You are on page 1of 2
KEC RPG NOTE SHEET FOR REPLENISHMENT OF FIELD LOSS avai. [xeirv too [Dat eet No, |TBA10 | Proect name ‘Approval 9s 26.57.8000 Project | ie, Prakash ose rhe _| 852657800 Magar _| MF Prakash Bo ProjectStatus | There are lines under Pkg AS ou of which 1 line have Been {Pragesyeonmerctl | commissioned and construction works under progress forrest of Cie stn) | Sines ThetiDamage] ——] Wile eectng ng work iu boween sre 91700920 Te Dwerslon Dect | Noel Pg ast te mit of4s Fenrary2 some vlnown mscresnts | fhacesonDere/, | came othe seal te S527 Kt of ACS Zebra Condor Ae we L Reasonttems) have received insurance lim ragarding the sme. | Tarmac | [SiovSconssle | ssoaiaon | fit Seaos/eson for | | | Sort ay esse | sect cox of eeeeeee ae {oe eta ae | Toil a pcre i AS aa rua 3S [inte en |r ae base Obra se Ble Oe (Projet Conmmercia) —(Proket Manager) [fommerciat) (Regional Manager) (Commerciale) cn (resident) KEC RPG A) Detail of Field Losses / Damages os a Amount in ve SNo.| Material Description | Rate) | Amount | $No | ___ Material Descrip | Raters | ) CSR abe Conducioe 17237_| 100000 hove Freight) 1700000. Total | 26.57,800.00 1) etal of insurance Claim / Serap Sale / Other Recovery 1) Insurance Claim Received Receivable Amount |” Amount Amount | fits ase] “a pee No, | material Description 77 | esi eben Condi faa Wo | encos 940,213.00 ou jtOuetoney) | (other) | “Tora ————— —-— (Project Commerciat) (Project Manager)

You might also like