F. No. NH- 24028t14t2014-H (Vot-il)(Comp no.

134863)
Government of lndia
Ministry of Road Transport & H.ighways
(Highways Section)
Transport Bhawan, 1, Parliament Street, New Dethi-110001.

Dated:lf Awit,zozz
To

1 The Chairperson, National Highways Authority of India, G5&6, sector-10, Dwarka,


New
Dethi.
2. The Managing Director, NHIDCL, pTl buitding, partiament Street, New Delhi.
3. ADG-Nodat officer, Ministry of Road rransport & Highways, Transport Bhawan, 1
partiament Street, New Delhi

subject: changes in Eidder Eligibility criteria of NH projects under Hybrid Annuity tr{ode
reg.

Sir,

I am directed to refer to this Ministry's letter No. 35014/3s/zozo-H dated oz.11.zo2o


(copy enclosed) vide which changes in provisions of the standard RFp
document of Epi projects
regarding bidder etigibility criteria were conveyed.

2. lt
has now been decided to extend the amended provisions relating to ,Threshotd
Technical capacity' of ctause z.z.z.z (ii) & (iii) of standard RFp document oi Eec prolects
to
the similar works of HAI projects. Accordingly, ctauses 2.2.2 (AA) and (nqlt betow cL use 2.2.2
(A), as attached, have been inserted in the Modet RFp document of HAM.

3. .Att the executive agencies of MoRTH are directed to implement the aforesaid changes
with immediate effect.

4. This issues with the approval of Hon'bte Minister(RT&H).

Yours fairhfully,

Enct: As above

Depury sec rera ry,",n" o"r"(rt"lilX?:?i::l]


T.No.23314316
Copy to;

1 Sr. PPS to Secretary, RTH


2 AS&FA, lrtoRTH
3 A5 (H & LA)
4 AtI J5, MoRTH
5 Att ADGs/CEs in the MoRTH
6 Sr. Director, NIC for uptoading on the website of lvtoRTH
ANNEXURE

SfJJirr*,i#,r"1;'r;h'.H;,r,,
t" normal Highwav projects (including Major
Provided that at least one simitar work of
7a% of Estimated project cost .,*.crore (Rs. --.)]
shat[ have been compteted from the rtigiote proje.f,'in-iut"gorv [Rs.
in Crause 3.4.1. For this Drrrpose, a prolect
rn.[t
1 and/or category
uu.onirau;;',,;
i
specified
90?" of the vatue of work'has n""n il;;:",=;;',ir'.more tnan
.o.ir"tla ;;;;;':;rptered vatue of work is equar to or
more than 20% of the estimated project'cost.
lf any-Major Bridge / RoB / Ftyover/Tunnel is (are] part
project,' then the- sore Bidder or in
case the Bidder beinq a Joint ventur", uny 'r".b"rthe
of
-n"ecessarity
demonstrate additionat experience in .onstiuitron oi .tornt ventri" ,nuir
the tast 10 (Ten) financial vears preceding the
oi,lta;or Bridge/RoBs/ Ftyovers/Tunner in
Bid Due but" i... shatl have completed at teast
one similar Major Bridge/RoB/Ftyover h"fig
i;;;;;t Io or greater than:
(a) ln case, longest span of Bridge/RoB/ Ftyover is less than or
qua[ification is required. equal to 60m, no additionat

(b) When longest span is more than 60m:


50% of the rongest span or 100m, whichever
of the structure proposed in this project. is tess,

and in case of tunnet' if any,. shatt


consistins of sinsre * :yl-.lq:r, .have compteted construction of at least one tunnel
tinitlaing- tunner(s) for noaJ/niilwayzr*etro
Rai[/irrigation/ Hydro-etectric- projects etc. ,having
) at 6ast
(a) rn case Tunnel is a Dart of project having
rength less than or equat to 200 m, then no
additionat qua tification is required.
(b) when tength of tunner more than 200 m: 50% of
the cross sectional area of proposed
tunnet or two [ane highwav tunnel cross-sectionar
tunnel to be constructed in this project or 2 km,
i[a,-wni;;;;ir-i;;il
- '--- -"- ii,iJrJ"nln
-v'u ,!"5r or ,n"
;hi.h"u;, is tesi.

2.2.2. (AAA) For Stand-alone specialized projects:


(a) Major Bridges/RoB/Flyovers projects:
1al) ln case the cost of soecialized project is ress than or equar to Rs. 1,000
cr: The sote
Bidder or in case the Bidder being-" ;;i-i;;;r;;;"*i
compteted at least one simitar r\4afor addgel noaT FiyovJr
."r0", of Joint venture shatl have
pro.lect in the last 1o (Ten) financial
years preceding the Bid Due Date, having
ipan equa[to o,. g."at", than 50% or tn! ioigest span
or 100 m, whichever is ress of.the strr.irr" proioi"j rn
similar project shart be at teast 20% ot tne ritimateJ project
trii, pi";"i. ."a .d" ii," .i* or ,r.r,
shatt be considered to be compteted, rr more
cost. For this purpose, a project
ttin soi or-[ne ratue ;";kil;f;tompteted
and such compteted vatue of work is equar to or ror"ihun "f irii.ul"a-p.j"".t c*t.
20% of the
(a2)
..ln :?lg the cost of specjalized project is more than Rs. 1 ,000 cr: The sote Bidder or in
case the Bidder being a Joint.venture, any member
least one simitar Major Bridge/ RoBl fly;r",
oiLtint venture ir,iti n"""'."*,pteted at
preceding the Bid Due Date, having span,equat f.i".t ln the tast 10 (Ten) financial years
t6 oi gi"ut". rhan 50% ili" irig"li'ipan of the
structure. proposed in this project or ioom, whichevir "i the cost of such simi[ar
ri-tess, and also
project shatt be at least 20% of the Estimated erolect
tost or Rs. 1oo0 cr., whichever is [ess.
For this purpose, a project shatl be considered to be compteted, if more than 90% of the vatue
of work has been completed and such compteted vatue of work is equal to or more than 20% of
the Estimated Project Cost or Rs. 1000 Cr., whichever is tess.
(b) Tunnel Project: The sole Bidder olin case the Bidder being a Joint Venture, any
member of Joint Venture sha[[ have comp[eted at least one tunnel project in the tast 1O (Ten)
financial years preceding the B'ide Due Date, consisting of singte or twin tubes (inctuding
tunnet(s) for roads/ Rai [way/Metro Ra'it/irrigation/ hydro- Etectric Projects etc.) having at teast
50% of the cross-sectional area of the tunne[ to be constructed or cross sectional area of 2 lane
highway tunnel, whichever is [ess, and 20% tength of the tunnel to be constructed in this
project or 2 km, whichever is less and the cost of such project shatt be at [east 20% of the
Estimated Project cost or Rs. 1000 cr., whichever is [ess. For this purpose, a project shatt be
considered to be completed, if more than 90% of the value of work has been completed and
such compteted vatue of work is equal to or more than 20% of the Estimated Project Cost or Rs.
1000 Cr., whichever is less.