Professional Documents
Culture Documents
Important Instructions:
· Please read the document thoroughly before you code.
· Please do not change the Business Requirements.
Coverage:
1. Sort Stage
Source Files:
Design a job that will remove duplicate rows in the source and loads the distinct rows into target.
Controlled copy
Project ID: <Project ID. > <SCI.ID. > / Ver: <Ver No.>
Controlled copy
Project ID: <Project ID. > <SCI.ID. > / Ver: <Ver No.>
Design a job that will create the following output where the products are listed in descending order of
total Total Sales i.e. SUM(SELLING_PRICE * QUANTITY) .
Product Total_Sales
2003 1791669.39
2001 1328768.16
2000 933800
2002 854381.07
2004 602491.23
86521 4650.5
86533 4486.68
86518 2495.48
86524 1987.56
….
Controlled copy
Project ID: <Project ID. > <SCI.ID. > / Ver: <Ver No.>