NOTE SHEET FOR REPLENISHMENT OF FIELD LOSS
avai. [xeirv too [Dat
eet No, |TBA10 | Proect name
‘Approval 9s 26.57.8000 Project | ie, Prakash ose
rhe _| 852657800 Magar _| MF Prakash Bo
ProjectStatus | There are lines under Pkg AS ou of which 1 line have Been
{Pragesyeonmerctl | commissioned and construction works under progress forrest of
Cie stn) | Sines
ThetiDamage] ——] Wile eectng ng work iu boween sre 91700920 Te
Dwerslon Dect | Noel Pg ast te mit of4s Fenrary2 some vlnown mscresnts |
fhacesonDere/, | came othe seal te S527 Kt of ACS Zebra Condor Ae we
L Reasonttems) have received insurance lim ragarding the sme. |
Tarmac |
[SiovSconssle | ssoaiaon |
fit Seaos/eson for | |
| Sort ay esse
| sect cox of
eeeeeee ae
{oe eta ae | Toil a pcre i AS aa rua 3S
[inte en |r ae base Obra se
Ble Oe
(Projet Conmmercia) —(Proket Manager) [fommerciat) (Regional
Manager)
(Commerciale) cn (resident)KEC RPG
A) Detail of Field Losses / Damages
os a Amount in ve
SNo.| Material Description | Rate) | Amount
| $No | ___ Material Descrip | Raters | )
CSR abe Conducioe 17237_| 100000
hove Freight) 1700000.
Total | 26.57,800.00
1) etal of insurance Claim / Serap Sale / Other Recovery
1) Insurance Claim Received Receivable
Amount |” Amount Amount
| fits ase] “a
pee
No, | material Description
77 | esi eben Condi faa Wo
| encos
940,213.00
ou
jtOuetoney) | (other) | “Tora
—————
—-—