You are on page 1of 6

Creating Parallel Jobs

Source File:

Task1:

Import new table definition from the sequential file EMPLOYEES.csv

Controlled copy

Project ID: <Project ID. > <SCI.ID. > / Ver: <Ver No.>

Release ID: QTAD-SRDUC.doc / 1.0 / 07.07.2020 C2: Protected


Creating Parallel Jobs

Task2:

Create a parallel job using Row Generator Stage and Peek Stage. Use Employees table definition (task1)
for Row Generator Stage and generate 100 rows. Specify extended properties.

Controlled copy

Project ID: <Project ID. > <SCI.ID. > / Ver: <Ver No.>

Release ID: QTAD-SRDUC.doc / 1.0 / 07.07.2020 C2: Protected


Creating Parallel Jobs

Controlled copy

Project ID: <Project ID. > <SCI.ID. > / Ver: <Ver No.>

Release ID: QTAD-SRDUC.doc / 1.0 / 07.07.2020 C2: Protected


Creating Parallel Jobs

Task3:

Add Annotation Stage that describe job.

Task4:

Controlled copy

Project ID: <Project ID. > <SCI.ID. > / Ver: <Ver No.>

Release ID: QTAD-SRDUC.doc / 1.0 / 07.07.2020 C2: Protected


Creating Parallel Jobs

Add a new job parameter named NumRows with a default value 10 of type Integer. Use it in Row
Generator Stage.

Controlled copy

Project ID: <Project ID. > <SCI.ID. > / Ver: <Ver No.>

Release ID: QTAD-SRDUC.doc / 1.0 / 07.07.2020 C2: Protected


Creating Parallel Jobs

Controlled copy

Project ID: <Project ID. > <SCI.ID. > / Ver: <Ver No.>

Release ID: QTAD-SRDUC.doc / 1.0 / 07.07.2020 C2: Protected

You might also like