Assessment of Solar PV Installer - Electrical

Date of Exam- _________


QP- SGJ/Q0102 (Solar PV Installer - Electrical)
Note:
● Theory- 108 Marks
● Total- 30 questions. Answer all
● Time- 30 Mins.
● No negative marking

SGJ/N0101-Site Survey for installation of solar PV system


1. Which of the following factors you need to assess for optimizing route plan? (2 Marks)
A. Location
B. Price of the solar PV system
C. Quality of Solar PV system
D. Both A&B
2. For ensuring availability of tools and materials at the time of solar PV installation one should assess__________.
(2 Marks)
A. The quality of the system
B. Site level prerequisites
C. Both A&B
D. None of the above
3. Which of the following factors can influence the output given by a solar PV system? (2 Marks)
A. Shading obstacles
B. Movement of sun
C. Placement of PV system
D. All of the above
4. What is solar module racking? (2 Marks)
A. Photovoltaic cells
B. The difference between expected and actual output of the PV system
C. Photovoltaic mounting systems
D. Optimizing the energy produced by mixing different type of PV cells
5. If any civil construction is required for solar PV installation, then you might have to inform which of the following
people? (1 Marks)
A. Customer
B. Supervisor
C. Govt. Authorities
D. All of the above
6. To enhance light capture and for increasing energy production, which type of mounting should be constructed?
(2 Marks)
A. Solar trackers
B. Fixed mounting facing west
C. Fixed mounting
D. None of the above
7. For calculating load to be run on the solar PV system, what type of equipment should be assessed?(1 Marks)
A. Appliances using AC power
B. Appliances using DC power
C. Both A&B
D. Only batteries
8. How can knowledge of MS Excel can help to at your job? (2 Marks)
A. It will help you write letters more precisely
B. It will help you prepare load chart on a spreadsheet
C. It will help you manage you mail more easily
D. It can help you make good presentations and slides
9. Which of the following things can significantly affect the power generated by solar PV system? (2 Marks)
A. Change in season
B. Sunlight observed
C. Both A&B
D. None of the above
SGJ/N0104-Install Electrical components of Solar PV System
10. Why it is important to clarify the maximum working voltage? (4 Marks)
A. To find help if any hazard occurs
B. To be aware about all the risks involved
C. To ensure hazards will affect only the PV system and not the installer
D. All of the above
11. Which of the following equipment should be inspected and tested on regular basis? (4 Marks)
A. Safety equipment
B. Testing equipment
C. Monitoring equipment
D. All of the above
12. What is AC/DC? (4 Marks)
A. Alternating Current/Direct Current
B. Alternative Current/ Directive Current
C. Alter Current/ Drawn Current
D. None of the above
13. _____________ is a device that integrates the output of multiple strings of PV modules for connection to the
inverter. (4 Marks)
A. PV array
B. The combiner box
C. PV battery
D. PV cells
14. What will you do immediately after installing battery interconnection cables? (4 Marks)
A. Select PPE
B. Select the location of DC combiner box
C. Apply anti-oxidant material
D. Both B&C
15. Why it is important to check cables? (4 Marks)
A. For continuity
B. To locate underground hazards
C. For maximum working voltage
D. All of the above
16. What should be done with fine stranded cables after installing the battery bank? (4 Marks)
A. Leave them as it is
B. Connect them with PV modules
C. Both A&B
D. Terminate them
17. Before getting the grounding system installed, which of the following things should be verified?(3 Marks)
A. Grounding conductor size
B. Any underground hazard
C. Both A&B
D. None of the above
18. Which of the following things can help you identify tools and materials required for certain task more easily?
(4 Marks)
A. Proper knowledge of techniques
B. Proper labelling
C. Awareness about work procedures
D. All of the above
19. You are not required to install grounding system for which of the following things? (4 Marks)
A. DC meters
B. Modules
C. Mounting system
D. Inverters

SGJ/N0105-Test and Commission Solar PV System


20. Which of the following components of a solar PV system you are required to inspect? (5 Marks)
A. Mechanical
B. Civil
C. Electrical
D. All of the above
21. When testing the PV system, what should be done immediately after verifying system grounding? (5 Marks)
A. Measure load requirements of that particular facility
B. Measure insulation resistance
C. Minimize the load requirement of that particular facility
D. Both A&C
22. Before any product reaches customers, they should pass QC, what is QC? (4 Marks)
A. Quality Check
B. Quality Concern
C. Quantity Check
D. Quantity Concern
23. What will you do if you observe some anomalous conditions when testing the solar PV system? (5 Marks)
A. Record details
B. Do the necessary repair
C. Both A&B
D. Ignore minor details
24. What is DAS? (5 Marks)
A. Directly Affecting Sunlight
B. Data Acquisition Systems
C. Data Analyzing System
D. The output voltage range of PV system
SGJ/N0106-Maintain Personal Health & Safety at project site
25. What is PPE? (5 Marks)
A. Personal Protective Equipment
B. Personalized Protection Equipment
C. Protection Person Equipment
D. Proper Protection Equipment
26. What should you do to ensure that correct PPE is used? (5 Marks)
A. Ask supervisor
B. Identify job requirements
C. Follow your instincts
D. It's not possible at all

27. When should first-aid kit be available? (5 Marks)


A. If there are risks involved
B. If risks are not involved
C. If there is a hazard
D. All of the above
28. What type of hazards can occur at work place? (4 Marks)
A. Environmental hazards
B. Bilogical hazards
C. Accidents
D. All of the above
29. What are OHS standards? (5 Marks)
A. Occupational Health and Safety
B. Office and Home Safety
C. Official Hours Safety
D. None of the above
30. Which of the following PPE you might have to use at workplace to avoid electrical hazards? (5 Marks )
A. Special clothes
B. Special Shoes
C. Both A&B
D. Metal gloves

Assessment of Solar PV Installer - Electrical


Date of Exam- _________
QP- SGJ/Q0102 (Solar PV Installer - Electrical )
● Practical- 112 Marks
● Total- 30 questions. Answer all
● Time- 30 Mins.
● No negative marking

1. SGJ/N0101
Viva (6 Marks)
1. Why it is important to assess the site conditions before installing solar PV system?
2. Explain how will you identify load to be connected to solar PV system?
Practical (8 Marks)
1. How will you conduct site survey for installation of solar PV systems? What are the different things you need to
consider and ensure?
2. ELE/N5903
Viva (21 Marks)
3. List the things that you should keep in mind or consider when installing conduits and cables?
4. How will you get the grounding systems installed. Mention all the steps involved.
5. Why you should be extremely careful when installing battery bank? Explain the whole process and the risks
involved.
Practical (30 Marks)
2. How will you install electrical components of a PV system? List all the steps involved

3. SGJ/N0103
Viva (15 Marks)
6. What are the different issues that you may observe after testing the system?
7. What is anti-islanding performance? Explain in detail.
8. List any three defects that you may observe during tests of the solar PV system, also mention how to remove such
defects?
Practical (11 Marks)
3. What are the different tests that you must perform or things you need to ensure before passing the solar PV
system on quality grounds?

4. SGJ/N0104
Viva (6 Marks)
9. What are the different measures that one should take to ensure safety when working at height?
10. Explain how not following company policies could lead to hazard. Also, mention 5 PPEs that can be used at
worksite/workplace. (5 Marks)
Practical
4. List any 5 hazards or give 5 examples of hazards that can occur while installing solar PV system and also mention
how to avoid each hazard. (10 Marks)

Name: ____________________________________

Sign: ____________________________________
Answer Key of Solar PV Installer-Electrical
1. A
2. B
3. D
4. C
5. D
6. A
7. C
8. B
9. C
10. B
11. D
12. A
13. B
14. C
15. A
16. D
17. C
18. D
19. A
20. D
21. B
22. A
23. C
24. B
25. A
26. B
27. D
28. D
29. A
30. C