Diameter Ф Excavation
ID Station Type NO CELL Dia. (mm) Length Fill ht
(Inch) Depth
18 14+036 PC 1 15
48 1.22 0.90 1.47
19 14+283 PC 1 48 1.22 15 0.86 1.37
20 14+700 PC 1 48 1.22 14 0.74 1.30
21 15+190 PC 1 48 1.22 15 0.61 1.14
22 16+150 PC 1 48 1.22 14 0.59 1.10
23 18+262 PC 1 48 1.22 15 1.12 1.50
24 20+377 PC 1 48 1.22 14 0.54 1.05
Segment 2
Dobrar Spur
29
Total 381 19.10225
0.65869828
Segment 1 Segment 2 Dobrar Spur
Br 2 Br 0 Br 0
SC 13 BC/SC 0 BC/SC 0
PC 24 PC 0 PC 0
e 1 Pipe list
Concrete Stone
Excavation Backfill Channel Stone Masonry
Pipe Pitching(3
(32.01a) (32.02) Excava (34.03)bi
(32.03) 4.01)(b)i
ID Station
53.9 47.4 16 87.87 10.42 23.80 1 1+048
43.7 51.5 16 84.87 10.42 23.80 2 6+397
24.1 59.6 16 2.01 10.42 23.80 3 7+129
46.7 59.0 17 75.32 10.42 23.80 4 8+964
15.7 75.0 15 5.02 10.42 23.80 5 9+504
18.7 63.2 15 2.22 10.42 23.80 6 9+997
18.5 100.5 17 50.53 10.42 23.80 7 10+454
44.2 61.6 15 13.03 10.42 23.80 8 11+676
39.0 47.4 14 43.05 10.42 23.80 9 12+789
19.1 50.1 14 32.15 10.42 23.80 10 17+683
21.4 41.8 13 0 10.42 23.80 11 19+953
18.4 54.0 14 42.25 10.42 23.80 12 22+133
12.3 55.4 14 40 10.42 23.80 13 23+937
181.9 138.4 27 40.25 10.42 23.80 14
27.1 133.3 26 4.25 10.42 23.80 15
18.6 58.8 15 40.11 10.42 23.80 16
15.6 57.8 15 42.74 10.42 23.80 17
1 3+484
2 3+938
3 4+290
1
2
Excavatio
n
No of Hydrologist 81.02(a)iii
Type cell Span Span Depth Fill Ht. Length Excav. Depth
SC/BC 1 3X1.2 3 2 1.28 16.38 2.83 180.79
SC/BC 1 1.5X1.2 2 1.2 1.22 12.68 3.01 110.68
SC/BC 1 4X2.1 4 3 0.68 12.28 3.35 201.58
SC/BC 1 1.5X1.2 2 1.2 0.21 25.07 3.12 226.83
SC/BC 2 3X1.3 3 2 2.18 25.01 2.29 395.18
SC/BC 1 1.5X1.2 2 1.2 0.60 25.74 2.9 216.47
SC/BC 1 5X1.9 5 2 0.90 24.38 1.5 215.76
SC/BC 1 1.5X1.2 2 1.2 0.03 23.46 2.54 172.81
SC/BC 1 4X1.5 4 2 0.70 12.37 2.28 138.20
SC/BC 1 1.5X1.2 2 1.2 0.20 11.72 2.25 76.47
SC/BC 1 1.5X1.2 2 1.2 0.20 12.18 2.12 74.88
SC/BC 1 1.5X1.2 3 1.2 1.16 26.09 3.7 376.48
SC/BC 1 1.5X1.2 2 1.2 0.20 24.14 2.39 167.31
Total 2,553.45
36 251.5
RETAINING WALL 0
Lenth of footing
pad Excavation
Station Length Side Total Ht (M3)
From To (Mt.) Lt., Rt. Length (Mt.)
128280 128440 2 0 6 3.2 -
154700 154760 2 0 6 3.2 -
0 1 0 -
0 1 0 -
Total -
25% Consider due to
Unknown Material
SIDE DITCH
Probable Road Width 11.50 Mt 34.03b ii
station Length
No. Town (Mt.) Masonry (M3) Pitching
From To (M2)
1 Village Segm I 2+340.00 2+600.00 260.00 187.2 156
2 Village Segm I 9+133.00 9+433.00 300.00 216 180
3 Village Segm I 9+700.00 10+000.00 300.00 216 180
4 Village Seg II 0+000.00 0+300.00 300.00 216 180
5 Village Seg II 3+460.00 3+660.00 200.00 144 120
6 Village Seg II 8+120.00 8+456.63 336.63 242.3736 201.978
370.78 178.13
t
Lean Paved
Backfill Form Work Reinforcemen Concrete 84.01 Cut off Channel
Concrete Water
81.05(a) iii 82.01 t 83.01(b)iii (a) wall(M3
) Excava
81.08(d) ii way(M2)
seathing
Back Formwork( Total Weep Material( Lean Concete
fill(M3) m2) Conc (M3) Reif(Kg) Hole(Mt) M3) (M3)
- 0 - 0 0 0 0
- 0 - 0 0 0 0
- 0 - 0 0 0 0
- 0 - 0 0 0 0
- - - - - - - ª
Alter. I RW
DEMOLISH SC
Station Length Span Ht. Concrete(M3) Mason(M3)
10+012 16.2 2 1.2 11.988 24.8832
10+483 7.5 5 3.5 14.85 57.75
Concrete Stone
Channel Stone
Pipe Pitching(34. Masonry
Excava (34.03)bi
(32.03) 01)(b)i
12.9 10.42 23.80
14 15.48 10.42 23.80
14 21.12 10.42 23.80
-49.10
2504.35
-49.10
-49.10
Alternative 1 Pipe list
Excavation
Diameter Ф Excavation (32.01a)
ID Station Type NO CELL (Inch) Dia. (mm) Length Depth
1 0+170.0 PC 1 48 1.22 16 3.22 109.2224
2 0+370.0 PC 1 48 1.22 16 3.22 109.2224
3 0+510.0 PC 1 48 1.22 16 3.22 109.2224
4 0+680.0 PC 1 48 1.22 16 3.22 109.2224
5 0+950.0 PC 1 48 1.22 16 3.22 109.2224
6 1+309.2 PC 1 48 1.22 16 3.22 109.2224
7 1+770.0 PC 1 48 1.22 16 3.22 109.2224
8 1+977.9 PC 1 48 1.22 16 3.22 109.2224
9 2+140.0 PC 1 48 1.22 16 3.22 109.2224
10 2+389.0 PC 1 48 1.22 16 3.22 109.2224
11 2+710.0 PC 1 48 1.22 16 3.22 109.2224
12 2+860.0 PC 1 48 1.22 16 3.22 109.2224
13 3+230.0 PC 1 48 1.22 16 3.22 109.2224
14 3+520.0 PC 1 48 1.22 16 3.22 109.2224
15 3+956.5 PC 1 48 1.22 16 3.22 109.2224
16 4+515.0 PC 1 48 1.22 16 3.22 109.2224
17 4+990.0 PC 1 48 1.22 16 3.22 109.2224
Br 5
BC/SC 11
PC 408
t
Concrete Stone
Backfill Stone Masonry
Pipe Pitching(3 No of Hydrologist
(32.02) (34.03)bi
(32.03) 4.01)(b)i ID Station Type cell Span
85.408 16 10.42 23.8 1 2+560 BC/SC 1 3.5x2.2
85.408 16 10.42 23.8 2 4+660 BC/SC 1 2.5x1.6
85.408 16 10.42 23.8 3 26+470 BC/SC 1 2x1.6
85.408 16 10.42 23.8 4 32+900 BC/SC 1 2.5x1.7
85.408 16 10.42 23.8 5 82+430 BC/SC 1 5x2.7
85.408 16 10.42 23.8 6 88+550 BC/SC 1 3.5x2.1
85.408 16 10.42 23.8 7 91+980 BC/SC 1 2.5x1.6
85.408 16 10.42 23.8 8 106+054 BC/SC 1 2.5x1.5
85.408 16 10.42 23.8 9 111+900 BC/SC 1 2.5x1.6
85.408 16 10.42 23.8 10 112+570 BC/SC 1 2.5x1.5
85.408 16 10.42 23.8 11 114+210 BC/SC 1 2x1.5
85.408 16 10.42 23.8
85.408 16 10.42 23.8
85.408 16 10.42 23.8
85.408 16 10.42 23.8 RETAINING WALL
85.408 16 10.42 23.8
85.408 16 10.42 23.8
ª
Alternative 1 Box/Slab list
NING WALL
Lenth of footing
pad
Excavation Back Formwork( Conc
Length Side Total Ht (M3) fill(M3) m2) (M3)
(Mt.) Lt., Rt. Length (Mt.)
160 2 320 6 3.2 7,872.00 6,976.00 4032 896.00
60 2 120 6 0 648.00 312.00 1512 336.00
0 1 0 - - 0 -
0 1 0 - - 0 -
Total
25% Consider due to 2,130.00 1,822.00 1,386.00 308.00
Unknown Material Alter. I RW
SIDE DITCH
robable Road Width 17 Mt 34.03b ii 34.01b i 33.09a ii 31.01a
station Masonry Concrete Excavation
Town Length Pitching
From To (M3) (M2) Bedding (M3) (M3) Lot
Awalabegu 80+970.00 83+100.00 2130.00 766.8 2556 127.8 1789.2 Lot 2
Abagnendano 89+420.00 91+050.00 1630.00 586.8 1956 97.8 1369.2 Lot 2
Gonkoro 134+260.00 139+100.00 4840.00 1742.4 5808 290.4 4065.6 Lot 2
8600.00
Total 6,192.00 20,640.00 1,032.00 14,448.00
DEMOLISH CP
Head wall Paved
Station # Maonry Water way
72 823.032 695.52
18 278.64 180.36
495.75 394.15 ª
Reinforcemen Concrete 84.01
t 83.01(b)iii (a)
6294.88 90.4
4674.24 61.28
4674.24 61.28
4674.24 61.28
9737.76 114.08
6294.88 90.4
4674.24 61.28
4674.24 61.28
4674.24 61.28
4674.24 61.28
4674.24 61.28
59721.44 785.12
seathing
Total Weep Material( Lean Concete
Reif(Kg) Hole(Mt) M3) (M3)
22.06 c
Side ditch
Demol(LM)
Alternate
Common
Common
Alt I& II
17,200.00 ª
Alternative 2 structure list To Hidasse
Span
1 br. 1 20 20
2 br. 3 15.83 47.49
3 Br. 1 20.7 20.7
4 Br. 1 220 220
5 br. 1 12 12
6 br. 1 10 10
7 br. 1 12 12
8 br. 1 12 12
354.19
RETAINING WALL
Excavation
Station Length Side Ht Lenth of (M3)
From To (Mt.) Lt., Rt. Total Length (Mt.) footing pad
128280 128440 160 2 320 6 3.2 7,872.00
154700 154760 60 2 120 6 3.2 2,952.00
0 1 0 -
0 1 0 -
Total 2,706.00
25% Consider due to
Unknown Material
SIDE DITCH
Probable Road Widt 17 Mt 34.03b ii
station Masonry
No. Town Length (M3)
From To Pitching (M2)
1 Kebele Awalabegu 80+970.00 83+100.00 2130.00 766.8 2556
2 Kebele Abagnenda 89+420.00 91+050.00 1630.00 586.8 1956
3 Kebele Gonkoro 134+260.00 139+100.00 4840.00 1742.4 5808
8600.00
DEMOLISH CP
Head wall Paved Water
Dia Length Station Maonry way
36 1080 72 823.032 695.52
42 260 18 278.64 180.36
720865 1201960
719328 1209090
717790 1212170
717315 1217530
719490 1221570
723190 1224640
16 3.22 109.22 85.41 16 10.42 23.8
16 3.22 109.22 85.41 16 10.42 23.8
16 3.22 109.22 85.41 16 10.42 23.8
16 3.22 109.22 85.41 16 10.42 23.8
16 3.22 109.22 85.41 16 10.42 23.8
16 3.22 109.22 85.41 16 10.42 23.8
16 3.22 109.22 85.41 16 10.42 23.8
16 3.22 109.22 85.41 16 10.42 23.8
16 3.22 109.22 85.41 16 10.42 23.8
16 3.22 109.22 85.41 16 10.42 23.8
16 3.22 109.22 85.41 16 10.42 23.8
16 3.22 109.22 85.41 16 10.42 23.8
16 3.22 109.22 85.41 16 10.42 23.8
16 3.22 109.22 85.41 16 10.42 23.8
16 3.22 109.22 85.41 16 10.42 23.8
16 3.22 109.22 85.41 16 10.42 23.8
16 3.22 109.22 85.41 16 10.42 23.8
16 3.22 109.22 85.41 16 10.42 23.8
16 3.22 109.22 85.41 16 10.42 23.8
16 3.22 109.22 85.41 16 10.42 23.8
16 3.22 109.22 85.41 16 10.42 23.8
16 3.22 109.22 85.41 16 10.42 23.8
16 3.22 109.22 85.41 16 10.42 23.8
16 3.22 109.22 85.41 16 10.42 23.8
16 3.22 109.22 85.41 16 10.42 23.8
16 3.22 109.22 85.41 16 10.42 23.8
16 3.22 109.22 85.41 16 10.42 23.8
16 3.22 109.22 85.41 16 10.42 23.8
16 3.22 109.22 85.41 16 10.42 23.8
16 3.22 109.22 85.41 16 10.42 23.8
16 3.22 109.22 85.41 16 10.42 23.8
16 3.22 109.22 85.41 16 10.42 23.8
16 3.22 109.22 85.41 16 10.42 23.8
16 3.22 109.22 85.41 16 10.42 23.8
16 3.22 109.22 85.41 16 10.42 23.8
16 3.22 109.22 85.41 16 10.42 23.8
16 3.22 109.22 85.41 16 10.42 23.8
16 3.22 109.22 85.41 16 10.42 23.8
16 3.22 109.22 85.41 16 10.42 23.8
16 3.22 109.22 85.41 16 10.42 23.8
16 3.22 109.22 85.41 16 10.42 23.8
16 3.22 109.22 85.41 16 10.42 23.8
16 3.22 109.22 85.41 16 10.42 23.8
16 3.22 109.22 85.41 16 10.42 23.8
16 3.22 109.22 85.41 16 10.42 23.8
16 3.22 109.22 85.41 16 10.42 23.8
16 3.22 109.22 85.41 16 10.42 23.8
16 3.22 109.22 85.41 16 10.42 23.8
16 3.22 109.22 85.41 16 10.42 23.8
16 3.22 109.22 85.41 16 10.42 23.8
16 3.22 109.22 85.41 16 10.42 23.8
16 3.22 109.22 85.41 16 10.42 23.8
16 3.22 109.22 85.41 16 10.42 23.8
16 3.22 109.22 85.41 16 10.42 23.8
16 3.22 109.22 85.41 16 10.42 23.8
Lot II Alter. II PC ª
Lean Form
Excavation Backfill Reinforcement Concrete
Concrete Work
81.02(a)iii 81.05(a) iii 83.01(b)iii 84.01 (a)
Excav. 81.08(d) ii 82.01
Length Depth
16 5 312 216 2.4 112 4674.24 61.28
16 5 312 216 2.4 112 4674.24 61.28
16 5 312 216 2.4 112 4674.24 61.28
16 5 312 216 2.4 112 4674.24 61.28
16 5 312 216 2.4 112 4674.24 61.28
16 5 312 216 2.4 112 4674.24 61.28
16 5 312 216 2.4 112 4674.24 61.28
16 5 312 216 2.4 112 4674.24 61.28
16 5 312 216 2.4 112 4674.24 61.28
16 5 312 216 2.4 112 4674.24 61.28
16 5 312 216 2.4 112 4674.24 61.28
16 5 312 216 2.4 112 4674.24 61.28
16 5 312 216 2.4 112 4674.24 61.28
16 5 312 216 2.4 112 4674.24 61.28
16 5 312 216 2.4 112 4674.24 61.28
16 5 312 216 2.4 112 4674.24 61.28
16 5 312 216 2.4 112 4674.24 61.28
16 5 312 216 2.4 112 4674.24 61.28
16 5 552 360 4.8 160 7646.4 127.68
16 5 552 360 4.8 160 7646.4 127.68
16 5 552 360 4.8 160 7646.4 127.68
16 5 552 360 4.8 160 7646.4 127.68
16 5 712 328 6.4 224 12088.64 211.04
16 5 712 328 6.4 224 12088.64 211.04
16 5 712 328 6.4 224 12088.64 211.04
16 5 712 328 6.4 224 12088.64 211.04
16 5 712 328 6.4 224 12088.64 211.04
16 5 712 328 6.4 224 12088.64 211.04
16 5 552 360 4.8 160 7646.4 127.68
16 5 4680 68760 36 1680 114696 1915.2
16 5 312 216 2.4 112 7646.4 127.68
Lot II Alter. II BC
Lot II Alter. II RW ª
PC 1-
PC 1-
PC 1-
PC 1-
PC 1-
PC 1-
PC 1-
PC 1-
PC 2-
PC 1-
PC 1-
PC 1-
PC 1-
PC 1-
PC 1-
PC 1-
PC 1-
PC 1-
PC 1-
PC 1-
PC 1-
PC 1-
PC 1-
PC 1-
PC 1-
PC 1-
PC 1-
PC 1-
PC 1-
PC 1-
PC 1-
PC 1-
PC 1-
PC 1-
PC 1-
PC 1-
PC 1-
PC 1-
PC 1-
PC 1-
PC 1-
PC 1-
PC 1-
PC 1-
PC 1-
PC 1-
PC 1-
PC 1-
PC 1-
PC 1-
PC 1-
PC 1-
PC 1-
PC 1-
PC 1-
PC 1-
PC 1-
PC 1-
PC 1-
PC 1-
PC 1-
PC 1-
PC 1-
PC 1-
PC 1-
PC 1-
PC 1-
PC 1-
PC 1-
PC 1-
PC 1-
PC 1- 172
1
2
3
4
5
6
7
8
SIDE DITCH
Probable Road Width 17 Mt
station
No. Town Length
From To
4 Kebele Bamza 5+130.00 6+750.00 1620.00
5 Kebele Guba 202+590.14 205+102.00 2511.86
4131.86
Total
DEMOLISH CP
Head wall Paved Water
Dia Length Station Maonry way
36 0 0.00
42 0 0
Total 0 0.00
e list From Hidasse to Guba
Excavation
(32.01a)
Type No of cell Span Depth Dia. (mm) Length Depth
BC/SC 3 3 2 -
BC/SC 1 2 2 -
BC/SC 3 3 2 -
BC/SC 2 3 2 -
BC/SC 1 3 2 -
BC/SC 1 2 2 -
BC/SC 3 3 2 -
BC/SC 2 3 2 -
BC/SC 3 3 2 -
BC/SC 3 3 2 -
BC/SC 1 3 2 -
BC/SC 3 3 2 -
BC/SC 3 3 2 -
BC/SC 2 3 2 -
BC/SC 1 3 2 -
BC/SC 1 3 2 -
BC/SC 3 3 2 -
BC/SC 2 3 2 -
BC/SC 1 2 2 -
BC/SC 1 3 2 -
BC/SC 2 3 2 -
BC/SC 2 3 2 -
BC/SC 3 3 2 -
BC/SC 3 3 2 -
BC/SC 2 3 2 -
BC/SC 3 3 2 -
BC/SC 2 3 2 -
BC/SC 1 3 2 -
BC/SC 2 3 2 -
BC/SC 1 3 2 -
BC/SC 1 3 2 -
BC/SC 1 3 2 -
BC/SC 1 2 2 -
BC/SC 3 3 2 -
BC/SC 3 3 2 -
BC/SC 1 3 2 -
BC/SC 1 2 2 -
BC/SC 1 3 2 -
BC/SC 3 3 2 -
BC/SC 3 3 2 -
Br. 1 220 8 -
br. 1 12 5 -
br. 1 12 5 -
br. 1 11 6 -
br. 1 10 5 -
br. 1 12 5 -
br. 1 11 6 -
br. 1 10 5 -
PC 1 - - 1.22 16 3.22 109.22
PC 1 - - 1.22 16 3.22 109.22
PC 1 - - 1.22 16 3.22 109.22
PC 1 - - 1.22 16 3.22 109.22
PC 1 - - 1.22 16 3.22 109.22
PC 1 - - 1.22 16 3.22 109.22
PC 1 - - 1.22 16 3.22 109.22
PC 1 - - 1.22 16 3.22 109.22
PC 1 - - 1.22 16 3.22 109.22
PC 1 - - 1.22 16 3.22 109.22
PC 1 - - 1.22 16 3.22 109.22
PC 1 - - 1.22 16 3.22 109.22
PC 1 - - 1.22 16 3.22 109.22
PC 1 - - 1.22 16 3.22 109.22
PC 1 - - 1.22 16 3.22 109.22
PC 1 - - 1.22 16 3.22 109.22
PC 1 - - 1.22 16 3.22 109.22
PC 1 - - 1.22 16 3.22 109.22
PC 1 - - 1.22 16 3.22 109.22
PC 1 - - 1.22 16 3.22 109.22
PC 1 - - 1.22 16 3.22 109.22
PC 1 - - 1.22 16 3.22 109.22
PC 1 - - 1.22 16 3.22 109.22
PC 1 - - 1.22 16 3.22 109.22
PC 1 - - 1.22 16 3.22 109.22
PC 1 - - 1.22 16 3.22 109.22
PC 1 - - 1.22 16 3.22 109.22
PC 1 - - 1.22 16 3.22 109.22
PC 1 - - 1.22 16 3.22 109.22
PC 1 - - 1.22 16 3.22 109.22
PC 1 - - 1.22 16 3.22 109.22
PC 1 - - 1.22 16 3.22 109.22
PC 1 - - 1.22 16 3.22 109.22
PC 1 - - 1.22 16 3.22 109.22
PC 1 - - 1.22 16 3.22 109.22
PC 1 - - 1.22 16 3.22 109.22
PC 1 - - 1.22 16 3.22 109.22
PC 1 - - 1.22 16 3.22 109.22
PC 1 - - 1.22 16 3.22 109.22
PC 1 - - 1.22 16 3.22 109.22
PC 1 - - 1.22 16 3.22 109.22
PC 1 - - 1.22 16 3.22 109.22
PC 1 - - 1.22 16 3.22 109.22
PC 1 - - 1.22 16 3.22 109.22
PC 1 - - 1.22 16 3.22 109.22
BC/SC 7 3 2
PC 47 1.22 15 3.22 4812.61
147
Total 9,727.62
Lot III Alter. II PC
Br. 1 220 220
br. 1 12 12
br. 1 12 12
br. 1 11 11
br. 1 10 10
br. 1 12 12
br. 1 11 11
br. 1 10 10
298
Lean
Excavation Backfill Form Work Reinforcement
Concrete
81.02(a)iii 81.05(a) iii 82.01 83.01(b)iii
Excav. 81.08(d) ii
Dia. (mm) Length Depth
- 16 5 312 216 2.4 112 4674.24
- 16 5 312 216 2.4 112 4674.24
- 16 5 312 216 2.4 112 4674.24
- 16 5 312 216 2.4 112 4674.24
- 16 5 312 216 2.4 112 4674.24
- 16 5 312 216 2.4 112 4674.24
- 16 5 312 216 2.4 112 4674.24
- 16 5 312 216 2.4 112 4674.24
- 16 5 312 216 2.4 112 4674.24
- 16 5 312 216 2.4 112 4674.24
- 16 5 312 216 2.4 112 4674.24
- 16 5 312 216 2.4 112 4674.24
- 16 5 312 216 2.4 112 4674.24
- 16 5 312 216 2.4 112 4674.24
- 16 5 312 216 2.4 112 4674.24
- 16 5 312 216 2.4 112 4674.24
- 16 5 552 360 4.8 160 7646.4
- 16 5 552 360 4.8 160 7646.4
- 16 5 552 360 4.8 160 7646.4
- 16 5 552 360 4.8 160 7646.4
- 16 5 552 360 4.8 160 7646.4
- 16 5 552 360 4.8 160 7646.4
- 16 5 552 360 4.8 160 7646.4
- 16 5 552 360 4.8 160 7646.4
- 16 5 552 360 4.8 160 7646.4
- 16 5 712 328 6.4 224 12088.64
- 16 5 712 328 6.4 224 12088.64
- 16 5 712 328 6.4 224 12088.64
- 16 5 712 328 6.4 224 12088.64
- 16 5 712 328 6.4 224 12088.64
- 16 5 712 328 6.4 224 12088.64
- 16 5 712 328 6.4 224 12088.64
- 16 5 712 328 6.4 224 12088.64
RETAINING WALL
61.28
61.28
61.28
61.28
61.28
61.28
61.28
61.28
61.28
61.28
61.28
61.28
61.28
61.28
61.28
61.28
127.68
127.68
127.68
127.68
127.68
127.68
127.68
127.68
127.68
211.04
211.04
211.04
211.04
211.04
211.04
211.04
211.04
211.04
211.04
211.04
211.04
211.04
211.04
12088.64
893.76
18,066.56
ª
Lean
seathing Concete
Material(M3) (M3)
96 25.6
12 3.2
192 51.2
24 6.4
180 48
48 12.8
120 32
168.00 44.80
ª
Alternative 3 structure list To Hidasse
1 br. 1 20 20
2 br. 3 15.83 47.49
3 Br. 1 220 220
4 br. 1 12 12
5 br. 1 12 12
6 br. 1 12 12
7 br. 1 10 10
8 br. 1 11 11
344.49
Alternative 3 structure list From Hidasse to Guba
1 br. 1 12
2 br. 1 12
3 br. 1 11
4 br. 1 12
5 br. 1 12
6 br. 1 11
7 br. 1 11
8 br. 1 12
9 br. 1 12
10 br. 1 12
Dia. (mm) Type NO CELL Span
- 1 BC/SC 3 3 9
- 2 BC/SC 3 3 9
- 3 BC/SC 1 2 2
- 4 BC/SC 1 2 2
- 5 BC/SC 3 3 9
- 6 BC/SC 1 2 2
- 7 BC/SC 2 3 6
- 8 BC/SC 1 2 2
- 9 BC/SC 1 2 2
- 10 BC/SC 1 2 2
- 11 BC/SC 1 3 3
- 12 BC/SC 1 2 2
- 13 BC/SC 3 3 9
- 14 BC/SC 2 3 6
- 15 BC/SC 3 3 9
- 16 BC/SC 3 3 9
- 17 BC/SC 1 3 3
- 18 BC/SC 3 3 9
- 19 BC/SC 3 3 9
- 20 BC/SC 3 3 9
- 21 BC/SC 2 3 6
- 22 BC/SC 1 2 2
- 23 BC/SC 1 3 3
- 24 BC/SC 1 3 3
- 25 BC/SC 1 2 2
- 26 BC/SC 3 3 9
- 27 BC/SC 1 2 2
- 28 BC/SC 1 2 2
- 29 BC/SC 1 2 2
- 30 BC/SC 1 3 3
- 31 BC/SC 2 3 6
- 32 BC/SC 1 2 2
- 33 BC/SC 1 3 3
- 34 BC/SC 1 2 2
- 35 BC/SC 1 2 2
- 36 BC/SC 1 2 2
- 37 BC/SC 1 2 2
- 38 BC/SC 3 3 9
- 39 BC/SC 1 3 3
- 40 BC/SC 1 2 2
- 41 BC/SC 2 3 6
- 42 BC/SC 3 3 9
- 43 BC/SC 1 2 2
- 44 BC/SC 2 3 6
- 45 BC/SC 1 3 3
- 46 BC/SC 1 2 2
- 47 BC/SC 2 3 6
- 48 BC/SC 3 3 9
- 49 BC/SC 3 3 9
- 50 BC/SC 1 2 2
- 51 BC/SC 1 3 3
- 52 BC/SC 1 3 3
- 53 BC/SC 1 2 2
- 54 BC/SC 1 2 2
- 55 BC/SC 1 3 3
- 56 BC/SC 3 3 9
- 57 BC/SC 1 3 3
- 58 BC/SC 1 2 2
- 59 BC/SC 1 2 2
- 60 BC/SC 1 3 3
- 61 BC/SC 3 3 9
- 62 BC/SC 1 2 2
- 63 BC/SC 1 2 2
- 64 BC/SC 3 3 9
- 65 BC/SC 1 2 2
- 66 BC/SC 1 3 3
- 67 BC/SC 1 2 2
- 68 BC/SC 1 3 3
- 69 BC/SC 1 2 2
- 70 BC/SC 3 3 9
- 71 BC/SC 3 3 9
- 72 BC/SC 1 2 2
- 73 BC/SC 3 3 9
- 74 BC/SC 1 2 2
- 75 BC/SC 2 3 6
- 76 BC/SC 1 3 3
- 1 Br. 1 10 340
- 2 br. 1 12
- 3 br. 1 12
- 4 br. 1 11
- 5 br. 1 12
- 6 br. 1 12
- 7 br. 1 11
- 8 br. 1 11
- 9 br. 1 12
- 10 br. 1 12
- 11 br. 1 12 11
1.22 1 PC 1-
1.22 2 PC 2-
1.22 3 PC 2-
1.22 4 PC 2-
1.22 5 PC 2-
1.22 6 PC 2-
1.22 7 PC 2-
1.22 8 PC 2-
1.22 9 PC 2-
1.22 10 PC 2-
1.22 11 PC 2-
1.22 12 PC 2-
1.22 13 PC 2-
1.22 14 PC 2-
1.22 15 PC 2-
1.22 16 PC 1-
1.22 17 PC 1-
1.22 18 PC 1-
1.22 19 PC 1-
1.22 20 PC 1-
1.22 21 PC 1-
1.22 22 PC 1-
1.22 23 PC 1-
1.22 24 PC 1-
1.22 25 PC 1-
1.22 26 PC 1-
1.22 27 PC 1-
1.22 28 PC 1-
1.22 29 PC 1-
1.22 30 PC 1-
1.22 31 PC 1-
1.22 32 PC 1-
1.22 33 PC 1-
1.22 34 PC 1-
1.22 35 PC 1-
1.22 36 PC 1-
1.22 37 PC 1-
1.22 38 PC 1-
1.22 39 PC 1- 99
1.22
95
12
12
11
12
12
11
11
12
12
12
117
STRUCTURAL QTY ESTIM
Bill Item DESCRIPTION Unit
Side ditch LM
3000
3101 Excavation of open drain
31.01(a) Soft Excavation for open drains irrespective of depth M3
31.01(b) Extra over item 31.01(a) for excavation of hard material irrespective of depth M3
32.01(a) Excavation of Soft material irrespective of depth M3
32.01(b) Excavation of Hard material irrespective of depth M3
3202 Backfilling
32.02(a) Using Excavated material M3
32.02(b) Using imported selected material M3
8000 STRUCTURES
81.02 Excavation for Structures
81.02(a)i Excavation of Soft material irrespective of depth for major structure
M3
81.02(a)ii Excavation of Soft material irrespective of depth for road way retaining wall
M3
81.02(a)iii
Excavation of soft material irrespective of depth for slab/box culvers M3
81.02(b)i Excavation of Hard material irrespective of depth for major structure
M3
81.02(b)ii Excavation of Hard material irrespective of depth for road way retaining wall
M3
81.02(b)iii
Excavation of Hard material irrespective of depth for slab/box culvers M3
81.05 Backfilling to Excavation
81.05(a)i Utilizing materials from excavation for major structure M3
81.05(a)ii Utilizing materials from excavation for road way retaining wall M3
81.05(a)iii Utilizing materials from excavation for Slab/Box Culverts M3
81.05(b)i Using imported materials for major structure M3
81.05(b)ii Using imported materials for road way retaining wall M3
81.05(b)iii Using imported materials for Slab/Box Culverts M3
81.08 FOUNDATION FILL
81.08(a) Rock fill M3
81.08(d)i Lean concrete 50mm (C-15) beneath the concrete footings (Major Structure),
M2
81.08(d)ii Lean concrete 50mm (C-15) beneath the concrete footings (Retaining wall),
M3
81.08(d)ii Lean concrete 50mm (C-15) beneath the concrete footings (Box Culvert),
M3
81.08(d)iii Lean concrete 50mm (C-15) beneath the concrete footings (U-ditch),
M3
8200 FORMWORK FOR STRUCTURES
82.01-(i) Formwork class F2 Finish (For Major structurs) M2
82.01-(ii) Formwork class F2 Finish for Bank Protection. M2
82.01-(ii) Formwork class F2 Finish foru- Ditch M2
82.01-(iii) Formwork class F2 Finish for Slab/Box Culverts M2
-
110 - 276.65 30,431.50
36 - 360.05 12,961.80
33 16 -
-
-
-
2,290.45 0.00 -
-
706.69 2805.02 -
78.52 311.67 -
-
-
154.35 685.74 100.32 15,484.67
1,821.82 6171.64 204.35 372,288.07
-
-
-
381.00 1526.00 5851.5 2,229,421.50
-
-
-
-
250.08 1146.20 542.16 135,583.37
-
1,017.98 0.00 542.16 551,906.95
-
44.96 44.96 89.92 89.92 -
571.20 2618.00 1842.5 1,052,436.00
1,221.57 0.00 1842.5 2,250,749.36
-
-
-
-
-
0.00 157.87 -
157.87 -
-
0.00 2120 -
38.40
49.28 2120 81,402.70
152.70
0.00 2120 323,717.00
-
230.21 94.53 324.74 846.02 843.81 274,018.18
-
1,017.98 0.00 843.81 858,980.02
2,313.61 2906.30 843.81 1,952,250.63
-
-
799.77
885.58 4647.03 3,716,555.18
305.39 0.00 4647.03 1,419,172.29
- 0.00 122.7 -
6.00 - 6.00 24.00 38120.72 228,724.32
30.00 16.00 46.00 168.24 2263.02 104,098.92
16.00 16.00 32.00 48.00 1476.78 47,256.96
16.00 16.00 32.00 48.00 202 6,464.00
54.00 54.00 108.00 108.00 172.26 18,604.08
- 0.00 172.26 -
- 0.00 504.64 -
-
-
29.60 56
185.00 350 -
-
-
-
-
200.00 2104.12 -
-
300.00 5008.23 -
Total 26,695,684.63
3674.357497 2579.461104
2158.26
421.2011045 83 321,634.75
171.36
210.66
46.40
760.00
620.99
110.00
36.00
17.00
-
-
-
2,290.45
-
(2,098.32)
(233.15)
-
-
(531.39)
(4,349.82)
-
-
-
(1,145.00)
-
-
-
-
(896.12)
-
1,017.98
-
-
(2,046.80)
1,221.57
-
-
-
-
38.51
1,812.16
(24.96)
201.35
-
-
-
-
(243.69)
-
(952.35)
-
(308.06)
(7.51)
(10.88)
152.70
-
(521.28)
-
1,017.98
(592.69)
-
-
(23.69)
-
(4.91)
17.33
(9.58)
-
-
(254.36)
(38.49)
(85.81)
305.39
-
(18.00)
(122.24)
(16.00)
(16.00)
-
-
(9.60)
-
-
-
(767.46)
1,221.57
(165.00)
-
-
-
(200.00)
(300.00)
Bridge Demolishing
Stone
Concrete
ID Station Masonry
1 3+900 23.2 380
2 8+697 23.2 380
Side ditch LM
22.06(c).ii
DRAINAGE STRUCTURE
3000
3101 Excavation of open drain
31.01(a) Soft Excavation for open drains irrespective of depth M3
31.01(b) Extra over item 31.01(a) for excavation of hard material irrespective of depth M3
32.01(a) Excavation of Soft material irrespective of depth M3
32.01(b) Excavation of Hard material irrespective of depth M3
3202 Backfilling
32.02(a) Using Excavated material M3
32.02(b) Using imported selected material M3
8000 STRUCTURES
81.02 Excavation for Structures
81.02(a)i Excavation of Soft material irrespective of depth for major structure
M3
81.02(a)ii Excavation of Soft material irrespective of depth for road way retaining wall
M3
81.02(a)iii
Excavation of soft material irrespective of depth for slab/box culvers M3
81.02(b)i Excavation of Hard material irrespective of depth for major structure
M3
81.02(b)ii Excavation of Hard material irrespective of depth for road way retaining wall
M3
81.02(b)iii
Excavation of Hard material irrespective of depth for slab/box culvers M3
81.05 Backfilling to Excavation
81.05(a)i Utilizing materials from excavation for major structure M3
81.05(a)ii Utilizing materials from excavation for road way retaining wall M3
81.05(a)iii Utilizing materials from excavation for Slab/Box Culverts M3
81.05(b)i Using imported materials for major structure M3
81.05(b)ii Using imported materials for road way retaining wall M3
81.05(b)iii Using imported materials for Slab/Box Culverts M3
81.08 FOUNDATION FILL
81.08(a) Rock fill M3
81.08(d)i Lean concrete 50mm (C-15) beneath the concrete footings (Major Structure),
M2
81.08(d)ii Lean concrete 50mm (C-15) beneath the concrete footings (Retaining wall),
M3
81.08(d)ii Lean concrete 50mm (C-15) beneath the concrete footings (Box Culvert),
M3
14,448.00 14448.00
16,661.88 14228.95
1,851.32 1580.99
2,435.40
506.88 157.87
15,876.00
10319.40 157.87
270.60
56.32 157.87
1,764.00
1146.60 157.87
17.60
5.06 2120
144.00
117.00 2120
61352.67
317.24 257.76 61352.67
5,050.56
4103.58 4647.03
308.00 66.00 4647.03
89.78 89.78 89.78 122.7
- 6 4 6 30 30.00 38120.72
22 26 4 88.2 192.2 192.20 2263.02
16.24 16.24 4 34.104 99.064 99.06 1476.78
16.24 16.24 4 34.104 99.064 99.06 202
54 54 4 113.4 329.4 329.40 172.26
253.00 101.20 172.26
66.00
26.40 504.64
150
150.00 5008.23
Total
86.4
Amount, Birr
308,396.00 -
7,067.04 -
- -
28,334.88 -
41,806.80 -
- -
298,906.49 -
93,649.01 -
- -
- -
- -
- -
- -
- -
- 2,432.93
- 270.33
- -
- -
290,459.63 422.77
2,366,643.72 1,691.08
- -
- -
- -
15,869,268.00 396.00
- -
- -
- -
- -
- -
971,680.84 -
- -
11,190,182.40 -
- -
- -
7,542,458.00 -
11,408,760.00 -
- -
- -
- -
- -
857,597.20 -
384,476.60 1,928.52
2,506,344.12 5,556.60
2,982.16 -
42,719.62 214.28
278,482.68 617.40
- -
- -
- -
1,626,284.30 5,576.40
580,385.15 -
487,585.34 1,900.80
12,465,267.65 ###
- -
447,603.70 -
137,070.72 -
37,312.00 12.54
305,280.00 27.00
- -
- -
2,128,126.79 -
- -
1,169,520.66 1,016.40
5,022,357.12 1,116.00
- -
- -
2,530,736.39 -
1,465,163.11 15.86
2,242,746.85 -
- -
19,463,678.09 59.48
- -
- -
2,588,853.12 -
2,155,854.80 -
23,470,103.84 946.98
1,431,285.24 242.00
11,016.01 -
1,143,621.60 -
434,952.44 -
146,295.73 -
20,010.93 -
56,742.44 -
43,581.78 151.80
133,721.53 -
33,306.24 39.60
- -
- -
8,409,404.00 -
- -
- -
- -
- -
- -
210,412.00 -
751,234.50 -
145,639,729.27
1,685,645.01
STRUCTURAL QTY ESTIMATE
32.01 Excavation
32.02 Backfilling
33.18 (a) Stone Masonary Paved Ditch on Rolling terrain and Other
83.01(a) Reinforcement for structure bar high yield steel bars, Grade 40
83.01(b) Reinforcement for structure bar high yield steel bars, Grade 60
87.03 Bearings
675,496.41
m3 55882.00 103.68
m3 2879.00 144.23
m3 6263.55 103.68
m3 14133.80 144.23
m3 3741.33 716.40
m3 3342.90 83.59
m3 7695.20 396.75
lm 57.00 9,553.88
lm 17.00 12,225.90
lm 1193.96 14,435.40
m2 2467.93 1,169.23
lm 30197.10 557.28
lm 15098.04 364.24
m3 35256.30 3,526.81
lm 5962.00 2,821.45
m2 2010.73 1,113.69
m3 8352.57 3,465.40
m3 3875.26 173.89
m 3
1742.85 715.42
m3 3714.01 396.75
m3 2635.97 1,497.19
m 3
147.42 3,465.40
m3 3608.66 17,562.21
m2 1338.00 5,846.17
lm 150.00 6,254.04
lm 98.00 5,228.52
lm 98.00 2,460.48
lm 114.00 553.61
m3 19719.59 3,465.40