You are on page 1of 7

RESUME

MOHD TARIQ RIZVI


Sr. Planning Engineer
UZ – 750 Project Support
ADNOC Offshore
WTC (48th Floor)
Hamadan Street – Abu Dhabi
Mobile +971-563172661
rizvitariq@hotmail.com
m.tariqrizvi@gmail.com

EDUCATIONAL QUALIFICATION
• Bachelor of Engineering (Mechanical) from Aligarh Muslim University Aligarh India, with First Division in 1999.
• Diploma in Mechanical Engineering from Aligarh Muslim University Aligarh India with First Division in 1994.
CERTIFICATIONS AND APPROVALS
• Approved by Kuwait National Petroleum Company (K.N.P.C), as a Lead Planning Engineer.
• Approved by Kuwait Oil Company (K.O.C) as Engineer (Planning and Design).
• Advanced Course in Primavera Project Management P-6.2 from KLG Systel.
• Certificate Course in Primavera (P3.1)
• Certificate Course in M.S Project
PROFILE/SUMMARY OF EXPERIENCE
A Multi Discipline Sr. Planning Engineer working with ADNOC offshore – A Joint Venture of ADNOC, Exxon Mobil and
JODCO in UZ – 750 Project (A Multi Billion USD mega project comprising construction of 04 artificial Islands, Drilling of
producer and Injection wells, Construction of modularized process plants and Utilities).
Achieved over 20 year Experience with Client, PMC and EPC Contractors and deals in vast array of projects for
ADNOC offshore, Kuwait Oil Company, Kuwait National Petroleum Company, Wood group, SNC Lavalin, Strabag
Zublin International Qatar and Lodige Systems GmbH Germany etc. with experience encompassing but not limited to
the following.

• Planning, Scheduling, Budgeting, Monitoring, Controlling and Reporting of projects from assessment to
handover, with the help of various tools like Primavera Project Management (P6), Primavera Project Planner
(P3.1), M.S Project, Janus for Engineering PMS, Easy plant for Construction PMS, M.S office etc.

• Coordinate and help varies divisions of Company to develop the bidding document by bench marking of new
projects with the help of historical data.

• Budget, track and update 05 year business plans, Provide technical support to the change management
process, Certify monthly progress and Invoices for payment.

• Project claims resolution by Prospective and Retrospective forensic analyses of the program according to the
recommended protocols as AACE® International Recommended Practice No. 29R-03, Forensic Schedule
Impact Analyses and Society of Construction Law Delay and Disruption Protocol.

Such experience has cultivated strong Project controls and Communication skills with the Knowledge and ability to deal
with the Contractual matters of the project and move between different levels of management as the industry forces
dictates. Skilled at handling a variety of tasks effectively, can liaise with and motivate others both tactfully and

Mohd Tariq Rizvi 1-6


diplomatically. Experience illustrates conscientious approach to all tasks, either on own initiative or in a team
environment, readily accepting the challenge of additional roles.

DETAILS OF PROFESSIONAL EXPERIENCE

1. ORGANIZATION

Working with ADNOC Offshore Abu Dhabi from 15 th November 2014 in UZ – 750 Project through Wood group
PMC in - Project support team.

POSITION

Sr. Planning Engineer (UZ-750 project Support)


Reporting to Project Support Manager

FUNCTIONS AND RESPONSIBILITIES

• Establishing and defining job orientated project control procedures as progress measurement procedure,
Progress reporting procedure, invoicing procedure, schedule risk assessment procedure, CTN Procedure etc.

• Join CER)/IPR teams for different projects within ADNOC group.

• Helps in preparation of ITTs, Bid reviews etc.

• Focal point for project support division regarding planning, scheduling and progress issues of UZ-750 program.

• Administer and Control P6 software along with the review and administration of all OBS, EPS, WBS codding
system for UZ-750 Program.

• Studying and understanding all relevant documents and conditions pertaining to the project and prepare the
schedules based on the available information at that particular time/phase.
• Ensuring that Corporate Systems are set up and maintained in line with project schedules.
• Prepare integrated schedule of UZ – 750 program by Integrating the L3 schedule of ECW, AUP, EPC-01, EPC-
02 and SRP project/packages.

• Incorporate and monitor all milestones for Company provided services in to integrated program including B/F
milestones.

• Review and approval of level – 03 Contractor’s planning package including, L3 schedule, S-curves, Resource
histograms, Progress measurement systems (PMS) etc.

• Review and acceptance of all level 04 Sub-contractor’s planning packages including, L4 schedule, S-curves,
Resource histograms, Progress measurement systems (PMS) etc.

• Helps in preparation, monitoring and maintenance of 05 year business plan for UZ-750 program.

• Preparation of various KPIs to monitor and control cost and time of UZ-750 program and individual packages.

• Ensure that the planning, schedules and systems are integrated to measure, trend and forecast the work, and
are in place and managed.

• Be particularly diligent in recognizing and reporting to Project Management potential problems in all phases of
the project.

• Assist Change management by highlighting impact on schedule and cost, and assist with related tracking and
re-baselining effort.

• Prepare monthly integrated planning report for UZ-750 program including the milestone comparison sheet,
interface milestone comparison sheet, integrated progress curves, manpower and equipment histograms along
with unified camp profile curves, integrated level 02 schedule etc. and publish it on the ADNOC offshore portal
after finalization with the UZ-750 Project support manager.

Mohd Tariq Rizvi 2-6


• Reviewing actual site progress against planned progress, particularly with regard to manpower levels,
productivity, construction metrics and payment.

• Liaising with other departments related to project operations to ensure that information affecting schedule and
cost is continually up-dated and communicated to the right authority.

• Schedule risk analyses of the UZ-750 integrated schedule with the help of primavera risk analyses software by
applying Monte-carlo simulation technique.

• Qualitative and Quantitative risk analyses of the projects and help in preparation of project risk register.

• Evaluate and certify monthly progress and Invoices claimed by the Contractors.

• Monthly schedule analyses along with the change log and critical path with the project manager and suggest
mitigation measures if required.

• Review and analyze look-ahead schedule and variance reports with project manager.

• Audit Contractor’s schedule compliance.

• Check the changes in the logic relationship of the program with the help of claim digger etc.

• Regular interaction with the project interface team lead regarding the Engineering and Construction interfaces.

• Regular interactions with the site planning engineers in order to have the latest information regarding the site
activities.
• Co-ordination of the final job statistics and analysis of the effectiveness of procedures for possible improvement
on future projects.

• Preparation of planning package for the new projects by utilizing the actual/historical date from UZ-750
program.

• Coordinate and provide actual data to other departments for the benchmarking of their upcoming project.

• Preparation, monitor and maintenance of all Camp daily/monthly POB reports and provide the related
information to finance for cost allocation/back charging to different ADNOC offshore departments and
Contractors.

• Preparation of Islands camps profile plan along with different curves and provide look ahead to the
management.

• Preparation of accommodation budget for catering, laundry, maintenance of R.O and STP for all Company
managed camps on all Island.

2. ORGANIZATION

Working with Strabag and Züblin International Qatar L.L.C and ED Zublin AG Abu Dhabi as Sr. Planning
Engineer Since 10th April 2011 to 15 October 2014.

Züblin International is a subsidiary of STRABAG SE one of Europe’s leading construction groups, With some
76,000 employees.

POSITION

Sr. Planning Engineer


Reporting to Project Manager

3. ORGANIZATION

Mohd Tariq Rizvi 3-6


Lodige System Middle East a unit of Loedige Industries GmbH Germany, in “Design, Procurement,
Manufacturing, Installation and Commissioning of Cargo Handling Facility” project for New Doha International
Airport, Doha Qatar, from 02nd October 2009 to 20th March 2011.

POSITION

Sr. Planning Engineer

Report to Project Manager

4. ORGANIZATION

SNC Lavalin International a Leading Canadian based EPCM Company, through Project Manning solutions
Limited United Kingdom from 15th February 2009 to 31st August 2009 in their multi billion USD project
“QATALUM” Qatar Aluminum Project In Mesayeed Qatar

POSITION

Project Planner

Report to Project Controls Manager

5. ORGANIZATION
ARABI ENERTECH K.S.C from 13th August 2005 to 06th February 2009 in “New Hydrogen Compressor project
Kuwait National Petroleum Company” at Mina Abdullah Refinery and Up gradation of SUG oil production
facilities for Joint Operations (Kuwait oil Company and Saudi Arabian Texaco)

POSITION

Lead Planning Engineer with the additional responsibilities of Construction Manager

Report to Project Manager.


6. ORGANIZATION
KUWAIT OIL COMPANY (K.S.C) A Government of Kuwait undertaking deals in Production, Storage and Export
of Crude Oil, Seconded through Contractor Tariq Al-Ghanim gen. Trad. and Cont. Co. (ALMEN) in their
Contract No. 16181 (Desludging, Cleaning, Repairs and Painting of Storage Tanks) in Core group under Export
Services Team of K.O.C. from 3rd Dec, 2002 to 21 July 2005.
POSITION
Engineer (Planning and Design)
Report to Senior Engineer Export Services (K.O.C)
7. ORGANIZATION -
Daurala Organics limited Daurala Meerut, A unit of D.C.M Shariram Group of Companies Deals in Production of
drugs intermediate and fine Chemicals in their projects department from 15-07-1999 to 10-08-2002.

POSITION

Planning Engineer (Mech).

Report to Project Manager


SUMMERY OF MAJOR PROJECTS UNDERTAKEN

• UZ – 750 Project A USD 10 billion USD project comprising construction of 04 artificial Islands in Persian
gulf, Drilling of oil and Injection water wells, Construction of infrastructure and installation of modularized
process units for ADNOC offshore.

Mohd Tariq Rizvi 4-6


• EPCC of Duty Free Warehouse Facilities Project at New Doha International Airport Doha Qatar with
Zublin International Qatar under the consultancy of MACE International.

• EPCC of ULD and Consignment system project for New Doha International airport with Lodige system
middle east and ADCC, under the consultancy of Overseas Bechtel Inc.

• EPCCM of Qatar aluminum Project with SNC Lavalin International for Qatalum (A Joint venture of Hydro
Norway and Qatar Petroleum Company).

• EPCC of New Hydrogen Compressor Facility Project No. CB/PD/1170 at unit 18 in MAB refinery with
Arabi Enertech for KNPC Kuwait.

• EPCC of SUG Oil production facilities project with Arabi Enertech for Joint Operations (Kuwait oil
Company and Saudi Arabian Texaco)

• Crude Oil Storage Tanks Maintenance Project at South Tank Farm, North Tank farm and various
Gathering Centers for Kuwait Oil Company.

• Improvement of Crude Pump House project at Mina Al-Ahmadi for Kuwait Oil Company.

• Rehabilitation of crude oil storage tanks project with ALMEN for Kuwait Aviation Fueling Company.

• Rehabilitation of crude oil storage tanks with ALMEN for Saudi Arabian Texaco Inc. Mina Al-Zoor.

• EPCC of a Drug intermediate Plant “(PGCH) project Of Daurala Organics limited (A Unit of D.C.M
Shariram group of Industries) Engineering Consultant was Jacobs India Limited.

• EPCC of a Drug intermediate Plant “(PHPG) project Of Daurala Organics limited (A Unit of D.C.M
Shariram group of Industries) Engineering Consultant was Jacobs India Limited.

COMPUTER LITERACY:
PLANNING SOFTWARE

• Primavera Project Management (P6 Version - 07)

• Primavera Project Management (P5)

• Primavera Enterprises (P3e)

• Primavera Project planner (P3.1)

• Primavera Expediter

• Primavera risk analyses

• Janus for Engineering project control

• Easy plant for Construction project control

• Microsoft Project Professional

• Sure Track.

DESIGNING SOFTWARE

• Auto CAD

OTHER SOFTWARE

•M.S Word, M.S Excel, M.S Power point, M.S Outlook, Choral draw, Choral Photo Shop etc.

COMPUTER LANGUAGES

•Fortran 77 and C++

Mohd Tariq Rizvi 5-6


OPERATING SYSTEMS

•DOS, WINDOS, UNIX

PERSONAL INFORMATION
Father’s Name : Mr. Salim Akhtar

Date of Birth : 12th August 1976

Language Known : English, Hindi & Urdu

Marital Status : Married

Nationality : Indian

Permanent Address : Vill. & Post Rohasa,


Distt. Meerut.
Utter Pradesh
PROFFESSIONAL REFRENCES
Faris Al Khoori Rajesh Rajan Thopil
Team Leader, Project Controls (UZ) Project Controls Team Leader (EPC -2)
Project Control (UZ) Team UZ – 750 Project
PO Box 303, Abu Dhabi, UAE Zakum Development Company (ZADCO)
Tel: +971 2 6058161 / +971 50 6155181 Location: WTC Abu-Dhabi
48-114
Ph. No – 00971 504261759
fakhoori@adnoc.ae

Asim Javed Mohammed Rafiq Holia


Senior Cost Engineer Project Team Leader (Warranty, Handover & Interface)
UZ750-PS - UZ750 Project Support UZ750-PS - UZ750 Project Support
PO Box 303, Abu Dhabi, UAE PO Box 303, Abu Dhabi, UAE
Tel: Location: WTC 48-113 Tel: 00971508113872 Location: WTC-48-107
ajaved@adnoc.ae rholia@adnoc.ae

Date: 06-May-19

MOHD TARIQ RIZVI

Mohd Tariq Rizvi 6-6


OPERATING SYSTEMS

•DOS, WINDOS, UNIX

PERSONAL INFORMATION
Father’s Name : Mr. Salim Akhtar

Date of Birth : 12th August 1976

Language Known : English, Hindi & Urdu

Marital Status : Married

Nationality : Indian

Permanent Address : Vill. & Post Rohasa,


Distt. Meerut.
Utter Pradesh
PROFFESSIONAL REFRENCES
Faris Al Khoori Rajesh Rajan Thopil
Team Leader, Project Controls (UZ) Project Controls Team Leader (EPC -2)
Project Control (UZ) Team UZ – 750 Project
PO Box 303, Abu Dhabi, UAE Zakum Development Company (ZADCO)
Tel: +971 2 6058161 / +971 50 6155181 Location: WTC Abu-Dhabi
48-114
Ph. No – 00971 504261759
fakhoori@adnoc.ae

Asim Javed Mohammed Rafiq Holia


Senior Cost Engineer Project Team Leader (Warranty, Handover & Interface)
UZ750-PS - UZ750 Project Support UZ750-PS - UZ750 Project Support
PO Box 303, Abu Dhabi, UAE PO Box 303, Abu Dhabi, UAE
Tel: Location: WTC 48-113 Tel: 00971508113872 Location: WTC-48-107
ajaved@adnoc.ae rholia@adnoc.ae

Date: 06-May-19

MOHD TARIQ RIZVI

Mohd Tariq Rizvi 6-6

You might also like