You are on page 1of 8

SYNOPSIS

Date: 28/03/2022

Name of Project: Foot Step Power Generation

Name & Sign of Project Group member:

Roll No. Course Name of student Sign


ME6I-A
ME6I-A
ME6I-A
ME6I-A

Name & Sign of Name & Sign of Name & Sign of


Project Co-ordinator Project Guide HOD
ACTION PLAN
A. Introduction
1. Promoters
Self-Promoters
2. Market Scope
In the market this type machine currently not available, if manufacturing this
type machine all people satisfactory use the machine for generation of the electricity.

3. Requirement
 To understand the basic principal of the our project
 Describe the construction and working of various parts of our project
 Development of the working model of the our project
 To reduce time spent on this activity.
 To analyze the technology according to needs and capabilities.

4. Need
Man has needed and used energy at an increasing rate for his sustenance and
wellbeing ever since he came on the earth a few million years ago. Due to this a lot of
energy sources have been exhausted and wasted. So, non-conventional energy is very
essential at the time to world. Walking is the most common activity in day to day life.
The average human takes 3,000 5,000 steps a day. Seems like a lot, but most health
experts would tell you to average 10,000 a day. Each step produces only enough
electricity to keep a LED-powered street lamp lit for 30 seconds. So this is the very
innovative thought in a commercial way for reduce the cost of power used in daily
life. The purpose of this analysis is to analyze various methods of foot step power
generation such as foot using foot step electricity converter device, using pavgen
slabs (recycled rubber), using liquid droplets and metal electrode embedded in shoe
sole, using piezoelectric material. In piezoelectric shoe insert and complementary
conditioning unobtrusive, parasitic harvesting of the compression energy normally
absorbed by an insole during walking. The process of acquiring the energy
surrounding a system and converting it into usable electrical energy is termed power
harvesting
5. Problem Statement

Fuel deposit in the will soon deplete by the end of 2020Fuel scarcity will be
maximum. Country like India may not have the chance to use petroleum products.
Keeping this dangerous situation in mind we tried to make use of non-pollutant
natural resource of petrol energy. It is not possible to consider such systems and
meeting continuous uninterrupted concentrated base load electric power
requirements. Energy plays an important role in the material, social and cultural life
of mankind. The energy needs are increasing day by day. This is the result of
population growth and increase in the standard of living which is directly proportional
to energy consumption.

B. Concept Model

Concept Drawing

Foot Step Rack

Spring

Pinion

Generator 230 Volt


Supporting Structure
C. Project Concept & Product (Details of Product)

1. Component Construction
 Generator
In AC Generator, an armature rotates inside a magnetic field. The basic working
principle of AC generator is based on the fact that whenever a current carrying
conductor is placed inside a magnetic field, there will be mechanical force
experienced by that conductor. All kinds of AC generator work under this
principle. Hence for constructing AC generatorr, it is essential to establish a
magnetic field. The magnetic field is established by using a magnet. You can use
different types of magnets – it may be an electromagnet or it can be a permanent
magnet

 Bearing
A bearing is a machine element that constrains relative motion to only the desired
motion, and reduces friction between moving parts. The design of the bearing
may, for example, provide for free linear movement of the moving part or for
free rotation around a fixed axis; or, it may prevent a motion by controlling
the vectors of normal forces that bear on the moving parts. Most bearings
facilitate the desired motion by minimizing friction. Bearings are classified
broadly according to the type of operation, the motions allowed, or to the
directions of the loads (forces) applied to the parts.

 Shaft
A shaft is a rotating machine element, usually circular in cross section, which is
used to transmit power from one part to another, or from a machine which
produces power to a machine which absorbs power. Shaft form the important
element of machines. They support rotating parts like gears and pulleys and are
themselves supported by bearings resting in the rigid machine housing.

 Nut bolts
A nut is a type of fastener with a threaded hole. Nuts are almost always used in
conjunction with a mating bolt to fasten multiple parts together. The two partners are kept
together by a combination of their threads' friction (with slight elastic deformation), a
slight stretching of the bolt, and compression of the parts to be held together.

 Square Pipe
A pipe is a tubular section or hollow cylinder, usually but not necessarily
of circular cross section, used mainly to convey substances which can
flow liquids and gases (fluids), slurries, powders and masses of small solids.
It can also be used for structural applications; hollow pipe is far stiffer per unit
weight than solid members.
D. Manufacturing Process & Technology /Principal.

1. Measurement of the material required dimension


2. Cutting operation as per dimension
3. Machining operation on required parts
3. Drilling and tapping the material as per dimension
4. Welding the material as per dimension
5. Grinding the project welding joints

E. Machine/Machining required

 Scale
 Chop Saw Cutter
 Lathe Machine
 Drilling Machine and Tapping set
 Welding Machine
 Portable Hand Grinding Machine

F. Material
1. Raw material

 Square pipe
 CRC Sheet

2. Purchased material

 Generator
 Bearing
 Shaft
 Nut bolts
 Spring

3. Material required machining

 Rack & Pinion


 Gear

4. Material Required Design

2. Cost of Project:

The Approximate cost of the project model will be: Rs. 8000/-

3. List of material (with their specification)

Sr. No. Name of the Parts Specification


1 Generator A.C. 230 Volts, Power Supply
2 Bearings Flange Bearing P204,
3 Shaft Mild Steel, 20mm Dia.
4 Spring 20 mm Dia , 8 inch Length
5 square pipe Mild Steel, 1 inches square pipe
6 Nut & bolt 8mm dia. 1.5 inches length
7 Gear 3 inch diameter

a. Conclusion

1. Feasibility of Project
A satisfactory electricity generation process produces a electricity in a minimum
time with a minimum cost.

2. Future Scope

The project has covered almost all the requirements. Further requirements and
improvements can easily be done since the as per requirements is mainly structured or
modular in nature. Improvements can be appended by changing the existing
modules