Mobile Crane - Lifting Calculation & Basic Lifting Plan

South Dhahran Home Ownership (SDHO) Initial Site Development Increment II


Package 1 & 2 (6600041347 & 6600042398)
Kolin Construction Tourism Industry and Trading Co. Inc

LIFT 1 LIFT 2 LIFT 3 LIFT 4 LIFT 5

LIFT CALCULATIONS: DATE (DD/MM/YY


Date and Time of Lifts
TIME (HH:MM)
Y N Y N Y N Y N Y N

Crane set on
LIFTlevel
1 ground and out riggersLIFT
fully
2 extended? LIFT 3 LIFT 4 LIFT 5

Pick up and drop paths identified?


Date and Time the lift is conducted
Rigging equipment inspected and correctly color coded?
What is to be lifted? Is the lift area around the crane is controlled?
Daily crane checklist completed and safe to commence work?
Weight of the load to be lifted? If answer is no to any of these questions, DO NOT COMMENCE LIFT ****

Type and Model of the Crane use


for the lift
Lifting Locations:
 Snatch Block ____________  Snatch Block ____________  Snatch Block ____________  Snatch Block ____________  Snatch Block ____________
Kg/tonne Kg/tonne Kg/tonne Kg/tonne Kg/tonne
 Flat Sling
LIFT 1  Flat Sling
LIFT 2  Flat Sling
LIFT 3  Flat Sling
LIFT 4  Flat Sling
LIFT 5
Crane No.:____________
____________Kg/tonne ____________Kg/tonne ____________Kg/tonne ____________Kg/tonne ____________Kg/tonne
What auxiliary lifting equipment is
A –and
Boom  Wire Rope  Wire Rope  Wire Rope  Wire Rope  Wire Rope
being used whatLength (M)
is the SWL
____________Kg/tonne ____________Kg/tonne ____________Kg/tonne ____________Kg/tonne ____________Kg/tonne
 Others: Others: Others: Others: Others:
B - Radius (M) ____________Kg/tonne ____________Kg/tonne ____________Kg/tonne ____________Kg/tonne ____________Kg/tonne

Is all equipment to be
C – Hook used in(T)
Weight date Yes  No  Yes  No  Yes  No  Yes  No  Yes  No 
for inspection? (if No do not carry out the lift) (if No do not carry out the lift) (if No do not carry out the lift) (if No do not carry out the lift) (if No do not carry out the lift)
Has the slinger received basic Yes  No  Yes  No  Yes  No  Yes  No  Yes  No 
D – Load Weight (T)
slinging training? (if No do not carry out the lift) (if No do not carry out the lift) (if No do not carry out the lift) (if No do not carry out the lift) (if No do not carry out the lift)
Are Tag-Lines required to Yes  No  Yes  No  Yes  No  Yes  No  Yes  No 
Total Weightthe
steady/control (C+D)
load? (if No do not carry out the lift) (if No do not carry out the lift) (if No do not carry out the lift) (if No do not carry out the lift) (if No do not carry out the lift)
Is there a clear pathway for the Yes  No  Yes  No  Yes  No  Yes  No  Yes  No 
MaximumofWeight
movement Capacity (T) (if No do not carry out the lift)
the load? (if No do not carry out the lift) (if No do not carry out the lift) (if No do not carry out the lift) (if No do not carry out the lift)
Has Set down point been Yes  No  Yes  No  Yes  No  Yes  No  Yes  No 
prepared?
Current % Crane Capacity (%) (if No do not carry out the lift) (if No do not carry out the lift) (if No do not carry out the lift) (if No do not carry out the lift) (if No do not carry out the lift)
Is the set down point able to take Yes  No  Yes  No  Yes  No  Yes  No  Yes  No 
the load? (if No do not carry out the lift) (if No do not carry out the lift) (if No do not carry out the lift) (if No do not carry out the lift) (if No do not carry out the lift)
Crane Operator Name:
Name and Signature of the Rigger
Rigger Name:
Name and Signature of the Crane
Operator
Name and Signature of the Safety
Officer
Name and Signature of the Safety
Supervisor