Mobile Crane - Lifting Calculation

South Dhahran Home Ownership (SDHO) Initial Site Development Increment II


Package 1 & 2 (6600041347 & 6600042398)
Kolin Construction Tourism Industry and Trading Co. Inc

LIFT 1 LIFT 2 LIFT 3 LIFT 4 LIFT 5

DATE (DD/MM/YY
Date and Time of Lifts
TIME (HH:MM)
Y N Y N Y N Y N Y N
Crane set on level ground and out riggers fully extended?
Pick up and drop paths identified?
Rigging equipment inspected and correctly color coded?
Is the lift area around the crane is controlled (signage & barricades?
Daily crane checklist completed and safe to commence work?

LIFT CALCULATIONS: If answer is no to any of these questions, DO NOT COMMENCE LIFT ****

Lifting Locations:
Crane No.:____________ LIFT 1 LIFT 2 LIFT 3 LIFT 4 LIFT 5
**Crane Capacity**
Boom Angle
A – Boom Length (M)
B - Radius (M)
C – Hook Weight (T)
D – Load Weight (T)
(1)
Total Weight (C+D)
(2)
Maximum Allowable Weight
Capacity (based on load chart) (T)
Load Percentage (≥80%)
(1) ÷ (2) X 100

Crane can lift based on load chart: ☐ YES ☐ NO ☐ YES ☐ NO ☐ YES ☐ NO ☐ YES ☐ NO ☐ YES ☐ NO
Crane Operator Name:
Rigger Name:
Verified by: (Safety Personnel)