SS Hydrolysis Rector Tanks 04 Nos. / SS Tankages-III 13 Nos. and Steel Structure with
conveyor.
Working as a Project Manager in M/s Mahathi Infra Service Pvt. Ltd. at IOCL Manmad
depo Nashik MH
⮚ Client M/s Indian Oil Corporation Ltd (IOCL Manmad Terminal Nashik)
Page 1 of 6
MS / HSD and Water storage Tanks largest tanks 36 Mtr dia and 20 Mtrs Hight for HSD
and 32 Mtrs. dia 20 Mtrs. hight for MS storage Tanks.
⮚ Client: M/s Bilt Power Project Ballarpur dist. chandrapur (MH) (Fuel Oil Handling
System and CW, ACW with full plant LP Piping)
⮚ Client: M/s Vidhanta Alm. Project Limited Jharsugura (Orissa) (FOHS and Fire
Protection System) (Tank dia 12 mtr and hight 10 Mtrs.)
⮚ Client: M/s JSW 4x300 MW Jaigarh Ratnagiri (MH) (Oil Tank and LP Piping)
⮚ Client: M/s Reliance Energy Ltd. 2x300 MW Butibori Nagpur (MH) (Fuel Oil
Handling System with Oil Storage Tanks Max. dia 12 mtrs. And hight 10 mtrs. and
Fire Protection System)
⮚ Client: M/s Jaypee Power Project 4x 600 MW Allahbad (UP) (CW and all plant
piping)
⮚ Client: M/s L&T power 2x 660 MW Khandwa (MP) (Fuel Oil Handling System
along with Oil Storage Tanks Max. dia 12 mtrs and hight 10 mtrs., Fire Protection
System and LP Piping)
⮚ Client: M/s BHEL 2x 660 MW Suratgarh Thermal Project (RJ) (Fuel Oil Handling
System wagon unloading along with Oil Storage Tanks Max.dia Tank 16 Mtr dia 15
mtr hight)
⮚ Client: M/s SAIL Bhilai Steel plant Bhilai (CG) (FPS) (Only starting)
⮚ Client: M/s WABAG C/o M/s AP Genco Kadapa power Project (AP) (FPS)
⮚ Client: M/s HPCL Ext plant Barwala, Bahadurgarh, (Haryana) (Water Tank’s,
Max. dia 12 mtr and hight 10 mtrs. Process piping, FPS and all Electric work)
⮚ Client: TOSHIBA Power Project 1x660MW UPRNNL Aligarh (LP Piping)
Jan 1997 to Nov 2008 Working with M/s Unitech Machines Ltd Delhi.
Page 2 of 6
⮚ Project: 2 X 210 MW (EPC) at Parichha Thermal Power Plant Ext-2, Parichha,
Jhansi. (U.P)
⮚ Client: M/s INDURE Pvt. Ltd Thru M/s Reliance Energy, Delhi
⮚ Client: M/s ALSTOM Power Project, Neyveli dist. Kadalur, Tamil Nadu.
Page 3 of 6
Working as a Site Engineer in M/s Unitech Machines Limited, New Delhi.
Working as a Site Engineer in M/s Sellers Safety Control Pvt. Ltd., New Delhi &
Lucknow.
EDUCATION
ASNT LEVEL-II
RT and UT from R.K. Associate Yamuna Nagar in 2006.
Bord of Technical Education, Delhi (B.Tech. Electrical) from G.B.Pant Okhla New
Delhi
68%, 1992
SSC,
Page 4 of 6
Sri Sunder High School, Muktapur, Bihar
72%, 1987
COMPUTER SKILLS
PERSONAL DETAILS
Sex : Male
Nationality : Indian
Page 6 of 6