You are on page 1of 2

PF PUMP SPECIFICATION Page 1 di 2

EDITION : 2 PF PUMP ASSEMBLY NO.


APPLICATION: SEE PAGE 2 38372 (PF70/38372).
DATED: 30-06-2006 SUPERSEDES:
CUSTOMER: Yanmar CUSTOMER PART NO. 714320 - 51130 [N4D]

TEST CONDITION 3. NOZZLE : 38389 (opening pressure 19,6


Mpa)
1. CALIBRATION FLUID :SAE J967 / ISO 4113 4. CAM PROFILE : 114320-14010
AT THE TEMPERATURE 102-104 ° F(39-40°C) 5. INLET PRESSURE 14.5 psi (1.0bar)
2. CALIBRATION HIGH TEST PRESSURE PIPES
1,60 x 450 mm

ITEM PART Q.T DESCRIPTION


No. No. Y
1
1 36365 1 Holder delivery valve
2 2 36366 1 Spring
Delivery valve(retraction
3 36367 1 volume 18mm3/stroke)
4 3 4 36374 2 Gasket
Plunger & barrel assy
5 38373 1
(plunger Φ=7 mm R)
Paper shim (thickness
6 36373 1
0,2 mm)
5
7 36372 1 Flange
8 36384 2 Pin
6 9 36368 1 Phasing plate
10 36385 1 Pin
11 36369 1 Spring
7 12 36371 1 Metering sleeve
13 OT867 1 Phasing plate
8 For engineering use only
9 Date ECN Number Edition

07-03-06 29838 1
10 30-06-06 30170 2

11

12

13

© STANADYNE Corporation, all rights reserved. Unless otherwise specified, no part of this publication may be reproduced or utilized in any
form or by any means, electronic or mechanical, including photocopying and microfilm, without permission in writing from the publisher.
Page 2 di 2
APPLICATION AND SERVICE INFORMATION
FOR PUMP ASSEMBLY

CALIBRATION SPEC
RACK FROM STOP RPM DYMAMIC FLOW
[ mm3/stroke ]
See note 1* 1500 21,8 ± 0,44

* SETTING POINT ENGINE APPLICATION : L100N (3000 rpm)


LIFT CLOSE TO CLOSURE: 2,75–2,65 mm
(REF.TO B.D.C. DIMENSION) : 45,5 mm
LIFT: 6,5 mm

Data di produzione :
3(anno) F(mese)19(giorno)
Data code
3(yaer) F(month)19(day)

Il segno sulla flangia indica la


posizione del manicotto di regolazione a
cui corrisponde la portata indicata in
tabella .

The mark on the flange is the metering


sleeve position able to guarantee the Pump
delivery shown on the table. identification :
N4D

Le ultime due cifre indicate sulla


flangia, nella posizione indicata in
figura, rappresentano il valore dell’inizio
mandata reale della pompa

The two digit written on the flange in


the position shown in the pictures , are
the last two digit of the start of delivery

© STANADYNE Corporation, all rights reserved. Unless otherwise specified, no part of this publication may be reproduced or utilized in any
form or by any means, electronic or mechanical, including photocopying and microfilm, without permission in writing from the publisher.

You might also like