PROJECT

Greenberry Hotel and Resorts


Narkanda ,Shimla ,Himachal Pradesh

RCC BEAM RCC BEAM

(+ 20600)
Attic level MS BEAM MS BEAM (+ 20600)
(+ 20600)
Attic level
Attic level

3050
GUEST

3050
GUEST ROOM

2150
ROOM

2150
SS M16 CHEMICAL
(+ 17250)
ANCHOR
(+ 17250)
CEILING MOUNTED
MONORAIL SOCKET
Fourth floor SS M16 CHEMICAL
(+ 17250)
SS M16 CHEMICAL
ANCHOR
MATERIAL : STEEL (HDG)

MONORAIL TRACK
ANCHOR CEILING MOUNTED
MONORAIL SOCKET
Fourth floor
MATERIAL : ALUMINUM
GR.6063 T6
CEILING MOUNTED
MONORAIL SOCKET
Fourth floor MATERIAL : STEEL (HDG)
MONORAIL TRACK
MATERIAL : STEEL (HDG) MATERIAL : ALUMINUM
ELECTRIC TRAVERSING
MONORAIL TRACK GR.6063 T6
TROLLEY
MATERIAL : ALUMINUM
ELECTRIC TRAVERSING
GR.6063 T6
TROLLEY
ELECTRIC TRAVERSING
TROLLEY

3350
DOUBLE SUSPENSION
STANDARD CRADLE
(2.0 x 0.7 x 1.1) M DOUBLE SUSPENSION
GUEST

3350
STANDARD CRADLE
(2.0 x 0.7 x 1.1) M
DOUBLE SUSPENSION
STANDARD CRADLE GUEST ROOM
(2.0 x 0.7 x 1.1) M Wt. of Cradle = 350 kgf
ROOM Wt. of manpower = 80x2 = 160 kgf

Wt. of Cradle = 350 kgf


Wt. of manpower = 80x2 = 160 kgf
(+ 13900) Wt. of Cradle = 350 kgf
Wt. of manpower = 80x2 = 160 kgf
Wt. of Tools & Tackles = 80 kgf
Wt. of Tools & Tackles
Safe Working Load
= 80 kgf
=320 kgf
LOAD BEING SUSPENDED AT TWO POINTS
Wt. of Tools & Tackles = 80 kgf
Safe Working Load =320 kgf
LOAD BEING SUSPENDED AT TWO POINTS Third floor Safe Working Load =320 kgf
LOAD BEING SUSPENDED AT TWO POINTS

(+ 13900)
(+ 13900)
Third floor
Third floor

3350
3350
(+ 10550)
(+ 10550)
Second floor (+ 10550) Second floor
Second floor

3350
GUEST

3350
ROOM
GUEST
(+ 7200) ROOM
(+ 7200)
First floor First floor
(+ 7200)
First floor

(+ 3600)

6600
(+ 3600)
MEZZANINE LEVEL MEZZANINE LEVEL

6600
(+ 3600)
MEZZANINE LEVEL
(+ 3150)
Ground floor
(+ 3150)
Ground floor

(+ 600) (+ 600) R
Stilt floor Stilt floor
(±00) (+ 600) (±00)

600
NGL Stilt floor NGL
(±00) (±00)
(±00)
600

NGL NGL ADVANCETECH


NGL Building Maintenance Pvt. Ltd.
Advancetech Building Maintenance Pvt. Ltd.

3000
Plot No.01,Pachgaon (Manesar),
Near Indusind Bank
3000

Gurgaon, India-122413
(+ 600) (-3000)
Greenberry Hotel and Resorts

DWG TITLE
BASEMENT FLOOR BASEMENT
FLOOR SECTION
(-3000) Section - 01 , 02 & 07
BASEMENT
FLOOR
SHOP DRAWINGS
SECTION - 2 DRAWN BY RAJINDER CHECKED BY RANJIT

DRAWING
DATE 04.03.2021 SCALE 1:100
SECTION - 1 SECTION - 7 SHEET SIZE A1 SHEETS 02/04
REV. NO.
NUMBER ATECH-A-BMU-111 A