iii) Central PTCC: This consists of members from the CEA, DOT,
Railways and the Army. The composition of the committee is given in
Annexure ‘A’. The basic functions of this committee are:
a)To consider all matters relating to adverse effect of power lines on
telecom lines.
b) To consider specific cases of route approval of power lines
exceeding 33 KV and telecom lines.
c)To consider and adopt new protective measures to minimize the cost
of protection.
iv) State Level PTCC: The present membership of the State Level PTCC
consists of officers of Junior Administrative Grade from the concerned
SEB, Telecom Circle, Railways and Defence. The composition of the
committee is given in Annexure ‘B. The main function of this committee
are:
a) To review the progress of route approval cases of 11 KV lines dealt
with by Telecom District Engineers.
b) To consider route approval cases up to service voltages of 33 KV.
c) To consider re-engineering schemes for cases where induction
exceeds the protection limit for GD tubes.
d) To co-ordinate and watch the progress of installation of protective
measures and re-engineering works and issue of energization certificates
on completion of protective works.
e) To consider violation of PTCC regulations and take suitable corrective
measures.
f) To discuss cases of power lines of 66KV and above held up for PTCC
clearance.
2.3 i) Central PTCC deals with cases of energization of power lines of 220KV
and above.
ii) Cases of energization of power lines up to 132KV DC are processed at
the state level. However, for cases of 33KV DC and above up to 132 KV
DC, final PTCC clearance is to be given by DET(PTCC).
For cases of above 11KV up to 33KV S/C clearance is given by State Level
PTCC.
Topographical maps of the Survey of India are used for this purpose.
The distances over which the details are to be marked, are as under:
Capacity of Power Line Telecom assets to be marked
HT (High Tension power line)
11 KV 3 Kms on either side of proposed power line
22 KV 5 Kms on either side of proposed power line
33 KV SC (Single Circuit) 5 Kms on either side of proposed power line
EHT (Extra High Tension power line)
33 KV DC (Double Circuit 8 Kms on either side of proposed power line
66 KV SC and above 8 Kms on either side of proposed power line
2.5 On receipt of the power line route maps, Railways shall check whether the
proposed power line falls within the jurisdiction of the Zonal Railway. If it
does not fall within the Zonal Railways jurisdiction, the proposal shall be
returned back to the PTCC without any delay and the Railway to which it
should be sent shall also be advised. The Railway concerned on receipt
the proposal shall mark their telecom lines on the maps and submit one
copy to the PTCC. The details in full of all the circuits working on the
telecom alignments giving the discontinuity points and route length should
be furnished.
V=MxI
If IV Figures NO NO If IV Figures
within safe within safe
limits? limits?
Re-engineering
proposed
Yes Yes
End
B. Power Lines up to 132 KV
Begin
If IV Figures NO NO If IV Figures
within safe within safe
limits? limits?
Re-engineering
proposed
Yes Yes
End
2.7 Safe limit for induction due to Low Frequency Induction due to short circuit
fault is 430V and is generally the ruling factor. In specific cases, longitudinal
induced voltages under normal conditions are to be examined. In case,
where the induced voltages due to short circuit fault on the telecom circuits,
exceeds prescribed safe limit of 430V, it is necessary to consider various
protection measures so that the equipment installed and the personnel
working on these circuits are not subjected to the influence of hazardous
potentials.
One of the measures commonly adopted for protection is the use of three
electrode Gas Discharge (GD) tubes. Two electrodes of the tube are
connected to the wires of a telephone pair and the third electrode to the
earth, through the earth cap. Under normal conditions, the telecom line is
kept insulated. The gap breaks-down and the telecom line is virtually earthed,
when induced voltage excess the pre-determined value (250V). Through the
discharge path, the earth connection to the tube should be of very low
resistance so that the voltage across the tube is restricted to safer values.
Numbers of GD Tubes are required for protection :
Nos of GD tubes = Induced Voltage/Constant , Value of constant is 300.
If value comes in fraction then it is rounding off to next integer value.
If Nos of GD tubes are 3 then two GD tubes should be installed at the
ends of telecom lines in the paralleling section and one in the middle of
these two.
In case the number of GD tubes worked out are more than three, two of
these should be fitted at each end of the paralleling section of the telecom
lines and the rest of the GD tubes be fitted in between space at equal
intervals.
GD tubes worked out by the above method should be fitted on all the telecom
wires in the paralleling section.
2.8 Protective measures against induced voltages in excess of the safe limits
on different types of block instruments in use in Indian Railways is given
in Appendix XVII to Chapter I of PTCC manual – edition 2010. The limits
for the block instruments presently in use on IR are given below:
(i) SINGLE LINE BALL TOKEN/ TABLET TOKEN BLOCK INSTRUMENT
(b) For induced voltages exceeding 430 V metallic return and appropriate
Gas Discharge tubes are to be provided.
A-3 position polarized relay of the type used in Neale’s token or SGE
double line block instrument is to be interposed in the line circuit and the
existing line relay (NR Relay) fed from local battery through the contacts
of polarized relay. Also the line condensers C1 & C2 each of the
microfarad capacity with a voltage rating of 160V are to be replaced by
condensers of equal capacitance but with a voltage rating of 1000V
Standard gas dischargers will also have to be provided for the lines.
Please refer to OEM manual for voltage limit for safe working.
(viii) UFSBI
Please refer to OEM manual for voltage limit for safe working.
.
(ix) Electronics Interlocking
Please refer to OEM manual for voltage limit for safe working.
The cases of induced voltages above these limits should be treated as re-
engineering cases and each such case should be treated separately in
consultation with the Railway Board.
2.10 Railway control/block and all other Circuits are now normally working on
OFC/Quad however Railway control and other overhead circuits to be
invariably provided with GD tubes on par with the protective
arrangements required for protection of block circuits.
2.13 Divisions shall ensure that protective measures are maintained properly.
During inspections, the availability of the protective measures at the
stations shall be checked.
2.15. Method for carrying out low frequency induction test if required, and code
of practice for protection from earth potential rise (EPR) are described in
the PTCC manual. It should be ensured that the EPR at locations of
telephone exchanges, cable joints, terminals, pillars, cabinets etc., is
within safe limits. The EPR counters which define hazard zone for
telephone plants are given below:
(iii) For 33 KV D/C and above up to 132 KV Power Lines (Central Cases)
Notes:
1. In general, the time schedule recommended for the various functions shall
not apply to cases where re-engineering is involved. Even for such cases
the appropriate authorities may quote the reasonable time required for the
re-engineering.
2. The period for implementing the protective works has been recommended
assuming the essential materials for those works would be available in
reasonable time.
3. Director (PTCC),