Objective Questions
a. Job Production
b. Batch Production
c. Mass Production
d. None of above
a. Job Production
b. Batch Production
c. Mass Production
d. None of above
a. Job Production
b. Batch Production
c. Mass Production
d. None of above
a. Casting
b. Finishing
c. Inspection
d. Machining
a. Business Function
b. Product Development Function
c. Manufacturing Process Function
d. Manufacturing Control Function
a. Elevated Chutes
b. Bucket Conveyors
c. Roller Conveyors
d. Chain Conveyors
a. Storage of Item
b. Handling of Item
c. Delivery of Item
d. All of above
a. Storage of Items
b. Handling of Items
c. Delivery of Item
d. Re-position & Screening of Items
a. Circular Interpolation
b. Linear Interpolation
c. Tool change
d. Rapid Traverse
a. Milling
b. Boring
c. Welding
d. Tapping
a. Higher flexibility
b. Improved quality
c. Reduced scrap rate
d. Improved strength of the components
a. Reaming
b. Parting
c. Grooving
d. Facing
a. Drilling action
b. Melting action
c. Shearing acting
d. Using brittleness of the material
Q20.Part-programming mistakes can be avoided in
Q21. In CNC machine tool, the part program entered into the computer memory
a. Spindle Start
b. Spindle stop
c. Coolant on
d. Tool Change
Q23. Statement 1: It is generally not possible to change the direction of flow with belt
conveyors. Statement 2: If belt conveyors are to be used in the bent position, Flat
belts are used.
a. True, False
b. True, True
c. False, False
a. True, False
b. True, True
c. False, False
d. False, True
Q25.In the specifications of a screw conveyor, the shaft length is shorter than the flight
length.
a. True
b. False
Q26. Statement 1: Chain drive rollers move faster than belt driven rollers.
Statement 2: Screw conveyors are used in the feeding of raw materials like wheat or
chilly into the grinding unit to make a powder out of it.
a. True, False
b. True, True
c. False, False
d. False, True
Q27. What is the flow rate of materials in a bucket conveyor dependent on?
Q28. Fork-lift trolleys are a combination of chain hoists and interlock transfer cranes.
a. True
b. False
Q29. In food industry, the animal processing sector requires mechanical transportation to
minimize human intervention and to maintain hygiene.
a. True
b. False
Q30. Statement 1: Cranes and hoists have an incline up and down option.
Statement 2: Trucks can be used for continuous operations.
a. True, False
b. True, True
c. False, False
d. False, True
a. High pressure
b. Vacuum
c. Fluidization
d. Any of the mentioned
Q33. The following type of Layout caters to ‘intermittent flow’ type of production.
a. Process layout
b. Product layout
c. Combined layout
d. All of the above
a. Manufacturing Technology
b. Production Technology
c. Group Technology
d. None of the above
a. Small batches
b. Medium batches
c. Large batches
d. Any of the above
Q37. In a simple and visual method of Cell design, the priorities in classifying may be in the
order
a. Rotational or non rotational – Material – Size – Shape
b. Material – Rotational or non rotational – Size – Shape
c. Size – Rotational or non rotational – Material – Shape
d. Shape – Rotational or non rotational – Material – Size
Q39. In cell formation using production flow analysis, following process will beleft out of
analysis
a. Grinding
b. Milling
c. Drilling
d. Gear cutting
Q40.Which of the following technique of grouping does not consider the design and shape
aspect?
Q41. The greatest change as a result of CAD/CAM is taking place in which industry?
a. Medical
b. Aerospace
c. Electronics
d. Cartography
Q42. The creation of goods and services using the factors of production is called
a. Time
b. Form
c. Place
d. Product
Q43. A process or system that either changes raw materials into other products or
combines raw materials or parts into a finished product is called
a. Synthetic system.
b. Process manufacturing and assembly process.
c. Analytic system.
d. A & B.
a. Canada.
b. USA.
c. Japan.
d. Germany.
a. Assembly process.
b. Analytic system.
c. Chemical process.
d. Transport process.
Q49. Which of the following techniques would be used to control a project schedule?
a. Pert chart.
b. Taylor chart.
c. Walker chart.
d. Grant chart.