Government of lndia
Ministry of Road Transport & H.ighways
(Highways Section)
Transport Bhawan, 1, Parliament Street, New Dethi-110001.
Dated:lf Awit,zozz
To
subject: changes in Eidder Eligibility criteria of NH projects under Hybrid Annuity tr{ode
reg.
Sir,
2. lt
has now been decided to extend the amended provisions relating to ,Threshotd
Technical capacity' of ctause z.z.z.z (ii) & (iii) of standard RFp document oi Eec prolects
to
the similar works of HAI projects. Accordingly, ctauses 2.2.2 (AA) and (nqlt betow cL use 2.2.2
(A), as attached, have been inserted in the Modet RFp document of HAM.
3. .Att the executive agencies of MoRTH are directed to implement the aforesaid changes
with immediate effect.
Yours fairhfully,
Enct: As above
SfJJirr*,i#,r"1;'r;h'.H;,r,,
t" normal Highwav projects (including Major
Provided that at least one simitar work of
7a% of Estimated project cost .,*.crore (Rs. --.)]
shat[ have been compteted from the rtigiote proje.f,'in-iut"gorv [Rs.
in Crause 3.4.1. For this Drrrpose, a prolect
rn.[t
1 and/or category
uu.onirau;;',,;
i
specified
90?" of the vatue of work'has n""n il;;:",=;;',ir'.more tnan
.o.ir"tla ;;;;;':;rptered vatue of work is equar to or
more than 20% of the estimated project'cost.
lf any-Major Bridge / RoB / Ftyover/Tunnel is (are] part
project,' then the- sore Bidder or in
case the Bidder beinq a Joint ventur", uny 'r".b"rthe
of
-n"ecessarity
demonstrate additionat experience in .onstiuitron oi .tornt ventri" ,nuir
the tast 10 (Ten) financial vears preceding the
oi,lta;or Bridge/RoBs/ Ftyovers/Tunner in
Bid Due but" i... shatl have completed at teast
one similar Major Bridge/RoB/Ftyover h"fig
i;;;;;t Io or greater than:
(a) ln case, longest span of Bridge/RoB/ Ftyover is less than or
qua[ification is required. equal to 60m, no additionat