Professional Documents
Culture Documents
1. SGJ/N0101
Viva (6 Marks)
1. Why it is important to assess the site conditions before installing solar PV system?
2. Explain how will you identify load to be connected to solar PV system?
Practical (8 Marks)
1. How will you conduct site survey for installation of solar PV systems? What are the different things you need to
consider and ensure?
2. ELE/N5903
Viva (21 Marks)
3. List the things that you should keep in mind or consider when installing conduits and cables?
4. How will you get the grounding systems installed. Mention all the steps involved.
5. Why you should be extremely careful when installing battery bank? Explain the whole process and the risks
involved.
Practical (30 Marks)
2. How will you install electrical components of a PV system? List all the steps involved
3. SGJ/N0103
Viva (15 Marks)
6. What are the different issues that you may observe after testing the system?
7. What is anti-islanding performance? Explain in detail.
8. List any three defects that you may observe during tests of the solar PV system, also mention how to remove such
defects?
Practical (11 Marks)
3. What are the different tests that you must perform or things you need to ensure before passing the solar PV
system on quality grounds?
4. SGJ/N0104
Viva (6 Marks)
9. What are the different measures that one should take to ensure safety when working at height?
10. Explain how not following company policies could lead to hazard. Also, mention 5 PPEs that can be used at
worksite/workplace. (5 Marks)
Practical
4. List any 5 hazards or give 5 examples of hazards that can occur while installing solar PV system and also mention
how to avoid each hazard. (10 Marks)
Name: ____________________________________
Sign: ____________________________________
Answer Key of Solar PV Installer-Electrical
1. A
2. B
3. D
4. C
5. D
6. A
7. C
8. B
9. C
10. B
11. D
12. A
13. B
14. C
15. A
16. D
17. C
18. D
19. A
20. D
21. B
22. A
23. C
24. B
25. A
26. B
27. D
28. D
29. A
30. C