V A L U E
������� �������
��
The APEX Big Bore Classification System helps you choose the best completion level and
design to match your isolation needs - and lower risk and cost.
APplication EXperience Leader
2
About the APEX levels
APEX 1 and 2 - Wellbore construction Experience and choices add value at
completions all levels
• Objective - reservoir-face comple- Only Baker Oil Tools supplies the
tions that take place during the breadth and depth of products and
drilling process application experience in both wellbore
construction and completions to be able
• Constraints - based on liner top to provide single-source, integrated
load analysis and the operator’s solutions for all levels of big bore com-
completion philosophy pletions. Baker combines its applica-
• Benefit - operational simplicity tion experience, innovative processes,
and best-in-class products - including
• Costs/risks - completing in a drill- fit-for-purpose systems - to reduce risk
ing environment and increase overall completion reli-
• Risk reduction - contingency avail- ability and value at all APEX classifica-
able to convert to an APEX 3 or 4 tion levels.
completion
3
APEX Big Bore Completion Solutions
Application Experience Leaders, Best-in-Class Products
APEX Level 1: Cemented Completion
Objective: Liner top completion
Completion: Cemented liner tied back to surface
Applications: Monobore, cemented liner, remote location
Experience: Colombia, United Kingdom
Description: In this most basic of completions, the liner is run,
hung and cemented. Another trip is made to clean
and polish the polished bore receptacle (PBR). The
integrity of the liner top can then be tested by a vari-
ety of means. If the integrity test fails, subsequent
remedial cementing may be required, or the scheme
can be converted to an APEX Level 3, using a liner
top isolation packer. After a successful integrity
test, the completion string, consisting of subsurface
safety valve and seal assembly, are run in the well
and the seals are stabbed into the PBR.
BYPASS COMPARISON
(TO SCALE)
FLOW AREA IN WHITE
5
APEX Big Bore Completion Solutions
Application Experience Leaders, Best-in-Class Products
APEX Level 3: Isolation Completion
Objective: Isolate leaking liner top or protect liner top
Completion: Liner top isolation with hydraulic set packer
Applications: Monobore, cemented liner, horizontal/extended
reach, deepwater, remote location
Experience: Colombia, Norway, United Kingdom
Description: A PBR, hydraulic set packer, landing nipple, and
tieback stem are run and located in the top of
the liner PBR. A blanking plug is run and set in
the landing nipple so applied pressure can set the
packer. After packer setting, the plug is retrieved
and an integrity test performed.
Retrievable PBR
• Optional PBR and seals provide option to float seals and reduce induced tubing stresses
• When run with hydraulic set packer, production seals need not leave the PBR during installation
7
APEX Big Bore Completion Solutions
Application Experience Leaders, Best-in-Class Products
APEX Level 4: Dual Isolation Completion
Objective: Liner top completion
Completion: Dual isolation across cemented liner
Applications: Monobore, cemented liner, HP/HT, horizontal/
extended reach
Experience: Indonesia, Australia, East coast of Canada
Description: After an APEX Level 3 completion is installed, a
Double-Grip JMZX™ Liner Tieback Packer with a
special Snap-In/Snap-Out Shear Release (SISOSR)
S™ Liner Setting Sleeve is run, stabbed into the
existing liner top, and set with compression of the
drillpipe. On the final trip, a completion-type SISOSR
Anchor Seal Assembly is run on the completion
string, along with the safety valve. After the necessary
space-out is determined using the Snap-In/Snap-Out
feature, the tubing is landed and the seal assembly is
anchored in place. No rotation is required during this
completion process. The seal assembly can be fur-
nished with rotational and/or shear release, for redun-
Conventional NPT
Connection
dant methods of retrieving the tubing, should the well
require workover.
8
APEX Level 4: Dual Isolation Completion
Objective: Minimize completion time associated with lower
completion isolation
Completion: Dual isolation with remotely actuated upper packer
Applications: Monobore, deepwater, cemented liner, HP/HT,
interventionless
Experience: Philippines
Description: After an APEX 2 completion is installed, a PBR,
SB-3H Interventionless Hydrostatically Set
Packer, landing nipple, and tieback stem are run
and located in the top of the liner PBR. Apply-
ing pressure to a rupture disk allows the packer
to hydrostatically set. Days of rig time are saved
using remotely actuated packers.
�������
• Brings new levels of rig time savings to
APEX Levels 3 and 4
������������������
�����
���
�
���������
����
APEX Level 4: Dual Isolation Completion
��������
Objective: Lower completion isolation
Completion: Dual isolation with hydraulic
set upper packer ����� � �����
���������������������
Applications: Monobore, deepwater, HP/HT,
horizontal/extended reach, PERFORMTM rating
cemented liner, open and cased hole gravel packs envelope predicts packers
performance which can be
Experience: Norway, Myanmar, Holland, United Kingdom, critical in higher load APEX
Denmark, China, Peru completions
Description: After an APEX 2 completion is installed, a PBR,
hydraulic set packer, landing nipple, and tieback
stem are run and located in the top of the liner
PBR. A blanking plug is then run and set in the
landing nipple so applied pressure can set the
packer. After packer setting, the plug is retrieved
and an integrity test performed.
9
APEX Big Bore Completion Solutions
Application Experience Leaders, Best-in-Class Products
APEX Level 4: Dual Isolation Completion
Objective: Control production of sand, minimize water cut, and
maximize recovery with a minimum number of wells
Completion: Use large gas cap to produce from a thin oil rim.
Wells must be geosteered to 3 ft above the oil/water
contact to minimize risk of gas coning. Subsequently,
the water cut is very sensitive to friction pressures
and drilling accuracy.
Applications: Monobore, cemented liner, open and cased hole
gravel pack, intelligent well with feedthrough tech-
nology, multi-zone production
Experience: Norway
Description: To enhance production rates, a unique natural gas lift
completion is installed above the horizontal section of
each well. This upper completion requires the design
of special, fit-for-purpose production packers and
PBRs with feedthroughs. A short cased-hole gravel
pack is installed across the gas cap using an H2O-
FRAQ™ treatment in combination with 8-5/8 in.
blank pipe and a 7-5/8 in. EXCLUDER™ Extended
Longevity Well Screen. This allows for a 7 in. tubing
string to be stabbed through the upper completion,
leaving a 5.75 in. ID through the lower zone. A com-
bination of ZXP Liner Top Packers and Flex-Lock
Liner Hangers meets the large ID requirements.
EXCLUDER 2000™
• Unique extened-longevity screen con- EQUALIZER™ Screen
sists of outer vector shroud, vector • Optimizes production and delays water or gas coning in
weave filtration membrane, and pat- long, low draw-down, high-rate horizontal wells
ented Bakerweld® inner jacket
• Consists of extended-longevity wellscreen with unique
• New swaging process improves strength inflow control device
and corrosion resistance while reducing
• First to successfully create uniform production profile
its outside diameter
along entire length of horizontal wellbore
10
Flex-Lock Liner Hanger with ZXP Packer
APEX Big Bore Completion Solutions
Baker Oil Tools understands that operators run big bore completions
to maximize production. The APEX system leverages our application
experience, best-in-class products, rigtime-saving processes, and
proven technology to do just that at every step of the completion
process.
11
APEX Big Bore Completion Solutions
Bring your big bore operations to the
top of the value chain.
The strength of a chain is determined
by its weakest link. Big bore comple-
tion leaders prefer Baker Oil Tools for
the unmatched strength that links appli-
cation experience, products, processes,
and technology - and for the resulting
fit-for-purpose completion designs that
improve asset value. For more informa-
tion on getting top value from your big
bore completions, contact your local
Baker representative today, or visit
www.bigborewells.com.
www.bakerhughes.com/bot/
Baker Oil Tools 6023 Navigation Blvd. (77011-1136) • P.O. Box 3048 (77253-3048) • Houston, Texas • Tel 713-923-5198
Headquarters 9100 Emmott Road (77040-3514) • P.O. Box 40129 (77240-0129) • Houston, Texas • Tel 713-466-1322
e-mail: bigbore.wells@bakeroiltools.com
Copyright 2000 Baker Hughes Incorporated. All rights reserved. Publication # 00/00