You are on page 1of 48

COMMUNICATING TO LARGE POWER CUSTOMERS

KDN : PP8515/01/2013(031995)        

What
you need
to know
about ELECTRICITY
TARIFF REBATE
DUE TO ICPT...

Hydropower Malaysia Going Paperless Powerline Safety, Emergency Aid


Showcasing a Century with e-Billing effort Energy Efficiency & TNB Flood
of Success Power Quality Advice Relief Efforts from
KeTTHA’s View Volume 2 | 2015
Sometimes, happiness is nothing
more than a fresh coat of paint.
TENAGA NASIONAL BERHAD (200866-W)

Progress means little at all if the communities in which we do business don’t benefit from our endeavours too.
Hence, through our community programmes such as Projek Mesra Rakyat and Projek Baiti Jannati, we have played
a part to ease the burdens of the nation’s needy by transforming homes considerably worse for wear into comfortable
homes equipped with electricity, water and proper sanitation. We do all this to better lives for a brighter tomorrow.

www.tnb.com.my
MESSAGE

T enaga Nasional Berhad (TNB) is poised to build on


and exceed the achievements it realised in 2014, to
accomplish greater success this year.
Meanwhile, TNB has also instituted measures to further
strengthen our operations to ensure continual
improvements in terms of efficiency and reliability. In
addition to raising the effectiveness and profitability
We have made numerous efforts to ensure that we are of our operations, this approach is also vital towards
prepared for the implementation of the 6% Goods and guaranteeing that electricity supply can be provided
Services Tax (GST). At the same time, TNB has initiated at the electricity tariff rebate due to ICPT which was
a number of measures to ensure that its Large Power recently approved by the government.
Customers (LPCs) are equipped with the knowledge
and expertise necessary to satisfy the new compliance Through these developments, TNB continues to
requirements introduced alongside the GST. demonstrate that in spite of fluctuations in global prices
and shifts in the Malaysian regulatory landscape, we
Primarily, we have revamped the electricity bills remain committed to consistently raising the standard
received by LPCs to allow them to serve the additional of services rendered to our customers.
function of a tax invoice, in addition to presenting them
in an electronic format which is more convenient and
efficient. Aside from the enhanced speed with which
TNB is now able to issue monthly bills, this also means
that LPCs are provided with all the documentation Datuk Ir. Baharin Din
necessary to file for tax returns and recover the GST- Vice President (Distribution)
related costs attached to their electricity consumption. Tenaga Nasional Berhad

1
Feedback

We welcome your FEEDBACK,


CommEnts and/or suggEstions to
help us improvE our sErviCEs.
Please email your responses to dist_news@tnb.com.my
or log on to www.tnb.com.my/customer-care.html.

Volume 2 3
Contents

MESSAGE FROM ThE VICE


2 PRESIDENT (DISTRIBUTION)
18
SPECIAl FEATURE
electricity tariff reBate due to icpt
Frequently asked questions
NEwS AND hIGhlIGhTS on the recent electricity tariff
6 Local and international energy news,
breakthroughs and policies.
review.

20
cultivatinG caution
TNB’s efforts to propagate
COVER FEATURE responsible techniques and
10 GettinG to
procedures, and inculcate a safety-
oriented working culture among
Grips with Gst farm and plantation operators.
Tenaga Nasional
Berhad (TNB)
prepares Large
Power Customers
22 enerGy efficiency and enerGy cost
Adopting Energy Efficiency is a
multi-edged solution to financial and
(LPCs) for the
environmental power concerns.
Goods and
Services Tax (GST).
CORPORATE RESPONSIBIlITy
INSIDE TNB 34 helpinG hands
24 continuous supply flow
Malaysia’s hydropower dams, in terms
The late-2014 East Coast floods at
their onset, TNB provided relief and
respite to those most affected.
of supporting the nation’s sustained
growth and development.
ExPERT TAlk
TENAGA GREEN 38 iMportance of power Quality
28 strateGic partnership
Megagreen and TNB exchange
Highlighting TNB’s efforts to maintain
effective and efficient communication
with LPCs, to minimise avoidable
documents at the Biogas Asia Pacific
downtime.
Forum 2015 to spur the advancement
of biogas development.
DIRECTORy
30
paperless BillinG
The new TNB electronic billing for LPCs
41 A listing of TNB offices and service
centres across the country.
enables optimised natural resources.

Publisher Conceptualised and Produced by


Distribution Division, Tenaga Nasional Berhad AMG Holdings International Sdn. Bhd.
Wisma TNB, No. 19, Jalan Timur (356247-V)
46200 Petaling Jaya No. 10-3A, Jalan PJU8/3
Selangor Darul Ehsan, Malaysia Damansara Perdana, 47820 Petaling Jaya
Tel: + 603-7967 9000 Selangor Darul Ehsan, Malaysia
Fax: +603-7960 0343 Tel: +603 7729 4886
Email: dist_news@tnb.com.my Fax: +603 7729 4887
Website: http://www.tnb.com.my Website: www.amginternational.net

may also be read online at


www.tnb.com.my/business/tenaga-link.html

4
SMArTEr SAvINgS

“We hope to install smart meters in the


households of each of our millions of
domestic customers within 10 years.”

– TNB President and Chief Executive Officer


Datuk Seri Ir Azman Mohd

Tenaga Nasional Berhad (TNB) is presently in the Through the use of digital technology, smart meters also
process of undertaking a large-scale pilot project to facilitate the sharing of information on the generation,
determine the feasibility of implementing smart transmission and consumption of electricity among
electrical meters across the entire national grid. energy suppliers, distributors and consumers. Aside from
This is to enable the utility’s domestic, commercial enabling all energy sector players to better monitor and
and industrial customers to better manage and predict electricity demand, Education Minister II Datuk
optimise their utilisation of electricity. According Seri Idris Jusoh highlighted that the technology will also
to the company’s President and Chief Executive enable consumers to improve understanding of their own
Officer Datuk Seri Ir Azman Mohd, the utility is consumption patterns. He added, “It will help consumers
planning to dramatically increase the adoption of monitor their energy consumption; for instance, they can
such devices over the coming decade. “We hope to set the washing machine to run during non-peak hours.
install smart meters in the households of each of our This will allow more control over monthly electricity
millions of domestic customers within 10 years,” bills and help prevent blackouts during periods of peak
revealed Datuk Seri Ir Azman. demand.”

6
NEWS AND HIgHlIgHTS

SECurINg COAl SuPPly


To ensure the availability of adequate sources of limestone, iron ore and biomass in addition to coal,
feedstock for its coal-fired electricity generation TNB issued a notice of intent to take over the company
facilities, Tenaga Nasional Berhad (TNB) had bid on 9 January 2015.
to takeover infrastructure firm Integrax Bhd, which
operates the strategically located lumut Port, near In late March 2015, Perak Corp relinquished their
the utility’s 2,100MW Janamanjung power plant in 15.74% share in Integrax to TNB, enabling the latter to
Manjung, Perak. attain a 50.83% stake in Integrax. Subsequently, the
other major shareholder of Integrax at the time, Amin
The port comprises the lumut Maritime Terminal Halim rasip, announced that he too has accepted TNB’s
(lMT) and the lekir Bulk Terminal (lBT), the latter of offer and disposed his 24.76% stake in the company.
which has predominantly handled coal shipments in With this new development, TNB successfully acquired
the past. Following Integrax’s announcement of plans 90.21% of the voting shares in Integrax, officially
to convert the lBT into a multi-use terminal handling assuming ownership of the company.

To secure reliable supplies of


feedstock for its 2,100MW
Janamanjung power plant in
Manjung, Perak (foreground),
TNB has raised its offer for the
takeover of the conveniently
located Lekir Bulk Terminal
(LBT) (in background).

volume 2 7
grEENEr PrOSPECTS
According to a recent statement by the Ministry of of 84,565. Meanwhile, the Minister also explained
Energy, green Technology and Water (KeTTHA), the that in line with the National Electric Mobility Action
continued adoption of green technology products and Plan (NEMAP), 300 electric vehicle charging stations
services is set to raise the sector’s contribution to would be constructed across the country by the end
Malaysia’s gross Domestic Product (gDP) to rM22.4 of this year, at a projected cost of rM5 million. This
billion by the year 2020 and rM60 billion by 2030. initiative complements various priorities identified
Announcing these figures during his address at under the NEMAP, by promoting the use of electric
the launch of the yaHijau green youth of Malaysia vehicles in public transport, strengthening the electric
Foundation at universiti Malaysia Sabah (uMS) in mobility ecosystem and relevant infrastructure, and
labuan on 28 February 2015, KeTTHA Minister Datuk expediting the development of local electric mobility
Maximus Ongkili also stated that this would be a result technology.
of the strategies and approaches implemented through
the green Technology Master Plan (gTMP). In addition to contributing towards increased
investment in the green technology products
and services sector, the propagation of solar
Datuk Maximus also revealed that under the gTMP, photovoltaic power plants such as this also
the Ministry anticipated the creation of an estimated serves to supplement energy supply through
144,590 employment opportunities by 2020 and a total the use of renewable alternatives.
of 211,500 by 2030, as compared to the 2014 figure

8
NEWS AND HIgHlIgHTS

GLOBAL RESERVES
The percentages of coal, gas and oil reserves that should
Coal
not be burned in order to prevent a global temperature
increase of more than 2°C.

Gas

82%

Oil
49%

33%
Sources McGlade & Ekins, Nature, 2015

PrEvENTINg ClIMATE CHANgE


According to a new research done by university At the current rate of fossil fuel usage, it is predicted
College london (uCl), and published in the journal that the world will experience a catastrophic 5°C rise
Nature, massive amounts of the world’s coal, oil and in temperature. As explained by Christophe Mcglade,
gas reserves have to stay unburned if the planet is who helmed the research team, they have tangible
to remain under a global temperature increase safety figures of the quantities and locations of fossil fuels
limit of 2°C, which was agreed on by the world’s that should remain unused in trying to keep within
nations. vast reserves of oil in the Middle East, and the 2°C limit. A global climate deal is expected to be
coal in the uS, Australia and China will have to be left established at the uN summit, scheduled to be held
in the ground. in Paris in December 2015.

volume 2 9
TNB Helps Large
Power Customers
Navigate Compliance

10
Cover feature

I
ntroduced over three decades ago, the Sales and Service Tax
(SST) utilised by the Malaysian government has been due for
a revamp for quite some time. Announced in October 2013,
the Goods and Services Tax (GST) replaces the SST, to enhance
the efficiency, effectiveness and transparency of the tax system,
while distributing the financial burden more fairly, based on
consumption patterns rather than income.

In light of these developments, Tenaga Nasional Berhad (TNB) has


concertedly sought to ensure that Large Power Customers (LPCs)
and businesses, including SMEs, transition to the new system as
smoothly as possible. For this issue’s Cover Feature, TENAGALINK
takes a detailed look at these efforts, as well as the intricacies of
GST and the ways in which it impacts electricity costs faced by LPCs.

Distinct Differences
In effect on 1 April 2015, the GST As explained by TNB Chief
is a broad-based consumption tax Financial Officer (CFO) and Vice
which is levied at 6%. In addition President (Group Finance) Fazlur
to applying to goods and services Rahman Zainuddin, the step of
which are supplied within Malaysia, registering is therefore vital, as
the GST also applies to services it is the only way for companies
which are imported and used in to recover the tax-related costs
the country – which is in stark imposed by counterparts higher
contrast to its predecessor. Aside up in the supply chain. “LPCs
from providing the benefit of the making taxable supplies which are
reduced tax rate in comparison registered for GST will find that
to the previous 10% rate under the GST-related costs previously
the SST, the GST is also expected incurred do not raise the cost of
to improve the efficiency and business, as they can recover the
effectiveness of tax administration GST paid through the RMCD’s input
and management as it places a tax credit mechanism,” he notes.
greater burden of compliance on
the part of companies. As a result of this, the new system
is also anticipated to drastically
In fact, it is mandatory for all reduce the prevalence of companies
companies with a yearly turnover operating in the black market,
of RM500,000 or more to register as they will naturally face higher
for GST with the Royal Malaysian costs should they choose not to
Customs Department (RMCD) – register for GST. Interestingly, the
which continues to administer the RMCD also recently reported that
tax regime, just like it did with the the number of companies which
SST. This is because companies play have registered to date exceeds
a pivotal role in the new taxation the estimated total number of
framework, facilitating the collection companies with turnover above the
of taxes on behalf of the RMCD. designated threshold.

Volume 2 11
“TNB has taken meticulous
steps to ensure that the
format of electricity bills
which are sent to LPCs
complies with the various
criteria and requirements
prescribed by the Royal
Malaysian Customs
Department.”

– TNB Chief Financial Officer and


Vice President (Group Finance)
Fazlur Rahman Zainuddin

This demonstrates that even the Due to the broadened scope of


operators of Small and Medium items which are subjected to tax
Enterprises (SMEs) acknowledge under the GST, the new system also
the importance of complying with allows the government to widen
the new rules and procedures, and diversify the tax base. This
to ensure that they do not not only creates greater flexibility
face unnecessary costs and are in the nation’s sources of revenue,
able to pass them on to the final but it also allows the government
consumers of the goods or services to reduce its reliance on revenues
they provide. obtained through direct taxes.

National Significance While the GST is designed to


improve adherence through its
In addition, the GST brings in-built mechanisms to promote
Malaysia’s tax regime in line with self-compliance, it should be
international standards practised noted that this very feature also
by an estimated 90% of countries underpins the new system’s crucial
around the world, ranging from advantage of being tax-neutral
regional nations such as Singapore to the private sector. Even so,
to developed Western countries there are significant requirements
such as the United States and the that companies must adhere to,
United Kingdom. As a result, the meaning that businesses should
new system also provides greater be prepared to bear the costs
simplicity in administering the associated with the administrative
tax regime as it adopts a negative procedures entailed.
concept in which all goods and
services are subject to GST unless Working Together
specifically exempted. This is in
contrast to the previous services Additionally, Fazlur Rahman
tax, where only specifically highlights that in ensuring that
identified services were taxable. its LPCs are well-prepared for the
Continued on page 15

12
Cover feature

UNDERSTANDING GST

Manufacturer pays 6% GST Tax to Customs


Import Raw Materials : RM100
6% GST Paid : RM 6 (Input Tax)

Manufacturer collects 6% GST based on selling price


Selling price : RM100 + RM100 (Including Profit) = RM200
6% GST Collected: RM12 (Output Tax)
Manufacturer

Supplier pays RM12 Tax to Manufacturer


Purchase from Manufacturer: RM200
6% GST paid: RM12 (Input Tax)

Supplier collects 6% GST based on selling price


Selling price: RM200 + RM100 (including Profit) = RM300
6% GST Collected : RM18 (Output Tax)
Supplier

Costomer pays 6% GST for the Items


Total Price paid RM 300 + RM18 (GST)
Customer

During an outreach
programme held in Klang
Valley with LPCs on
implementation of the
GST, senior representatives
from TNB were on hand to
field queries and provide
clarification. Among
them are Commercial
Management Unit General
Manager Abu Bakar
Ismail (far left), Revenue
Management Unit Assistant
General Manager (Billing)
Selimin Othman (second
from left), and Customer
Service Senior General
Manager Ir Kamaliah Abdul
Kadir (fourth from left).

Volume 2 13
Right: During the Seminar
and Dialogue Session on
the Goods and Services
Tax (GST) with TNB’s
Commercial and Industrial
Customers, over 300
representatives from large
commercial and industrial
enterprises across the
country were in attendance.

FREQUENTLY ASKED QUESTIONS


Are deposits subject to GST?
No, deposits are not subject to GST.

Are late payment surcharges/power factor surcharges/connected load


charges subject to GST?
No, these charges are punitive in nature. So they are not subject to GST.

DID YOU KNOW?


The supply of electricity to non-domestic customers is
subject to 6% GST.

Non-domestic customers who have registered for GST and


are making taxable supplies can claim GST paid on their
electricity bill through the Input Tax Credit (ITC) mechanism.

14
Cover feature

Why Malaysia Needs GST


First introduced in 2009, the proposal to implement GST in
Malaysia underwent several rounds of deliberation before arriving at
its present form. Among the main reasons for its adoption are to:

Broaden the tax base and


diversify the government’s
revenue sources

Distribute the financial


burden more fairly and
evenly

Enhance the transparency


and consistency of the
taxation regime

Promote the practice of


self-compliance among
the private sector

Simplify the
administration of taxable
items and exemptions

Continued from page 12

implementation of the GST, TNB has The impact of the Incentive Cost “Engagement efforts such as this
initiated a number of programmes Pass Through (ICPT) mechanism provide the platform for TNB to
and seminars to provide support on LPCs’ bills and effective ways maintain communication with
and assistance. This includes in which to reduce electricity- LPCs, especially those which
explanations on the nature of GST related costs by improving energy require further clarification on
and the ways in which it impacts efficiency, in addition to issues how GST impacts their electricity
upon the industry, as well as the related to the GST. bills, since it affects specific
effects of the new tax regime on the billing components in different
monthly electricity bills which LPCs Among those who shared their ways,” explains Fazlur Rahman.
receive. knowledge and expertise were the Furthermore, he adds that these
Senior General Manager of Customer efforts are in line with TNB’s
A prime example of this was the Service at TNB’s Distribution commitment to ensure that
session titled Seminar and Dialogue Division Ir Kamaliah Abdul information on electricity billing
Session on the Goods and Services Kadir and the Assistant General layouts and components related to
Tax (GST) with TNB’s Commercial Manager (Billing) at the Customer charges are consistently shared with
and Industrial Customers, which Service Department’s Revenue the utility’s customers in a clear
was held at the Matrade Exhibition Management Unit Selimin Othman, and transparent manner.
and Convention Centre (MECC) as well as the General Manager of
on 11 March 2015. Attended by TNB’s Commercial Management Better Billing
more than 300 representatives of Unit Abu Bakar Ismail, TNB Energy
large commercial and industrial Services representative Ahmad Aside from outreach programmes
enterprises from across Malaysia, Nizam Hassan and the Assistant such as this, the utility has also
this session featured numerous Director of the GST Division at the taken other steps to smoothen
speakers and subject matter experts. RMCD Patmawaty Jubily. LPCs’ transition to the new system.

Volume 2 15
goods or services provided are
categorised as zero rated, standard
rated or exempt supplies. To satisfy
this criterion, items are listed in a
convenient two-column layout which
provides at-a-glance identification
of the billing components which are
subject to GsT.

This modification was particularly


vital. fazlur rahman explains,
“Certain billing components such
as connected load charges,
power factor surcharges, power
factor rebates, penalty charges
and renewable energy fund
contributions are not subject
to GsT, as these transactions do
not fall under the definition of
taxable supplies. Thus, it is worth
noting that the increase in LPCs’
electricity bills could amount to
less than 6%, as these billing
components are not affected
by GsT.”

as a result of the comprehensive


efforts that have been made to
revise the structure of electricity
bills which are rendered to LPCs,
these bills are now able to serve the
dual-purpose of a comprehensive
tax invoice. This is indeed
crucial, as it effectively means
that LPCs are provided with the
Primarily, TNB has revamped the well as the incorporation of TNB’s documentation necessary to file
format of electricity bills which are GsT registration number, a tax claims for tax credits to offset
rendered to LPCs, to comply with invoice serial number and the date the GsT-related costs attached
the latest requirements prescribed of issuance of each invoice. to the electricity consumed, and
by the rMCD. among these criteria pass these costs on to consumers
is the inclusion of the term ‘Tax another important requirement or other companies in the supply
Invoice’ in a prominent location, as is the distinction of whether the chain, rather than absorb them.

The process of adapting business processes and procedures to comply with the
requirements set out for the implementation of GST may prove to be a daunting task
for enterprise operators, and TNB has acknowledged these challenges, seeking
to extend assistance and help make the transition as painless as possible. Having
made the necessary changes to the format of electricity bills sent to its LPCs, TNB
also continues to demonstrate its commitment in maintaining clear communication
with its various stakeholders, to effectively discuss and resolve GST-related issues
affecting both the utility and its customers. For any queries on the impact of GST on
your electricity bill, kindly contact TNB Careline at 15454.

16
THE NEW TNB BILL FOR LARGE POWER CUSTOMERS CoVer feaTure
PrIMe PersPectIve

IOI Mall PuchOng


azMI YaakOb, MaIntenance &
engIneerIng Manager

“Attending this session has enabled me to


make clear distinctions between the billing
components which are subject to GST, and
those which are exempted from the tax, such as
the 1.6% Renewable Energy Fund contribution.”

PrIMe PersPectIve
“considering that the gst-related

as one of the oldest and most well-


costs attached to the inputs which
are vital to our business processes ePsOn
PrecIsIOn
established commercial shopping can be claimed from the royal
complexes located in Puchong, Malaysian customs Department
selangor, IOI Mall has undoubtedly (rMcD), I think it is fair to say
become one of the most iconic and
easily-recognisable landmarks in
that the impact of the gst on IOI
Mall Puchong will be minimal,” he
MalaYsIa
the area. explains. “In fact, this may also
mean that the impact of taxes on our
shah rIzal
however, establishing this operations will ultimately reduce, as harun, FacIlItY
reputation has been no mean feat, compared to the sales and services
requiring the mall’s operators to tax (sst) which is currently being MaIntenance
continually elevate the shopping levied,” he adds.
experience, in order to keep up with Manager
consumers’ changing expectations. “Prior to this session, I had already
attended some seminars and obtained
even so, one constant requirement information on the implementation of
that has not changed in the years the gst. however, having attended
since its inauguration is the this session, I realised that there
perpetual need for a stable, reliable are some issues which I may have
and consistent supply of electricity, overlooked, particularly relating to
in the volumes required by the the registration with the rMcD, as
nearly-220 tenants which operate well as the need to ensure that the
at the complex. account holder registered with tnb
corresponds with the entity registered
as explained by Maintenance & with the rMcD,” azmi reveals.
engineering Manager azmi Yaakob,
IOI Mall had already acknowledged In addition to gaining clarity and
the impact of the 6% goods and crucial guidance on this matter,
services tax (gst) on its business attending tnb’s seminar meant that
processes, before he made the he was able to attain information
decision to attend a recent seminar on the relevant procedures, as
on the implementation of the gst, well as identify the tnb personnel
which was organised by tenaga responsible for rendering assistance
nasional berhad (tnb). in order to resolve issues such as this.

D
PrIMe PerSPeCtIVe CoVer feature

royaL MaLaySIa PoLICe


GILBerd LayaNG, SuPerINteNdeNt
“This was the first seminar that I have attended on
the implementation of the GST and it has enabled me
to better differentiate between the various taxes and
levies which have been put in place in Malaysia.”

With operational facilities located “While we have previously


across the nation, there is no doubt been paying taxes under the
that the stable and reliable supply government’s Sales and Services
of electricity plays a pivotal role tax (SSt), the number of taxable
in supporting the mission of the goods and services has expanded
royal Malaysia Police, towards under the updated GSt scheme,”
guaranteeing the safety and he adds.
security of all Malaysians.
for Superintendent Gilberd, one
as such, Superintendent Gilberd of the most important facets of the
Layang immediately recognised the new system is that it dramatically the necessary services which are
value in attending one of tenaga reduces opportunities for essential to improving the quality
National Berhad’s (tNB) most unethical entities to avert paying of life for all Malaysians,” he notes.
recent engagement programmes taxes by choosing not to declare
relating to the implementation of the their income. He also shares that the event
6% Goods and Services tax (GSt). organised by tNB was the first
“aside from this, the GSt increases seminar on the implementation
“from the explanations given, I the government’s revenue of GSt that he has had the
understand that the implementation sources and widens the pool of opportunity to attend, finding it an
of GSt comprises a restructure tax collection, meaning that it invaluable experience which was
of the tax scheme,” he explains. will be better equipped to render both helpful and informative.

“After attending the TNB electronic equipment related to consideration for him is that GSt-
seminar, I am more aware information and imaging, it should related costs can be recouped
of the ways in which the come as no surprise that electricity by filing the relevant claims with
implementation of GST supply is one of its most vital inputs. the royal Malaysian Customs
department (rMCd).
affects the electricity prices for facility Maintenance Manager
which we will be facing.” Shah rizal Harun, this provided aside from this, the facility
adequate impetus to attend one of Maintenance Manager also reveals
Located at the Sri damansara tenaga Nasional Berhad’s (tNB) that by attending the seminar, he
Industrial Park in Sungai Buloh, recent outreach programmes on was able to gain a clearer picture of
Selangor, epson Precision Malaysia the Goods and Services tax (GSt), the impact that the new tax system
is the local manufacturing subsidiary which was tailored to the utility’s will have on monthly electricity
of the multinational Seiko epson large commercial and industrial bills.
Corporation, which is headquartered customers.
in the city of Suwa, in the Nagano Most importantly, he notes, the
Prefecture of Japan. Sharing his view that the revamped electricity bills supplied
implementation of the GSt by tNB provide all of the necessary
Considering that the company comprises a positive development documentation that is required to
specialises in the manufacture of for the country, Shah rizal file and secure input tax claims
computer printers, as well as other explains that the most important from the rMCd.

Volume 2 17
ELECTRICITY
TARIFF REbATE
duE To ICpT
Frequently Asked
Questions
18
speciAl FeATURe

O
n 11 February this year, the Ministry of Energy, Green Technology and Water
(KeTTHA) approved rebates in electricity tariffs due to Imbalance Cost Pass
Through (ICPT) in Peninsular Malaysia. The ICPT mechanism, which was
implemented as part of the Incentive Based Regulation (IBR) framework, was first
introduced on 1 January 2014.

In this Special Coverage, TEnAgALInk addresses some of the most commonly posed
queries on the IBR and ICPT systems, and provides clarity on the rules and conditions
governing the tariff rebates.
Electricity Sales for FY2014
Customer Unit (GWh) RM million No of Customers
Category
Domestic 22,123 6,908 6,639,123
(21.60%) (18.17%) (82.00%)

Commercial 35,353 15,885 1,379.796


(34.50%) (41.78) (17.02%)

Industrial 43,026 14,700 25,557


(42.00%) (38.67%) (0.32%)
WhAT is The icpT
mechAnism? Mining 131 30 29
(0.13%) (0.08%) (0.0003%)
imbalance cost pass Through Streetlight 1,348 321 62,672
(icpT) is a mechanism under (1.32%) (0.84%) (0.77%)
the incentive Based Regulations
Specific Agriculture 398 172 1,543
(iBR) framework allowing TnB, (0.39) (0.44%) (0.02)
as a utility, to reflect the changes
(either an increase or a reduction) Total 102,382 38,018 8,108,720
in fuel and other generation costs
in the eletricity tariff every six The Fuel cost pass Through hOW is The icpT AmOUnT
months. (FcpT) mechanism, which deTeRmined?
captures variations in the cost of
WhO is RespOnsiBle fuel sources (specifically piped The icpT amount is calculated
FOR The meThOdOlOgy gas, lng and coal). This may based on the difference between
the estimated cost of fuel and
OF icpT cAlcUlATiOn? occur as a result of changes in fuel
prices, available quantities and other generation cost, as compared
As the regulatory agency responsible the energy generation mix, among to the actual baseline costs.
over the domestic energy sector, the other factors.
energy commission of malaysia WhAT is The icpT
determines and implements the The generation specific cost pass AmOUnT FROm 2014
calculation methodology for the Through (gscpT) mechanism Which is Being pAssed
icpT mechanism, with its results captures variations in other
subject to government approval on
On TO cUsTOmeRs?
generation-specific costs. This
a semi-annual basis. includes changes in the costs As a result of the icpT mechanism,
due to utilisation of distillate and a tariff rate rebate of 2.25
WhAT ARe The fuel oil, other generation costs sen/kWh has been applied to
cOmpOnenTs OF The incurred under power purchase electricity customers. This rate
icpT mechAnism? Agreements (ppA), service level took effect on 1 march 2015
Agreements (slA), fuel supply and will remain in place until
There are two main components contracts, interconnection and 30 June 2015. This amounts to
under the icpT mechanism: others. Rm727m.

Volume 2 19
CuLTIvATING CAuTIoN
Promoting safe Practices in
Farms and Plantations
A
s the main energy utility serving Peninsular Malaysia, Tenaga
Nasional Berhad’s (TNB) primary concerns relate to ensuring the
efficiency and performance of electricity generation, transmission
and distribution. Considering that its ultimate goal is to support Malaysia’s
social and economic development, TNB also prioritises engagement with
commercial energy customers, to educate and spread awareness on
electrical safety.

In this issue, TENAGALINK sheds light on the measures that the utility has
taken to ensure that those involved in the agricultural sector are aware of
powerline safety efforts they can adopt for more secure farming processes.

NAtioNAl Focus and improve operational integrity. osman, initiatives such as this
these efforts also serve the utility by enable tNB to engage directly with
to accomplish best practices in minimising avoidable outages and stakeholders. “this allows the
safety, tNB has conducted a series interruptions caused by inadvertent company to better understand the
of seminars and other outreach mistakes. areas in which accidents commonly
programmes with farm and occur, and offer specialised
plantation owners and operators As explained by occupational guidance that is tailored to the
throughout the country. this helps safety, Health and Environment unique challenges and difficulties
reduce the occurrence of accidents (osHE) unit chief Mohd Farith being faced,” he reveals.

20
sAFEtY FiRst

Safety Precautions Near TNB Powerlines


Right: Plantation managers and workers
should be aware of the dangers of
venturing near TNB powerlines.

Below: Whether working in a paddy field


(left) or an oil palm plantation (right),
the danger of injury or death as a result
of electrical accidents always poses an
4.88 66 feet
imminent threat. Acknowledging this, metres
TNB actively engages with communities
to promote industrial best practices when
working in close proximity with powerlines.

3.68
metres

costlY lEssoN height of 4.88 metres, leaving just safety, compared to their larger
1.2 metres of clearance above the counterparts.
one such area that has been machine when it passes beneath
identified relates to farming works such cables. Among the specific practices which
that involve the use of combine are encouraged by the utility, is
paddy harvesting machines. the DEliVERiNg iNsigHt ensuring that oil palm harvesting
last fatal accident involving paddy poles are never transported vertically,
harvesters occurred on 1 February Aside from this, numerous accidents instead carried horizontally with
2006, when a teenager standing involving oil palm harvesting poles the help of another person, if
on top of one such machine was have been recorded over the past necessary. Additionally, the pole
severely electrocuted after coming two years, with the majority should be made of an insulating
in contact with a 33kV electrical resulting in fatal injuries. in material such as wood or bamboo,
distribution cable. Acting swiftly to light of this, the osHE unit has rather than a conducting material
initiate an annual series of talks also made active efforts to improve such as aluminium. Meanwhile,
on best practices relating to safety awareness on electricity safety among plantation managers should ensure
– tNB has contributed towards smallholder plantation operators. that trees are never planted beneath
the zero-accident rate which this is because these operators electrical lines, ensuring that an empty
has been realised in the years have significantly less access to space of at least 66 feet wide is
since then. information and advice on electricity maintained on either side of the line.

in order to ensure that incidents Ensuring that electricity supply is utilised in a safe and
such as this do not recur, paddy
harvesting operators are strongly
secure manner is a responsibility that is shared by all
advised never to stand on top of stakeholders in Malaysia’s energy sector, including
paddy harvesting machines during individual and commercial electricity consumers.
operations. this is particularly Despite that, Tenaga Nasional Berhad has taken bold
important considering that paddy
harvesting machines typically are
steps to safeguard stakeholders at risk of injury,
3.68 metres in height and 33kV demonstrating its leadership and commitment to reduce
distribution lines are deployed at a the occurrence of both fatal and non-fatal accidents.

Volume 2 21
EnErgy EfficiEncy
and EnErgy cost
contributed by Ir dr Mohamed Fuad Faisal, Power
Quality & Energy Efficiency specialist, asset
Management department, distribution division, tnB

M
ost customers agree that
implementing Energy Efficiency
(EE) measures can optimise
the consumption of electricity in
factories. While EE programmes assist in
accomplishing this, management support
and knowledge on what must be done are
required to successfully implement them.

EE programmes require cost, so the MakIng a dIstInctIon


engineers responsible for EE must
ensure that the effort or investment one important factor to note is
put in the implementation of the that EE is not energy conservation.
programmes result in real energy Where the latter means avoiding the
efficiency and energy savings. In use of a service to save energy – such
addition, the monetary savings due as not turning on an air conditioner
to implementation of any EE plans or not using the vacuum cleaner –
must be measurable. EE means accomplishing the same

22
EnERgY EFFIcIEncY

level of tasks using less power. In


general, this requires purchasing
energy-efficient devices and
appliances. For instance, replacing
an incandescent lamp (which
uses more energy) with an energy-
efficient compact fluorescent lamp
(cFL) is EE, whereas turning off
the incandescent lamp is energy
conservation.

some EE technology – for instance


light emitting diode (LEd) lamps
– may have a higher initial cost,
but the long-term savings from
the reduction in monthly charges
make it worth adopting. In addition
to cost savings, adopting and
implementing EE programmes help
reduce carbon dioxide emissions
and damage to the environment.
this is in line with the goal of the
Malaysian government to reduce
up to 40% of emission intensity of
the gross domestic Product (gdP)
by 2020. Compact fluorescent lamps (CFL), which use less power
than incandescent light bulbs, should be used in homes,
industries and factories for higher energy efficiency.
EnERgY costs
at the end of every month, the
amount of electrical energy ENERGY COST FOR DOMESTIC CUSTOMERS
consumed by the customer is
recorded by energy meters. the Electrical energy (kWh) = Electrical power (kW) x duration (hours)
cost of energy consumption is then Energy cost (RM) = Electrical energy (kWh) x cost per unit
determined based on the existing
energy tariff. this is the energy Example:
cost. this tariff is applicable
to all categories of customers. kWh consumption = 100 kWh
Meanwhile, the term kilowatt- average cost per kWh (domestic) = RM0.3166/kWh
hour (kWh) refers to the energy Energy cost = 100kWh x RM0.3166kWh = RM31.66
consumed by customers.

In essence, the impetus of energy-saving rests primarily with


the consumers; starting with the selection of EE appliances for
homes, offices and industries, to practicing energy-conserving
procedures – such as turning-off equipment, devices and lights
when not in use. These provide not only financial benefits in cost
savings, but also contribute to the welfare of the environment
and the advancement of national goals and the economy.

Volume 2 23
continuous
supply flow

Seen as an industrial

TNB Taps into undertaking of


massive scale during
its construction

Hydropower to Safeguard in the 1920s, the


Chenderoh Power

Energy Security
Station or Chenderoh
Dam continues to
reliably serve the
nation until today.

24
INSIDE TNB

T
o support the continued growth and development take place with greater prominence
and frequency in Malaysia,
of Malaysia, it is essential that adequate following the success of this
sources of energy supply are maintained in an initial undertaking. “at present,
efficient and sustainable manner. Considering that Peninsular Malaysia is home
hydroelectric projects comprise some of the largest to three major hydropower
schemes operated by TNB – each
power generating facilities in the world – with some of which are made up of numerous
even eclipsing the largest nuclear power plants – it individual dams with generating
is only natural that Tenaga Nasional Berhad (TNB) units integrated within,” he reveals.
has leveraged its expertise to manage and operate a
These three hydroelectric
variety of such projects in the country. schemes – which are located in
Perak, Terengganu and cameron
In this issue, tEnAGAlinK delves into the technology Highlands, Pahang – currently
behind the principles of hydropower, as well as the account for a total of 21 individual
dams with integrated power
completed and prospective projects which put the plants. When combined, the total
science to work for the benefit of all Malaysians. installed generation capacity of
these projects is 1,911MW, which
HyDroElEcTrIc HErITagE coNSIDEraBlE corresponds with 10.3% of TNB’s
coNTrIBuTIoNS overall mix of electricity generation
The history of Malaysia’s involvement sources.
with hydropower energy predates as explained by the Senior general
the birth of the country itself, Manager (asset Management) at In fact, these projects also have
with construction on the first the generation Division of TNB a significant contribution towards
large-scale project initiated by azman Talib, the development ensuring the electricity security
the administration of the British of hydropower projects began to of the nation as a whole. according
Federated Malay States in the early-
1920s. completed and officially
opened by 1930, the chenderoh
Power Station or chenderoh Dam is
TNB’S GENERATION MIX IN 2014
located near Kuala Kangsar, Perak,
and has five turbines which currently As one of the
components in
provide an installed generation
TNB’s mix of
capacity totalling 40.5 MW. generation sources,
Coal hydropower plays
35.3%
considered to be Peninsular a major role in
ensuring the stability
Malaysia’s most ambitious industrial
and consistency
undertaking of its time, chenderoh of supply.
Dam was built at an estimated cost
of gBP 3.5 million. aside from
creating a reliable source of power
Hydro
10.3%
supply for tin mining operators Gas
across the Kinta Valley, the dam was 53.8%
also built specifically to manage
surges in the water level of the Distillate
Perak river, which had previously MFO 0.6%
resulted in disastrous floods in the 0.04%
state’s blossoming commercial and
administrative capital of Ipoh.

Volume 2 25
to the Malaysia Energy Statistics Terengganu Hydropower Project, installed capacity of 150MW and
Handbook 2014 – which was which is located in the Puah Forest 5.8MW respectively, with the
produced by the Energy commission reserve of Hulu Terengganu. This entire project slated for completion
of Malaysia and released last project comprises two generating in 2020. Meanwhile, the Telom
year – hydropower projects such units with an installed capacity Hydropower Project has also been
as these accounted for 7% of all of 125MW each in Puah and two proposed and is set to be located
power sources contributing to generating units with an installed in Kuala lipis, Pahang, featuring a
the generation of electricity in the capacity of 7.5MW each in Tembat, 132MW surface power station.
country, in 2012, which is the last with the schedule for completion of
year for which data is available. each unit ranging from September This project will also serve as a
this year to april 2016. pilot study for the development of
ExPaNDINg ScoPE a public acceptance model that will
aside from this is the Tekai address the social and environmental
at present, TNB is also embarking Hydropower Project, which is impact of hydropower stations. To
on the development of a further located in Jerantut, Pahang and accomplish this, TNB is adopting
four hydropower projects in consists of two cascading dams international guidelines published
Peninsular Malaysia. First, the ulu with surface power stations. The by organisations such as the World
Jelai Hydropower Project, which power stations at the upper and commission on Dams (WcD)
is located in cameron Highlands, lower Tekai Dams will have an and the International Hydropower
comprises two generating units
with an installed capacity of
186MW each. Next is the Hulu
NATURAL BASIN

A drainage basin, or a catchment area as it is more commonly known, is an


expanse of land where a natural border of peaks around a river valley forms a
basin, into which precipitate flows. This precipitate provides the river with a
regular supply of water. In order to generate power, hydroelectric dams rely on a
steady stream of water to spin their turbines. Therefore they are typically built
on rivers that are liberally fed with water from their catchment areas.

26
INSIDE TNB

Association (IHA), with the final


product anticipated to be used as
a reference for the development
of future hydropower projects in
“Aside from driving Malaysia’s
Malaysia. growth by supplementing the mix
of electricity generation sources
TNB also adheres to international
operated by the TNB generation
standards and best practices in dam
design and management, namely Division, the nation’s hydroelectric
by the International Commission plants are also pivotal to flood
on Large Dams (ICOLD). These mitigation and the provision of
practices include subjecting the
hydropower dams to monthly domestic raw water supply.”
(daily during the monsoon season)
surveillance and monitoring of – TNB Generation Division
the dam structure, six-monthly Senior General Manager (Asset
dam surveillance inspections by Management) Azman Talib
internal experts, comprehensive
10-yearly dam safety inspections
by independent international
experts, and controlled discharge of
dam water during high water level
situations.

DrIVINg SuSTAINABILITy
In addition to the direct benefits observed to serve a number of the dam and the regular inspections
derived in the form of electricity auxiliary functions as well, such as and maintenance required, the
generation, hydropower dams also facilitating the irrigation of nearby resource requirements imposed
offer a slew of additional advantages, agricultural areas, while also by hydropower projects remain
in terms of promoting socially potentially serving as an interesting among the lowest as compared to
and environmentally-responsible and attractive tourist destination. other power generation technologies
development. “Primarily, the and approaches. This is because
construction of dams enables On the other hand, it is also worth electricity is generated from the
operators to manage waterways in a noting that hydropower stations potential energy that is embodied
more exact and deliberate manner, still provide one of the most in dammed river water, which is
thus having the potential to assist in sustainable and environmentally- extracted when the water passes
mitigating the detrimental impacts of friendly methods to generate energy. through the dam and drives the
flooding,” notes the Senior general Apart from the initial construction of turbines it contains.
Manager (Asset Management).

Aside from this, dams serve a Having first appeared in Malaysia nearly a century
number of roles which are perhaps ago, the nation’s numerous hydroelectric projects
just as critical, such as facilitating have firmly established themselves as prime
the consistent provision of
domestic raw water supply. This
contributors to the country’s overall energy mix.
is due to the reliability associated Apart from adding crucial diversity and reliability to
with the availability of fresh water Malaysia’s range of energy sources, these facilities
at hydropower stations, which also return several well-documented benefits to
positions them as a popular location
for water filtration and distribution
society and the environment, thus enabling greater
companies to establish operations. achievements in realising the nation’s sustainable
Additionally, dams have been development goals.

Volume 2 27
Strategic Partnerships
TNB Collaboration to Advance
Biogas Development

C
urrently in its fourth year, the
Biogas Asia Pacific Forum 2015
was held on the 28 and 29 of
April at the Sunway Pyramid Convention
Centre. The event saw the convergence
of biogas industry leaders and policy
makers from across Asia Pacific, with
more than 400 delegates from 27
countries present. The Biogas Asia
Pacific Forum 2015, themed Commercial
Integration of the Biogas Value Chain
in Asia – Opportunities and Challenges
for All, promoted partnership and
knowledge sharing to strengthen
Malaysia's position as a biogas hub,
and encourage innovation, growth and
commercialisation in the sector.

28
TENAGA Green

*Fiah Name Installation Address State Capacity Type Acual Date


(kw) Design

Megagreen Energy Kilang Sawit Felcra Maran Simpang Jengka, Peti Surat Pahang 1000 BG1 2-Dec-14
Sdn Bhd 69, Jalan Maran 26500 Maran, Pahang Darul Makmur

Megagreen Energy Kilang Sawit Felcra Bukit Kepong, Labis, Johor 1000 BG1 2-Dec-14
Sdn Bhd 85300 Labis, Johor

Megagreen Energy Kilang Sawit Felcra Seberang Perak, Kampung Gajah, Perak 2000 BG1 2-Dec-14
Sdn Bhd 36800 Perak Tengah, Perak Darul Ridzuan

Megagreen Energy Kilang Sawit Felera Nasaruddin kilometer 37, Perak 1000 BG1 14-Nov-14
Sdn Bhd Jalan Tonoh Bota, 32600 Bota, perak Darul Ridzuan

Megagreen Energy Kilang Sawit Sungai Melikai KM9 Jalan Mersing Nitar, Johor 1000 BG1 14-Nov-14
Sdn Bhd Peti Surat 24, 86000 Mersing, Johor Darul Takzim

*Feed-in Approval Holders (FIAH)

Above: At the Biogas Asia Pacific As part of this initiative Ventures; and Megagreen and
Forum 2015, TNB exchanged to advance and develop the Tenaga Nasional Berhad (TNB).
documents with Megagreen for the
development of five biogas plants biogas industry in the country,
with a total output of 6MW to help four significant collaborations Represented by Ir Kamaliah Abdul
electrify rural communities, reduce were highlighted at the Kadir, Senior General Manager
carbon dioxide emissions and drive forum with the exchange of (Consumer Services) and Datin
the adoption of sustainable energy in
the country. documents, witnessed by Ruslinda Ibrahim, Senior Manager
Datuk Dr Ewon Ebin (Science, (Communications);TNB's document
Left: Biogas Asia Pacific Forum Technology and Innovation exchange with Megagreen Energy
2015 participants during a press Minister), Datuk Bung Moktar involved the exchange of five
conference. From left to right:
Dato' Dr Mohd Nazlee Kamal, Radin (Kinabatangan MP and biogas to power plants (with a total
Malaysian Biotechnology Corporation Felcra Berhad Chairman), capacity of 6MW) in Federal Land
(BiotechCorp) CEO; Dato' Sri Dr and Dato' Ir Dr Ali Askar Sher Consolidation and Rehabilitation
Noorul Ainur Mohd Nur, Science, Mohamad (Sustainable Energy Authority (Felcra) mills. The
Technology and Innovation Ministry
Secretary General; Datuk Dr Ewon Development Authority COO). collaboration is part of the
Ebin, Science, Technology and The partnerships were between Sustainable Energy Development
Innovation Minister; Datuk Bung Gas Malaysia and Sime Authority Malaysia's (SEDA) Feed-
Moktar Radin, Kinabatangan MP and Darby Offshore Engineering, in Tariff and Renewable Energy
Felcra Berhad Chairman; and Vincent
Choy, International Clean Energy Megagreen Energy and Felcra; Power Purchase Agreement
Sustainability & Network (ICESN). Green & Smart and Felda Global (REPPA) initiative.

Bottom Left: TNB representatives


Datin Ruslinda Ibrahim, Senior
The aim of the strategic partnership project is to
Manager of Communications (first provide electricity in the rural areas where the
left) and Ir Kamaliah Abdul Kadir,
Senior General Manager of Consumer mills are located – Kilang Sawit, Seberang Perak,
Services (third left) flank Datuk Dr Sungai Melikai, Maran and Bukit Kepong – using
Ewon Ebin, Science, Technology and
Innovation Minister (second left) at biotechnology to convert palm oil mill effluent
the Biogas Asia Pacific Forum 2015
where TNB exchanges documents
(POME) and agro-waste into high-value added
with Megagreen to advance the Green energy. With the ground survey of the
development of biogas in the country.
Also present were Datuk Bung Moktar
biogas plant construction site completed and the
Radin, Kinabatangan MP and Felcra REPPA signed, the collaboration will also reduce
Berhad Chairman (second right) and
Dato' Ir Dr Ali Askar Sher Mohamad, diesel subsidy and cut carbon dioxide pollution.
Sustainable Energy Development All of which are in line with TNB’s commitment to
Authority COO.
sustainability in the country.

Volume 2 29
paperless Billing
Using IT to Reduce
Environmental Impact

30
TENAGA Green

A
s a major power utility both domestically and within the region
– with an estimated 80,000 industrial customers which have
significant monthly power consumption qualifying them as Large
Power Customers (LPCs) – Tenaga Nasional Berhad (TNB) prioritises
the consistent elevation of service standards to meet rising needs.
Simultaneously, the emergence of environmental concerns has seen
the utility seeking out new ways to improve operational sustainability.
TenagaLink examines the implementation of e-billing for all LPCs.

Existing Obstacles that there is no longer a need


to supply the customer with a
E-billing, or paperless billing, is physical bill.
a measure initiated by TNB to
overhaul the way bills are issued Even so, Senior General Manager
to its LPCs. Originally, meters of Customer Service at TNB’s
were manually read by meter Distribution Division Ir Kamaliah
readers and the bills furnished Abdul Kadir said that for the
at each address. However, this past two years, eligible LPCs have
procedure occasionally resulted in been receiving both hard copy
inaccuracies which were caused bills delivered by Pos Malaysia
by human error. and electronic bills delivered via
email, in order to facilitate the
In an effort to facilitate a more transition process. As TNB places
accurate billing system, TNB saw importance on ensuring that its
potential in e-billing. This new IT systems and infrastructure
method not only adds convenience benefit from continual development
to the billing process, it helps and enhancement, she explains
to alleviate repercussions to the that a number of new systems and
environment as well, as it does processes had been implemented
away with the need for a hard to support the e-billing mechanism.
copy bill.
Primarily, the conventional
A Fresh Framework electromechanical meters at
the majority of LPCs’ premises
To effectively mitigate these issues have been replaced with digital
and practically eliminate the meters. This enables the utility to
possibility of human error, TNB conduct meter readings remotely.
embarked on the installation of Following the collection of this
digital meters at LPCs’ premises data, the information is relayed to
in 2009, enabling the utility to a billing system and subsequently
actively track electricity consumption an Output Management System
figures in real-time, as well as (OMS). At this point, a bill is
monitor and predict demand in generated in PDF format, which is
order to adequately and reliably then sent to the email address of
meet it. At present, nearly all of the customer. This process requires
the utility’s 80,000 LPCs across the presence of communications
Malaysia have been equipped equipment at the customers’
with this modern facility, meaning premises. If the equipment is

Volume 2 31
“apart from mitigating difficulties faced
with the delivery of bills, we believe that
the value-added services introduced
through this initiative are enormously
beneficial for the customer.”

– Senior General Manager of Customer Service at TNB’s


Distribution Division Ir Kamaliah Abdul Kadir

e,
ag dout
m
e r i fol
g 7
l ar ge 1
o r a o pa
F nt
r
tu

By migrating to
digital bills and
implementing its
e-billing initiative,
TNB has emphasised
its commitment
to saving the
environment.

customer’s telecommunications capability to record and store the


lacking, TNb will bear the cost of its service provider, which may be customer’s consumption data,
installation, as part of the utility’s subject to outage or poor bandwidth before transmitting it when the
continuous efforts to elevate the quality. As a result of this, there connection improves. In addition
standard of service it provides. are challenges in maintaining the to overcoming this limitation,
frequency of the reports returned TNb has consistently reduced the
sAFEGUARDING THE sysTEm to the control centre at TNb. margin of error associated with
other unforeseen difficulties since
One drawback of this process is Fortunately, the smart meters the electronic billing of lPcs
its dependence on the internet installed at lPcs’ premises using remote smart meter readings
connection provided by the are also equipped with the first began in 2013, successfully

32
TENAGA GREEN

minimising the probability of best practices, this initiative


failure to a mere 0.1 to 0.2%. aligns well with the utility’s overall
efforts and programmes to improve
In spite of this, Assistant General environmental sustainability.
manager (billing) at the customer specifically, this e-billing initiative
service Department’s Revenue has helped TNb accomplish
management Unit selimin Othman significant environmental gains by
assures that TNb will maintain the reducing the use of paper to produce
apparatus necessary to conduct and distribute hard copy bills for
wide-scale manual reading, as a its 80,000 lPcs. In addition, the
fallback measure in the event of programme also mitigates natural
a large or sustained connection resource use by making it
outage. Additionally, he explains unnecessary for the utility to
that lPcs will still be able to deploy additional staff to read
liaise directly with the customer meters manually. This reduces fuel
service representatives at the TNb
“The hard copy bills
consumption as well as the costs
state or regional office nearest previously delivered associated with it.
to them. through pos Malaysia
were limited to a size selimin Othman also highlights
RElIAbIlITy REAlIsED that there are other ways in
of 4 inches by 12 which the environmental benefits
“benchmarking against utilities and inches. as a result of offered by this programme can be
other companies both domestically this, there were also maximised. “Primarily, when lPcs
and abroad revealed that the register the email address which will
majority had already embarked limitations on the receive TNb’s monthly bills, they
on digital or email billing,” notes amount of information should list one that is accessible
customer service senior General which they could by multiple users, especially
manager Ir kamaliah, revealing the the individuals responsible
impetus behind the initiative.
effectively convey.”
over financial and administrative
matters such as this,” he said. by
Aside from enabling the utility to – Assistant General Manager utilising this approach, lPcs can
keep up with developments in the (Billing) at the Customer assist in promoting environmental
international business landscape, Service Department’s Revenue sustainability, by minimising the
this initiative is also part of TNb’s Management Unit Selimin Othman need to generate hard copy printouts
efforts to ensure the accuracy and for internal circulation.
reliability of the 30-day billing
cycle, as all bills can now be
generated and distributed at exactly As illustrated by the utility’s migration from
12:01 am on the first day of each
month. In addition, the updated
manual meter readers and the posting of bills
system means that the utility is to the implementation of this e-billing policy,
also provided with the ability to TNB is taking the latest step in its ongoing drive
actively track consumption figures to improve the standard and sustainability of
in real time. This allows TNb
to monitor and predict demand,
the services it provides while also eliminating
thus enabling it to adequately meet irregularities which may prevent bills from being
its customers' electricity demands. delivered in a timely manner. While the e-billing
initiative was initially made available exclusively to
ElEVATING sUsTAINAbIlITy LPCs, customers registered at the TNB e-services
besides improving TNb’s portal, which is located at www.tnb.com.my, can
compliance with the industry's also enjoy the service.

Volume 2 33
Helping Hands
TNB Offers Flood Victims
Emergency Relief

I
n late December last year, a spate of disastrous floods engulfed
several states in Northern and Eastern Peninsular Malaysia,
displacing hundreds of thousands of people and resulting in
damage to property and infrastructure costing billions of ringgit.
These circumstances saw Tenaga Nasional Berhad (TNB) venture
beyond its usual purview as the country’s main power utility, to
initiate numerous immediate relief and recovery efforts, and render
aid to those most affected by the tragedy.

34
CORpORaTE REspONsIBIlITy

paRTNERINg FOR
ThE pEOplE

as explained by the Deputy


secretary general (Energy) at
the Ministry of Energy, green “TNB staff worked
Technology and Water (KeTTha) round the clock to
Dato’ Dr Nadzri yahaya, the
ensure that the daily
relationship between TNB and the
Malaysian government is unique routine of the flood
and does not follow the model victims is minimally
usually adopted by government- affected. This was a
linked Companies (glCs). Rather
than having a one-directional clear demonstration
relationship in which priorities of TNB’s true strength
are solely determined by the when everyone
government, the energy utility
often contributes its significant
expected things to
assets and capabilities to deliver fall apart.”
innovative and unconventional
solutions to ongoing national – Deputy Secretary General
challenges. (Energy) at the Ministry of
Energy, Green Technology
according to Dato’ Dr Nadzri – who and Water (KeTTHA)
was the former Director general Dato’ Dr Nadzri Yahaya
of the National solid Waste
Management Department – this
was particularly evident when
TNB elected to provide aid and

Fast Flood Aid


With the widespread flooding creating a crisis situation in which swift action was imperative,
a number of steps were immediately initiated spanning all sectors of TNB’s operations:

80 mobile Over RM300,000


More than 2,000 of daily necessities
and portable
technical staff handed over to
generators
members mobilised flood victims
deployed

Tabung Bantuan
Satu Warga Kerja, Satu 12,000 kg of
Kemanusiaan 1TNB
Barang campaign launched, immediate relief
established, allowing
channelling over RM600,000 supplies in food and
TNB staff to donate
in goods and donations from basic necessities
via salary deduction
TNB offices throughout
Malaysia to the areas affected

Volume 2 35
NatioNal Effort

Weathering
the Storm
“TNB staff went beyond their normal duties by innovatively
using lorry batteries as a power source so that the displaced
flood victims had access to lighting during night time.”

– Deputy Secretary General (Energy) at the Ministry of Energy,


Green Technology and Water (KeTTHA) Dato’ Dr Nadzri Yahaya

36
CorporaTe respoNsiBiliTy

In the wake of the


heavy rainfall and
floods which struck
Northern and Eastern
Peninsular Malaysia,
Tenaga Nasional Berhad
initiated comprehensive
recovery efforts
encompassing the states
of Pahang, Kelantan, piVoTal player
Terengganu and Perak.
Dato’ Dr Nadzri reveals that in
addition to working hand-in-hand
relief to affected residents in with the Ministry, TNB was part
the states of Kelantan, pahang, of a response group assembled by
perak and Terengganu. This was KeTTHa. This group comprised
in the wake of heavy rainfall of members from the National
which preceded some of the worst security Council (MKN), the
flooding in an estimated 30 years. Department of irrigation and
“in addition to the monetary aid Drainage (Jps), the Ministry of
that was offered, TNB exhibited Health (MoH), the National Water
the willingness to get involved in services Commission (spaN) and
many public engagement efforts, the Department of Water supply
and the utility’s exemplary deeds (JBa), as well as other relevant
as a corporate citizen need to be agencies and ministries.
recognised,” he states.
as part of this group, TNB
To minimise the impact of the communicated with the MoH
disaster on the daily routine of on the hospitals which urgently
flood victims and ensure that relief required assistance, and spaN on
centres, schools and hospitals were the water treatment plants which
provided with continuous electricity required immediate electricity
supply, TNB dedicated considerable supply reconnection. The utility
personnel and equipment to these also provided the group with live
efforts. aside from this, Dato’ updates on its electricity restoration
Dr Nadzri recognises that the initiatives, as well as up-to-date
tireless efforts of each individual reports on the reservoir levels
TNB staff member – in terms of at its hydroelectric dams across
working diligently to bring effective the nation, to curtail rumours of
solutions to the people affected – excess water being released in
were also integral to the success of an uncontrolled manner, thus
the undertaking. contributing to the floods.

as one of the country’s most successful and productive organisations,


tNB has long helped enable holistic nation building by guaranteeing the
stable and reliable supply of electricity to industrial, commercial and
domestic customers. through its recent efforts to give back by rendering
aid in the aftermath of the East Coast floods, the utility has also shown
itself to be an indispensable partner to the Malaysian government, in
terms of collaboratively providing relief and assistance during disasters
and other emergency situations.

Volume 2 37
IMPORTANCE OF
POwER QuAlITy
Communicating with
Large Power Customers
Contributed by Ir Dr Mohamed Fuad Faisal, Power Quality & Energy Efficiency
Specialist, Asset Management Department, Distribution Division, TNB

H
istorically, most complaints received from Large Power Customers
(LPCs) relate to power interruptions. But now, power quality (PQ)
disturbances such as voltage sags, harmonic distortion and voltage
transients have caused more problems to sensitive industries than power
reliability issues. Power quality disturbances usually affect certain equipment
and not all equipment in a plant. Because of this, PQ can be as big a problem
to LPCs as power interruption. Therefore, TNB has increased its focus on
dealing with PQ issues to ensure prime customer satisfaction.

38
EXPERT TALK

TNB launches an
Costumer complains to TNB investigation

TNB sends an acknowledgement of


the complaint (within 3 days)
SEND

TNB sends a report to the customer and


advocates PQ best practice (within 2 weeks)

When a Large Power Customer faces a power quality


issue, their complaint goes through an internal TNB
process to ensure that the customer is informed of the
cause of the problem as soon as possible.

RELEVANT REQuIREMENT electrical and electronic equipment operations, the prime customer needs
to operate with a perfect, sinusoidal to immediately know the cause of
Years ago, a brief voltage fluctuation voltage waveform in order to the equipment failure, whether it is
or voltage sag was not considered achieve continuous operation. due to an internal equipment failure
a problem, but today’s solid- This condition is called the PQ or an external event or voltage sag.
state devices are very sensitive requirement. If the cause is an external event,
to power system fluctuations. It customers can immediately
is this vulnerability of modern STRENgTHENINg RELATIoNS restart their machines and resume
technology that has brought an operations. If the cause is unknown,
increased awareness of PQ, which This sharing of information on PQ customers will need to spend time
is a reality of life that has always events – especially voltage sags – troubleshooting their machines to
been present. Nowadays, it has is very important. If any critical find out the actual cause. This can
become a requirement for sensitive equipment suddenly trips during be a time consuming process.

TNB regularly
conducts engagement
programmes with
LPCs such as
semiconductor
manufacturing
company Infineon
Technologies
(Malaysia), to
improve the standard
of relations and
enable the utility to
better understand the
needs of customers.

Volume 2 39
EXPERT TALK

The sharing of relevant information on


PQ forms a very important element in
guaranteeing customer satisfaction.
At TNB, the management of customer
complaints relating to PQ disturbances
follows an internal engineering
procedure (ENGR 750-31). In line
with this procedure, all complaints
from customers on PQ-related issues
must be recorded, attended to by
engineers in the respective area/state,
and reports must subsequently be
submitted to the customers.

Reference Number: TNB (B)/KJLO/PK 20/3/24

TNB POWER QUALITY DISTURBANCE REPORT TO CUSTOMER Top: Upon receiving complaints on matters
relating to power quality and voltage sags, staff
No. Item Report from the respective local or state TNB office
1 Area and State are often able to provide tailored power quality
Area State
consultancy and servicing at the LPC’s facility.
PK (Subang Jaya) Selangor
Left: A sample of TNB's power
quality disturbance report that is
2 Date and Time Date Time provided to the customer.
of PQ Event
14 Apr 2015 1:38:46.240

3 Type of PQ Event Sag

4 Magnitude and Duration Nominal Voltage Monitored (kV) -


Sharing information on
of PQ Event
the Power Quality is one
of the major initiatives by
Phases Voltage (%) Duration (ms)

TNB. The information will


R-N 93 79

Y-N 92 79

B-N 73 79
include types and causes
of PQ disturbances, EMC
5 EMC Assessment
for PQ Event Standard
Compliance assessment and mitigation
actions. TNB also conducts
(Yes or No)

Yes
frequent discussions with
SEMI F47-0706
IEC 61000-4-34 (Class 1) No

IEC 61000-4-34 (Class 3) Yes


large power customers on
issues related to PQ as well as
6 Source of PQ Event Transmission Network other matters. This proactive
7 Cause of PQ Event Lightning communication on PQ events
8 TNB’s Corrective Action
Performed and Timeline
[Overhead] Repair Tower Footing Resistance between TNB and customers
has enabled TNB to better
9 Recommended Action
Plan to be Performed
Customer must ensure all critical loads are properly
immuned from voltage sags. Standard to refer is
understand the needs of its
by Customer IEC 61000-4-34 (Class 1 & Class 3). commercial and industrial
customers.

40
PERLIS

KELANTAN
KEDAH

TNB STATE PULAU PINANG

OFFICES
TERENGGANU

PERAK

Wilayah Persekutuan
Kuala Lumpur KUALA LUMPUR

Pengurus Besar Negeri SELANGOR PAHANG

Bahagian Pembahagian
PUTRAJAYA/
Tenaga Nasional Berhad CYBERJAYA
NEGERI
SEMBILAN
Aras 11, Wisma TNB
Peti Surat 11050 MELAKA

50990 Kuala Lumpur


Tel : 03 – 6250 6030
Fax : 03 – 6250 6500 JOHOR

Selangor Darul Ehsan Wilayah Persekutuan Pahang Darul Makmur


Pengurus Besar Negeri Putrajaya/Cyberjaya Pengurus Besar Negeri
Bahagian Pembahagian Pengurus Besar Negeri Bahagian Pembahagian
Tenaga Nasional Berhad Bahagian Pembahagian Tenaga Nasional Berhad
Wisma TNB Subang Jaya Tenaga Nasional Berhad Aras 13, Wisma TNB
Jln USJ 10/1A, USJ 10 Blok 4802-0-7, Jalan Perdana Lot 14, Seksyen 19
47620 Subang Jaya CBD Perdana, 63000 Cyberjaya Jln Gambut, 25000 Kuantan
Tel : 03 – 8022 9400 Tel : 03 – 8886 6888 Tel : 09 – 515 5555
Fax : 03 – 8022 9554 Fax : 03 – 8886 6933 Fax : 09 – 515 5656

Johor Darul Takzim Kelantan Darul Naim


Pengurus Besar Negeri Pengurus Besar Negeri Perak Darul Ridzuan
Bahagian Pembahagian Bahagian Pembahagian Pengurus Besar Negeri
Tenaga Nasional Berhad Tenaga Nasional Berhad Bahagian Pembahagian
Aras 14, Wisma TNB Aras 5, Wisma TNB Tenaga Nasional Berhad
Jln Yahya Awal Jln Tok Hakim Aras 2, Wisma TNB
80100 Johor Bahru 15000 Kota Bharu Jalan Lahat, 30200 Ipoh
Tel : 07 – 219 2000 Tel : 09 – 745 1100 Tel : 05 – 208 8000
Fax : 07 – 223 1425 Fax : 09 – 747 3611 Fax : 05 – 254 5199

Kedah Darul Aman Pulau Pinang Negeri Sembilan Darul Khusus


Pengurus Besar Negeri Pengurus Besar Negeri Pengurus Besar Negeri
Bahagian Pembahagian Bahagian Pembahagian Bahagian Pembahagian
Tenaga Nasional Berhad Tenaga Nasional Berhad Tenaga Nasional Berhad
Aras 8, Wisma TNB Aras 17, Wisma TNB Aras 5, Wisma TNB
887 Jalan Sultan Badlishah 30 Jalan Anson Jalan Dato Bandar Tunggal
05990 Alor Setar 10400 Pulau Pinang 70990 Seremban
Tel : 04 – 774 5600 Tel : 04 – 222 4000 Tel : 06 – 768 3400
Fax : 04 – 732 4185 Fax : 04 – 227 3110 Fax : 06 – 764 4271

Melaka Perlis Indera Kayangan Terengganu Darul Iman


Pengurus Besar Negeri Pengurus Besar Negeri Pengurus Besar Negeri
Bahagian Pembahagian Bahagian Pembahagian Bahagian Pembahagian
Tenaga Nasional Berhad Tenaga Nasional Berhad Tenaga Nasional Berhad
Aras M, Jln Banda Kaba Wisma TNB, Bulatan Jubli Emas Jln Cherong Lanjut
75990 Melaka 01000 Kangar 20673 Kuala Terengganu
Tel : 06 – 282 8544 Tel : 04 – 976 0021 Tel : 09 – 622 3022
Fax : 06 – 282 6460 Fax : 04 – 976 1921 Fax : 09 – 624 3896

Volume 2 41

You might also like