FEBRURY, 2011
PROJECT PROPOSAL FOR THE CONSTRUCTION OF SECONDARY SCHOOL IN MAICHEW TOWN
PROJECT PROPOSAL
FOR
2
PRIME CONSULTANTS PLC ℡ – 251-116-476982 – 251-116-477023 190013
PROJECT PROPOSAL FOR THE CONSTRUCTION OF SECONDARY SCHOOL IN MAICHEW TOWN
CONTENTS
I. BACKGROUND
III. OBJECTIVE
X. RESPONSIBLE BODIES
MAJOR RESOURCES
3
PRIME CONSULTANTS PLC ℡ – 251-116-476982 – 251-116-477023 190013
PROJECT PROPOSAL FOR THE CONSTRUCTION OF SECONDARY SCHOOL IN MAICHEW TOWN
I. BACKGROUND
In the early of the 1970 the growing number of students, who were completing the junior secondary
school annually demanded for a senior high school and became a vital question for Maichew town and
Raya and Azebo Awraja students and community at large. At that time the nearest high school was
located 120 km away in Mekelle. Therefore, families, who could afford, had to send their children to
Mekelle and those students with no resources had to quit schooling. To overcome this pressing
problem, the Raya and Azebo Awraja Administration, the Maichew Municipality and the people had
made a long and concerted effort to get the permission and the necessary funds from the government.
With the help of some parliamentarians’ representatives of the district/Awraja, permission had been
given by the Ministry of Education and the Ministry promised to provide teachers. Concerning funds,
however, the support was very limited. So, raising funds was entirely fallen on the shoulders of the
residents of the town and the surrounding weredas. Accordingly, with the contribution of the residents
of the town, the surrounding weredas and the municipality, the construction of the “Tilahun Gizaw
Secondary School” began in 1971 and it was taken into service in 1974/75. Originally this school was
called Maichew secondary school and after the fall of the Derg it was renamed by the name of the
renowned leader of student movements “Tilahun Gizaw Secondary School” who was shot dead in 1972
by the then regime. /Maichew Integrated Development Plan, 2007/
Tilahun Yigzaw Secondary School is the oldest senior secondary school in Maichew and Southern
Tigray Region. Currently it has a student population of above 3200 students of grade 9 and 10. In
addition Tilahun Gizaw Technical and Vocational School is also in the same compound. Currently the
school is serving for the Maichew town communities, the population of the Endamehoni Wereda and
the nearby surrounding weredas.
According to the development plan of Maichew town prepared in 2007, Tilahun Gizaw secondary
school had 3652 students and 25 sections with 73 students per section with a double shift system. The
school during the same period housed an extra 1650 students, which needed 41 sections or have
required 2 schools under a double shift system. As shown in the figure 1 and annex, many blocks of
classrooms are also constructed with temporary corrugated iron sheet which are part of the 25
classrooms.
4
PRIME CONSULTANTS PLC ℡ – 251-116-476982 – 251-116-477023 190013
PROJECT PROPOSAL FOR THE CONSTRUCTION OF SECONDARY SCHOOL IN MAICHEW TOWN
Figure 1: Tilahun Gizaw Secondary School and Tilahun Gizaw Technical and Vocational School, 2006
The capacity of existing educational institutions, the National School Standard Capacity estimated
school age population and projected enrollments are the factors taken into account for estimating the
number of schools Maichew town needs within the planning period 2007 – 2017.
In Maichew and Endamehoni Wereda there are 22 schools of grade 1-8 of which 5 are in Maichew
town and the rest 17 are in Endamehoni Wereda. These schools are the major suppliers of students to
the only secondary school exist in Maichew town.
According to Maichew Integrated Development Plan, a total of 28,982 students are estimated to be
enrolled at the end of the planning period, out of which 56.06% belongs to primary followed by
(35.55%) for secondary and KG enrollment (8.4%) as shown in table below.
5
PRIME CONSULTANTS PLC ℡ – 251-116-476982 – 251-116-477023 190013
PROJECT PROPOSAL FOR THE CONSTRUCTION OF SECONDARY SCHOOL IN MAICHEW TOWN
Table 2: Number of Students, and Sections and Student/ section Ratios, Tilahun Gizaw School
Number Remark
Year Students Sections Student/Sections Ratio
Double shift Single shift
1997 2418 23 52.5 105 Grade 9, 10, 11 and 12
1998 3142 23 68 136 Grade 9, 10, 11 and 12
1999 3652 23 73 146 Grade 9, 10, 11 and 12
2000 2493 23 54 108 Grade 9 and 10
2001 3151 23 68.5 137 Grade 9 and 10
2002 3237 23 70.5 141 Grade 9 and 10
Source: Maichew Development Plan, 2007 and Maichew City Administration, 2011
In addition the numbers of students are increasing from year to year. As shown in table above, in
1997 the total number of students including the preparatory (grade 11 and 12) were 2418. By 2000
the total number of students of grade 9 and 10 only excluding the preparatory students were 2493. By
2002 the total number of students of grade 9 and 10 only excluding the preparatory students were
3237. This shows that there is an increment of 744 students or by 23% between 2000 and 2002.
The Ministry of Education standard shows that for the standard student-classroom ratio is 40 for
secondary school. One secondary school should serve at least 800 students with in 20 sections under
a single shift system.
6
PRIME CONSULTANTS PLC ℡ – 251-116-476982 – 251-116-477023 190013
PROJECT PROPOSAL FOR THE CONSTRUCTION OF SECONDARY SCHOOL IN MAICHEW TOWN
III. OBJECTIVE
General objective:
Improve the standard and quality of the secondary school education of the town and surrounding
weredas by fulfilling the gap of classrooms and educational facilities exist in the town.
Specific objective:
• To construct new secondary school having the capacity to accommodate 1600-2000 students
with a single shift program
• To fulfill basic facilities that are necessary for secondary school education
o Tables and chairs
o Books
o Laboratory equipment
o Sport field
o Computer, printer, duplicator and other related facilities
Design work: designing of the architectural design based on the gap identified and the proposed
project location. The structural and electrical designs also be prepared based on the prepared
architectural designs. The overall design considerations are indicated in part IV.
Cost Estimation: Based on the Architectural, Structural and Electrical designs preparation of the bill of
quantities and the cost estimation is the other activity of the project
Promotional work: The municipality needs to launch a promotional work to aware the community and
to finance the project through different mechanisms such as community involvement, telethon and
other fund raising campaigns
Target Group Identification: Identifying target groups that have roles in financing and supporting the
project.
Fund Raising: Undertaking fund raising campaign such as Telethon to finance the implementation of
the overall project cost
Internal capacity building: The tasks of this project may only be achieved only if supplemented by
the corresponding capacity particularly at the municipality's technical department. This project should
thus be integrated with the capacity building matters
Construction and Supervision: This is the core of the activities. Based on the plans, and agreements
to be signed between the City Administration and the Contractor, supervisors should be assigned to
evaluate the construction process.
8
PRIME CONSULTANTS PLC ℡ – 251-116-476982 – 251-116-477023 190013
PROJECT PROPOSAL FOR THE CONSTRUCTION OF SECONDARY SCHOOL IN MAICHEW TOWN
competitions. Therefore, the plan of the school is designed by considering the stated and other
important functions as shown below.
PLAYING FIELDS
Stores
Classrooms Science
P Conference
Sport
A
R Art
K Courtyard
Classrooms
I
N
Library
G Lounge
Maths Administration
Classrooms Language
Toilets
Services
Technical
Compute r
ENTRANCE
9
PRIME CONSULTANTS PLC ℡ – 251-116-476982 – 251-116-477023 190013
PROJECT PROPOSAL FOR THE CONSTRUCTION OF SECONDARY SCHOOL IN MAICHEW TOWN
Fundamental space types for secondary schools include, but are not limited to:
• Regular Classrooms
• Administrative Offices
o Principal
o A/principal
o Reception areas
o Secretary
o Record office
o Department offices
• Technical education rooms
o Computer technology
o Wood work
o Metal work
o Others
• Conference rooms
• Student support offices
o Guidance
o Health Services
o Media services
• Staff support areas
o Group teacher offices
o Lounge
• Common areas/courtyards
• Multipurpose Rooms
• Restrooms
o Staff toilets
o Student toilets
• Science laboratory rooms
o Physical science
o Biology
o Physics
o Chemistry
o Earth science
• Library rooms
• Sport facilities
o Sport fields
o Gymnasium
10
PRIME CONSULTANTS PLC ℡ – 251-116-476982 – 251-116-477023 190013
PROJECT PROPOSAL FOR THE CONSTRUCTION OF SECONDARY SCHOOL IN MAICHEW TOWN
D. DESIGN PRINCIPLES
The following design principles are considered in the architectural design of the secondary school
Accessibility
o Design spaces to meet the specific needs of students and teachers with disabilities.
o Design for future flexibility, which enables spaces to be easily modified.
Aesthetics
The importance of the physical appearance of a public school should not be minimized. A school
building that is attractive and responds to and is consistent with the design and context of the
neighborhood, builds a sense of pride and ownership among students, teachers, and the community.
The exterior should complement the neighborhood and reflect the community's values. The interior
should enhance the learning process.
Cost-Effectiveness
To reduce the total cost of owning a building while ensuring its quality
11
PRIME CONSULTANTS PLC ℡ – 251-116-476982 – 251-116-477023 190013
PROJECT PROPOSAL FOR THE CONSTRUCTION OF SECONDARY SCHOOL IN MAICHEW TOWN
o Select building elements on the basis of analysis Mirror the lifespan of projects and
systems with the expected lifespan of the facility.
o Consider the recyclability of materials.
o Specify materials and products that are easy to maintain (balance this with their impact
on children's health and the environment).
o Utilize life-cycle cost analysis tools.
o Use energy simulation and analysis tools to optimize energy performance (integrate day
lighting systems, high-performance HVAC, energy-efficient building shell, and high-
performance electric lighting)
Functionality
o Use operable walls to increase the efficiency of large, multipurpose spaces, such as the
cafeteria and gymnasium.
o Accommodate technology upgrades.
Productivity
Secondary schools should enhance the health and productivity of students, teachers, and staff.
o Make day lighting a priority, especially in classrooms. Glare and hot spots can
undermine the learning process. Studies show a positive correlation between day
lighting and student performance.
o Integrate day lighting with high-efficient electric lighting and controls to optimize visual
comfort.
o Use natural ventilation when possible.
o Ensure acoustical comfort. Poor classroom acoustics are more than merely annoying,
they can disrupt learning.
o Ensure superior indoor air quality. Consider displacement ventilation systems.
12
PRIME CONSULTANTS PLC ℡ – 251-116-476982 – 251-116-477023 190013
PROJECT PROPOSAL FOR THE CONSTRUCTION OF SECONDARY SCHOOL IN MAICHEW TOWN
Sustainability
To ensure sustainability
The proposed school has three buildings of G+3 used for classroom, laboratories, library and other
related services, one administrative building of G+2 and other spaces for circulation, parking and
sport field. The total built up area of the buildings is estimated to be 1461m2. The Physical
components consists three main parts namely: The Site Plan, Architectural Design, The 3D View
13
PRIME CONSULTANTS PLC ℡ – 251-116-476982 – 251-116-477023 190013
PROJECT PROPOSAL FOR THE CONSTRUCTION OF SECONDARY SCHOOL IN MAICHEW TOWN
The site located in the northern part of the town that is proposed for educational purposes in the main expansion area of the town
by the master plan of the town prepared in 2007. It has a total area of 73,900 m2.
14
PRIME CONSULTANTS PLC ℡ – 251-116-476982 – 251-116-477023 190013
PROJECT PROPOSAL FOR THE CONSTRUCTION OF SECONDARY SCHOOL IN MAICHEW TOWN
B. ARCHITECTURAL DESIGN
15
PRIME CONSULTANTS PLC ℡ – 251-116-476982 – 251-116-477023 190013
PROJECT PROPOSAL FOR THE CONSTRUCTION OF SECONDARY SCHOOL IN MAICHEW TOWN
16
PRIME CONSULTANTS PLC ℡ – 251-116-476982 – 251-116-477023 190013
PROJECT PROPOSAL FOR THE CONSTRUCTION OF SECONDARY SCHOOL IN MAICHEW TOWN
17
PRIME CONSULTANTS PLC ℡ – 251-116-476982 – 251-116-477023 190013
PROJECT PROPOSAL FOR THE CONSTRUCTION OF SECONDARY SCHOOL IN MAICHEW TOWN
C. THE 3D VIEW
18
PRIME CONSULTANTS PLC ℡ – 251-116-476982 – 251-116-477023 190013
PROJECT PROPOSAL FOR THE CONSTRUCTION OF SECONDARY SCHOOL IN MAICHEW TOWN
19
PRIME CONSULTANTS PLC ℡ – 251-116-476982 – 251-116-477023 190013
PROJECT PROPOSAL FOR THE CONSTRUCTION OF SECONDARY SCHOOL IN MAICHEW TOWN
20
PRIME CONSULTANTS PLC ℡ – 251-116-476982 – 251-116-477023 190013
PROJECT PROPOSAL FOR THE CONSTRUCTION OF SECONDARY SCHOOL IN MAICHEW TOWN
21
PRIME CONSULTANTS PLC ℡ – 251-116-476982 – 251-116-477023 190013
PROJECT PROPOSAL FOR THE CONSTRUCTION OF SECONDARY SCHOOL IN MAICHEW TOWN
22
PRIME CONSULTANTS PLC ℡ – 251-116-476982 – 251-116-477023 190013
PROJECT PROPOSAL FOR THE CONSTRUCTION OF SECONDARY SCHOOL IN MAICHEW TOWN
23
PRIME CONSULTANTS PLC ℡ – 251-116-476982 – 251-116-477023 190013
PROJECT PROPOSAL FOR THE CONSTRUCTION OF SECONDARY SCHOOL IN MAICHEW TOWN
3. MASONRY WORKS
141,680.00
A. TOTAL
810,104.00
B. SUPER STRUCTURE
1. CONCRETE WROK
2,045,404.00
2. BLOCK WORKS 202,824.00
3. ROOFING
267,075.00
4. CARPENTRY & JOINERY
192,716.00
24
PRIME CONSULTANTS PLC ℡ – 251-116-476982 – 251-116-477023 190013
PROJECT PROPOSAL FOR THE CONSTRUCTION OF SECONDARY SCHOOL IN MAICHEW TOWN
5. METAL WORKS
336,920.00
6. FINISHING WORK
711,782.00
7. GLAZING WORK
43,200.00
8. PAINTING WORK
86,250.00
9. SANITARY INSTALLATION
77,388.00
10. SITE WORK
37,799.00
11. ELECTRICAL WORK 164,650.00
B. TOTAL 4,166,008.00
TOTAL A+B
4,976,112.00
B. SUPER STRUCTURE
25
PRIME CONSULTANTS PLC ℡ – 251-116-476982 – 251-116-477023 190013
PROJECT PROPOSAL FOR THE CONSTRUCTION OF SECONDARY SCHOOL IN MAICHEW TOWN
B. SUPER STRUCTURE
1 CONCRETE WROK 25,404.00
2. BLOCKS WORK 41,780.00
3. ROOFING 52,350.00
4. CARPENTRY & JOINERY 38,372.00
5. METAL WORKS 12,400.00
6. FINISHING WORK 86,318.00
7. GLAZING WORK 3,240.00
8. PAINTING WORK 12,665.00
9. SANITARY WORK 42,457.00
10. ELECTRICAL WORK 2,920.00
B. TOTAL 317,906.00
26
PRIME CONSULTANTS PLC ℡ – 251-116-476982 – 251-116-477023 190013
PROJECT PROPOSAL FOR THE CONSTRUCTION OF SECONDARY SCHOOL IN MAICHEW TOWN
B. SUPER STRUCTURE
1 CONCRETE WROK 20299.12
2. BLOCK WORK 3,716.80
3. ROOFING 6,116.80
4. METAL WORKS 14,800.00
5. FINISHING WORK 20,923.72
6. GLAZING WORK 4,185.00
7. PAINTING WORK 3,932.98
8. ELECTRICAL WORK 2,580.00
B. TOTAL 76,554.42
TOTAL A+B
96,331.06
27
PRIME CONSULTANTS PLC ℡ – 251-116-476982 – 251-116-477023 190013
PROJECT PROPOSAL FOR THE CONSTRUCTION OF SECONDARY SCHOOL IN MAICHEW TOWN
X. RESPONSIBLE BODIES
The central responsible body for this project is the city administration of Maichew town. In
addition the communities of the town, the Zonal Administration and respective stakeholders have
the responsibility in managing the implementation of the project by giving supports, advising,
and monitoring and evaluation aspects.
For the evaluation of the project components, there should be at least bi-annual joint forum with
key contributors about the project progress. Here, the bi-annual project performance will be
reported and evaluated; and the following six months programs are discussed and approved. Such
forums help to identify the critical gaps that occurred during the six month project
implementation period and to fill the gaps for the following project time. The evaluation will be
based on the project targets and the indicators set.
28
PRIME CONSULTANTS PLC ℡ – 251-116-476982 – 251-116-477023 190013
PROJECT PROPOSAL FOR THE CONSTRUCTION OF SECONDARY SCHOOL IN MAICHEW TOWN
Steering Committee
I
N
F
O
R
M Technique Committee Project
A Advisory Team
T
I
O
N
Project Manager
F
L
O
W
The steering committee is the upper body of the project management which gives decision, monitor
and follow up of the progress of the project. The committee has the responsibility to report to the bi-
annual meeting to be held with the key contributors and financiers of the project cost. The committee
is led by the city mayor and other stakeholders are members of the steering committee. Possible
members of the steering committee are:
29
PRIME CONSULTANTS PLC ℡ – 251-116-476982 – 251-116-477023 190013
PROJECT PROPOSAL FOR THE CONSTRUCTION OF SECONDARY SCHOOL IN MAICHEW TOWN
The role of the technical committee is evaluating the overall project progress technically. It is led by
the city manager and others who have a technical knowledge from different departments and
institutions are members of the committee. The committee has the responsibility to report to the
steering committee every three months. Possible members of the committee could be:
30
PRIME CONSULTANTS PLC ℡ – 251-116-476982 – 251-116-477023 190013
PROJECT PROPOSAL FOR THE CONSTRUCTION OF SECONDARY SCHOOL IN MAICHEW TOWN
The municipality has to work efficiently and effectively to secure the finance required for the
project, and to manage the project appropriately. In addition to strengthening its revenue
collection capacity, other sources should be identified and appropriate strategies designed to
mobilize the potential resources. Sources of finance may be identified as follows:
• Involvement of the community through financial and labor contribution
• Fund Raising Programs: fund raising programs are the major sources of finance to
implement the project. Among the different fundraising programs, Telethon is the one tha
should be held in different parts of the country. Involvement of different stakeholders in
financing the project through Telethon such as NGOs, Government Organizations,
Embassies, Religious Institutions and the Private Sector is important.
There are two potential risks involved in the implementation of the project. One is that the
project may face financial limitations and may fail to address the project objectives. The ultimate
result will be increasing the shortage of the classrooms and affects the quality of the secondary
education. In such circumstances, meeting of key stakeholders may be called to decide which of
the identified tasks should be given priority and where the available resources should be
mobilized. In addition a phase by phase work could also be the other solution to minimize the
financial risks to be occurred.
The other risk is that there might not be adequate committed management and staff to implement
the project. Here the possible risk management strategies are training of the available staff, and
involvement of different skills from different stakeholders involved in financing the project, the
institutions available within and around the town and interested individual who have the capacity
to fill gap.
The Maichew town and Endamehoni Wereda residents will participate in the different phases of the
project:
31
PRIME CONSULTANTS PLC ℡ – 251-116-476982 – 251-116-477023 190013
PROJECT PROPOSAL FOR THE CONSTRUCTION OF SECONDARY SCHOOL IN MAICHEW TOWN
32
PRIME CONSULTANTS PLC ℡ – 251-116-476982 – 251-116-477023 190013
PROJECT PROPOSAL FOR THE CONSTRUCTION OF SECONDARY SCHOOL IN MAICHEW TOWN
REFERENCES
• Maichew City Administration (2010): Unpublished Sectoral Reports
• Mathewos Consult (2007): Reports of Maichew Integrated Development Plan.
• Mathewos Consult (2007): Report on the Improvement of the Existing Drainage Lines (channels) of
Maichew Town
• Prime Consultants (2009): Reports of Korem Integrated Development Plan.
• Prime Consultants (2009): Reports of Woldiya Ten Year Structure Plan.
• TDA (2009): A Project Proposal on Availing Latrine Facility in Primary Schools of Tigray
• U.S. Department of Education and managed by the National Institute of Building Sciences.
National Clearinghouse for Educational Facilities (NCEF)—, NCEF is the world's largest
repository of information about Pre-K to 12 school planning, designing, funding, building,
improvement, and maintenance.
• Bradford Perkins/2010/. Building Type Basics for Elementary and Secondary Schools, 2nd
Edition New York, NY: John Wiley & Sons, Inc.
• U.S. Department of Energy and National Renewable Energy Laboratory/2007/. National
Best Practices Manual for Building High Performance Schools.
33
PRIME CONSULTANTS PLC ℡ – 251-116-476982 – 251-116-477023 190013
PROJECT PROPOSAL FOR THE CONSTRUCTION OF SECONDARY SCHOOL IN MAICHEW TOWN
ANNEX
34
PRIME CONSULTANTS PLC ℡ – 251-116-476982 – 251-116-477023 190013
PROJECT PROPOSAL FOR THE CONSTRUCTION OF SECONDARY SCHOOL IN MAICHEW TOWN
35
PRIME CONSULTANTS PLC ℡ – 251-116-476982 – 251-116-477023 190013