You are on page 1of 1

TIME REPORT FOR MONTH OF MAY 2022

Instructions :
1
Azharin Bin Siraj@Saringat Hours include actual time spent on job, travelling to work site, meetings and discussions and other activities related to execution of work.
Staff Name
2 Staff are to record at least 8 hours per day i.e. 156 hours per month. Any shortage of man hours is to be explained in the remarks
C00118568
Staff Number column.
3 This manual time reporting form is applicable for OPU staff attached to GTS RTS Project. GTS staff is required to capture man-hours
RTS Number F 009 03GRAPH 00018.006 using online time reporting system.
Project Title PGU-1 Gas Pipeline Replacement (GRAPHITE) 4 Please specify leave type: Annual Leave or Sick Leave
5 Check to ensure that the total are shown and correct, both by row and column
OPU (if applicable)
6 To ensure that information on the timesheet is legible and complete.

Man-Hour Category 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Total


Project/Work Description 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 8.0 8.0 8.0 8.0 8.0 8.0 8.0 8.0 64.0
Overtime 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.0 2.0 12.0 2.0 2.0 2.0 2.0 24.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Public Holiday 0.0
Annual Leave 0.0 0.0 0.0
Sick Leave 0.0
Others 0.0
Total 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 8.0 8.0 10.0 10.0 12.0 10.0 10.0 10.0 10.0 88.0

Remarks/Note: 27/5/2022 -Friday


23//6/2022-Day start to work at Graphite Project

Submitted by (Staff) : Reviewed by : Approved by :

Signature : Signature : Signature :

Name : Azharin B. Siraj@Saringat Name : Name :

Position : General Inspector Position : Position :

Date : 05/06/2022 Date : Date :

Open