The document outlines the status of railway system training for various topics. It lists trainings that are ongoing, completed, or have submission deadlines. Topics include power supply systems, SCADA, signaling for operations and maintenance, telecommunications, platform screen doors, third rail systems, and seismic detection. Most trainings are currently in process with the working committee, though some documentation has been submitted and other documents have submission deadlines in May 2022.
The document outlines the status of railway system training for various topics. It lists trainings that are ongoing, completed, or have submission deadlines. Topics include power supply systems, SCADA, signaling for operations and maintenance, telecommunications, platform screen doors, third rail systems, and seismic detection. Most trainings are currently in process with the working committee, though some documentation has been submitted and other documents have submission deadlines in May 2022.
The document outlines the status of railway system training for various topics. It lists trainings that are ongoing, completed, or have submission deadlines. Topics include power supply systems, SCADA, signaling for operations and maintenance, telecommunications, platform screen doors, third rail systems, and seismic detection. Most trainings are currently in process with the working committee, though some documentation has been submitted and other documents have submission deadlines in May 2022.
A POWER SUPPLY SYSTEM D SIGNALING (Maintenance) 1. MV Switchgear 2. DC Traction D.1 System Overview On Process WPC 3. LVMDP D.2 S&D System On Process WPC DONE 4. EDG 5. Auxilliary Transformer D.3 CBI System On Process WPC 6. PLC 7. UPS & DC Charger D.4 Communication System On Process WPC B SCADA On Process WPC D.5 ATS System DONE C SIGNALING (Operation) D.6 TGMT Onboard System On Process WPC C.1 Overall System Overview On Process WPC D.7 TGMT Onboard System (Practice) On Process WPC C.2 ATS System DONE D.8 TGMT Trackside System On Process WPC C.3 CBI System On Process WPC E Platform Screen Door On Process WPC C.4 TGMT Onboard & Trackside System On Process WPC F Third Rail DONE C.5 TGMT Onboard System (Practice) On Process WPC G Seismic Detection On Process WPC C.6 Operation Principle & Management On Process WPC of Emergency Situation STATUS PELAKSANAAN TRAINING RAILWAY SYSTEM (2/2)
No. TRAINING STATUS No. TRAINING STATUS
H Telecommunication (O&M) H Telecommunication (O&M) H.1 Access Control System On Process WPC H.11 PIDS Simpleway System On Process WPC H.2 CBN System On Process WPC H.12 Public Address System On Process WPC H.3 CCTV On Process WPC H.13 Radio Communication Syst On Process WPC H.4 Clock System On Process WPC H.14 Telephone System On Process WPC H.5 Fiber Optic On Process WPC H.15 Voice Recording System On Process WPC H.6 Fire Alarm System On Process WPC H.7 Intercom System On Process WPC H.8 Operation Support On Process WPC H.9 PDP OM On Process WPC H.10 PIDS Hardware On Process WPC DOKUMEN TRAINING RAILWAY SYSTEM (1/2) No. DOCUMENT Submitted Refference Plan to Submit B Training Document 0. Training Plan (Update) W5 May 2022 1. Power Supply (PS). 1,1 MV Switchgear 095/DPKA-II/2022 - 1,2 DC Traction 095/DPKA-II/2022 - 1,3 LVMDP 095/DPKA-II/2022 - 1,4 EDG 095/DPKA-II/2022 - 1,5 Auxilliary Transformer 095/DPKA-II/2022 - 1,6 PLC 095/DPKA-II/2022 - 1,7 UPS & DC Charger 095/DPKA-II/2022 - 2. SCADA (SC). On Proses WPC 3. Signaling (SG). 3,1 Operation Training 3.1.1 Overal System Overview On Proses WPC 3.1.2 ATS System 203/DPKA-III/2022 - 3.1.3 CBI System 3.1.1 Axle Counter ACM250 Training Presentation W2 May 2022 3.1.2 Westrace Interlocking Training Presentation W2 May 2022 3.1.3 Power Distribution Cabiner Training Presentation W2 May 2022 3.1.4 Signal Training Presentation Proses approval OCG 3.1.5 BSG9 Point Machine Training Presentation W2 May 2022 3.1.6 ETS & SPK Training Presentation W2 May 2022 3.1.4 TGMT Onboard & Trackside System On Proses WPC 3.1.5 TGMT Onboard System (Practice) W2 May 2022 3.1.6 Operation principles & management of emergency situations On Proses WPC 3.2 Maintenance Training 3.2.1 System Overview On Proses WPC 3.2.2 S&D System W2 May 2022 3.2.3 CBI System 3.2.1 Axle Counter ACM250 Training Presentation W2 May 2022 3.2.2 Westrace Interlocking Training Presentation W2 May 2022 3.2.3 Power Distribution Cabiner Training Presentation W2 May 2022 3.2.4 Signal Training Presentation On Proses WPC 3.2.5 BSG9 Point Machine Training Presentation W2 May 2022 3.2.6 ETS & SPK Training Presentation 3.2.4 Network Communication System Training W2 May 2022 Proses approval OCG Referensi Surat: 3.2.5 ATS System 203/DPKA-III/2022 - 509/DPKA-V/2022, tanggal 12 Mei 2022 3.2.6 TGMT Onboard System W2 May 2022 3.2.7 TGMT Onboard System (Practice) W2 May 2022 3.2.8 TGMT Trackside System W2 May 2022 DOKUMEN TRAINING RAILWAY SYSTEM (2/2) No. DOCUMENT Submitted Refference Plan to Submit B Training Document 4. Telecommunications (TL). 4.1 Training ACS On Proses WPC 4.2 Training CBN On Proses WPC 4.3 Training CCTV W2 May 2022 4.4 Training Clock System W2 May 2022 4.5 Training Fiber Optic On Proses WPC 4.6 Training Fire Alarm System On Proses WPC 4.7 Training Intercom System W2 May 2022 4.8 Training Operation Support On Proses WPC 4.9 Training PDP OM W2 May 2022 4.10 Training PIDS Hardware W2 May 2022 4.11 Training PIDS Simpleway System W2 May 2022 4.12 Training Public Address System W2 May 2022 4.13 Training Radio Communication System W2 May 2022 4.14 Training Telephone System On Proses WPC 4.15 Training VRS System W2 May 2022 5. Platform Screen Door (PD). W2 May 2022 6. Power Rail/ Third Rail (TR). 718/DPKA-IX/2021 - 7. Seismic Detection & Alarming System (SDAS). On Proses WPC
Referensi Surat: 509/DPKA-V/2022, tanggal 12 Mei 2022