Professional Documents
Culture Documents
3.65
3.65
Top of Beam Top of Beam
0.20
0.20
2.60
2.60
Fourth Floor Line Fourth Floor Line
0.20
0.20
15.0501
15.0501
2.60
2.60
Third Floor Line Third Floor Line
0.20
0.20
2.60
2.60
Second Floor Line Second Floor Line
0.20
0.20
2.60
2.60
Finish Floor Line Finish Floor Line
0.20
0.20
Natural Ground Line Natural Ground Line
SCALE: 1:100
UNIVERSITY: PROJECT TITLE DRAFTSMAN: ENGINEER: SHEET CONTENT RATING: SHEET No.
AGAS, JORENCE E.
CAVITE STATE PROPOSED 4-STOREY ENGR. JOZEL BRYAN LEFT ELEVATION
UNIVERSITY HOTEL BUILDING
GOYENA, JHUNELL IVAN A.
JAMORA, MILAELAH LYE O. TERRIBLE REAR ELEVATION B-5
MARCELINO, LORAINE SHANE C.