Equipment Number Grp Counter Desription

C(018) C(002) C(040)


10006666 SHUT ENACT P1 P/VESSEL/HYDRO - 3/10 Yrly-PM
PlanningPlant Status Work Center PlannerGrp Maint. Strategy Usage
C(004) C(003) C(008) C(003) C(004) C(003)
VA01 4 PMECH 010 OFFM 4
EQUIPMENT: STABILIZER T-101
Activity: Blinding / Inspection / Reinstatement of T-101

Equipment Number Grp Counter Operation Sub Operation Operation Description Work Center Control Key Duration Unit Number
C(018) C(002) C(004) C(004) C(040) C(008) C(004) C(006) C(003) C(003)

10006666 SHUT 0010 Prep Work ERRECT SCAFFOLD 4OFF2X2X4M AS PER DRAWING PSCAF PM01 6 H 4 2 scaff, 1 help
10006666 SHUT 0020 Prep Work REMOVE INSULATION AT INDICATED POINTS PINSUL PM01 8 H 4
10006666 SHUT 0030 Ramp Down DECOMM EQUIPMENT, ISOLATE & DRAIN PROD PM01 24 H 2
10006666 SHUT 0040 SPADE VESSEL AS PER VESS/ENTR SPADE LIST PFITER PM01 8 H 6
10006666 SHUT 0040 0010 CRANE TO ASSIST P80CRN PM01 4 H 1
10006666 SHUT 0060 UNBOLT AND OPEN MANWAYS PFITER PM01 4 H 6 need 1 more hour. Ok 4hr, 2 mech
10006666 SHUT 0070 OPEN MANWAYS, FORCE AIR VENTILATION, TEST OXYGEN LEVEL PFITER PM01 12 H 2 2 mech, 1 helper, 1 HSE
10006666 SHUT 0080 PREPARE & INSTALL VESSEL ENTRY EQUIPM PFITER PM01 2 H 3 add 1 watchman. OK 2 mech 1 help, 1 watch
10006666 SHUT 0090 REMOVE TRAY HATCHES PFITER PM01 10 H 2 add 2 PFITER and 1 watchman. OK 4 mech, 1 help, 1 watch
10006666 SHUT 0100 CLEAN VESSEL INTERNAL PHPCLN PM01 4 H 4 add 1 watchman
10006666 SHUT 0110 ERECT SCAFFOLD INTERNAL AS REQUIRED PSCAF PM01 2 H 4 add 1 watchman. Ok 2 scaff, 1 help, 1 watch.
10006666 SHUT 0120 UNBOLT & REMOVE INTERNALS AS REQUIRED PFITER PM01 2 H 2 add 1 watchman
10006666 SHUT 0130 CARRY OUT INT. INSPECTION AS PER PROD. PINSP PM01 1 H 1 add 1 watchman
10006666 SHUT 0140 RE-INSTALL VESSEL INTERNALS PFITER PM01 2 H 2 add 1 watchman
10006666 SHUT 0150 CLOSE & BOX UP TRAY HATCHES PFITER PM01 10 H 2 add 2 PFITER and 1 watchman. OK 4 mech, 1 help, 1 watch
10006666 SHUT 0160 DISMANTLE INTERNAL SCAFFOLD & REMOVE PSCAF PM01 2 H 4 add 1 watchman. Ok 2 scaff, 1 help, 1 watch.
10006666 SHUT 0170 REMOVE VESSEL ENTRY EQUIPMENT PFITER PM01 1 H 3 add 1 watchman. OK 2 mech 1 help, 1 watch
10006666 SHUT 0180 CLOSE MANWAYS AND BOX UP PFITER PM01 4 H 6 Ok 4hr, 2 mech
10006666 SHUT 0190 REMOVE BLINDS AS PER 2 SPADE LISTS PFITER PM01 8 H 6
10006666 SHUT 0190 0010 CRANE TO ASSIST P80CRN PM01 4 H 1
10006666 SHUT 0200 CARRY OUT QA INSPECTION PROD PM01 2 H 1
10006666 SHUT 0210 CARRY OUT PRESSURISATION / LEAK TEST PROD PM01 2 H 4
10006666 SHUT 0220 RE-INSTATE INSULATION PINSUL PM01 8 H 4
10006666 SHUT 0230 REMOVE ALL SCAFFOLDING PSCAF PM01 4 H 4 add 2 more hours. WHY? 2x2x4M Simply remove, no planning, no certification, no
Equipment Number Group Counter Operation Material Number Quantity
C(018) C(002) C(004) C(018) C(013)
10006666 1 10 J200935966 4
10006666 1 10 J200935739 8
10006666 1 10 J200935736 6
10006666 1 10 J200935735 3
10006666 1 10 J200935743 14
10006666 1 10 J200935742 3
10006666 1 10 J200936169 16
10006666 1 10 H040200092 2
10006666 1 10 H340802709 1