Please find below MOD-3 activities for today (Date: March 18, 2019)
https://docs.google.com/spreadsheets/d/1Hx3xAufTVhQOs5uH4VVt7bid9eFfaKiydXxzUGGCsGQ/edit?usp=sharing
Regards,
Yacob
A. Safety
No Issue
B. Daily KPI Dashboard
KPI No Description Unit Target Actual Status Remarks
KPI 1 Electric Class A Breakdown Case 0 0
KPI 2 Electric abnormal effect to OPE Case 0 0
KPI 3 Number of Leak of Field Electric System 0<Leak<6 0 0
KPI 4 Motor Loads ≥ 100% rated Case 0 0
Legend : Green = Outstanding; Yellow = On target; Red = Threshold
No abnormalities
C. Ethylene Plant
No Tag No. & Previous Day Today Suspect Start Progress ETC Remarks
Eq. Name Root Cause Date Status Date
(If Any) and
Plan to do
1 6kv Motor Inspected and PM Activity 18-03- Completed No
Recorded 19 abnormalities
current of 17 found
MV motors
Ethylene
2 3530-6001- Support Support 18-03- Completed
52BF11, operation to Operation 19
MCC Feeder rack out and
for Motor rack in VCS for
FDF BA-104 motor GB-114-
(GB-114-M) M
D. Butadiene Plant
No Tag No. & Previous Day Today Suspect Root Start Progress ETC Remarks
Eq. Name Cause (If Any) Date Status Date
and Plan to
do
1 6kv Motor Inspected and PM Activity 18-03- Completed No
Recorded 19 abnormalities
current of 7 MV found
motors
Butadiene
2 Cover CSS Install CSS Cover Improvement 18-03- Continue Remaining
Motor Motor after 19 CSS 1 EA for
complete GAM-8231S,
fabrication cover motor still run
using insulation Will request
sheet fabrication to
Install on WSS again
following item:
GAM-
8345S-CSS
GAM-
8345A-CSS
E. Man Power
NO CAP STAFF POSITION TODAY TOMORROW
1 Yacob Hermawan Section Manager Present Present
2 Adhitya Sukma Wijaya Engineer Present Present
3 Erwin Ardianto Engineer Present Present
4 Muhammad Zainal Anwar Supervisor Present Present
5 Aten Badrudin Daily Electrician Present Present
6 Eka Habibullah Daily Electrician Present Present
7 Umar Ismail Daily Electrician Present Present
*Training Upright