ARTICLE 5 – Asset Performance


Management – The Promise Versus Reality
Gary West
Assetivity Pty Ltd, Brisbane, Australia,
e-mail: gwest@assetivity.com.au

ABSTRACT much hype about the potential interact with execution systems to
of APM, in my experience many provide a more holistic approach
TAsset Performance Management businesses fail to realise full value to asset management, and the
(APM) applications are heralded during the initial implementation value that they can deliver. I will
as the most disruptive technology and it can take years to start to then describe the common pitfalls
to hit the Asset Management see value. In this paper I will that I have observed while helping
function since the advent of discuss Asset Performance several businesses to realise
the humble Computerised Management, describing the value from their systems post
Maintenance Management capabilities available from this implementation.
System (CMMS). While there is family of applications, how they

40
TECH

I will then propose solutions to Moving on, I joined Anglo APM systems all aim to provide
these challenges and present a American, and worked with the tools to improve equipment
simple checklist to gauge your technology team there to develop availability and reliability while
organisations readiness for the business requirements and test reducing risk and cost.
move to an APM solution. the market for an APM system.
It became apparent through this They typically capture data related
process that while some pockets to asset condition which includes
Keywords: Asset Performance
of the business were ready for work order history, delay and
Management, Reliability
an APM tool, the majority of the loss accounting, online condition
Engineering, Asset Information
business was not. So rather data via plant historians, and
Systems
than select an APM system, we batch condition data such as
1. INTRODUCTION would adopt niche point solutions oil lab results and inspection
at specific sites, with a view to results to provide a holistic view
My journey with Asset of the asset performance. This
migrating to an APM platform in
Performance Management (APM) data is then able to be used for
years to come.
systems started around 2004. At reliability analytics and asset
the time, I was working in the Which brings us to today, where health visualisation, to support
newly formed Asset Management I have been supporting BHPs development and fine tuning of
Centre of Excellence at Rio Tinto, journey down the APM path at various asset models including
and the mining boom was in various points over the last couple lifecycle costing and reliability
full swing. We found ourselves of years. Firstly, in developing modelling, and as the base data
working across major projects and requirements and supporting set to support the various APM
the operations, looking for ways market testing, and more recently capabilities shown in Figure 1.
to reduce time to market, and in supporting deployment
improve utilisation. planning for the implemented From an asset health and
solution. condition monitoring perspective,
As a part of that approach, we APM systems provide the ability
identified the need for a tool In this paper, I want to share to develop relatively complex
to support reliability modelling, with you my observations and ‘rules’ based on available
lifecycle costing, maintenance perspectives on APM, and will data to flag the requirement
strategy development and cover what APM systems do, for maintenance or other
optimisation, and spare parts where they fit within the Asset interventions to the user, or to
optimisation. This resulted in Management information systems automatically trigger work order
selection and implementation landscape, what businesses hope etc from within the system.
of an APM system for Rio Tinto. to achieve by implementing APM
While the intention was good, systems, the most common APM systems also provide
execution was not and nor was challenge I see to successful tools to support key reliability
uptake, with the business still uptake, and how to avoid them. engineering approaches including
trying to get full value from the Defect Elimination, Maintenance
solution over a decade later. 2. WHAT IS AN Strategy Development, Asset
Integrity Management.
I then joined Peabody Energy, just APM SYSTEM?
in time to observe the demise In the Defect Elimination process,
Asking what an APM system
of its APM system across the dashboard and reports flag to the
can do is a lot like asking how
Americas. Again, the intention user chronic and acute events
long a piece of string is. There
had been good, execution was worthy of further investigation,
are several APM systems in the
also good, but the business just provide tools to support the root
market, and each quite different
wasn’t ready nor did it have the cause analysis process, and tools
in terms of the complete range of
appetite to properly resource the for capturing actions and defining
functionality offered.
reliability function. an appropriate workflow and
So, it is probably easier to escalation process.
consider what they have in
common.

41
Technical Article 5

Figure 1 – Asset performance management functions

In some cases, this will 3. WHERE DOES APM FIT The APM system also ingests
require optimisation of existing FROM A SYSTEM VIEW? data from various production
maintenance strategies or systems including production
changes to inspection programs. As described in the previous data, loss and delay data etc. It
section, APM systems consume also ingests asset condition data.
For maintenance strategy and produce a significant amount
development, APM systems of data. This can range from batch data
typically provide tools to support such as condition reports, oil
criticality assessment, various Figure 2 is a simple sample results, through to
strategy development approaches representation of where an APM inspection results from work
from FMEA to RCM, some tools system fits within the typical orders, through to alarm and
are then able to optimise these systems landscape. event data from production
strategies based on cost or risk systems and even streaming
Where the ERP/EAM provide the
using simulation tools, and they sensor data from machines.
transactional platform to support
then provide the ability to package
the work management process, The APM system also ingests
work for deployment in the EAM/
APM sits beside it consuming data from various production
ERP system.
work order history, changes to systems including production
Finally, most systems also the asset hierarchy etc to enable data, loss and delay data etc.
support Asset Integrity optimisation of the maintenance It also ingests asset condition
Management providing tools to strategies in the ERP, and these data. This can range from batch
support integrity management, optimised strategies are then data such as condition reports,
process safety management pushed back to the ERP/EAM for oil sample results, through to
including functionality to develop execution. Where asset health is inspection results from work
and manage risk based inspection used to trigger work orders, these orders, through to alarm and
programs. are also pushed to the ERP/EAM event data from production
for execution. systems and even streaming
sensor data from machines.

42
TECH

Figure 2 – Asset performance management system architecture

Some APM systems even offer reliability domain are looking to never gone smoothly. While far
mobility tools to support data consolidate the various tools from a complete list, some of the
collection such as pushing they are using to provide a ‘one more common challenges I have
out inspection routes and stop shop’ for their reliability observed are described below.
recording inspection results engineers.
and photographs etc, and even Overspecification in design.
provide tools for scheduling work Most are looking for enterprise APM is a tool for engineers,
to users. solutions capable of running a and engineers love to gold plate
client/server or cloud architecture things. In one case, the APM
4. WHAT DO BUSINESSES to support global access to a system was to be used to support
central data repository, and all fleet replacement decision using
HOPE TO ACHIEVE FROM
the other features that come with life cycle costing, and experts
APM? an enterprise solution including from within the business were
Most businesses start on the security models, multi-language, engaged to specify business
APM journey because they are high levels of responsiveness, requirements. The APM tools
looking for a tool to support intuitive user interface etc. was modified to deliver the
asset health monitoring, or a required solution, and the tool
There is generally an expectation was deployed. The result …
tool to develop and optimise of seamless integration to and
maintenance strategies, or a zero up-take of the LCC tool by
from the ERP/EAM and with the sites as it was seen as too
tool to support asset integrity production systems.
management. They have a complicated.
reasonably mature maintenance Finally, businesses usually expect Sorting out the overlaps. APM
execution toolset and see one of to streamline and simplify their tools provide a wide range of
the above processes as their next reliability engineering processes. capabilities that often overlap
step in the reliability journey, and with other tools. For example,
APM as the tool to support this, 5. WHAT ARE THE KEY they provide visualisation tool
and then they grow into the other CHALLENGES THEY FACE? and dashboards, but many
capabilities offered. businesses are using other
As mentioned at the start of the
However, some businesses that tools for this purpose – Spotfire,
paper, I have been through several
are reasonably mature in the Tableau, PowerBI to name a few.
implementations, and they have

43
Technical Article 5

Similarly, many of the APM tools resourcing, in other cases Don’t get stuck in the ‘one stop
provide rules engines to trigger processes will be simplified shop’ mindset. APM systems
events based on live streams of and require less resources. can cover a range of functionality.
machine data etc. Again, there Sometimes these processes will But you may have existing
is an increasing array of tools have been performed using other systems or tools that overlap and
capable of filling this space, some tools, and so there will be the meet your requirements better.
of which may already exist in the challenge migrating users to use Beware the ‘one stop shop’
business. Finally, some APM APM. Change Management is approach as it may yield a poorer
systems provide mobility tools for therefore a key challenge for any outcome.Start to think about your
dispatching work generated by implementation. data today. One of the biggest
the APM system, and collecting challenges I have observed
results – these tools need to be Implementation timeframes. A relates to data. I want work
considered in the broader context final challenge is implementation order, failure codes, and costs
of other mobility solutions linked timeframes. The gestation period in APM, but I don’t book time to
direct to the ERP/EAM to support for a large implementation can be work orders and only occasionally
maintenance execution. anywhere up to two years – with complete failure codes. I want
the technical implementation historian data in my APM system,
Reality of integration. There is component taking anywhere up but each plant structures its data
often an expectation of seamless to nine months. Having got the differently. I expect to deploy
integration – particularly between business excited at the prospect central strategies across global
the strategy development/ of a holistic reliability toolset, and fleets, but they all use different
optimisation modules and the then taking two years to deliver equipment structures. Start to
ERP/EAM. The reality is that the leaves the door open for niche work on these data challenges
complexity of sequencing data solutions to fill the gap, and these today.
build within the ERP requires are then often well entrenched by
complex interfaces, and given APM go-live and complicate the Remember it is your people
that each business structures its change management process. that will make the difference.
data quite differently, ‘out of the John Mowbray, the author of
box’ interfaces do not exist. So, 6. CONCLUSION RCMII, used to say RCM is about
in many cases, businesses are ‘thought-ware’ not software.
left moving data between ERP/ Despite the challenges, the The best tools without the right
EAM and APM using load sheets. benefits are there. APM people supported by appropriate
Similarly, the sheer volumes of systems bring together asset change management and
online condition data generated related information in a way training will not deliver change
by machines will drown most that support enhanced asset in your business. So, focus on
APM systems. So, this data is related decision making and organisational capability first, and
likely to require pre-processing provide the tools to optimise software second.
to simplify ingestion, meaning asset performance. However,
that it’s not just a matter of they can be expensive and time It doesn’t all have to happen
integrating, but rather developing consuming to implement, and today. Finally, don’t be forced
a complete data strategy. slow to deliver value.But there into a ‘big bang’ implementation.
are some things you can do to Select a tool that will support the
Introducing new processes. realise value sooner.Be clear what change you are trying to make
you want. Beware of gold-plating, today, but that can grow with you
Introduction of the APM typically and sensitive to the maturity over time to meet your future
introduces new processed into of your business processes aspirations.
the business. In some cases, and readiness for deployment
these will be processes that have and tune your requirement Good luck with your journey!
not been performed in the past accordingly.
and will require additional

44