Professional Documents
Culture Documents
Source File:
Task1:
Controlled copy
Project ID: <Project ID. > <SCI.ID. > / Ver: <Ver No.>
Task2:
Create a parallel job using Row Generator Stage and Peek Stage. Use Employees table definition (task1)
for Row Generator Stage and generate 100 rows. Specify extended properties.
Controlled copy
Project ID: <Project ID. > <SCI.ID. > / Ver: <Ver No.>
Controlled copy
Project ID: <Project ID. > <SCI.ID. > / Ver: <Ver No.>
Task3:
Task4:
Controlled copy
Project ID: <Project ID. > <SCI.ID. > / Ver: <Ver No.>
Add a new job parameter named NumRows with a default value 10 of type Integer. Use it in Row
Generator Stage.
Controlled copy
Project ID: <Project ID. > <SCI.ID. > / Ver: <Ver No.>
Controlled copy
Project ID: <Project ID. > <SCI.ID. > / Ver: <Ver No.>