Crane set on
LIFTlevel
1 ground and out riggersLIFT
fully
2 extended? LIFT 3 LIFT 4 LIFT 5
Is all equipment to be
C – Hook used in(T)
Weight date Yes No Yes No Yes No Yes No Yes No
for inspection? (if No do not carry out the lift) (if No do not carry out the lift) (if No do not carry out the lift) (if No do not carry out the lift) (if No do not carry out the lift)
Has the slinger received basic Yes No Yes No Yes No Yes No Yes No
D – Load Weight (T)
slinging training? (if No do not carry out the lift) (if No do not carry out the lift) (if No do not carry out the lift) (if No do not carry out the lift) (if No do not carry out the lift)
Are Tag-Lines required to Yes No Yes No Yes No Yes No Yes No
Total Weightthe
steady/control (C+D)
load? (if No do not carry out the lift) (if No do not carry out the lift) (if No do not carry out the lift) (if No do not carry out the lift) (if No do not carry out the lift)
Is there a clear pathway for the Yes No Yes No Yes No Yes No Yes No
MaximumofWeight
movement Capacity (T) (if No do not carry out the lift)
the load? (if No do not carry out the lift) (if No do not carry out the lift) (if No do not carry out the lift) (if No do not carry out the lift)
Has Set down point been Yes No Yes No Yes No Yes No Yes No
prepared?
Current % Crane Capacity (%) (if No do not carry out the lift) (if No do not carry out the lift) (if No do not carry out the lift) (if No do not carry out the lift) (if No do not carry out the lift)
Is the set down point able to take Yes No Yes No Yes No Yes No Yes No
the load? (if No do not carry out the lift) (if No do not carry out the lift) (if No do not carry out the lift) (if No do not carry out the lift) (if No do not carry out the lift)
Crane Operator Name:
Name and Signature of the Rigger
Rigger Name:
Name and Signature of the Crane
Operator
Name and Signature of the Safety
Officer
Name and Signature of the Safety
Supervisor