23 May 2022 18:06:42 - B-C3-CPK01 Electrical Equipment Fp.

sm
Electrical Equipment FP Calculations [ASCE 7-10]
Component Information *Attach in Appendix [Appx: XXXX]
Total Equipment Weight: WE 94000 lbs
Total Slab Weight: WS 324 kip
Support Slab Width: DA 14.5 ft
Total Seismic Weight: W WE WS 418000 lbs
Center of Gravity
Height: HCG 6 ft (Taken as T.O.S.)
DA
Depth: DCG 2.21 m
2
Number of Anchors: NA 4
Component Height in Structure: z 0 ft (Utility - Level 1) [2141-L: Tbl. 2]
Component Amplification Factor: ap 1.0 [2141-L: Tbl. 3]
Response Modification Factor: Rp 2.5 [2141-L: Tbl. 3]
Component Importance Factor: Ip 1.5 [2141-L: Tbl. 4]
Overstrength Factor: ΩO 2.5 [ASCE 7-10: Tbl 13.6-1]
Site Information
Spectral Acceleration: SDS 0.74 [2141-L: Tbl. 1]
Roof Height of Structure: h 95.04 ft (D1X) [2141-L: Tbl. 2]
Seismic Design Force [ASCE 7-10: Sec. 13.3.1]
0.4 a p
S DS
W z
Fp 1 2 74236.8 lbs [ASCE 7-10: Eqn. 13.3-1]
Rp h
Ip
Limits: Minimum: Fpmin 0.3 SDS Ip W 139194 lbs
Maximum: Fpmax 1.6 SDS Ip W 742368 lbs
Use: Fp 139194 lbs
Overturning Check
Overturning Moment: 6 m
MO Fp HCG 8.19 10 lb ft
2
s
Resisting Moment: m
MR W DCG 29719052.82 lb ft
2
s
Anchor Design Forces
Tension: 0 >No Overturning<
ΩO Fp
Shear: 86996.25 lbs
NA