BIZZASA TILE

GR-01/04-60MM THICK FLAG STONE

GR-02/04- 40MM THICK STEEL GREY SARRATED GRANITE

5%

Sl no Description Material Unit Nos L B D Qty Qty+5% Buffer Remarks

1 Quarry Dust

1.1 Driveway Location in all Podium


Arrival Plaza 1 72.74 0.1 7.274
1 806.67 0.1 80.667
Central/Middle Plaza & North Plaza 1 1176 0.16 188.16
1 358.58 0.16 57.3728
1 662.49 0.16 105.9984
1 610.36 0.16 97.6576
Deduct Planter area -1 15.84 0.16 -2.5344
Difference in Granite thickness for
1 347.15 0.02 6.943
20mm granite
Difference in Granite thickness for
1 324.75 0.01 3.2475
10mm granite

544.7859 572.03

1.2 Pathway Location in all Podium

North Block @ Arrival plaza Grid M2


Cum 1 456.62 0.09 41.0958
to G
seater Cum
8 0.3 0.3 0.7 0.504
2 1.3 0.3 0.7 0.546
4 0.3 0.3 0.7 0.252
13 2 0.3 0.7 5.46
1 4 0.3 0.7 0.84
2 5.25 0.3 0.7 2.205
1 2 0.3 0.7 0.42
1 5.5 0.3 0.7 1.155
2 2.1 0.3 0.7 0.882
1 1.5 0.3 0.7 0.315

53.6748 56.36

2 HDPE Sheet 300 Micron

2.1 Driveway Location in all Podium

Central/Middle Plaza & North Plaza 1 1176 1176


1 358.58 358.58
1 662.49 662.49
1 610.36 610.36
Deduct Planter area -1 15.84 -15.84

2791.59 2931.17
2.2 Pathway Location in all Podium

North Block @ Arrival plaza Grid M2


Sqm 1 456.62 456.62
to G

456.62 479.45

3 RCC concrete

3.1 Driveway Location in all Podium


Reinforcement Calculation
Arrival Plaza Cum 1 72.74 0.1 7.274 72.74
1 806.67 0.1 80.667 806.67

Page 41 OF 57
Sl no Description Material Unit Nos L B D Qty Qty+5% Buffer Remarks

Central/Middle Plaza & North Plaza 1 1176 0.1 117.6 1176


1 358.58 0.1 35.858 358.58
1 662.49 0.1 66.249 662.49
1 610.36 0.1 61.036 610.36
Deduct Planter area -1 15.84 0.1 -1.584 -15.84

367.1 385.46 3671 14.684


3.2 Pathway Location in all Podium

North Block @ Arrival plaza Grid M2 Sqm 1 456.62 0.1 45.662 456.62
to G
456.62 1.82648
45.662 47.95 18

3.3 Below Flag Stone


North Block 243 0.6 0.9 0.15 19.683

Cum 19.683 20.67

4 Aggregate

4.1

North Block area surrounding 1 684.82 0.05 34.241


1 190.36 0.05 9.518
-1 160.88 0.05 -8.044
-1 33.33 0.05 -1.6665
Central/Middle Plaza 1 65.93 0.05 3.2965
1 269.67 0.05 13.4835
1 72.26 0.05 3.613
1 87.98 0.05 4.399
-1 184.93 0.05 -9.2465
Deduct Planter area -1 28.38 0.05 -1.419

Arrival Plaza 1 84.75 0.05 4.2375


1 37.25 0.05 1.8625
1 17.9 0.05 0.895
1 31 0.05 1.55
Planter Box at North Side 2 100 0.05 10
Planter Box North Block 1 13.63 0.05 0.6815
1 19.29 0.05 0.9645
1 67 0.05 3.35
1 40.81 0.05 2.0405
1 26.79 0.05 1.3395
Mount-1 1 184.93 0.05 9.2465
Mount-2 1 28.38 0.05 1.419
Mount-3 1 21.43 0.05 1.0715

Cum 86.833 91.17


5 Screed for slope rectification

5.1
North Block area surrounding 1 684.82 0.08 54.7856
1 190.36 0.08 15.2288
-1 160.88 0.08 -12.8704
-1 33.33 0.08 -2.6664
Central/Middle Plaza 1 65.93 0.08 5.2744
1 269.67 0.08 21.5736
1 72.26 0.08 5.7808
1 87.98 0.08 7.0384
-1 184.93 0.08 -14.7944
Deduct Planter area -1 28.38 0.08 -2.2704

Arrival Plaza 1 84.75 0.08 6.78


1 37.25 0.08 2.98
1 17.9 0.08 1.432
1 31 0.08 2.48
Mount-1 1 184.93 0.08 14.7944
Mount-2 1 28.38 0.08 2.2704
Mount-3 1 21.43 0.08 1.7144

Cum 109.5312 115.01

6 Cinder

6.1
North Block area surrounding 1 684.82 0.1 68.482
1 190.36 0.1 19.036
-1 160.88 0.1 -16.088
-1 33.33 0.1 -3.333
Central/Middle Plaza 1 65.93 0.1 6.593
1 269.67 0.1 26.967
1 72.26 0.1 7.226
1 87.98 0.1 8.798
-1 184.93 0.1 -18.493

Page 42 OF 57
Sl no Description Material Unit Nos L B D Qty Qty+5% Buffer Remarks

Deduct Planter area -1 28.38 0.1 -2.838

Arrival Plaza 1 84.75 0.1 8.475


1 37.25 0.1 3.725
1 17.9 0.1 1.79
Planter Box at North Side 2 100 0.1 20
Planter Box North Block 1 13.63 0.1 1.363
1 19.29 0.1 1.929
1 67 0.1 6.7
1 40.81 0.1 4.081
1 26.79 0.1 2.679

Cum 147.092 154.45


7 GeoFabric 150 GSM

North Block area surrounding 1 684.82 684.82


1 190.36 190.36
-1 160.88 -160.88
-1 33.33 -33.33
Central/Middle Plaza 1 65.93 65.93
1 269.67 269.67
1 72.26 72.26
1 87.98 87.98
-1 184.93 -184.93
Deduct Planter area -1 28.38 -28.38

Arrival Plaza 1 84.75 84.75


1 37.25 37.25
1 17.9 17.9
Planter Box at North Side 2 100 200
Planter Box North Block 1 13.63 13.63
1 19.29 19.29
1 67 67
1 40.81 40.81
1 26.79 26.79

Sqm 1470.92 1544.47

8 50mm Sand Filling

North Block area surrounding 1 684.82 0.05 34.241


1 190.36 0.05 9.518
-1 160.88 0.05 -8.044
-1 33.33 0.05 -1.6665
Central/Middle Plaza 1 65.93 0.05 3.2965
1 269.67 0.05 13.4835
1 72.26 0.05 3.613
1 87.98 0.05 4.399
-1 184.93 0.05 -9.2465
Deduct Planter area -1 28.38 0.05 -1.419

Arrival Plaza 1 84.75 0.05 4.2375


1 37.25 0.05 1.8625
1 17.9 0.05 0.895
Planter Box at North Side 2 100 0.05 10
Planter Box North Block 1 13.63 0.05 0.6815
1 19.29 0.05 0.9645
1 67 0.05 3.35
1 40.81 0.05 2.0405
1 26.79 0.05 1.3395

Cum 73.546 77.22

9 150mm Blockwork

North Block 1 80.96 0.15 12.144


1 334.54 0.15 50.181
1 17.29 0.15 2.5935
Central plaza 1 71.09 0.15 10.6635
1 68.76 0.15 10.314
1 37.52 0.15 5.628
1 88.1 0.15 13.215
Mount-1 1 101.55 0.15 15.2325
Mount-2 1 27.91 0.15 4.1865

Sqm 124.158 130.37

10 Screed concrete

Seater 8 0.3 0.3 0.7 0.504


2 1.3 0.3 0.7 0.546
4 0.3 0.3 0.7 0.252
13 2 0.3 0.7 5.46

Page 43 OF 57
Sl no Description Material Unit Nos L B D Qty Qty+5% Buffer Remarks

1 4 0.3 0.7 0.84


2 5.25 0.3 0.7 2.205
1 2 0.3 0.7 0.42
1 5.5 0.3 0.7 1.155
2 2.1 0.3 0.7 0.882
1 1.5 0.3 0.7 0.315

12.579 13.21

Groove cutting

Drive way 400mm Width 6 5.3 31.8


14 4.8 67.2
2 14.35 28.7
4 4.9 19.6
8 4.45 35.6
4 11.1 44.4
2 11.24 22.48
2 18.85 37.7
2 32.63 65.26
2 27 54
10 17.5 175
2 11.11 22.22
2 9.88 19.76

Drive way infront of the north block


200mm Band
14 10 140
4 8.57 34.28
2 7.9 15.8
20 8.85 177
6 11.1 66.6
2 8.64 17.28
2 7.49 14.98
2 4 8
4 6.77 27.08
2 6.1 12.2
32 4.2 134.4

B/W the bands 8 4.6 36.8


1 14.35 14.35
1 8.5 8.5
5 4.45 22.25
1 13.88 13.88
1 16.63 16.63
2 5.53 11.06
1 6.54 6.54

Arrival plaza and North side 6 10.6 63.6


2 2.85 5.7
72 1.975 142.2
4 5.65 22.6
8 7.58 60.64
8 2.8 22.4
4 15.65 62.6
2 4.91 9.82
2 2.8 5.6
22 2.8 61.6
6 2.2 13.2
2 2.4 4.8
2 2.3 4.6
2 1.35 2.7
2 2.75 5.5
32 3.8 121.6
2 10.96 21.92
2 12.01 24.02
10 2.8 28
2 11.11 22.22

Middle plaza-1 4 19.4 77.6


28 3.1 86.8
10 13.2 132
2 19.16 38.32
2 17.85 35.7
2 11.77 23.54
2 2.73 5.46
2 14.52 29.04

Middle plaza-2 2 18.9 37.8


2 19.6 39.2
12 2.8 33.6
2 2.55 5.1
8 13.65 109.2
10 2.75 27.5
2 1.82 3.64

Page 44 OF 57
Sl no Description Material Unit Nos L B D Qty Qty+5% Buffer Remarks

2 12.75 25.5
2 11.7 23.4
2 5.02 10.04
2 19.5 39
2 19.17 38.34
2 2.55 5.1

Rmt 2932.55 3079.18

GR-02/02- 30MM THICK


Drive way Band POLISHED STEEL GREY
GRANITE

Drive way 400mm Width 3 5.3 0.4 6.36


7 4.8 0.4 13.44
1 14.35 0.4 5.74
2 4.9 0.4 3.92
4 4.45 0.4 7.12
2 11.1 0.4 8.88
1 11.24 0.4 4.496
1 18.85 0.4 7.54
1 32.63 0.4 13.052
1 27 0.4 10.8
5 17.5 0.4 35
1 11.11 0.4 4.444
1 9.88 0.4 3.952

Sqm 124.744 130.98

Drive way infront of the north block


200mm Band
7 10 70
2 8.57 17.14
1 7.9 7.9
10 8.85 88.5
3 11.1 33.3
1 8.64 8.64
1 7.49 7.49
1 4 4
2 6.77 13.54
1 6.1 6.1
16 4.2 67.2
At expansion joint 1 120.8 120.8

Rmt 444.61 466.84

Infill PV-01/01-100MM BROOM


FINISHED CONCRETE

Drive way Sqm 1 512.78 512.78


1 358.58 358.58
1 523.63 523.63
1 1070 1070.00
Deduct middle plaza area -1 303.23 -303.23
Deduct 30mm thick polished grey -88.92
granite
-124.744
Arrival plaza & North side 1 456.62 456.62
1 639.75 639.75
Middle plaza -1 397.99 -397.99
1 43.87 43.87
1 16.66 16.66
-1 19.5 -19.50

Sqm 2687.50 2821.88

GR-01/01-20MM THICK
Pathway Band 200mm RIVERWASH STEEL GREY
GRANITE.

Arrival plaza and North side 3 10.6 31.8


1 2.85 2.85
36 1.975 71.1
2 5.65 11.3
4 7.58 30.32
4 2.8 11.2
2 15.65 31.3
1 4.91 4.91
1 2.8 2.8
11 2.8 30.8
3 2.2 6.6
1 2.4 2.4
1 2.3 2.3
1 1.35 1.35
1 2.85 2.85

Page 45 OF 57
Sl no Description Material Unit Nos L B D Qty Qty+5% Buffer Remarks

16 3.8 60.8
1 10.96 10.96
1 12.01 12.01
3 2.8 8.4
1 11.1 11.1

Rmt 347.15 364.51

GR-02/02- 30MM THICK


Infill RIVERWASH STEEL GRAY
GRANITE

Drive way infront of the north block 1 385.01 385.01


1 194.92 194.92
Deduct : GR-02/02- 30MM THICK
-1 323.81 -323.81
POLISHED STEEL GREY GRANITE
Middle plaza area 1 19 19
1 31 31
1 18.63 18.63

sqm 324.75 340.99

Middle plaza

GR-01/02- 20MM THICK


Band POLISHED STEEL GREY
GRANITE

Middle plaza-1 2 19.4 38.8


14 3.1 43.4
5 13.2 66
1 19.16 19.16
1 17.85 17.85
1 11.77 11.77
1 2.73 2.73
1 14.52 14.52

Middle plaza-2 1 18.9 18.9


1 19.6 19.6
6 2.8 16.8
1 2.55 2.55
4 13.65 54.6
5 2.75 13.75
1 1.82 1.82
1 12.75 12.75
1 11.7 11.7
1 5.02 5.02
1 19.5 19.5
1 19.17 19.17
1 2.55 2.55

Rmt 412.94 433.59

PV-01/01-100MM BROOM
Infill
FINISHED CONCRETE

Middle plaza-1 1 397.99 397.99


Deduct Band area -1 214.23 -214.23
Middle plaza-2 1 415.22 415.22
-1 198.71 -198.71

Sqm 400.27 420.28

GR-01/04- 60MM thick Flag


Flag Stone
Stone
North Block 243 0.6 0.9 131.22

Sqm 131.22 137.78

Page 46 OF 57
PROJECT: BAGMANE LUXOR
EXTERNAL DEVELOPMENT WORKS

LEGEND: PAVING FINISH TEXTURE PAINT


PV-01/01-100MM BROOM FINISHED CONCRETE TP-01/01-TEXTURE PAINT
PV-01/02- 20MM THICK KOTA STONE PT-01/01- PLASTER PAINT
PV-01/03- 75MM THICK INTERLOCKING STONE
GRANITE FINISH MILD STEEL
GR-01/01-20MM THICK RIVERWASH STEEL GREY
MS-01/01-MILD STEEL
GRANITE.
GR-02/01- 30MM THICK RIVERWASH STEEL GRAY
GRANITE

GR-01/02- 20MM THICK POLISHED STEEL GREY GRANITE

GR-02/02- 30MM THICK POLISHED STEEL GREY GRANITE

GR-01/03- 6MM BIZZASA TILE

GR-01/04-60MM THICK FLAG STONE

GR-02/04- 40MM THICK STEEL GREY SARRATED GRANITE

5%

Sl no Description Material Unit Nos L B D Qty 5% buffer Remarks

GR-02/01- 30MM THICK


Coping RIVERWASH STEEL GRAY
GRANITE

Rmt 822.44 863.56

GR-02/01- 30MM THICK


Seating area at arrival plaza RIVERWASH STEEL GRAY
GRANITE
Sqm 47.4785 49.85

GR-01/01-20MM THICK
Cladding RIVERWASH STEEL GREY Sqm
GRANITE.

Sqm 176.3327 185.15

GR-01/01-20MM THICK
Cladding RIVERWASH STEEL GREY Rmt
GRANITE.

Rmt 390.61 410.14

GR-01/01-20MM THICK
Skirting RIVERWASH STEEL GREY
GRANITE.

Rmt 1234.83 1296.57

Texture paint TP-01/01-TEXTURE PAINT

Sqmt 474.92 498.66

Plaster Paint PT-01/01- PLASTER PAINT

Rmt 852.7365 895.37

150mm Blockwork

41.93 44.03

waterproof Plastering around the lawn


8 area

Page 47 OF 57
Sl no Description Material Unit Nos L B D Qty 5% buffer Remarks

Sqm 306.005 321.31

Plastering for Seater Blockwork

41.93 44.03

Page 48 OF 57
PROJECT: BAGMANE LUXOR
EXTERNAL DEVELOPMENT WORKS
LEGEND: PAVING FINISH TEXTURE PAINT
PV-01/01-100MM BROOM FINISHED CONCRETE TP-01/01-TEXTURE PAINT
PV-01/02- 20MM THICK KOTA STONE PT-01/01- PLASTER PAINT
PV-01/03- 75MM THICK INTERLOCKING STONE
GRANITE FINISH MILD STEEL
GR-01/01-20MM THICK RIVERWASH STEEL GREY
GRANITE. MS-01/01-MILD STEEL

GR-02/01- 30MM THICK RIVERWASH STEEL GRAY


GRANITE

GR-01/02- 20MM THICK POLISHED STEEL GREY GRANITE

GR-02/02- 30MM THICK POLISHED STEEL GREY GRANITE

GR-01/03- 6MM BIZZASA TILE

GR-01/04-60MM THICK FLAG STONE

GR-02/04- 40MM THICK STEEL GREY SARRATED GRANITE

5%

Sl no Description Material Unit Nos L B D Qty 5% buffer Remarks

GR-02/01- 30MM THICK


Coping RIVERWASH STEEL GRAY
GRANITE
North Side 2 62.6 125.2

Rmt 125.2 131.46

Cladding PT-01/01- PLASTER PAINT Sqm

North Side 2 62.6 1.16 145.232

Sqm 145.232 152.49

GR-01/01-20MM THICK
Skirting RIVERWASH STEEL GREY Rmt
GRANITE.

North Side 2 62.3 124.6

Rmt
124.6 130.83

Drain
Aco drain
Rmt
26.78 26.78
27.7 27.7
2 10 20
1 53.6 53.6
12.52 12.52
7.2 7.2
6.34 6.34
7.2 7.2
12.88 12.88
35.43 35.43

Rmt 1 32.37 32.37


33.7 33.7
19.94 19.94
45.75 45.75
6.3 6.3
30 30

377.71 396.60

Page 49 OF 57
PROJECT: BAGMANE LUXOR
EXTERNAL DEVELOPMENT WORKS
LEGEND: PAVING FINISH TEXTURE PAINT
PV-01/01-100MM BROOM FINISHED CONCRETE TP-01/01-TEXTURE PAINT
PV-01/02- 20MM THICK KOTA STONE PT-01/01- PLASTER PAINT
PV-01/03- 75MM THICK INTERLOCKING STONE
GRANITE FINISH MILD STEEL
GR-01/01-20MM THICK RIVERWASH STEEL GREY
MS-01/01-MILD STEEL
GRANITE.
GR-02/01- 30MM THICK RIVERWASH STEEL GRAY
GRANITE

GR-01/02- 20MM THICK POLISHED STEEL GREY GRANITE

GR-02/02- 30MM THICK POLISHED STEEL GREY GRANITE

GR-01/03- 6MM BIZZASA TILE

GR-01/04-60MM THICK FLAG STONE

GR-02/04- 40MM THICK STEEL GREY SARRATED GRANITE

5%

Sl no Description Material Unit Nos L B D Qty 5% buffer Remarks

GR-02/01- 30MM THICK


Coping RIVERWASH STEEL GRAY
GRANITE

Rmt 78.14 82.05

GR-01/01-20MM THICK
Cladding RIVERWASH STEEL GREY Sqm
GRANITE.
Sqm 21.1624 22.22

GR-01/01-20MM THICK
Cladding RIVERWASH STEEL GREY Rmt
GRANITE.

Rmt 35.3 37.07

GR-01/01-20MM THICK
Skirting RIVERWASH STEEL GREY
GRANITE.

Rmt 72.23 75.84

Page 50 OF 57
PROJECT: BAGMANE LUXOR
EXTERNAL DEVELOPMENT WORKS
LEGEND: PAVING FINISH TEXTURE PAINT
PV-01/01-100MM BROOM FINISHED CONCRETE TP-01/01-TEXTURE PAINT
PV-01/02- 20MM THICK KOTA STONE PT-01/01- PLASTER PAINT
PV-01/03- 75MM THICK INTERLOCKING STONE
GRANITE FINISH MILD STEEL
GR-01/01-20MM THICK RIVERWASH STEEL GREY
MS-01/01-MILD STEEL
GRANITE.
GR-02/01- 30MM THICK RIVERWASH STEEL GRAY
GRANITE

GR-01/02- 20MM THICK POLISHED STEEL GREY GRANITE

GR-02/02- 30MM THICK POLISHED STEEL GREY GRANITE

GR-01/03- 6MM BIZZASA TILE

GR-01/04-60MM THICK FLAG STONE

GR-02/04- 40MM THICK STEEL GREY SARRATED GRANITE

5%
Sl no Description Material Unit Nos L B D Qty 5% buffer Remarks

GR-02/01- 30MM THICK


Coping RIVERWASH STEEL GRAY Sqm 1 33.64 0.25 8.41 8.83
GRANITE

Cladding TP-01/01-TEXTURE PAINT Sqm


55.30 58.06

GR-01/02- 20MM THICK


Ramp Band POLISHED STEEL GREY Rmt
GRANITE

16.6 17.43

PV-01/02- 20MM THICK


Infill Sqm
SIRA GRAY LEATHER FINISH

64.462 67.69

Page 51 OF 57
PROJECT: BAGMANE LUXOR
EXTERNAL DEVELOPMENT WORKS
LEGEND: PAVING FINISH TEXTURE PAINT
PV-01/01-100MM BROOM FINISHED CONCRETE TP-01/01-TEXTURE PAINT
PV-01/02- 20MM THICK KOTA STONE PT-01/01- PLASTER PAINT
PV-01/03- 75MM THICK INTERLOCKING STONE
GRANITE FINISH MILD STEEL
GR-01/01-20MM THICK RIVERWASH STEEL GREY MS-01/01-MILD STEEL
GRANITE.
GR-02/01- 30MM THICK RIVERWASH STEEL GRAY
GRANITE

GR-01/02- 20MM THICK POLISHED STEEL GREY GRANITE

GR-02/02- 30MM THICK POLISHED STEEL GREY GRANITE

GR-01/03- 6MM BIZZASA TILE

GR-01/04-60MM THICK FLAG STONE

GR-02/04- 40MM THICK STEEL GREY SARRATED GRANITE

5%

Sl no Description Material Unit Nos L B D Qty 5% buffer Kg/M Total weight

Footing cum
14 0.6 0.6 0.2 1.008
9 0.6 0.6 0.2 0.648

1.656 1.74

Footing Shuttering Sqm


14 2.4 0.2 6.72
9 2.4 0.2 4.32

11.04 11.59

Column SHS 450*450 Rmt


14 2.925 40.95
9 2.925 26.325

67.275 70.64 2.82 199.201275

Lower beam ISMC 125*130 Rmt

14 3.92 54.88

12 3.92 47.04

101.92 107.02 13.1 1401.9096

Primary Beam RHS 145*82*5.4mm Rmt


2 31.24 62.48
3 7.3 21.9

84.38 88.60 17.94 1589.46606

Upper Beam RHS 120*60*5.4mm Rmt


13 5.4 70.2
3 9.5 28.5

98.7 103.64 13.95 1445.70825

Chemical Anchoring Nos


14 4 56
9 4 36

92 96.60
50*25mm Aluminium
Aluminium channel or wood member Rmt
channel
588 2.4 1411.2
98 0.6 58.8
180 0.6 108
180 3 540

2118 2223.90 0.151 335.8089

Page 52 OF 57
Sl no Description Material Unit Nos L B D Qty 5% buffer Kg/M Total weight

GR-02/01- 30MM THICK


Seater area RIVERWASH STEEL GRAY
GRANITE
12 0.45 0.45 2.43
1 1 0.45 0.45
1 2 0.45 0.9
3.78 3.97

SS wire vertical at Basement

Rmt 4660.07

Ms support for SS wire at top of


Angle size 80*80*6mm

Rmt 340.01 357.0105 7.34 2620.45707

Ms support for SS wire at Bottom of


Channel size 80*40*4.2mm

Rmt 333.41 350.0805 7.03 2461.065915

SS Brackets

Nos 3340 3507

Light pole
Footing cum

L1 12 12

L2 33 33
L4 22 22

67

Chemical Anchoring Nos

L1 12 4 48

L2 33 4 132
L4 22 4 88

268 281.40

GR-01/02- 20MM THICK POLISHED


STEEL GREY GRANITE

Coping

Sqm 10.72 11.26

Cladding

Sqm 48.24 50.65

Page 53 OF 57
COMMENTARY LIST
Sl no Description Instructed Discussion Date

1 5% Buffer Qty is consider for all activities

All planter wall Structure work is executed by civil Instructed by


2 vendor not consider in this package. Anand (Bagmane) Dated on 13-08-2019

Reinforcement single matt layer of 8mm dia spacing Instructed by


3 250mm Dia C/C (4 kg per sqm) for drive way and Dated on 20-08-2019
Anand (Bagmane)
pathway.

4 Seater area one side


Blockwork
Plastering Instructed by
Anand (Bagmane) Dated on 20-08-2019
Inside Quarry dust filling
Screed concrete on top

5 Arrival plaza steps sides Texture paint is consider Instructed by Dated on 20-08-2019
Anand (Bagmane)

Pergola Seater area material name consider GR-02/01-


6 30MM THICK RIVERWASH STEEL GRAY GRANITE

7 Lightpoles
Concrete
Shuttering
Reinforcement
Instructed by
Coping -GR-01/02- 20MM THICK POLISHED STEEL GREY Anand (Bagmane)
Dated on 20-08-2019
GRANITE
Clading -GR-01/02- 20MM THICK POLISHED STEEL
GREY GRANITE

Instructed by
8 Vertical fins- 40*60*5mm MS BOX section is consider Anand (Bagmane) Dated on 20-08-2019

9 MS support for SS wire

MS Support for SS wire Angle at Top 80*80*8mm Dated on 13-08-2019


Instructed by
MS Support for SS wire Channel at Bottom Anand (Bagmane)
80*40*3.2mm
SS wire spacing consider 200mm C/C

Page 54 OF 57
COMMENTARY LIST
Sl no Description Instructed Discussion Date

10 Below Flag stone

Instructed by
RCC concrete of 150mm thickness Dated on 20-08-2019
Anand (Bagmane)

Bostik Moisture Epoxy coating for granite base and Instructed by


11 cladding consider 0.3 kg/sqmt Anand (Bagmane) Dated on 20-08-2019

Instructed by
12 Groove cutting consider B/W the Bands in Driveway Anand (Bagmane) Dated on 20-08-2019

Instructed by
13 Plaster paint outside at STp area Ht consider 4.55m Dated on 13-08-2019
Anand (Bagmane)

Page 55 OF 57
External Drawing Register

BAGMANE LUXOR CAPITAL

DRAWING REGISTER - EXTERNAL DEVELOPMENT

LIST OF DRAWINGS / DOCUMENTS SPECIFIED IN THE SCOPE DRAWING RECEIPT STATUS


SL
REVISION NO. HARD COPY (PRINT OUT) ACAD SOFT COPY REMARKS
NO
DESCRIPTION DOC/DWG. NO.
STATUS RECEIVED DATE STATUS RECEIVED DATE

ACAD SOFT COPY


1 Luxor Capital-INDEX Sheet L-000 R0 RECEIVED
26-07-2019

ACAD SOFT COPY


2 Luxor Capital-General Arrangement L-001 R0 RECEIVED
26-07-2019

ACAD SOFT COPY


3 Luxor Capital-Site Series,Site Grading L-001SG R0 RECEIVED
26-07-2019

ACAD SOFT COPY


4 Luxor Capital-Site Series,Broad Grading Plan L-01G R0 RECEIVED
26-07-2019

ACAD SOFT COPY


5 Luxor Capital-Site Series,Broad Material Plan L-01M R0 RECEIVED
26-07-2019

ACAD SOFT COPY


6 Luxor Capital-Site Series,Broad Lineout Plan L-01L R0 RECEIVED
26-07-2019

ACAD SOFT COPY


7 Luxor Capital-Site Series,Lighting Plan L-01E R0 RECEIVED
26-07-2019

ACAD SOFT COPY


8 Luxor Capital-Coordination service plan L-01CS R0 RECEIVED
26-07-2019

ACAD SOFT COPY


9 Luxor Capital-Arrival Plaza General Arrangement Plan LD-100 R0 RECEIVED
26-07-2019

ACAD SOFT COPY


10 Luxor Capital-Arrival Plaza Grading Plan-1 LD-100G1 R0 RECEIVED
26-07-2019

ACAD SOFT COPY


11 Luxor Capital-Arrival Plaza Grading Plan-2 LD-100G2 R0 RECEIVED
26-07-2019

ACAD SOFT COPY


12 Luxor Capital-Arrival Plaza Lineout Plan-1 LD-100L1 R0 RECEIVED
26-07-2019

ACAD SOFT COPY


13 Luxor Capital-Arrival Plaza Lineout Plan-2 LD-100L2 R0 RECEIVED
26-07-2019

ACAD SOFT COPY


14 Luxor Capital-Arrival Plaza Material Plan-1 LD-100M1 R0 RECEIVED
26-07-2019

ACAD SOFT COPY


15 Luxor Capital-Arrival Plaza Material Plan-2 LD-100M2 R0 RECEIVED
26-07-2019

ACAD SOFT COPY


16 Luxor Capital-Arrival Plaza Longitudinal Section A LD-100S1 R0 RECEIVED
26-07-2019

ACAD SOFT COPY


17 Luxor Capital-Arrival Plaza Longitudinal Section-B LD-100S2 R0 RECEIVED
26-07-2019

ACAD SOFT COPY


18 Luxor Capital-Arrival Plaza Longitudinal Section-C LD-100S3 R0 RECEIVED
26-07-2019

ACAD SOFT COPY


19 Luxor Capital-Arrival Plaza Section-S3,S4,S5 LD-100S4 R0 RECEIVED
26-07-2019

ACAD SOFT COPY


20 Luxor Capital-Arrival Plaza Section-S5a,S5B & S5C LD-100S5 R0 RECEIVED
26-07-2019

ACAD SOFT COPY


21 Luxor Capital-Arrival Plaza Cascade wall Louver Details LD-100F R0 RECEIVED
26-07-2019

ACAD SOFT COPY


22 Luxor Capital-Arrival Plaza Trellis Planter Details LD-100TF R0 RECEIVED
26-07-2019

ACAD SOFT COPY


23 Luxor Capital-Dropoff Area Water Body-Grading,Material,Electrical,Lineout & Elevation E1 & E2. LD-150 R0 RECEIVED
26-07-2019

ACAD SOFT COPY


24 Luxor Capital-Dropoff Area Water Body-Elevation3 & Section3 LD-150A R0 RECEIVED
26-07-2019

ACAD SOFT COPY


25 Luxor Capital-South Plaza General Arrangement Plan LD-200 R0 RECEIVED
26-07-2019

ACAD SOFT COPY


26 Luxor Capital-South Plaza-Grading,Material,Electrical\ LD-200G R0 RECEIVED
26-07-2019

ACAD SOFT COPY


27 Luxor Capital-South Plaza-Lineout LD-200L R0 RECEIVED
26-07-2019

ACAD SOFT COPY


28 Luxor Capital-South Plaza General Arrangement Plan L-01G R0 RECEIVED
26-07-2019

503220987.xlsx Page 56of 57


External Drawing Register

BAGMANE LUXOR CAPITAL

DRAWING REGISTER - EXTERNAL DEVELOPMENT

LIST OF DRAWINGS / DOCUMENTS SPECIFIED IN THE SCOPE DRAWING RECEIPT STATUS


SL
REVISION NO. HARD COPY (PRINT OUT) ACAD SOFT COPY REMARKS
NO
DESCRIPTION DOC/DWG. NO.
STATUS RECEIVED DATE STATUS RECEIVED DATE

ACAD SOFT COPY


29 Luxor Capital-South Plaza Section S6,S7 & S8 LD-200s R0 RECEIVED
26-07-2019

ACAD SOFT COPY


30 Luxor Capital-North Plaza General Arrangement Plan LD-300 R0 RECEIVED
26-07-2019

ACAD SOFT COPY


31 Luxor Capital-North Plaza-Grading Plan LD-300G R0 RECEIVED
26-07-2019

ACAD SOFT COPY


32 Luxor Capital-North Plaza-Lineout LD-300L R0 RECEIVED
26-07-2019

ACAD SOFT COPY


33 Luxor Capital-North Plaza-Section S1,S2,S1A & S15 LD-300s R0 RECEIVED
26-07-2019

ACAD SOFT COPY


34 Luxor Capital-Podium Level central Plaza General Arrangement Plan LD-400 R0 RECEIVED
26-07-2019

ACAD SOFT COPY


35 Luxor Capital-Podium Level central Plaza-Grading material and lighting plan-1 LD-400G1 R0 RECEIVED
26-07-2019

ACAD SOFT COPY


36 Luxor Capital-Podium Level central Plaza-Grading material and lighting plan-2 LD-400G2 R0 RECEIVED
26-07-2019

ACAD SOFT COPY


37 Luxor Capital-Podium Level central Plaza-Lineout Plan-1 LD-400L1 R0 RECEIVED
26-07-2019

ACAD SOFT COPY


38 Luxor Capital-Podium Level central Plaza-Lineout Plan-2 LD-400L2 R0 RECEIVED
26-07-2019

ACAD SOFT COPY


39 Luxor Capital-Podium Level central Plaza-Section S16 & S17 LD-400S1 R0 RECEIVED
26-07-2019

ACAD SOFT COPY


40 Luxor Capital-Podium Level central Plaza-Section S18 LD-400S2 R0 RECEIVED
26-07-2019

ACAD SOFT COPY


41 Luxor Capital-Podium Level Semi covered Area General Arrangment LD-450 R0 RECEIVED
26-07-2019

ACAD SOFT COPY


42 Luxor Capital-Podium Level Semi covered Area Grading ,Electrical and Material Plan LD-450G R0 RECEIVED
26-07-2019

ACAD SOFT COPY


43 Luxor Capital-Podium Level Semi covered Area Lineout Plan LD-450L R0 RECEIVED
26-07-2019

ACAD SOFT COPY


44 Luxor Capital-Podium Level Semi covered Area Section S17A & S17B LD-450S R0 RECEIVED
26-07-2019

ACAD SOFT COPY


45 Luxor Capital-Podium Level Pergola Details,Plan, Section and Elevation LD-500 R0 RECEIVED
26-07-2019

ACAD SOFT COPY


46 Luxor Capital- Site series Section Lines LS-00 R0 RECEIVED
26-07-2019

ACAD SOFT COPY


47 Luxor Capital- Site Section S1,S2, & S3 LS-01 R0 RECEIVED
26-07-2019

ACAD SOFT COPY


48 Luxor Capital- Site Section S4,S5, & S6 LS-02 R0 RECEIVED
26-07-2019

ACAD SOFT COPY


49 Luxor Capital- Site Section S7, S8 LS-03 R0 RECEIVED
26-07-2019

ACAD SOFT COPY


50 Luxor Capital- Site Section S9, S10 LS-04 R0 RECEIVED
26-07-2019

ACAD SOFT COPY


51 Luxor Capital- Site Section S11,S12 LS-05 R0 RECEIVED
26-07-2019

ACAD SOFT COPY


52 Luxor Capital- Site Section S13,S14 LS-06 R0 RECEIVED
26-07-2019

ACAD SOFT COPY


53 Luxor Capital- Site Section S15,S16, & S17 LS-07 R0 RECEIVED
26-07-2019

ACAD SOFT COPY


54 Luxor Capital-Green Creeper wall Typical Detail LS-GW R0 RECEIVED
26-07-2019

ACAD SOFT COPY


55 Luxor Capital-Green Creeper wall Elevation-1 LS-GWE1 R0 RECEIVED
26-07-2019

ACAD SOFT COPY


56 Luxor Capital-Green Creeper wall Elevation-2 LS-GWE2 R0 RECEIVED
26-07-2019

ACAD SOFT COPY


57 Luxor Capital-Green Creeper wall Elevation-3 LS-GWE3 R0 RECEIVED
26-07-2019

503220987.xlsx Page 57of 57