PACIFIC RAWAN
CALL SIGN- V7WP7 / FLAG: M. ISLANDS/P.O.R: MAJURO
.
Vessel is presently on Voyage No.43 from Ulsan to Singapore to Tuban, Loaded Gasoline(90R &
92R), 88695MT with draft 13.1mtrs. SK Energy is the sub Charterer for this voyage.
Vessel is on time charter with Shell C/P. Shell operator handling this voyage is Mr.Chun Kai Liow
Mobile : + 65 86617912. Vessel to follow instruction as per voyage order issued for each voyage.
- Shell security team- as per voyage orders when passing thru GOA/red sea.
A separate file is maintained for IHM compliance which include compliance certificates issued
by Flag and all relevant records.
Bridge equipment
All equipment are working in good order. There are two ECDIS(JRC-9201) on board
mentioned in SEQ certificates. ECDIS have feed from Navtex. e-Np and ADP are installed on
computers. Sea passage is for getting correction for ENC’s . Voyage ENC’s are ordered thru
KODCO program.
S-band radar is SSR(solid state radar),therefore this radar is without magnetron, Motor of this
radar was renewed on 29 April 2022. X-band radar magnetron was renewed on 10 Jan 2022.
Cargo System-
3 Cargo Oil Pump , each capacity 3,000 m3/h.Automatic Unloading system: AUS4532-3 × 1 set (SHINKO)
Cargo Oil Stripping Pump: Steam driven vertical double stroke 200 m3/h
Water Ballast Pump: Vertical Centrifugal Single stage 1,800 m3/h × 25 mTH × 2 sets
Water Ballast Stripping Ejector: Water driven 250 m3/h × 1 set
Cargo Striping Ejector: 500 m3/h × 1 set
Main Cargo lines in tank 550 mm Dia and on deck 500 mm Dia, Ballast water pumping lines 450
mm Dia. Manifolds designed size 16”
Ballast handling:
Vessel have ozone injection type NK Ballast water treatment system.Please pay attention that in
case of system fault, you cannot run ballast pump if system is on normal mode. Thus when it is
required to do, system must be override mode on for running ballast pumps. When system is
ready for ballasting, will give warning as “Please Run Ballast Pump”
Cargo monitoring system (Hanla MMCU-500) is working well. Tank radars principle is microwave
type. All tanks are showing very accurate ullage reading.Alarms are adjusted well according to
ISGOTT-USCG requirements (1540-200 mmWg). System password is “0000”. Please pay attention
to ROT, which is pressure type radar and showing wrong level when tank atm pressure differs.
COP trips at 150mmwg
Loadicator is working well. It is capable of calculating damage stability as per new IMO
requirement. Its printouts are endorsed by the Class during the annual survey.
UTI: Vessel have 4 UTI on board.(One UTI to offland for repair at Singapore)
Hydraulic system for Remote controlled valves: working satisfactory and located in E/R
Note:
Slop wings tanks at the time of first load at Ulsan after dry dock not showing ullages, Technician
Hanla attended and advised can be repaired only after complete discharge and tanks washed
It is working well so far and measuring gases for ballast tanks, pump room and accommodation.
O2 sensor has been replaced in April’19. Please follow calibration instruction as per maker. Prior
to calibration system must be switch on calibration mode on main panel “utilization – calibration”.
After switch on calibration mode, each sensor must be calibrated one by one by using magnet.
“hold magnet 5 sec on “√” symbol. Main panel Password is “1234”.
Portable gas meters: 4 Personal, and 4 portables. One new portable GX 8000 received in August
2021 in Singapore. Pls refer to the inventory with ch.officer and also the certificates filed.
QHSE SYSTEM:
Please note QHSE manuals are revised with effect from 01 st Jan 2021. At present company has
only one manual other than cargo operational manual. Due to large size this manual has been
divided into two parts, all forms also in manual format with 2 files. Kindly refer to the circulars
folder file in which all circulars rec’d after above revised manuals, are kept. Soft copy of the
manuals along with revised forms and checklist and circulars are shared to all on board thru
network system.
Kindly refer to important message folder for various information like new mandatory reporting
introduced on china coast, drifting prohibited areas for EOPL Singapore etc.
Last internal audit was done remotely/completed on 25 Mar 2022 and report is filed.
Last VIR was done remotely/completed on 26 Dec 2022 and report is filed.
Last cargo audit was done remotely/completed on 25 September 2021 and report is filed.
RMI Aduit visit was on 10 May 2022 at Ulsan(S.Korea) for Renewal audit and issued full term SMC
certificate.
There are 3 alcohol meters on board one in E/R, one with 2/o on bridge and one in master cabin.,
Deck Maitenanace
All Mooring wire ropes end to end completed in June 2021. All wires were well greased last in Dec
2021 before SIRE inspection. Tail ropes last renewed on 05 Jan 2022. Pls refer to the MSMP file
kept with ch.officer.
Paint room is used as cargo sample locker too and MSDS folder is located and updated.
Cosmetic condition of vessel is good. Almost entire main deck spot rust, all tank domes, main
holes covers and various other deck fittings chipping and painted completed. All mooring winches,
windlass and fire wire drums completed. Adjacent area For’d of accdn B/heads , Pump room
blowers & booby # comings/covers , pipe lines and various fittings are completed.
Many flanges and U-clamps completed. Few U-clamps in mid ship areas and aft of mid ship
remaining to attend.
Security:
Steering gear room is designated as citadel. There is iridium phone, stores and fixed public toilet.
Doors are easily ready for locking. Security Hand torches are located in Nav locker on bridge deck.
Security files records are updated by ch.officer.
Passwords:
BWTS 1111
CARGO MONITOR PC OPERATOR
CMS MMCU-500 0000
FIXED GAS DETECTION SYSTEM 1234
PARIS USER NAME: master PASSWORD: Radar2010
OUTLOOK radar201
RX8000 0008
ISF WATCHKEEPER admin
CCTV mrckorea11
Pls refer to password file for various passwords in misc folder on desk top in master cabin
BRIDGE WITH 2ND MATE: ONE INFRARED FORHEAD THERMOMETER AND ONE PULSE OXIMETER
CH.OFFICER: ONE IR CONNECTIVITY KIT FOR CREW PERSONAL MULTI GAS METER.
MASTER’S CABIN : ONE INRARED FORHEAD THERMOMETER, One PULSE OXIMETER AND ONE
INTISICALY SAFE CAMERA WITH USB CABEL. ONE IR CONNECTIVITY KIT FOR CREW PERSONAL
MULTI GAS METER.