CHAPTER NO.

13
NG AND ROOFING
NOTES:-
(I) The rates, for item Nos. 13.1, 13.2, 13.3, 13.4, 13.8 and 13.9 are for height, upto 4 metres, above plinth level. Foradditional height extra
rates shall be paid as follows:-
(a) For item Nos. 13.1 to 13.4, Note. NO. V of Chpater NO. 10, “Concrete” shall appliy.
(b) For item Nos. 13.8 and 13.9, Note No. 1 of Chapter No. 18, “Steel and iron Work”, shall apply.
(II) The rates, for hoisting, are not to be paid over and above the rates, for manufacture of beams, battens, etc; as given in other chapters; as
these rates already include hoisting charges.
(III) The rates, for item Nos. 13.11, 13.13, 13.14, 13.15, 13.58, 13.65 and 13.66 are for work done in first storey. For every additional storey
add Rs. 1.00 per Sqm to the labour, as well as the through rates of item Nos. 13.11, 13.13 and 13.15. For rates of item Nos. 13.14 and
13.58 add RE. 0.50 per sqm to the labour, as well as the through rate; and for rate of item Nos. 13.65 and 13.66 and Rs. 300 per cum.
(IV) The labour and through rates include the cost of water and where the water is supplied by the department free of cost, the rates shall be
decreased accordingly.
(V) Unless specified to the contrary, the labour rates for various items of construction include handling of materials within 100 metres.
Through rate include all rehandling of materials, at the site of work, and no payment is due to the contractors, on this account.
(VI) Unless specified to the contrary, the labour rates include the cost of water, tools and plants, labour and materials for scaffolding and
centring and shuttering and cost of good earth for mud-mortar and mud-plaster, wherever required.
Sr. no Description Unit Labour Rate Through rate
(A) “HOSTING”
13.1 Hoisting R.C.C lintels and placing in positon cum 95.40 -
13.2 Hoisting R.C.C. battens and placing in position cum 110.00 -
13.3 Hoisting R.C.C shelves and placing in positon cum 66.65 -
13.4 Hoisting R.C.C. bed plates and placing in position cum 103.90 -
13.5 Hoisting wooden battens and placing in position cum 75.20 -
13.6 Hoisting wooden beams and placing in position cum 57.80 -
13.7 Hoisting wooden trusses and placing in position cum 216.25 -
13.8 Hoisting R.S Joists and placing in position Qtl 21.45 -
13.9 Hoisting steel roof trusses, plate girders of any span for buildings and plate
and trussed girders of any span for bridges. Qtl 38.80 -
13.10 Assembling at site and hoisting and placing in positon Tubular trasses,
complete with accessories, such as purlins, bracings, longitudinal tiles, truss, Qtl 73.15 -
shoes, purline
(B) MUD ROOFING clips and other truss components, complete in all respects.
13.11 Second class mud roofing consisting of one layer of tiles 30.48 cm X 15.24
cm X 5.08 cm laid in cement mortar 1:3 including 6 mm thick cement plaster sqm 23.25 73.25
1:4 on top with tow coats of bitumen painting at 2.63 kg per sqm coverted
13.12 Third class mud roofing consisting of two layers of sirki and sarkanda,
with 10 cm of mud and two layers of 25 mm mud plaster with gobri leeping
covered with 12.5cm mud and mud plaster with gobri leeping on top sqm 9.85 31.50
on top and cement plaster 1:4 on parapet between tiles and drip-course 1:2
(C) cement
TILE TERRACING/TILE
pointing under sideROOFING
of tiles and filling of spaces between the battens.
13.13 Terracing consisting of tiles 22.86 cm X 11.43 Cm X 3.81 cm laid over 87.50
mm mud filling on a layer of 25 mm mud plaster and on other layer of mud
mortar for laying the tiles, including two coats of bitumen laid hot at 1.65 kg
per sqm on top of R.C.C slab including grouting with cement sand mortar 1:3
and top surface to be left clean etc. sqm
OR
Terracing consisting of tiles 22.86 cm X 11.43 cm X 3.81 cm, laid over 87.50
mm mud filling, on a layer of 25 mm mud plaster and an other layer of mud
mortar for laying the tiles over a polythene film of 100 micron (0.1   mm)
thickness with 25 mm thick layer of of fine sand, above and below the
polythene film, laid on top of R.C.C., slab, including grouting with cement
sand mortar 1:3 and top surface to be left clean.
sqm 16.75 52.95
13.14 Tile terracing with one layer of tiles, 22.86 cm X 11.43 cm X 3.81 cm laid dry
over a layer of mud mortar including grouting with cement sand mortar 1:3 sqm 7.45 36.40
and top surface to be left clean.
13.15 Roofing consistiong of 5 cm thick precast cement concrete 1:2:4 tiles laid in
position with cement sand mortar 1:3 over R.C.C battens .6 metre apart, sqm 25.95 90.10
excluding cost of R.C.C battens, but including 4 cm thick Screed of cement sqm 40.35
(D) THATCHED ROOFS
concrete 1:4:8 over tiles, 2 coats of bitumen at 2.34 kg per sqm, 25 mm mud
plaster, 75 mm mud another layer of 25mmm mud plaster, filling space
13.16 Thatching 15 cm thick including bamboo Frame and matting, but excluding
the cost of Purlins sqm 6.00 45.50
13.17 Thatching 23 cm thick including bamboo Frame and matting, but excluding
the cost of Purlins sqm 7.40
(E) C.G. I & A.C.C SHEET ROOFING sqm
13.18 Corrugate G.I sheet roofing 0.80 mm thick fixed with galvanized iron ‘J’ or ‘L’
hooks, 10 mm dia G.I limpet and bitumen washers complete, excluding the
cost of purlins,rafters and trusses. sqm 4.75 137.40
13.19 Corrugates asbestos sheet roofing 7 mm thick sheets fixed with G.I hooks
and bolts, limpet and bitumen washers complete, fixed in position, excluding
the cost of purlins, rafters and trusses sqm 6.75 77.10
13.20 Corrugates asbestos sheet roofing 6 mm thick sheets fixed with G.I hooks
and bolts, limpet and bitumen washers complete, fixed in position, excluding
the cost of purlins, rafters and trusses sqm 6.75 73.50
13.21 Semi-Corrugates asbestos sheet roofing 7 mm thick sheets fixed with G.I
hooks and bolts, limpet and bitumen washers complete, fixed in position,
excluding the cost of purlins, rafters and trusses sqm 6.75 74.70
13.22 Semi-Corrugates asbestos sheet roofing 6 mm thick sheets fixed with G.I
hooks and bolts, limpet and bitumen washers complete, fixed in position,
excluding the cost of purlins, rafters and trusses sqm 6.75 71.15
13.23 Ridges and valleys 45 cm overall in plain,G.I sheets 0.80 mm thick fixed with
galvanised iron, J and L hooks 10 mm dia G.I. limpet and bitumen washers,
complete. Metre 11.25 62.40
13.24 G.I sheet gutters, 0.80 mm thick 45 cm over all semi circular, including fixing
with clamps and making connections with rain water pipes. Metre 10.85 71.20
13.25 Asbestos cement ridges fixed with galvanized iron J and L hooks 10 mm dia
G.I. plain and bitumen washers, complete. Metre 2.95 47.75
13.26 Asbestos cement valley gutter 45 cm X 12.5 cm X 15 cm size fixed with
galvanized iron J and L hooks 10 mm dia and flat iron Clamps 25 mm X 3 mm
size, G.I plain and bitumen washers including asbestos rope and plastic
compound in joints complete.
Metre 4.05 89.55
13.27 Providing and fixing asbestos cement corruGated and semi-corrugated apron
piece with crank bolts in position, etc., complete. Metre 3.60 41.2
13.28 Providing and fixing asbestos cement corrugated ridge finial in the ridge. Each 4.35 13.95
13.29 Providing and fixing asbestos cement semi-corrugated sheet ridge finial in
the ridge. Each 4.35 13.95
13.3 Providing and fixing asbestos cement corru-gated sheet caves filler piece in
position, etc.,complete. Metre 2.75 30.80
13.31 Providing and fixing asbestos cement semi-corru-gated sheet caves filler
piece in position, etc.,complete. Metre 2.75 22.75
13.32 Providing and fixing asbestos cement expans-ion joints for semi-corrugates
sheets, fixed compelte in all respects. Metre 2.15 48.35
13.33 Providing and fixing asbestos cement semiCorrugated sheet North light
curves with asbestos sheet roofing and purlins etc. Metre 2.70 50.45
13.34 Providing and fixing asbestos cement expansion joints for North light curves,
etc., complete. Each 3.30 37.50
13.35 Providing and fixing asbestos cement expansion joints for ridge, etc.,
complete. Pair 6.55 57.15
(F) SPOUTS AND PIPES
13.36 Providing and fixing asbestos cement rain water pipe 100 mm dia with M.S.
holder and clamps, fixed on wall face with cement mortar 1:4 complete.' Metre 7.30 22.70
13.37 Providing and embedding asbestos cement 100 mm dia rain water pipe in
cement mortar during masonry work. Metre 2.50 18.90
13.38 Providing and fixing asbestos cement plain Bend 100 mm dia in position with
gutter, etc. Each 3.35 15.90
13.39 Providing and fixing asbestos cement swan neck 100 mm dia in position with
asbestos cement pipe. Each 5.40 17.35
13.40 Providing and fixing asbestos cement hexagonal rain water head 33 cm X 24
cm for asbestos cement pipe in position. Each 6.65 24.95
13.41 Providing and fixing asbestos cement shoe for Asbestos cement rain water
pipe in position. Each 4.60 16.55
13.42 Providing and fixing union clips in V, gutters 45 cm X 12.5 cm X 15 cm of
asbestos cement sheet roofing, etc., complete. Each 6.20 32.80
13.43 Providing and embedding 100 mm dia H.C.I, rain water without ears I.S. I
mark pipe in cement mortar during masonry work. Metre 2.60 93.35
13.44 Providing and laying 100 mm dia H.C.I pipe I.S.I mark including filling joints
with lead and spun yarn, etc., complete fixed in position under floors. Metre 1.50 93.05
13.45 Providing and fixing cast iron rain water non Pressure pipe, I.S.I mark with
ears with screw and wooden plugs fixed on wall face including filling joints
with spun-yarn and cement mortar 1:2 excluding head and shoe, etc. Metre
(a) 100 mm dia pipe. Metre 8.30 88.25
(b) 150 mm dia pipe. Metre 9.20 176.05
Note:- In case rain water pipe 100 mm dia and 150 mm dia with 14 kg & 25 kg weight for 180 metres length of pipe without ears
respectively is used on the face of wall decrease, the through rate of item NO. 13.4 at Rs. 22.20 and Rs. 34.35 per metre
respectively.
13.46 Extra over rate of item Nos. 13.43 and 13.45 (a) in cas lead joints are used
(a) instead of cement joints. Per Joint 3.30 24.30
(b) Extra over rate of item No. 13.45 (b) in case lead joints are used instead of
cement joints. Per Joint 5.00 36.50
13.47 Providing and fixing cast iron head for rain water pipe on wooden plugs fixed
on wall face including filling the joints with spun yarn and cement mortar 1:2
Each 3.65 36.55
13.48 Providing and fixing cast iron shoe for 100 mm Dia rain water pipe on wooden
plugs, fixed on wall face including filling the joints with spun yarn and cement Each 3.65 31.05
mortar 1:2 Each
13.49   Providing and fixing C.I plain bends in position with gutter, etc.
(a) for 100 mm dia pipe Each 3.65 57.45
(b) for 150 mm dia pipe Each 3.65 95.60
(G) KHURRAS Each
13.50 Top khurra 0.6 m X 0.6 m for rain water pipe in 25 mm thick cement concrete
1:2:4 over 50 mm thick cement concrete 1:8:16 Each 3.00 12.30
13.51 Khurra on roof as per item No. 13.50 with C.I spouts and fixing in position. Each 4.50 67.55
13.52 Khurra on roof as per item No. 13.50 with A.C spouts and fixing in position. Each 4.50 22.05
13.53 Khurra on roof as per item No. 13.50 with G.I spouts and fixing in position. Each 4.50 35.80
13.54 Khurra on roof as per item no. 13.50 with R.C.C 1:2:4 precase rain water
spouts. Each 18.60 36.65
13.55 Supplying and fixing in position G.I. pipe Class ‘B’ spouts in chajjas and
cantilevers
(a) 15 mm internal dia . G.I. pipe Metre 3.35 24.20
(b) 20 mm internal dia, G.I. pipe Metre 4.55 32.00
(c) 25 mm internal dia, G.I. pipe Metre 6.05 40.45
(d) 40 mm internal dia, G.I. pipe Metre 7.55 59.00
(e) 50 mm internal dia. G.I. pipe Metre 9.05 75.50
13.56 Khassi paranalas 12 mm thick in cement Mortar 1:2, 35 cm outside width and
upto 4.25 Metres height. Metre 4.75 10.40
13.57 Bottom khurra on ground 1.2 m X 0.6 m consisting of brick-on-edge laid in
cement mortar 1:3 over 75 mm cement concrete 1:8:16 including 12 mm thick
cement plaster 1:3 Each 9.90 64.30
13.58 Laying 10 cm earth and a coat of 25 mm mud plaster with gobri leeping on
top including two coats of bitumen painting at 1.65 kg per sqm. sqm 13.20 20.75
13.59 Applying bitumen on roofs including heating and carriage to roof. Qtl 69.85 511.00
13.6 Extra for bitumen painting at 0.70 kg per sqm. Sqm 0.50 3.70
(H) WATRE PROOFING TREATMENTS
13.61 Providing and laying four courses of water proofing treatment with bitumen
felt over roofs consisting of first and third courses of blown tyye bitumen
grade 85/25 applied hot at 1.20 kg per sqm of area for each course, second
course on roofing felt type 3 grade-I (Hessian base self finished bitumen felt)
and fourth and final course of stone grit 6 mm and down size or pea sized grit
spreat at 0.006 cum per sqm including preparation of surface complete.

Sqm 3.50 27.85


13.62 Providing and laying four course of water proofing treatment consisting of first
and third course of blown type bitumen grade 85/25 applied hot at 1/6 kg per
sqm for each course and second course of fibre glass R.P Tissue and fourth
and final course of stone grit 6 mm and down size or pea-sized grit spread at
0.006 cum per sqm including preparation of surface
Sqm 3.50 31.00
13.63 Reduction for omitting in water proofing treatment final course spreading
stone grit 6 mm and down size or pea-sized grit at 0.006 cum per sqm sqm 0.40 1.25
13.64 Cement concrete 1:2:4 gola 10 cm X 10 cm quardrant along junction of roof
with parapet wall finished smooth, where specially specified. Metre 2.45 5.35
13.65 Supplying and filling cinder on roof (1st storey) including light ramming. cum 24.95 81.15
13.66 Providing and laying cinder concrete in cement 1:15 (1 cement and 15 cinder)
on terraced roofs & (1st storey), laid to slope, including consolidating the cum 49.95 213.65
same.
(I) CEILINGS
13.67 Deodar wood beading 50 mm X 12 mm including fixing in positon etc.,
complete. Metre 1.75 9.90
13.68 Deodar wood beading 64 mm X 12 mm including fixing in position, etc.,
complete. Metre 1.75 12.20
13.69 Deodar wood beading 75 mm X 12 mm including fixing in position, etc.,
complete. Metre 1.80 13.90
Note;_ In case the edges of the beading are chamfered, increase the labour as well as through rate by Re. 0.87 per metre.

13.70 Teak wood beading 50 mm X 12 mm including fixing in position etc.,


complete (frame work to be paid separately) Metre 2.10 14.40
13.71 Teak wood beading 63 mm X 12 mm including fixing in position etc.,
complete (frame work to be paid separately) Metre 2.15 17.65
13.72 Teak wood beading 75 mm X 12 mm including fixing in position etc.,
complete (frame work to be paid separately) Metre 2.15 20.30
Note;- In case the dges of the beading are chamfered increase the labour as well as through rate by Rs. 1.05 per metre.

13.73 Teak wood plank ceiling 12 mm thick tongued and grooved planking sqm 21.50 260.30
13.74 Teak wood plank ceiling 20 mm thick tongued and grooved planking. sqm 21.50 416.60
13.75 Deodar wood plank ceiling 12 mm thick tongued and grooved planking. sqm 16.50 174.90
13.76 Deodar wood plan ceiling 20 mm thick tongued and grooved planking. sqm 16.50 273.90
13.77 Kail wood plank ceiling 20 mm thick tongued and grooved planking. sqm 16.50 192.35
13.78 Providing and fixing ‘dusty’ cloth ceiling. sqm 4.00 17.80
13.79 Providing and fixing Hessian cloth ceiling. sqm 4.00 11.50
13.8 Providing and fixing commercial plywood 4 mm thick 3 ply ceiling. sqm 2.55 65.00
Note:- In case BWR H grade ply wood is used In item no. 13.80, increase the through rate by Rs. 22 per sqm.
(i)
(ii) In case decorative plywood teak faced, on one side 4 mm thick 3 ply is used in place of commercial ply, Item
no. 13.80, increase the through rate by Rs, 42.80 per sqm
13.81 Providing and fixing 5 mm thick asbestos sheet ceiling. sqm 4.35 69.80
13.82 Providing and fixing natural colour 12 mm thick insulation board (such as
celotex, treetex etc.) ceiling. sqm 3.25 104.80
13.83 Providing and fixing 12 mm thick white faced insulation perforated board
(such as perforated celotex, etc. ) ceiling. sqm 4.80 120.65
13.84 Providing and fixing tiles of size (60 cm X 60 Cm) flat pressed single or 3
layers particle board (medium density) B.W.R type of synthetic resin ceiling-
sqm
(a) 12 mm thick plain tiles. sqm 4.80 160.00
(b) 12 mm thick perforated at random hald and “through and through” tiles. sqm 4.80 170.00
13.85 Providing and fixing hard board sheet ceiling Of approved quality with
necessary nails etc., sqm
(a) Standard quality board:- sqm
(i) 3 mm thick sqm 3.25 39.25
(ii) 4.5mm thick sqm 3.25 52.45
(b) design boards:- sqm
(i) 3 mm thick sqm 3.25 52.45
(ii) 4.5mm thick sqm 3.25 59.60
Note:- The rates of Item Nos. 13.73 to 13.85, exclude the cost of the beadiong and frame work for base, which is to
be paid for, separately.
13.86 Plaster of paris ceiling 12 mm thick , consisting of 12 mm thick panels of
plaster of paris, reinforced with Hessian cloth, fixed to underside of deodar sqm 76.15 392.55
wood cradling of specified design, solignum painted (two coats) including cost
13.87 Extra fo circular cutting and waste in ceiling With-
of fixing in position, all, materials, etc.
(a) Teak wood planks 12 mm thick Metre 10.55 40.35
(b) Teak wood planks 20 mm thick Metre 10.55 59.85
(c) Deodar wood planks 12 mm thick Metre 10.55 30.36
(d) Deodar wood planks 20 mm thick Metre 10.55 42.65
(e) Kail wood planks. Metre 10.55 32.50
(f) Natural colour insulating board 12 mm thick Metre 10.55 23.20
(g) White face insulating board 12 mm thick Metre 10.55 25.00
(h) Standard quality hard board sheet: Metre
(i) 3 mm thick Metre 1055 15.00
(ii) 4.5mm thick Metre 10.55 16.70
(i) Decorative hard board sheet: Metre
(i) 3 mm thick Metre 10.55 16.70
(ii) 4.5 mm thick Metre 10.55 17.55
13.88 Extra for providing and fixing ceiling to curved surfaced I narrow width. sqm 12.40 -