You are on page 1of 4

Nahars engineering

Risk Assessment
Activity Ref

Description

Assessor Date

Hazard Identification
Hazard Likelihood Severity Risk

L M H L M H L M H

L M H L M H L M H

L M H L M H L M H

L M H L M H L M H

L M H L M H L M H

L M H L M H L M H

L M H L M H L M H

L M H L M H L M H

L M H L M H L M H

L M H L M H L M H

L M H L M H L M H

L M H L M H L M H

L M H L M H L M H

Risk 1
Nahars engineering

People at Risk
Workers
Adjacent Workers
Site Wide
Workers
Occupants
Visitors
Members of Public

Controls
Risk Control Measures

Risk 2
Nahars engineering

Risk Level

<L L M H !
Very Low
safe to proceed work under
Low standard control measures
Medium High Very High
safe to proceed with proceed with unsafe DO NOT
proceed work caution under caution under proceed -
under additional further controls essential
additional controls with further action
control measures supervision needed
measures

Further Action
Action Required Timeframe By Date

Ensure adequate supervision is provided


Ongoing
and that control measures remain valid for the
duration of the works.

Safe systems of work are provided and


1 week
issued to all staff and training
provided in their use. Refresh at inductions

All staff to be trained in the1 week importance and use of correctRefresh at Personal Protective Equip
made a condition of employment.

Risk 3
Nahars engineering

Acknowledgement
Name Signature Date

Risk 4

You might also like