Professional Documents
Culture Documents
12 3 3 - PPC- 0 0 1
3 - INJECTION OF HYDRATE INHIBITOR AND/ OR CORROSION
V- T- 12 3 3 0 1
INHIBITOR.
FT ANTI- SURGE 4- THIS FLOW SHOWS WATER PRESENT ONLY IN THE LIQUID
CONTROL PHASE, CONSIDERING THE SEA WATER DENSITY EQUAL AT
10 3 0 kg/ m 3 .
TC
PT
5- OIL VOLUMETRIC FLOW RATE AND OIL DENSITY ARE THE
ACTUAL VALUES IN DRY BASIS.
0
14 6 - GAS FLOW RATE AT 0 C AND PRESSURE OF 10 1,3 kPa abs.
9 12 3 3 - PPC- 0 0 1
T- 12 3 3 0 1 7 - TWO STAGES OF GAS COMPRESSION UNIT TO BE DEFINED
18
BY MANUFACTURERS WILL HAVE BACK- TO- BACK ERECTION
ANTI- SURGE
P- UC- 12 2 3 0 1A- 0 1 CONTROL ARRANGEMENT.
12 2 3 - PPC- 0 0 1
C.W. 6 17
PC C.W. 19 LIFT GAS HEADER - THE GAS SYSTEM FROM STREAM UP STREAM
FT
0
FQI SHALL BE DESIGNED TO 10 0 0 0 0 0 m 3/ d (2 0 C AND
8 7 13 PT 5 13 5 - PPC- 0 0 1 10 1,3 kPa abs).
12 2 3 - PPC- 0 0 3 21 P- 5 13 5 0 2
UC- 12 2 3 0 2
8 - THE GAS COMPRESSION SYSTEM:
12 4 4 - PPC- 0 0 1
- 3 x3 3 % TURBOCOMPRESSOR UNITS
3 V- 12 4 4 0 1
V- UC- 12 2 3 0 1A- 0 3 17 - 3 x3 3 % PROCESS SKIDS
ANTI- SURGE - 3 x3 3 % WASTE HEAT RECOVERY UNITS
(NOTE 12 )
CONTROL
P- UC- 12 2 3 0 1A- 0 2 (NOTE 15 ) 9
V- UC- 12 2 3 0 1A- 0 2
NC - THE PERFORMANCE CHARACTERISTICS OF EQUIPMENTS AND
LC LC FQI PC
P- 12 2 3 0 3 SYSTEMS, AS SHOWN ON THE UPPER PART OF THIS DRAWING,
(NOTE 12 )
C.W. ARE DESIGN DATA AND MAY NOT AGREE WITH THE BALANCE
C.W. 20 INFORMATION HEREUNDER, WHICH ARE ACTUAL EQUILIBRIUM
FT PT
1 2 10 PT 10 VALUES.
V- 12 2 3 0 1 PT 15
16 1 1- GAS CAPACITY AT 2 0 ° C AND 10 1.3 kPa abs.
(NOTE 2 )
11 TO P- XVIII
P- UC- 12 2 3 0 1A- 0 3 12 - THIS HEADER IS COMMON TO ALL UNITS.
12
PT
12 2 3 - PPC- 0 0 1 PT
13 - THE MASS AND ENERGY BALANCE INSIDE OF THE COMPRESSION
SG- 12 2 3 0 1A/ B PT UNIT PACKAGE IS VENDOR RESPONSIBILITY FOR MORE
SG- 12 2 3 0 2 DETAILS SEE DRAWINGS NUOVO PIGNONE SOK0 8 8 5 2 7 8 / 1
PY <
14 - THE THREE ARE TO OPERATE SIMULTANEOUSLY (IN
LC
PARALLEL) THUS REQUIRING APPROPRIATE CAPABILITIES IN
SC
THE CONTROL SYSTEM IN ORDER TO AVOID OR REDUCE,
(NOTE 1)
4 6 TO AN ACCEPTABLE LEVEL, THE INTERACTION BETWEEN
THE RESPECTIVE CONTROL LOOPS (CAPACITY AND ANTI-
GAS HEADER
UC- 12 2 3 0 1B/ C
5 (NOTE 9)
AS BUILT
D AS BUILT 13-11-97 LMY RSS RSS CAF
5 3 3 6- PPC- 0 0 1
C REV. WHERE INDIC./ APPR. BY PETROBRAS 03-07-96 JMC RSS RSS ARS
V- 5 3 3 60 1
JMC
B REVISED BY UTC 31-01-96 EJC - CANESIN
ETHANE C2 4,8431 4,8431 4,8700 1,0400 1,7506 4,8700 4,8700 4,8700 4,8852 2,5587 2,5587 4,8852 4,8852 4,8845 5,2749 4,8845 4,8845 4,8851 4,8851 4,8851 4,8851 PREVAILING LAW. IT SHALL ONLY BE USED FOR THE PURPOSE IT IS DELIVERED.
PROPANE C3 2,0242 2,0242 2,0285 1,4130 2,2378 2,0285 2,0285 2,0285 2,0279 3,1756 3,1756 2,0279 2,0279 2,0213 5,2965 2,0213 2,0213 2,0216 2,0216 2,0216 2,0216
i- BUTANE i- C4 0,4343 0,4343 0,4325 0,6923 1,0629 0,4325 0,4325 0,4325 0,4293 1,4842 1,4842 0,4293 0,4293 0,4259 2,1373 0,4259 0,4259 0,4259 0,4259 0,4259 0,4259
TENENGE ULTRATEC ASTILLEROS
Or ganiz ac - ENGENHARIA S.A.
' ao
- Odebr ec ht ASTILLERO CADIZ
n- BUTANE n- C4 0,9725 0,9725 0,9640 2,1799 3,2887 0,9640 0,9640 0,9640 0,9520 4,5493 4,5493 0,9520 0,9520 0,9415 6,1534 0,9415 0,9415 0,9416 0,9416 0,9416 0,9416
i- PENTANE i- C5 0,3685 0,3685 0,3577 1,8892 2,7336 0,3577 0,3577 0,3577 0,3448 3,6936 3,6936 0,3448 0,3448 0,3368 4,2555 0,3368 0,3368 0,3369 0,3369 0,3369 0,3369 '
CONSORCIO TENENGE/ULTRATEC
821-2-005-95-0
n- PENTANE n- C5 0,5212 0,5212 0,5009 3,3940 4,8024 0,5009 0,5009 0,5009 0,4771 6,4037 6,4037 0,4771 0,4771 0,4639 7,0252 0,4639 0,4639 0,4640 0,4640 0,4640 0,4640
HEXANE C6 0,5447 0,5447 0,4809 9,5710 12,3375 0,4809 0,4809 0,4809 0,4137 15,4827 15,4827 0,4137 0,4137 0,3869 13,6990 0,3869 0,3869 0,3869 0,3869 0,3869 0,3869
HEPTANE C7 0,5773 0,5773 0,4126 23,8621 25,8466 0,4126 0,4126 0,4126 0,2768 28,1029 28,1029 0,2768 0,2768 0,2392 18,9050 0,2392 0,2392 0,2392 0,2392 0,2392 0,2392 PETROLEO BRASILEIRO S.A.
OCTANE C8 0,3694 0,3694 0,1714 28,3649 24,1035 0,1714 0,1714 0,1714 0,0704 19,2584 19,2584 0,0704 0,0704 0,0519 9,2146 0,0519 0,0519 0,0519 0,0519 0,0519 0,0519 SEGEN/EMCOP
PETROBRAS
NONANE C9 0,1393 0,1393 0,0318 15,3360 10,3013 0,0318 0,0318 0,0318 0,0061 4,5771 4,5771 0,0061 0,0061 0,0034 1,3603 0,0034 0,0034 0,0034 0,0034 0,0034 0,0034
DECANE C10 0,0538 0,0538 0,0053 6,9142 4,0641 0,0053 0,0053 0,0053 0,0004 0,8237 0,8237 0,0004 0,0004 0,0002 0,1353 0,0002 0,0002 0,0002 0,0002 0,0002 0,0002 USER
UNDECANE C1 1 0,0123 0,0123 0,0005 1,6842 0,9316 0,0005 0,0005 0,0005 0,0000 0,0759 0,0759 0,0000 0,0000 0,0000 0,0061 0,0000 0,0000 0,0000 0,0000 0,0000 0,0000 E & P BACIA DE CAMPOS
C12 + C12 + 0,0000 0,0000 0,0000 0,0000 0,0000 0,0000 0,0000 0,0000 0,0000 0,0000 0,0000 0,0000 0,0000 0,0000 0,0000 0,0000 0,0000 0,0000 0,0000 0,0000 0,0000
Contract Nr. :
PROJECT TITLE
NITROGEN N2 0,0000 0,0000 0,0000 0,0000 0,0000 0,0000 0,0000 0,0000 0,0000 0,0000 0,0000 0,0000 0,0000 0,0000 0,0000 0,0000 0,0000 0,0000 0,0000 0,0000 0,0000
CARBON DIOXIDE CO 2 0,0506 0,0506 0,0509 0,0052 0,0089 0,0509 0,0509 0,0509 0,0511 0,0132 0,0132 0,0511 0,0511 0,0512 0,0307 0,0512 0,0512 0,0512 0,0512 0,0512 0,0512 MARLIM FIELD DEVELOPMENT
WATER H2 O 0,0190 0,0190 0,0191 0,0027 0,0043 0,0191 0,0191 0,0191 0,0192 0,0062 0,0062 0,0192 0,0192 0,0192 0,0127 0,0192 0,0192 0,0061 0,0061 0,0061 0,0061 UNIT
TOTAL 100,0000 100,0000 100,0000 100,0000 100,0000 100,0000 100,0000 100,0000 100,0000 100,0000 100,0000 100,0000 100,0000 100,0000 100,0000 100,0000 100,0000 100,0000 100,0000 100,0000 100,0000
SEMI-SUBMERSIBLE UNIT PETROBRAS-26
MOLAR FLOW RATE (kgmol/ h) 3314,05 3314,05 3290,78 23,27 43,74 1096,93 1096,93 1096,93 1092,30 6.82 6,82 1092,30 1092,30 1090,10 2,20 1090,10 1090,10 1295,41 918,00 961,20 95,26 DRAWING TITLE
MASS FLOW RATE (kg/ h) 65844 65844 63430 2414 4158 21143,3 21143,3 21143,3 20703,7 581,3 581,3 20703,7 20703,7 20561,7 142 20561,7 20561,7 24434 17316 18130 1797 PROCESS FLOW DIAGRAM
OIL VOLUMETRIC FLOW RATE (NOTE 5 ) (m/3 h) - - - 3,60 5,88 - - 0,74 - 0,91 0,88 - 0,24 - 0,24 - - - - - -
Nr. ::
DE-3010.29-1223-943-PPC-002
AESA Nr.
17 OCT94 UTC NUMBER D
AESA
DE-0069-3010-A1-101-002