POST MARK GRID LOCATION ELEVATION SHOP MATERIAL LIST FOR 1 ASSEMBLY

2HB100/11 G1/4> +22.642 Length Area Weight


Post Mark Profile Size Qty. (mm) (m 2) (kg)
2HB100/11 G2/4> +22.642
HB100/14 H100*100*6*8 1 2130 1.21 36.64
Total 1.21 36.64

BOLT LIST FOR ASSEMBLY 2HB100/11 Qty. 4


Dia. Grade Type Length Qty. Member

H100*100*6*8 x 2130

22

2HB100/11 H100*100*6*8

66
34
33 103

DRAWING NO. TITLE


REFERENCE DRAWING

PREP'D APP'D CHK'D APP'D


NO. DATE DESCRIPTION

REVISIONS

OWNER :

PT. SEMEN INDONESIA (PERSERO) Tbk.

CONTRACTOR :

PT. CAHYA TEGAR KENCANA

PROJECT :
REKONDISI CEMENT LOADING TT-3

TITLE :
CEMENT LOADING TT-3
GALLERY AIRSLIDE
BRACING 2HB100/11
DESCRP. DRAWN CHECKED CHECKED APPROVED SCALE :
1:5
DATE

SIGN SIZE
Tekla Structures

A3
NAME
COMPANY
TOTAL ASSEMBLY SD-ASSY-TT3-02- 2HB100/11 DWG No. SHEET REV.

Qty = 4 Area = 4.86 M 2 Weight = 146.55 kg SD-ASSY-TT3-02-2HB100/11 1 OF 1 0