You are on page 1of 2

Classification: Internal Use

EG-3 Daily Activity Report


Date : 11-Oct-2021 Report date : 11-Oct-2021
Shift Cycle : Night Report time : 6:00 AM
Group : NA Reporter : Majid AlGhamdi
SAFETY AND COMMUNICATIONS (Including E-SHEMs, Other highlights)

FIRE PROTECTION EQUIPMENT, SERVICE INTERRUPTION (FPESI)


Service/Location Outage (Date/Time) Valid Till (Date/Time)
NA NA NA
EHSCIBA
Tag Reason Validity
NA NA NA
GENERAL JOBS
1. Scaffollding ereact in SL from U&O to MPU.

SF SECTION (69) & BUILDINGS

Support Facility :
1. SU-6970 : Continues transferring to U&O and maintain TDS <2000 ppm.
2. SU-6974 continues transferring to waste water header with 12 t/hr by pump P-6979, the last level 73.18 % .
3. SU-6975 (Section B) sample result was PH :6.10 - TDS : 4424 .
4. TK-6960 : kept overflow for water dilution SU-6970.
5. common sample PH : 11.2 - TDS : 1617.
6. P-6980 Changed over from A to B due to abnormal sound and low performance.
7. 69-LIT- 9207 Calibration done level matching with LG but still IOP.
8. 69- LV -9207 Check by interment no responding .

EO SECTION (61-62-63)

Reactor Activity:
1. R1: Pressurizing going on, the last pressur 8.1 Barg
2. R2: Pressurizing going on, the last pressur 8.1 Barg
Ammonia Removal:
1. R1: Heating up maintend .
2. R2: Heating up maintend .
3. 61-TI-1133 & TI-1134 Calibration done.

Cycle Gas System :


1. Continues pressurize trough Primary seal. The last pressure12 Bar.
2. Liquid Nitrogen-LIN TRUCK : Connected Nitrogen to outlet ERU --->FV-1831--->CG in progress.

Carbonate System :
1. P-6220A : Instrumentation disconnect.

Follow Up:
2. OMS, CG & RXs pressurized & Leak test
3. RX1 & RX2 heating up.
4. P-6980A suction strainer to be cleaned.
5. 69- FV -9207 no responding.
6. 69-LC -9207 level matching with LG but still IOP.

EG SECTION (65-66-67)

EG Reaction & Purification :


1. P-6540: Modification circulation line ==> X-Ray Radiaton job Completed.
2. P-6540 circulation line, SP-5120 element installed then boxed up and FO-5109 installed.
3. Errected scaffolding V-6570B, V-6580B
6. Purification under vacuum.

Follow Up :
1. SU-6975 : Transferring to U&O and maintain TDS <2000 ppmw.
Classification: Internal Use #

Project Type Project Risk Indicator


Operational Low
Change ManagementMedium
Legislative High
External
New Build Status
Refurbishment G

You might also like