1 PURPOSE OF WORK INSTRUCTION


The goal of this work instruction is to facilitate a consistent work practice and
guaranteed minimum quality for “in-house” and workshare executed work.

2 SCOPE OF APPLICATION
This work instruction provides information about the Jacobs Leiden electrical
department, work methods, work instructions and design practices. It includes a
detailed overview of the, for projects executed in the petrochemical industry,
electrical deliverables.

3 DEFINITIONS
In-house:.......................... work executed by Jacobs, The Netherlands.

4 PROCESS REQUIREMENTS
This work instruction should be used for reference and guidance during the basic-
and detailed electrical engineering phase, in addition to Jacobs Leiden
procedures (PI-SOPs), electrical discipline work instructions and applicable
technical standards.

Copyright 2006 by Jacobs Engineering Group Inc.


All rights reserved. The contents of this document are proprietary and produce for the exclusive benefit of Jacobs Engineering group Inc and its affiliated companies. No
part of this document may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means, electronic, mechanical, photocopying, recording, or
otherwise, without the prior written approval of Jacobs Engineering Group Inc.

The current applicable version of this publication resides on Jacobs’ Intranet. All copies are considered to be uncontrolled.
File name: NL-LEI-WI-252-05 Electrical Engineering & Design Manual (10-Mar-2011)
Work Instruction Document No. NL-LEI-WI-252-05
Electrical Revision 0
Electrical Engineering and Design Manual Page 2 of 2

5 RELATED DOCUMENTATION (REFERENCES)


Document Required Suggested Sample

Required – Use of this document is mandatory.

Suggested – This document shows required content and a suggested format,


although it may be modified at the discretion of the Project Manager (e.g., the
Project Manager may elect to combine the Project Execution Plan and Project
Procedures Manual in a single document).

Sample – The document is included as an example of one way to implement the


intent of the Work Instruction.

Related Regulations and Jacobs Procedures


Document No. Document Title
PI-SOP-201 until PI- Engineering and Design
SOP-208
PI-SOP-300 until Quality
PI-SOP-320
PI-SOP-350 Health, safety and Environment
NL-LEI-WI-252-01 Electrical Deliverable Checklist
NL-LEI-WI-252-02 Guidance Electrical EDB
NL-LEI-WI-252-02 f1 EDB – How to create Electrical Technical Requisitions
NL-LEI-WI-252-02 f2 EDB – How to create Motor Data Sheets
NL-LEI-WI-252-02 f3 EDB – How to create Electrical Cable Lists
NL-LEI-WI-252-02 f4 EDB – How to create Electrical Load Lists
NL-LEI-WI-252-03 Electrical Intelec Checklist
NL-LEI-WI-252-03 f1 Electrical Intelec Checklist
NL-LEI-WI-252-04 Electrical Calculations
NL-LEI-WI-252-04 f1 Power Balance Calculation
NL-LEI-WI-252-04 f2 Cable Size Calculations
NL-LEI-WI-252-04 f3 Motor Starting Calculations
NL-LEI-WI-252-04 f4 Lighting Calculations
NL-LEI-WI-252-04 f5 Protective Device Coordination
NL-LEI-WI-252-04 f7 Short Circuit Currents Calculations
NL-LEI-WI-252-04 f10 Load Flow Analysis

6 ATTACHMENTS
Engineering and design manual Electrical.