DRG NO JOB NO

8 7 6 5 4 3 2 1
NOTES
PREVAILING
WIND
P.N
PLANT
NORTH
NORTH
E E
PN=1864.000 PN=1719.500
PE=1503.000 PE=1503.000
KEY PLAN
GENERAL NOTES
1. DENOTES ACCESSWAYS (CONCRETE)
2. DENOTES PLATFORMS
T-4.092.979
3. DENOTES PAVED AREAS
4. DENOTES HEAVY DUTY PAVED AREAS
PN=1719.500 PN=1509.500 PN=1261.500 PN=804.500
PE=1323.000 PE=1323.000 PE=1323.000 PE=1323.000
5. DENOTES CONTRACT SPLIT
6. DENOTES BATTERY LIMITS
7. DENOTES FUTURE
D D
8th AVENUE
8.HIGH POINT PAVING = EL.+100000 mm
9.FOR SITE MASTER PLAN
PN=555.000 SEE DRAWING No. T-13.369.401
T-4.092.978 PE=1323.000
1250 1650
T-4.092.975 T-4.092.976
PN=1719.500 T-4.092.966
PE=1213.000
PN=555.000
PE=1176.250
7th AVENUE PN=1509.500 PN=1261.500 PN=925.500 PN=804.500 PN=598.000
PE=1176.250 PE=1176.250 PE=1176.250 PE=1176.250 PE=1176.250
7th AVENUE 7th AVENUE
T-4.092.965
PN=1864.000
PE=1213.000

C C
T-4.092.958 T-4.092.956 T-4.092.969 T-4.092.971
ROAD D

ROAD G
T-4.092.952 T-4.092.953
T-4.092.960 T-4.092.973
ROAD C

PN=1232.500

PN=1128.500
PE=1015.500

PE=1015.500

ROAD F
PN=1053.750

PN=1006.750
PE=967.500

PE=967.500

T-4.092.977
T-4.092.954
PN=1053.750
PE=912.500

T-4.092.959 T-4.092.957 T-4.092.955 T-4.092.968 T-4.092.970 T-4.092.972


PN=1006.750
PE=912.500
T-4.092.963
PN=1128.500
PE=912.500

T-4.092.964
6th AVENUE
PN=1734.500
PE=865.000
FOR CONSTRUCTION
T-4.092.974
6th AVENUE 6th AVENUE
PN=1734.500
PN=1232.500
B PN=925.500 B
PE=824.000
PE=912.500
PE=866.000
PN=1864.000 PN=1589.000 PN=598.000
PE=865.000 PE=866.000 PE=866.000
PN=961.000
REFERENCE DRAWING :
T-4.092.962 T-4.092.961 T-4.092.967
PN=1261.500 PE=876.000 PN=555.000
PE=866.000 PE=866.000
PN=1222.000
PN=1589.000
PE=876.000
PE=824.000
PN=1864.000 PN=1734.500
C 27/02/2009 S.N J.Y K.A FOR CONSTRUCTION
PE=790.000 PE=790.000
B 10/12/2007 S.N J.Y A.B FOR CONSTRUCTION
T-4.092.952 PLOT PLAN SLUG CATCHER
PN=1222.000 PN=961.000
T-4.092.953 PLOT PLAN CONDENSATE STABILISATION (COMMON) A 13/02/2007 S.Y J.Y A.B FOR CONSTRUCTION
PE=764.000 PE=764.000
T-4.092.954 PLOT PLAN CONDENSATE STABILISATION (PHASE 1)
O 31/08/2006 S.Y J.Y A.B FOR COMPANY COMMENT
T-4.092.955 PLOT PLAN AGR UNIT (PHASE 1)
T-4.092.956 PLOT PLAN DMR UNIT (PHASE 1)
ISSUE DATE MADE CHECK'D APPR'D DESCRIPTION
T-4.092.957 PLOT PLAN NGL FRACTIONATION & EXTRACTION UNIT (PHASE 1)
T-4.092.958 PLOT PLAN LPG UNIT (PHASE 1)
T-4.092.959 PLOT PLAN CHILLED WATER AREA (PHASE 1) THIS PLOT PLAN IS DEVELOPED FROM FOLLOWING PS DRAWINGS.
Pearl GTL Project - Qatar
T-4.092.960 PLOT PLAN FGP SUBSTATION 1SS100 T-13.376.829 PLOT PLAN LOCATION DRAWING RAS LAFFAN QATAR YOKOHAMA JAPAN
T-4.092.961 PLOT PLAN SRU AND SCOT UNITS (COMMON) T-13.376.705 PLOT PLAN SLUG CATCHER
This document is confidential. Neither the whole nor any part of this document may be disclosed to any
T-4.092.962 PLOT PLAN SRU AND SCOT UNITS (PHASE 1) T-13.376.706 PLOT PLAN CONDENSATE STABILISATION (PHASE 1)
third party without the prior written consent of CHIYODA-HHI CONSORTIUM (CHC).
T-4.092.963 PLOT PLAN COMMON TANKAGE AREA T-13.376.707 PLOT PLAN CONDENSATE STABILISATION (COMMON)
Title in respect of this document is vested in Qatar Shell GTL Limited. Neither the whole nor any part of
T-4.092.964 PLOT PLAN FGP SUBSTATION 0SS600 T-13.376.708 PLOT PLAN NGL FRACTIONATION & EXTRACTION UNIT (PHASE 1) this document may be reproduced, stored in any retrieval system or transmitted in any form or by any means
(electronic, mechanical, reprographic, recording or otherwise) without the prior consent of CHC.
T-4.092.965 PLOT PLAN CONDENSATE STABILISATION (PHASE 2) T-13.376.709 PLOT PLAN LPG UNIT (PHASE 1)
T-4.092.966 PLOT PLAN COMMON ETHANE TREATING UNIT (PHASE 2) T-13.376.710 PLOT PLAN AGR UNIT (PHASE 1)
T-4.092.967 PLOT PLAN SRU AND SCOT UNITS (PHASE 2) T-13.376.711 PLOT PLAN SRU AND SCOT UNITS COMMON)
A A
FGP AREA OVERALL PLOT PLAN
T-4.092.968 PLOT PLAN AGR UNIT (PHASE 2) T-13.376.712 PLOT PLAN COMMON TANKAGE AREA
T-4.092.969 PLOT PLAN DMR UNIT (PHASE 2) T-13.376.728 PLOT PLAN CHILLED WATER AREA (PHASE 1)
T-4.092.970 PLOT PLAN NGL FRACTIONATION & EXTRACTION UNIT (PHASE 2) T-13.376.742 PLOT PLAN CHILLED WATER AREA (PHASE 2)
PROJECT/GROUP/LOCATION HP-3000-QAT CONTRACTOR PROJECT No 5887
T-4.092.971 PLOT PLAN LPG UNIT (PHASE 2) T-13.376.744 PLOT PLAN SRU AND SCOT UNITS (PHASE 1)
T-4.092.972 PLOT PLAN CHILLED WATER AREA (PHASE 2) T-13.376.748 PLOT PLAN COMMON ETHANE TREATING UNIT (PHASE 2)
CONTRACTOR CONTRACT No PI-096 ORIGINATING ORGANISATION CHC
T-4.092.973 PLOT PLAN FGP SUBSTATION 2SS100 T-13.376.817 PLOT PLAN FGP SUBSTATION 1SS100
T-4.092.974 PLOT PLAN FUTURE GAS COMPRESSOR AREA T-13.376.818 PLOT PLAN DMR UNIT (PHASE 1) CONTRACTOR NAME CHIYODA - HHI CONSORTIUM
T-4.092.975 PLOT PLAN FUTURE CO2 REMOVAL (PHASE 1)
T-4.092.976 PLOT PLAN FUTURE CO2 REMOVAL (PHASE 2) UNIT 0-0000
C
T-4.092.977 PLOT PLAN FUTURE AREA
CONTRACTOR
T-4.092.978 PLOT PLAN FUTURE CONDENSATE STABILISATION AREA
PCWBS ZZ NA (QPG JOB No 51505)
T-4.092.979 PLOT PLAN WATER RE-INJECTION AREA 0 50 100 150 DRG No
SCALE 1:1500 PROJECT DRG No T-4.092.951 REV C
BDR SIZE ; A0
A0 1189X841 8 7 6 5 4 3 2 1
FILENAME
T4092951RevC_F001.PDF