You are on page 1of 2
KEC RPG ‘NOTE SHEET FOR REPLENISHMENT OF FIELD LOSS “Approval No, [ KEC/T® 110/01 Date | 10th February 2022 Projecto. | T8120 Project Name | Lines under Pg AS of WISE, ‘Approval ns 942462.00 reject |e Prakash se "Amt stanager my Projeetstatus —_Thereare4 lines under Pkg AS out of which 1 line have been | commissioned and constriction work isunder progres ferret of| lose stats, lines “Thet/Damage/ | While exeatngsringing workin Betwown sieich 9170.0 9270 oFLne DiverslonDetall No ofp AS, at te ight of February’22, some unknown miscreants ron7Dot fame to the ste apd stale 527 KM of ACR Zebra Conductor. Already we ews have rested FIR ro local police station regarding same, Thsurance Gaim | Werhave applied for insurance a (Cain Wo. ENGOO627680) for Staus/SerapSale _Rsi482 0800. Now we request approtal or purése of condor an ‘which amounting’ o Rs 942,063.00 tcnmplete te ne. ‘Other Details (ike NPLRIEW tho Projet tasty proviston Please accord your approval for the procurement/suply of material 3¢ mentioned in ‘Annexure, forthe total cost of Rs-9.42.462,00 with atonal spe of Rs, Ble OM” Bie Di (Project Commercial) (Projet Manager) eiebfCommercial) (Regional Manager) (Commerc Head any (resident) KEC RPG ‘Annexure ‘Ay DetalorFeld Loses / Damages sve. Mateaescrigtion [OM |, 2% | wats) | Amount) Tesi aebe Conductor wr asi | aaa igit| — 5491.00 reste | 14876500 t "otal | 9.424620 1) Detail of surance Claim Srap Sale / Other Recovery 1) insurance lain Recelved / Reesivable ‘Amount mount] Amount — | | eter Dee Received | Recelvable| “Tota ‘ASR Tara Contr (Ua Wa 1 14, $3 eq 142000 atl nara ain 10 Scrap Sate ‘Amount | Amount | — Amount No, | Material Description (eres es Total Sapte) = Boles (reject Commerc) Cate "Project Manager)

You might also like