You are on page 1of 7

Lot Detail

Lot No. : BEPZA W- 49


Lot Construction of HBB Road of Approach Road-2 including land development (Group- Chha) at BEPZA
Description : Economic Zone, Mirsarai, Chattogram. (Package no: BEPZA W-49)

Bill of Quantities

Table
Bill of Quantities
Name :
Unit Total Total
Item Price Price Price
Unit Price
Item Group Code Description of Measurement Quantity
no. (if Item Unit In In In
In figures (BDT)
any) Words Figures Words
(BDT) (BDT) (BDT)
1 1 1 "Erection and Each 1
maintenance of
site office and
removal of the
same after
completion of
work in
accordance with
the conditions of
contract. In
addition to the
office required for
his own use, the
contractor shall
provide and
maintain furnished
field office for the
use of the
Engineer-in-
charge and his
staff. The field
office is to have a
concrete floor,
adequate
foundation, brick
walls, false ceiling
of hard board with
seasoned Garjan
wood frame and
painted, and all
windows are to
be glazed and
provided with
steel grill. Outside
and inside wall
surface are to be
painted on plaster
acceptable to the
Engineer-in-
charge. The field
office shall be
maintained in a
secure and
watertight
condition by the
contractor until
the completion of
the contract and
shall be provided
with electricity,
running water and
sewerage. All
doors shall be
fitted with
approved locks
and windows shall
be provided with
screen/blinds.
Before
construction the
contractor shall
submit plans and
drawings showing
proposed details
and location for
the field office,
including
foundations,
access roads,
shades, layout of
electrical and
water supply and
hard standings
thereto for the
approval of the
Engineer-in-
charge. The
Engineer-in-
charge may
require revision of
the plans prior to
giving approval for
construction. The
contractor shall
also submit
details proposed
furniture, fittings
and other items of
equipment and
plant to the
Engineer-in-
charge for
approval. These
items shall be of
the standard
quality suitable for
site.

The office,
complete with
furnishings,
fittings, access
roads and hard
standings shall be
ready for
occupation by the
Engineer-in-
charge within 28
days of the date
when the
contractor first
occupies the site.
The contractor
will provide day
and night guards
and a tea boy for
the field office. At
the end of the
project all
materials,
equipment and
plant, furniture,
fittings recovered
from dismantling
the office and
removing access
road will be the
property of the
contractor. No
interim payment
shall be certified
unless engineer?s
office with
required facilities
are constructed
and accepted by
the Engineer-in-
charge.
Engineer?s site
office of minimum
15 sqm plinth
area with
providing furniture,
first aid-box,
safety helmet,
level / theodolite,
consumables,
stationeries etc."
2 1 2 "Earth work in Cum 30653.91
excavation of
foundation
trenches in all
kinds of soil as
per layout plan of
foundation
excavation with all
leads and lifts and
placing the spoil
earth for
constructing of
the dyke where
necessary as per
design and
specification
including
placement &
setting of earth,
pushing, breaking
clods, levelling-
dressing with
chain dozzer,
bailing out of
water etc.
complete as per
direction of
Engineer in
charge.(Payment
will be made as
per the volume of
filling quantity in
dyke).
For moving spoil
earth upto a
distance of 100m
from the centre of
the pit."
3 1 3 Shoring for slope Sqm 405
protection of
embankment by
local hard wood
ballah post of
6.0m length,
125mm dia, 1.0m
c/c, and 2.0m
drive with 6.0m
long bamboo of
avarage 75mm
dia, @ 1.0m c/c
and 2.0m drive
with drum sheet
walling and
average 70mm
dia half split
bamboo batten @
2.0m c/c fixed
with nails. as per
design slopes,
grades including
removal of spoils
to a safe distance
as per direction of
Engineer in
charge
4 1 4 Cutting jungles Sqm 22852.5
and shrub
including removing
and cleaning the
spot/site.
5 1 5 Sand filling in road Cum 282625.89
with carted sand
from contrctors
own arrange or
sources carried
by truck or any
other means
having F.M. 0.5 to
0.8 in 150 mm
layers including
placing, leveling,
dressing and
spreading
uniformly with
chain dozer in/c
cost of fuel,
lubricants, spares,
maintenance,
driver cost and
watering etc
complete as per
instruction of
Engineer in
charge.
6 1 6 Providing Cum 18623.35
improved sub-
grade with
imported sand of
F M 0.80-1.20
having compacted
thickness as per
specification in/c
cost of sand,
carrying, local
handling,
spreading
uniformly in layers
of 150 mm to
proper grade,
camber, super
elevation, rolling
properly with 8-12
M Tonne vibratory
roller and
watering profusely
for compaction
95% MDD (STD)
as per design in/c
cost of fuel,
lubricants, spares,
maintenance,
driver and
compaction tested
charges etc. all
complete as per
item code
02/08/01 of RHD
Master schedule-
2018, direction
and accepted by
the Engineer-in
charge.
7 1 7 Brick on end Rm 4460
edging (125 mm
across the road)
with first class or
picked jhama
bricks and filling
the gaps with fine
sand (F.M. 1.00)
including cutting
trenches, true to
level and grade,
removing earth,
refilling and
ramming the sides
properly including
cost of all
materials and
accepted by the
Engineer-in-
charge.
8 1 8 Single layer brick Sqm 16318.34
flat soling in
roadwork with
first class or
picked jhama
bricks as per
camber and grade
and filling the
joints with fine
sand (F.M. 1.00)
and also providing
75 mm thick sand
cushion with the
same quality of
sand including
cost of all
materials and
accepted by the
Engineer-in-
charge.
9 1 9 Brick on edges Sqm 16318.34
pavement in
herring bone bond
(HBB) with first
class or picked
jhama bricks as
per alignment,
camber and grade
over 12 mm thick
sand cushion
(F.M. 1.00)
including filling the
joints with the
same sand
including cost of
all materials and
accepted by the
Engineer-in-
charge.
10 1 10 Creating turf on Sqm 12960
the side slopes
and top of
embankment with
good quality turf
not less than 225
mm square chunk,
watering till the
grass grown
including all leads
and lifts etc.
complete and
accepted by the
Engineer-in-
charge.
Grand
Total :

Schedule of Day works

Table
.
Name :
Unit Total Total
Item
Item Group Code (if Description Measurement Nominal Unit Price in Figures Price in Price in Price in
no. of Item Unit Quantity (BDT) Words Figures Words
any)
(BDT) (BDT) (BDT)
1 1 1 n/a n/a 1

Grand
Total :

Unconditional Discount Form

Table
Unconditional Discount
Name :
Discount in Percentage (%)[In figure] Discount in Percentage (%) [In word]

You might also like